ANNEX DEFINITION OF THE METHODOLOGY TO BE FOLLOWED BY THE SERVICES OF THE COMMISSION FOR PROSPECTING AND NEGOTIATING FOR BUILDINGS

Size: px
Start display at page:

Download "ANNEX DEFINITION OF THE METHODOLOGY TO BE FOLLOWED BY THE SERVICES OF THE COMMISSION FOR PROSPECTING AND NEGOTIATING FOR BUILDINGS"

Transcription

1 ANNEX DEFINITION OF THE METHODOLOGY TO BE FOLLOWED BY THE SERVICES OF THE COMMISSION FOR PROSPECTING AND NEGOTIATING FOR BUILDINGS 1. INTRODUCTION In its communication on buildings policy 1 the Commission adopted the principles of a new methodology aimed at improving the implementation of the existing procedures envisaged by the legislator for signing buildings contracts, on the one hand by adding the element of systematic market prospection by means of publication of publication of proposed real estate projects, and on the other by structuring and clarifying the Commission's internal procedures. This methodology will be applicable for the buildings to be occupied by the Commission's services in Brussels and Luxembourg, including those occupied by the executive agencies. It may also be used within an interinstitutional framework, in particular by the interinstitutional offices. All the users of this methodology should observe strictly the principles of long-term planning and timely publication of their buildings requirements. The new methodology is presented here in detail. It aims to preserve the necessary discretionary power of the Commission in the field of buildings procurement contracts, while guaranteeing the best price-quality ratio. This methodology, which comes under the procedures provided for by the Financial Regulation and its implementing rules, clarifies and details the prospection and negotiation phases of the procedure. This option has the benefit of increasing transparency while respecting the regulatory framework in force. The proposed methodology consists of six phases: preliminary phase: identification and publication of the Commission's multiannual needs; phase 1: definition of the needs for all new buildings; phase 2: publication of the Building Prospection Notice (API); phase 3: analysis and preselection; phase 4: preliminary studies, negotiation of technical and financial conditions and selection of the project adopted; phase 5: technical study and draft contract for the selected project; phase 6: interservice consultation and award of contract. 2. LEGAL FRAMEWORK Buildings contracts at the European Commission are governed by the Financial Regulation (which incorporates the provisions of Directive 2004/18/EC 1 on the coordination of procedures for awarding public works contracts, public supply contracts and public service contracts). 1 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts, OJ L 134, , p EN 1 EN

2 Article 91 of the Financial Regulation establishes five procedures for awarding public contracts: open procedure, restricted procedure, competition, negotiated procedure and competitive dialogue. In view of the nature of buildings contracts, the purpose of which is purchase, emphyteosis, usufruct, leasing, rental, or sale and lease-back, with or without a purchase option, of land, existing buildings or other property, the legislator has provided for the possibility of using a negotiated procedure after prospection of the local market without publishing a contract notice (Article 126(1)(h) of the implementing rules of the Financial Regulation). 3. NEW METHODOLOGY 3.1. Principles The proposed methodology provides for: better information for the market by means of the annual publication of an estimate of the Commission's buildings space requirements for the current year and the following four years. This information will be published in OJ S 2 and will also be available electronically via the TED service 3 and on the relevant Commission websites at the start of each year. This market information will be additional to the systematic market survey on buildings availability carried out by the competent services 4 ; increased competition among the market players by the systematic publication, in the OJ S and on the relevant Commission websites, of the specific needs for all new real estate projects and by the introduction of the concept of systematic negotiation of the financial and technical conditions with several tenderers in parallel. Projects for development of a new building and/or a set of new buildings on land offered/sold by a Member State and/or owned by the Commission will follow the procedures for the award of public contracts in accordance with the Financial Regulation and its implementing rules; increased transparency of the procedure, in particular by the systematic publication of building prospection notices containing: the minimum requirements of each specific project; the exclusion and prospection criteria; the result of the procedure; greater cooperation and interaction between the relevant Commission departments, on the one hand by setting up a multi-disciplinary committee, the Real Estate Committee 5, which will be required to give advisory opinions to the authorising officer by delegation 6 at all the phases listed in point 3.2, and on the other by developing a rapid diagnostic capacity in order to address any issues presenting major financial and/or technical difficulties Supplement to the Official Journal of the European Union Tenders Electronic Daily The services in charge of technical and legal real estate negotiations at OIB and OIL and/or at the other users of this methodology (executive agencies, interinstitutional offices, etc.). See point 3.2. The Director of the departments concerned EN 2 EN

3 3.2. The Real Estate Committee The Real Estate Committee will be made up of members of the following Commission departments: OIB or OIL; in the event that this methodology is used by an executive agency or an interinstitutional office, a representative of this user; DG ADMIN; DG DIGIT; a representative of the Occupational Health and Safety Committee designated by the Committee; an observer from the Secretariat-General; an observer from the DG/body that is to occupy the building (if known). The members will be designated by the management of the respective department. A single real estate committee will be set up for each site (Brussels and Luxembourg), which will be required to monitor all real estate issues relating to the site. To ensure better knowledge of the experience acquired and the consistency of the procedures followed, DG ADMIN will hold regular meetings with the real estate committees of both sites. The Committee will adopt its rules of procedure. For each project, the competent departments will be required to submit the file to the Real Estate Committee for review at the following stages: prior to the publication of the documents relating to a building prospection notice; when candidates are placed on a shortlist for negotiations; when a candidate is selected to begin the fitting-out studies in order to draw up the complete technical file; during the final selection, before launching the CIS. The Real Estate Committee may at any time, particularly in the critical phases of the procedure, call on outside and/or internal experts regarding any technical or financial matters. These experts may be consulted on an ad hoc basis, in accordance with the fourth subparagraph of Article 146(2) of the implementing rules of the Financial Regulation. The experts will in no case be members of the Real Estate Committee. The opinion of the Real Estate Committee will not be binding. The authorising officer by delegation will take decisions at his own responsibility. However, he must give written reasons for any departure from the opinion of the Real Estate Committee Phases of the methodology Preliminary Phase: identification of multiannual needs and publication At the beginning of each year, the Commission will publish in OJ S and on its relevant websites all its estimated needs for the current year and for the next four years. These multiannual needs will be updated in each annual publication. This estimate does not constitute a commitment on the part of the Commission or a request for the interested parties to submit proposals. EN 3 EN

4 The offices (OIB/OIL) will estimate the needs in cooperation with DG BUDG and DG ADMIN, based in particular on the multiannual policy framework for buildings (MAPF) Phase I: definition of needs Need per building The need for any specific new building is identified in two ways: (a) (b) Building prospection notice Monitoring by OIB/OIL of the expiry of current property contracts, taking account of planned changes in staffing levels at the Commission; or following a request in response to a specific need. For each real estate contract, the competent departments will draw up the building prospection notices, which will contain at least the following information 7 : (a) (b) (c) the purpose of the search; the minimum requirements (technical and legal) of each specific project; a list of conformity with the MIT (Building Standards Manual); (d) the essential elements per type of contract and the planned timeframes; (e) (f) exclusion criteria; prospection criteria. At this stage, the conditions for the various types of occupation (purchase, usufruct, lease) will be set out, and tenderers will have to submit proposals for each of these three options, paying particular attention to the best quality-price ratio. This will provide the financial elements necessary for carrying out the successive analyses of VAT and other tax issues (Phase IV) Phase II: publication For each specific need, a building prospection notice will be published in the OJ S and on the relevant Commission website. All pertinent information will be provided for individuals/companies wishing to put forward one or more buildings under the current building prospection notice. In addition to the building prospection notice, a mailing list will be created to inform interested individuals/companies of upcoming notices. The deadline for a reply will be established on a case-by-case basis but must not be shorter than 37 calendar days Phase III: analysis and preselection (a) This phase is divided into several sub-phases. The preliminary analysis consists of verifying that the tenders are legally compliant and that the minimum requirements established in the building 7 This information will be set out in the standard format to be established for that purpose. EN 4 EN

5 prospection notice have been met. Tenders which are not legally compliant, which do not contain the declaration concerning the exclusion criteria and/or which fail to meet the minimum requirements will not be admitted. Excluded tenderers will be notified. (b) Eligible proposals will be analysed on the basis of the prospection criteria 8, including quality (conformity with the MIT, the architectural policy document and the housing conditions manual), effectiveness, location, feasibility, delivery dates (basic building and fitting-out work) and the financial conditions for meeting the minimum requirements. (c) A maximum of three buildings will be preselected. The preselected tenderers will be notified and asked to provide evidence relating to the exclusion criteria (Article 134 of the implementing rules of the Financial Regulation). All the tenderers not selected at this stage will be notified. At this stage of the procedure, the preselected tenderers must sign the "guide to the procedures, explaining the new methodology and the conditions applicable for leasing/purchasing buildings" 9 before beginning negotiations. This preliminary analysis will be submitted for an opinion to the Real Estate Committee, which will first ask for the opinion of an internal expert and, if necessary, an external expert on any specific technical or financial issues concerning this preselection. If several tenderers propose the same project or property, the Commission will ask the owner to identify the exclusive or primary agent for the negotiations. Negotiations will begin with all the selected tenderers Phase IV: preliminary studies, negotiation of technical and financial conditions and selection The competent departments will draw up a programme of needs (specifications for the preliminary studies), which will be sent to the three preselected tenderers so that they can submit comparable price offers containing sufficient technical and financial elements to enable a comparison to be made. If a purchase or long lease with option to purchase is proposed, the tenderers will be informed of any financial arrangements that may involve equity financing in order to obtain the best financing rates for the Commission. The competent departments will then visit the buildings, analyse the preliminary study files and negotiate the occupation conditions for each of the preselected projects. At this stage the competent services may make specific requests to the tenderers in order to make the offers comparable (see points (2) and (3) below). If during this phase a more detailed analysis reveals that the results of the previous phases may be invalid, for example because the project(s) do(es) not meet the minimum requirements set out when the building prospection notice was issued, the project(s) in question will be excluded from the procedure. The competent departments will inform the Real Estate Committee, which will issue an opinion as to whether the preselection should be reviewed. One or more of the tenderers who were not selected in the previous phase but who meet the basic requirements and the exclusion criteria may be invited to take part in this Phase IV. 8 9 This list of criteria is not exhaustive. Decisions will be made on a case-by-case basis by the authorising officer by delegation. The communication COM(2007)501 states that the guide will be published in EN 5 EN

6 Following the negotiations of the technical and financial conditions with the three tenderers in parallel and the analyses carried out by the competent departments, a single project will be selected for the following phase. This selection will take account of the overall cost of the projects, which will be evaluated on the basis of: (1) the negotiated price according to the type of contract (purchase, usufruct, lease); (2) an estimate of the costs necessary for compliance with the MIT, the architectural policy document and the housing conditions manual; (3) an estimate of the cost of specific fitting-out works; (4) the schedule for making the buildings available; (5) an analysis by the competent departments of the tax implications (VAT, other taxes, dues, etc.); (6) an assessment of the operational costs of the various proposals, as soon as the Life Cycle Cost studies allow. The work indicated at this stage will not constitute the definitive list of work to be carried out and will not commit the Commission to effectively carrying out this work. The competent departments will submit their report to the Real Estate Committee, which will issue an opinion and send it to the authorising officer by delegation. The authorising officer by delegation will notify the selected tenderer, who must guarantee that the project is being offered exclusively to the Commission until the end of the decision-making procedure. The tenderers not selected will also be notified Phase V: technical and contractual phase Drawing up of the technical dossier After a preliminary analysis carried out in accordance with the procedure laid down in point 3.3.5, the tenderer will draw up a complete technical dossier for the fittingout and upgrade work, which will enable him to consult the market in order to submit a final price and a schedule for making the building available. The competent departments will supervise the drawing up of this technical dossier, if necessary with the participation of the DG/body which is to occupy the building (if known). These departments will ensure, as far as possible, that the cost of the works presented by the tenderer do not include profit margins on top of the coordination costs and financial charges. They will also endeavour to ensure the most favourable financing conditions, on the one hand by negotiating with several financial partners in parallel and on the other by verifying, on a case-by-case basis, the benefits of involving the European Investment Bank (EIB) in the project or of establishing a public-private partnership. If, during this phase, it is discovered that a project does not meet the minimum requirements set out when the building prospection notice was issued, the competent services will inform the Real Estate Committee, which will evaluate whether the preselection needs to be reviewed. EN 6 EN

7 If there is any significant change in the price with respect to the offer submitted in phase IV, the authorising officer by delegation may review the conclusions of this phase and revert to the preceding phase Drawing up of the contractual documents (draft) During this phase the legal aspects (constraints, permits, pollution, etc.) will be analysed in detail (due diligence), and the contractual documents will be negotiated with the tenderer's representative in parallel with the technical studies Phase VI: Internal approval procedure Before launching this phase, the Real Estate Committee will submit its opinion on the tender selected at the end of the negotiations that take place during Phase V Interservice consultation (CIS) The competent services will propose that ADMIN begin an interservice consultation with the Legal Service and DG BUDG on the real-estate procedure note in accordance with the Commission Decision of 16 January 2004 (SEC(2004)62). The competent services will negotiate with the tenderer on how to integrate the opinions and suggestions from the services consulted into the contractual documents. DG BUDG will evaluate whether the projects submitted for consultation have significant financial implications and whether, in accordance with Article 179 of the Financial Regulation, the budgetary authority must be informed of the project in question. In the case of building projects of which the budgetary authority must be informed, the authorising officer may proceed with the planned operation once the procedure of Article 179 of the Financial Regulation has been completed. However, if the nature of the opinions issued by one or both arms of the budgetary authority so requires, the competent Member, in collaboration with the Member responsible for the budget, must submit to the Commission the final decision on the execution of the building project Drawing up of the final contractual documents The completed dossier must be submitted to the authorising officer by delegation, who will take the final award decision, ask the successful tenderer to supply updated proof that the exclusion criteria do not apply to him and proceed with signing the contract. 4. DEROGATIONS NON-APPLICATION OF THE MÉTHODOLOGY By way of exception, particularly in the event of occupation of a building as a matter of urgency, extension of an existing lease and occupation of a building immediately adjacent to a building already occupied by the Commission, or for any other duly substantiated technical, financial or strategic reason, the competent services may decide not to apply the methodology described above and proceed with negotiations without preliminary publication of a building prospection notice. The competent services will request a prior opinion on the proposed derogation from the Real Estate Committee for the site in question. Once the opinion is given, the competent services will be able to decide whether or not to begin negotiations with the tenderer in question. EN 7 EN

8 5. RELINQUISHMENT OF THE METHODOLOGY AND/OR DISCONTINUATION OF NEGOTIATIONS The use of this methodology imposes no obligation on the competent authorising officer to continue to the end of the procedure. In order to guarantee the best quality-price ratio, the authorising officer may decide at any time, provided he duly substantiates his decision, either to relinquish this methodology while continuing negotiations or to discontinue the negotiations and abandon the procedure. The authorising officer may in all cases discontinue negotiations with a tenderer if the tender is found to be non compliant at any stage of the procedure. 6. REVISION An impact assessment of this new methodology, in particular of its effectiveness, will be made three years after its introduction. EN 8 EN

PPP Project Realization Roadmap for Public Entities. based on the PPP Act and the Act on Concessions for Construction Work or Services

PPP Project Realization Roadmap for Public Entities. based on the PPP Act and the Act on Concessions for Construction Work or Services PPP Project Realization Roadmap for Public Entities based on the PPP Act and the Act on Concessions for Construction Work or Services 1. Identification of needs and possibilities to fulfil them by means

More information

Annex BUILDING CONSULTATION SHEET. to the COMMISSION DECISION

Annex BUILDING CONSULTATION SHEET. to the COMMISSION DECISION EUROPEAN COMMISSION Brussels, XXX [ ](2016) XXX draft ANNEX 20 PART 2/3 Annex BUILDING CONSULTATION SHEET to the COMMISSION DECISION on the Internal Rules on the implementation of the general budget of

More information

ESTABLISHMENT OF USUFRUCT

ESTABLISHMENT OF USUFRUCT GUIDE TO CONTRACTUAL PRINCIPLES STANDARD CONTRACTUAL PROVISIONS OF THE EUROPEAN COMMISSION IN BELGIUM ESTABLISHMENT OF USUFRUCT *** March 2017 1 GUIDE TO CONTRACTUAL PRINCIPLES STANDARD CONTRACTUAL PROVISIONS

More information

Union procedure on the preparation, conduct and reporting of EU pharmacovigilance inspections

Union procedure on the preparation, conduct and reporting of EU pharmacovigilance inspections 21 March 2014 EMA/INS/PhV/192230/2014 Union procedure on the preparation, conduct and reporting of EU pharmacovigilance Adopted by Pharmacovigilance Inspectors Working Group 21 March 2014 Date for coming

More information

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 );

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 ); 219 Chapter 16 PPP & Concessions 1. General Public-private partnership ( PPP ) refers to forms of cooperation between public authorities and the world of business which aim to ensure the design, funding,

More information

EUROPEAN COMMISSION. Explanatory note

EUROPEAN COMMISSION. Explanatory note EUROPEAN COMMISSION Competition DG Explanatory note Best Practice Guidelines: The Commission's Model Texts for Divestiture Commitments and the Trustee Mandate under the EC Merger Regulation 5 December

More information

Corrigendum No.2 to the Guide for Applicants, the 1st Flagship Projects - Restricted Call for Proposals relaunched

Corrigendum No.2 to the Guide for Applicants, the 1st Flagship Projects - Restricted Call for Proposals relaunched Corrigendum No.2 to the the 1st Flagship Projects - Restricted Call for Proposals relaunched No. 1. 2. Place in the Guide for Applicant Chapter 2.1. Description of the Call Chapter 2.1. Description of

More information

Participants of the Ministerial Meeting on Housing and Land Management on 8 October 2013 in Geneva

Participants of the Ministerial Meeting on Housing and Land Management on 8 October 2013 in Geneva Summary At its meeting on 2 April 2012, the Bureau of the Committee on Housing and Land Management of the United Nations Economic Commission for Europe agreed on the need for a Strategy for Sustainable

More information

ToR Tender Specifications

ToR Tender Specifications ToR Tender Specifications Feasibility Study of an office and housing Development Project in Nairobi for the Delegation of the European Union to Kenya December 2013 TERMS OF REFERENCE 1. BACKGROUND INFORMATION...

More information

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS for PROPERTY AND RIGHT OF WAY ACQUISITION SERVICES CLEAN WATER PLAN CAPITAL PROJECT S-451 November 2017 1.0 INTRODUCTION ALCOSAN has agreed

More information

Mortgagee in Possession Section 106 Standard Clauses. Practice Note January 2019

Mortgagee in Possession Section 106 Standard Clauses. Practice Note January 2019 Mortgagee in Possession Section 106 Standard Clauses Practice Note January 2019 Introduction 1. Mortgagee in Possession (MiP) clauses within Section 106 agreements (S106 agreement) enable Registered Providers

More information

Main Contact: Admin Contact: N/a Technical Contact: N/a Other Contact: N/a. Full Notice Text CONTRACT NOTICE OFFICIAL JOURNAL

Main Contact: Admin Contact: N/a Technical Contact: N/a Other Contact: N/a. Full Notice Text CONTRACT NOTICE OFFICIAL JOURNAL Details Title: The development of a new mixed use scheme at Blackwell Farm, Guildford for the University of Surrey Published by: University of Surrey Publication date: 07/08/2013 Application Deadline:

More information

PURCHASE AGREEMENT No

PURCHASE AGREEMENT No PURCHASE AGREEMENT No. 201808 (hereinafter the Agreement ) concluded pursuant to Section 2079 et seq. of Act No. 89/2012 Coll., Civil Code, as amended (hereinafter the Civil Code ) I. Contracting Parties

More information

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) 2016-02 COMMERCIAL REAL ESTATE BROKERAGE SERVICES Proposals will be received at the Town of Bancroft Municipal Office, 24 Flint Ave., Bancroft, Ontario,

More information

Corrigendum No.2 to the Guide for Applicants, the 3rd Flagship Projects - Restricted Call for Proposals

Corrigendum No.2 to the Guide for Applicants, the 3rd Flagship Projects - Restricted Call for Proposals Corrigendum No.2 to the the 3rd Flagship Projects - Restricted Call for Proposals No. 1. 2. Place in the Guide for Applicant Initial Modified Rationale Copy of the establishing documents of the Applicants

More information

Scheme of Service. for. Housing Officers

Scheme of Service. for. Housing Officers REPUBLIC OF KENYA Scheme of Service for Housing Officers APPROVED BY THE PUBLIC SERVICE COMMISSION AND ISSUED BY THE PERMANENT SECRETARY MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRIME MINISTER

More information

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Law No. 04/L-144 ON ALLOCATION FOR USE AND EXCHANGE OF IMMOVABLE PROPERTY OF THE MUNICIPALITY Assembly of Republic

More information

PROJECT INITIATION DOCUMENT

PROJECT INITIATION DOCUMENT Project Name: Housing Futures Phase Two Project Sponsor: Steve Hampson Project Manager: Denise Lewis Date Issued: 15 February 2008 Version No: 1 Background: At Full Council on 31 January 2008 the following

More information

STAATSKOERANT, 30 JANUARIE 2009 GOVERNMENT NOTICE DEPARTMENT OF MINERALS AND ENERGY ELECTRICITY REGULATION ACT, 2006 ELECTRICITY REGULATION

STAATSKOERANT, 30 JANUARIE 2009 GOVERNMENT NOTICE DEPARTMENT OF MINERALS AND ENERGY ELECTRICITY REGULATION ACT, 2006 ELECTRICITY REGULATION STAATSKOERANT, 30 JANUARIE 2009 No.31849 3 GOVERNMENT NOTICE No.R.79 DEPARTMENT OF MINERALS AND ENERGY ELECTRICITY REGULATION ACT, 2006 30.January 2009 ELECTRICITY REGULATION I, Buyelwa P Sonjica, Minister

More information

Standard conditions of Eesti Energia AS gas contract for household consumer Valid from 19 April 2018

Standard conditions of Eesti Energia AS gas contract for household consumer Valid from 19 April 2018 1. GENERAL PROVISIONS 1.1 Eesti Energia AS (hereinafter the Seller or Party) sells natural gas (hereinafter gas) to household consumers (hereinafter Buyer or Party; Seller and Buyer together: Parties)

More information

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington Issue Date: March 2, 2018 Prepared By: Rural Municipality of Wellington Wellington, PEI

More information

Governing Body 323rd Session, Geneva, March 2015

Governing Body 323rd Session, Geneva, March 2015 INTERNATIONAL LABOUR OFFICE Governing Body 323rd Session, Geneva, 12 27 March 2015 Programme, Financial and Administrative Section Programme, Financial and Administrative Segment GB.323/PFA/3 PFA Date:

More information

Planning Act. Chapter 1 General provisions. Passed In force from: In force until: Translation published:

Planning Act. Chapter 1 General provisions. Passed In force from: In force until: Translation published: Issuer: Riigikogu Type: act In force from: 01.07.2015 In force until: 31.08.2015 Translation published: 18.12.2015 1. Aim and scope of regulation of the Act Passed 28.01.2015 Chapter 1 General provisions

More information

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax:

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: European Union Publication of Supplement to the Official Journal of the European Union 2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670 E-mail: ojs@publications.europa.eu Info & on-line

More information

Programme to rationalise international GMP inspections of active pharmaceutical ingredients/active substances manufacturers

Programme to rationalise international GMP inspections of active pharmaceutical ingredients/active substances manufacturers 20 February 2012 EMA/INS/GMP/129953/2012 Compliance and Inspection Programme to rationalise international GMP inspections of active pharmaceutical ingredients/active substances manufacturers Terms of reference

More information

Quality management system. of supplies and services

Quality management system. of supplies and services Quality management system of supplies and services (hereinafter referred to as Document ) of company Automotive Group SK, s.r.o., IČ: 35 884 789, seat Niklová 56, 926 01 Sereď, Slovak republic (hereinafter

More information

EFRAG s Letter to the European Commission Regarding Endorsement of Transfers of Investment Property

EFRAG s Letter to the European Commission Regarding Endorsement of Transfers of Investment Property Regarding Endorsement of Transfers of Investment Property Olivier Guersent Director General, Financial Stability, Financial Services and Capital Markets Union European Commission 1049 Brussels 6 April

More information

Chapter 11. Competitive Negotiation: Procedure

Chapter 11. Competitive Negotiation: Procedure Chapter 11. Competitive Negotiation: Procedure Summary This chapter provides an overview of the procedure for procuring goods and services using the competitive negotiation procedure. The competitive negotiation

More information

Inspection & Audit Procedure

Inspection & Audit Procedure Definitions: PAGE : 1 of 6 Annual Inspection and Audit Programme: means the annual programme for Audit and Inspection drafted by RGII and approved by the Commission for Energy Regulation ( CER ) and published

More information

REPUBLIC OF SOUTH AFRICA

REPUBLIC OF SOUTH AFRICA Please note that most Acts are published in English and another South African official language. Currently we only have capacity to publish the English versions. This means that this document will only

More information

Corrigendum No.1 to the Guide for Applicants, the 3 rd Open Call

Corrigendum No.1 to the Guide for Applicants, the 3 rd Open Call Corrigendum No.1 to the the 3 rd Open Call No. 1. Place in the Guide for Applicant Initial Modified Rationale Copy of the establishing documents of the Applicants: Articles of Association, Statutes, Deed

More information

Consulted With Individual/Body Date Head of Finance Financial

Consulted With Individual/Body Date Head of Finance Financial Equipment Disposal Policy Developed in response to: Policy Register No: 12037 Status: Public Internal Audit Report for Fixed Assets Contributes to CQC Regulation 17 Consulted With Individual/Body Date

More information

INVITATION TO NEGOTIATE

INVITATION TO NEGOTIATE INVITATION TO NEGOTIATE COMMERCIAL DEVELOPMENT OF A PROPERTY LOCATED IN WARSAW AT THE ALEJE JEROZOLIMSKIE 140 STREET Warsaw, October 2015 Invitation to Negotiate Terms defined and used in this Invitation

More information

PROPERTY ASSESSMENT KNOWLEDGE

PROPERTY ASSESSMENT KNOWLEDGE A P E N DE UM NOUN A COLLECTION OF CONCISE BUT DETAILED INFORMATION ABOUT APPRAISAL AND APPRAISAL MANAGEMENT, ESPECIALLY IN THE PROPERTY ASSESSMENT INDUSTRY. PROPERTY ASSESSMENT KNOWLEDGE KNOWLEDGE AREAS

More information

Union procedure on the coordination of EU pharmacovigilance inspections

Union procedure on the coordination of EU pharmacovigilance inspections 21 March 2014 EMA/INS/PhV/192234/2014 Union procedure on the coordination of EU pharmacovigilance inspections Adopted by Pharmacovigilance Inspectors Working Group 21 March 2014 Date for coming into effect

More information

EFRAG s Draft Letter to the European Commission Regarding Endorsement of Transfers of Investment Property

EFRAG s Draft Letter to the European Commission Regarding Endorsement of Transfers of Investment Property Regarding Endorsement of Transfers of Investment Property Olivier Guersent Director General, Financial Stability, Financial Services and Capital Markets Union European Commission 1049 Brussels [dd Month]

More information

1.3. The Policy is based on the City of London governing principles:

1.3. The Policy is based on the City of London governing principles: Real Property Acquisition Policy Policy Name: Real Property Acquisition Policy Legislative History: Enacted September 19, 2017 (By-law No. CPOL.-188-440); Amended July 24, 2018 (By-law No. CPOL.-188(a)-447)

More information

Land Registers Interconnection Network Study. Brussels, 02/04/2014

Land Registers Interconnection Network Study. Brussels, 02/04/2014 Land Registers Interconnection Network Study Brussels, 02/04/2014 Background Information: DG Justice Mission: To build a European Union area of Justice which ensures respect for the citizen s fundamental

More information

PROCEDURE FOR REPORTING OF PHARMACOVIGILANCE INSPECTIONS REQUESTED BY THE CHMP. GCP Inspectors Working Group

PROCEDURE FOR REPORTING OF PHARMACOVIGILANCE INSPECTIONS REQUESTED BY THE CHMP. GCP Inspectors Working Group The European Medicines Agency Inspections London, 12 November 2007 EMEA/INS/GCP/391114/2005 Procedure no: INS/PhV/3 Superseded by Union Procedures PROCEDURE FOR REPORTING OF PHARMACOVIGILANCE INSPECTIONS

More information

PART ONE - GENERAL INFORMATION

PART ONE - GENERAL INFORMATION Corrected Date: Page 7 Date of Submittal Changed to Coincide with Submittal Date on Page 5 PART ONE - GENERAL INFORMATION A. INTRODUCTION B. Background Miami Shores Village is soliciting responses to this

More information

Government Gazette REPUBLIC OF SOUTH AFRICA

Government Gazette REPUBLIC OF SOUTH AFRICA Government Gazette REPUBLIC OF SOUTH AFRICA Vol. 509 Cape Town 27 November 2007 No. 30520 THE PRESIDENCY No. 1124 27 November 2007 It is hereby notified that the President has assented to the following

More information

Arts and Humanities Research Council. Commons Fellowship

Arts and Humanities Research Council. Commons Fellowship Arts and Humanities Research Council Call for Applications Commons Fellowship Overview Applications are invited from appropriately experienced researchers in the arts and humanities for an AHRC Commons

More information

Customer Engagement Strategy

Customer Engagement Strategy Customer Engagement Strategy If you have difficulty with sight or hearing, or if you require a translated copy of this document, we would be pleased to provide this information in a form that suits your

More information

Olivier Péronnet. 4 December 2017 Bocconi Conference

Olivier Péronnet. 4 December 2017 Bocconi Conference French practice regarding fairness opinions: The role of independent appraisers in tender offers and squeezeouts according to the AMF General Regulation Olivier Péronnet 4 December 2017 Bocconi Conference

More information

CITY OF LONDON LAW SOCIETY LAND LAW COMMITTEE PROTOCOL FOR DISCHARGING MORTGAGES OF COMMERCIAL PROPERTY

CITY OF LONDON LAW SOCIETY LAND LAW COMMITTEE PROTOCOL FOR DISCHARGING MORTGAGES OF COMMERCIAL PROPERTY CITY OF LONDON LAW SOCIETY LAND LAW COMMITTEE PROTOCOL FOR DISCHARGING MORTGAGES OF COMMERCIAL PROPERTY 1. Introduction This protocol has been prepared by a sub-group of the City of London Law Society

More information

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK BACKGROUND MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK The objective of the above project is to support municipal development in a sustainable manner. To this end, the project will a) support

More information

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS

P420 PROCUREMENT, & DISPOSAL OF LAND AND ASSETS 1. INTRODUCTION Section 49 of the Local Government Act 1999 requires Council to prepare and adopt policies on the contracting out of services, competitive tendering and the use of other measures to ensure

More information

SUBJECT: Unacceptable Assignment Conditions in Real Property Appraisal Assignments

SUBJECT: Unacceptable Assignment Conditions in Real Property Appraisal Assignments 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 ADVISORY OPINION 19 (AO-19) This communication by the Appraisal Standards Board (ASB) does not establish new standards

More information

3.1.b Helping local authorities to meet their strategic housing goals. 3.1.d Providing clear information for customers about options / choices

3.1.b Helping local authorities to meet their strategic housing goals. 3.1.d Providing clear information for customers about options / choices Tenancy Policy 1 Introduction 1.1 This policy sets out a framework under which Notting Hill Housing Trust will let and manage homes following the introduction of the affordable rent product 2 Background

More information

Intent: To establish a policy and guidelines for all procurement activities in the city. SECTION I: Purpose of Purchasing Policies...

Intent: To establish a policy and guidelines for all procurement activities in the city. SECTION I: Purpose of Purchasing Policies... Policy Number: Appendix C Subject: Revised: 03/26/2012 Issued: 02/10/97 Page: 1 of 10 Intent: To establish a policy and guidelines for all procurement activities in the city. Applies to: All City Employees

More information

METROPOLITAN TRANSPORTATION AUTHORITY ALL-AGENCY GUIDELINES FOR THE DISPOSAL OF PERSONAL PROPERTY

METROPOLITAN TRANSPORTATION AUTHORITY ALL-AGENCY GUIDELINES FOR THE DISPOSAL OF PERSONAL PROPERTY METROPOLITAN TRANSPORTATION AUTHORITY ALL-AGENCY GUIDELIN NES FOR THE DISPOSAL OF PERSONAL PROPERTY Adopted by the Board on March 25, 2015 These guidelines, which have been adoptedd by the Board of the

More information

Master Repurchase Agreement

Master Repurchase Agreement Master Repurchase Agreement Dated as of Between: and Regions Bank 1. Applicability From time to time the parties hereto may enter into transactions in which one party ( Seller ) agrees to transfer to the

More information

2. Application of the APEC Architect Framework Purpose of this Arrangement Reciprocal Recognition Provisions 7. 5.

2. Application of the APEC Architect Framework Purpose of this Arrangement Reciprocal Recognition Provisions 7. 5. APEC ARCHITECT TRILATERAL ARRANGEMENT ON RECIPROCAL RECOGNITION OF REGISTERED/LICENSED ARCHITECTS IN AUSTRALIA, CANADA AND NEW ZEALAND TO FACILITATE MOBILITY OF ARCHITECTS IN THE PROVISION OF ARCHITECTURAL

More information

EXHIBIT A. City of Corpus Christi Annexation Guidelines

EXHIBIT A. City of Corpus Christi Annexation Guidelines City of Corpus Christi Annexation Guidelines Purpose: The purpose of this document is to describe the City of Corpus Christi s Annexation Guidelines. The Annexation Guidelines provide the guidance and

More information

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H380 KG Public Disclosure Authorized Financing Agreement Second Land and Real Estate Registration Project between Public Disclosure Authorized KYRGYZ

More information

ADMINISTRATIVE GUIDANCE

ADMINISTRATIVE GUIDANCE 11 ADMINISTRATIVE GUIDANCE ON CONTAMINATED SITES Effective date: April 1, 2013 Version 1.1 May 2013 Expectations and Requirements for Contaminant Migration Introduction This guidance focusses on the ministry

More information

AGREEMENT FOR THE SALE AND PURCHASE OF TELEPHONE KIOSK(S) TO A LOCAL AUTHORITY IN NORTHERN IRELAND

AGREEMENT FOR THE SALE AND PURCHASE OF TELEPHONE KIOSK(S) TO A LOCAL AUTHORITY IN NORTHERN IRELAND AGREEMENT FOR THE SALE AND PURCHASE OF TELEPHONE KIOSK(S) TO A LOCAL AUTHORITY IN NORTHERN IRELAND This agreement is made this day of 20 Background The Buyer wishes to buy the Goods from the Seller and

More information

Qualification Snapshot CIH Level 3 Certificate in Housing Maintenance (QCF)

Qualification Snapshot CIH Level 3 Certificate in Housing Maintenance (QCF) Qualification Snapshot CIH Certificate in Housing Maintenance (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is the leading

More information

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Law No. 04/L-175 ON THE INSPECTORATE OF ENVIRONMENT, WATERS, NATURE, SPATIAL PLANNING AND CONSTRUCTION Assembly

More information

NATIONAL RIFLE ASSOCIATION Real Estate Policy (July 2016)

NATIONAL RIFLE ASSOCIATION Real Estate Policy (July 2016) NATIONAL RIFLE ASSOCIATION Real Estate Policy (July 2016) Introduction This policy statement, which covers all uses of real estate and forms of tenure at Bisley, has been adopted by the Council of the

More information

October 27, Introduction. Pursuant to:

October 27, Introduction. Pursuant to: INVITATION FOR EXPRESSIONS OF INTEREST FOR TWO (2) INDEPENDENT VALUERS TO THE HELLENIC REPUBLIC ASSET DEVELOPMENT FUND IN RELATION TO THE PRIVATISATION OF DESFA S.A. 1. Introduction Pursuant to: October

More information

Rules for assessors. Date of approval by the Accreditation Advisory Board: SD Revision: November 2016.

Rules for assessors. Date of approval by the Accreditation Advisory Board: SD Revision: November 2016. 71 SD 0 008 Revision: 1.3 30. November 2016 Scope: Within the accreditation of conformity assessment bodies, the verification of the technical competence on-site is a decisive aspect. The results of the

More information

GENERAL TERMS AND CONDITIONS OF PURCHASE

GENERAL TERMS AND CONDITIONS OF PURCHASE GENERAL TERMS AND CONDITIONS OF PURCHASE 1. GENERAL TERMS AND CONDITIONS DEFINITIONS GENERAL CLAUSES 1.1 All purchases of goods, equipments, materials and Services by Bridgestone France (the «Purchaser»

More information

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes ) Assets, Regeneration & Growth Committee 17 March 2016 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Development of new affordable homes by Barnet Homes Registered Provider

More information

Camp Central Appraisal District LEGAL AND ADMINISTRATIVE REQUIREMENTS

Camp Central Appraisal District LEGAL AND ADMINISTRATIVE REQUIREMENTS Camp Central Appraisal District LEGAL AND ADMINISTRATIVE REQUIREMENTS Counties are responsible for creating and establishing an Appraisal District. As a political subdivision of the state the major responsibility

More information

RIGHTMOVE COMMERCIAL PRODUCT GUIDELINES

RIGHTMOVE COMMERCIAL PRODUCT GUIDELINES RIGHTMOVE COMMERCIAL PRODUCT GUIDELINES DEFINITIONS Core Membership means the basic Services on the Rightmove platforms to which You are entitled in return for Your Core Membership Fee. Additional Products

More information

2.4 The inspection and certification orders are processed in the order in which the documents and/or information are received.

2.4 The inspection and certification orders are processed in the order in which the documents and/or information are received. 1 Scope and Definition The Inspection and Certification Ordinance applies to the performance of inspections and the issuing of certificates for personnel and operating procedures for Permanent joining

More information

CIRCULAR On strategic environmental assessment, environmental impact assessment, and environmental protection plans (*)

CIRCULAR On strategic environmental assessment, environmental impact assessment, and environmental protection plans (*) Issue nos 09-10/June 2015 OFFICIAL GAZETTE 17 THE MINISTRY OF NATURAL RESOURCES AND ENVIRONMENT THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 27/2015/TT-BTNMT Hanoi, May 29,

More information

HAVEBURY HOUSING PARTNERSHIP

HAVEBURY HOUSING PARTNERSHIP HS0025 HAVEBURY HOUSING PARTNERSHIP POLICY HOME PURCHASE POLICY Controlling Authority Director of Resources Policy Number HS025 Issue No. 3 Status Final Date November 2013 Review date November 2016 Equality

More information

Water System Master Operating Agreement. for the. Marion, Howell, Oceola and Genoa. Sewer and Water Authority

Water System Master Operating Agreement. for the. Marion, Howell, Oceola and Genoa. Sewer and Water Authority Water System Master Operating Agreement for the Marion, Howell, Oceola and Genoa Sewer and Water Authority Dated as of February 1, 2011 TABLE OF CONTENTS Page ARTICLE I DEFINITIONS Section 1.1 Definitions...2

More information

Disposal of property: Procedures for Universities. Introduction

Disposal of property: Procedures for Universities. Introduction Disposal of property: Procedures for Universities Introduction 1. These Revised Procedure Notes supercede the Interim Procedure Notes in all matters relating to the arrangements which should be followed

More information

Law on Mineral Resources

Law on Mineral Resources Law on Mineral Resources Promulgated, The Official Gazette, No. 23 of 12 March 1999 PART ONE COMMON PROVISIONS Chapter One SUBJECT-MATTER AND SCOPE Article 1 (1) This Law regulates the terms and conditions

More information

SANTA CLARA COUNTY RHNA SUBREGION TASK FORCE GUIDING PRINCIPLES - May 2018

SANTA CLARA COUNTY RHNA SUBREGION TASK FORCE GUIDING PRINCIPLES - May 2018 SANTA CLARA COUNTY RHNA SUBREGION TASK FORCE GUIDING PRINCIPLES - May 2018 Attachment A Vision For Santa Clara County and its cities to work collaboratively to produce more housing in the Region. have

More information

FOR INFORMATION PURPOSES ONLY. Request for Proposals for the Purchase of a Site for the New Acute Care Hospital with Schedules

FOR INFORMATION PURPOSES ONLY. Request for Proposals for the Purchase of a Site for the New Acute Care Hospital with Schedules FOR INFORMATION PURPOSES ONLY Request for Proposals for the Purchase of a Site for the New Acute Care Hospital with Schedules Request for Proposals for the Purchase of a Site for the New Acute Care Hospital

More information

Position Paper. Dear Members of the European Parliament,

Position Paper. Dear Members of the European Parliament, Position Paper UEAPME 1 s proposal for Amendments to the proposed Directive on certain aspects concerning contracts for the online and other distance sales of goods (COM(2015)0635) Dear Members of the

More information

Empty Properties Enforcement Protocol

Empty Properties Enforcement Protocol Empty Properties Enforcement Protocol 1. Introduction 1.1 Ealing Council will take every step it can to assist owners of empty properties in bringing the accommodation back into use. The details of this

More information

INVITATION TO NEGOTIATE

INVITATION TO NEGOTIATE INVITATION TO NEGOTIATE COMMERCIAL DEVELOPMENT OF PROPERTIES IN 5 LOCATIONS MPD II (SDP II) : 1. BIELSKO-BIAŁA, UL. 3 MAJA 2. ELBLĄG, AL. GRUNWALDZKA 3. KOŁO, UL. KSIĘDZA OPAŁKI 4. KOSZALIN, AL. ARMII

More information

Designing for transparency and participation in the Hellenic Cadastral Project

Designing for transparency and participation in the Hellenic Cadastral Project Designing for transparency and participation in the Hellenic Cadastral Project Dr. Dimitris Rokos Director of Planning and Investments, Hellenic National Cadastre and Mapping Agency S.A. Table of Contents

More information

OVERVIEW OF HOUSING DEVELOPMENT CORPORATION, LONDON (HDC)

OVERVIEW OF HOUSING DEVELOPMENT CORPORATION, LONDON (HDC) OVERVIEW OF HOUSING DEVELOPMENT CORPORATION, LONDON (HDC) Information for Persons Interested in Applying to Serve on the HDC Board of Directors STEPHEN GIUSTIZIA EXECUTIVE LEAD SGIUSTIZIA@HDCLONDON.CA

More information

Chapter 8. Competitive Sealed Bidding: Addenda, Modifications, and Withdrawals

Chapter 8. Competitive Sealed Bidding: Addenda, Modifications, and Withdrawals Chapter 8. Competitive Sealed Bidding: Addenda, Modifications, and Withdrawals Summary This chapter addresses situations in which the invitation for bids is revised by an addendum or the bid submitted

More information

Chapter 5. Competitive Sealed Bidding: Procedure

Chapter 5. Competitive Sealed Bidding: Procedure Chapter 5. Competitive Sealed Bidding: Procedure Summary This chapter provides an overview of the procedure for procuring goods and nonprofessional services using the competitive sealed bidding procedure.

More information

BOROUGH OF POOLE CABINET 12 JANUARY 2016

BOROUGH OF POOLE CABINET 12 JANUARY 2016 AGENDA ITEM 10 BOROUGH OF POOLE CABINET 12 JANUARY 2016 AFFORDABLE HOUSING DEVELOPMENT ON COUNCIL OWNED LAND AT HOLES BAY ROAD, POOLE: REPORT OF THE HEAD OF HOUSING AND COMMUNITY SERVICES AND CHIEF EXECUTIVE

More information

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF)

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF) Qualification Snapshot CIH Certificate in Housing Services (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is the leading

More information

Revised translation by legal affairs Department CIB/CDC

Revised translation by legal affairs Department CIB/CDC Revised translation 26.08.07 by legal affairs Department CIB/CDC Law on Concessions CHAPTER I GENERAL PROVISIONS Article 1. The purpose of this Law is to promote and facilitate the implementation of privately

More information

How to avoid State aid when selling public land. European Commission DG Competition 1 April 2014

How to avoid State aid when selling public land. European Commission DG Competition 1 April 2014 How to avoid State aid when selling public land European Commission DG Competition 1 April 2014 Purpose Set out the legal framework, the Commission's practice and the case law of the European Courts with

More information

CEOC Position Paper - Independence, Impartiality, and Integrity of candidate institutions and inspection bodies

CEOC Position Paper - Independence, Impartiality, and Integrity of candidate institutions and inspection bodies CEOC/CML/039/2012 INTERNATIONAL CONFEDERATION OF INSPECTION AND CERTIFICATION ORGANISATIONS CEOC Position Paper - Independence, Impartiality, and Integrity of candidate institutions and inspection bodies

More information

Qualification Snapshot CIH Level 3 Award in Housing Practice (QCF)

Qualification Snapshot CIH Level 3 Award in Housing Practice (QCF) Qualification Snapshot CIH Award in Housing Practice (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is the leading awarding

More information

Direction for General Regulation Concerning Jointly Owned Properties. Chapter One Definitions and General Provisions

Direction for General Regulation Concerning Jointly Owned Properties. Chapter One Definitions and General Provisions Direction for General Regulation Concerning Jointly Owned Properties Chapter One Definitions and General Provisions Article (1) Terms used in the Law In these Regulations, the terms and expressions defined

More information

RIBA Chartered Practice

RIBA Chartered Practice RIBA Chartered Practice Accreditation Criteria and Standards Standards and Enforcement Procedures Royal Institute of British Architects 66 Portland Place, London, W1B 1AD, UK Tel: +44 (0)20 7580 5533 Fax:

More information

Asia Pacific Economic Cooperation. APEC Architect Operations Manual

Asia Pacific Economic Cooperation. APEC Architect Operations Manual Asia Pacific Economic Cooperation APEC Architect Operations Manual 2006 1 APEC Architect Operations Manual CONTENTS Glossary of Terms Foreword 1. The APEC Architect Framework an Overview 5 2. Registration

More information

NEM GENERATOR TRANSFER GUIDE

NEM GENERATOR TRANSFER GUIDE NEM GENERATOR TRANSFER GUIDE Purpose AEMO has prepared this document to provide information about the process for becoming a registered as a participant in the National Electricity Market, as at the date

More information

EXCLUSIVITY OR OPTION AGREEMENT SALE OF [ NAME OF PROPERTY] DATED THE [ ] DAY OF [ MONTH ] relating to. between [PARTY 1] and

EXCLUSIVITY OR OPTION AGREEMENT SALE OF [ NAME OF PROPERTY] DATED THE [ ] DAY OF [ MONTH ] relating to. between [PARTY 1] and DATED THE [ ] DAY OF [ MONTH ] 2015 ------------ EXCLUSIVITY OR OPTION AGREEMENT relating to SALE OF [ NAME OF PROPERTY] between [PARTY 1] and [PARTY 2] CONTENTS CLAUSE 1. Interpretation 1 2. Seller's

More information

RIGHTMOVE COMMERCIAL PRODUCT GUIDELINES

RIGHTMOVE COMMERCIAL PRODUCT GUIDELINES RIGHTMOVE COMMERCIAL PRODUCT GUIDELINES DEFINITIONS Core Membership means the basic Services on the Rightmove platforms to which You are entitled in return for Your Core Membership Fee. Additional Products

More information

Ref. No. SCMF/ENG/ NIT-24/ Date: N O T I C E I N V I T I N G T E N D E R

Ref. No. SCMF/ENG/ NIT-24/ Date: N O T I C E I N V I T I N G T E N D E R Fax : 033 2441 4372 THE WEST BENGAL benfed Website :- www.benfed.org STATE CO-OPERATIVE Phones : 033 2441 4366 MARKETING FEDERATION LTD. 4367 SOUTHEND CONCLAVE 3 rd Floor. 4368 1582, Rajdanga Main Road,

More information

CENTRAL GOVERNMENT ACCOUNTING STANDARDS

CENTRAL GOVERNMENT ACCOUNTING STANDARDS CENTRAL GOVERNMENT ACCOUNTING STANDARDS NOVEMBER 2016 STANDARD 4 Requirements STANDARD 5 INTANGIBLE ASSETS INTRODUCTION... 75 I. CENTRAL GOVERNMENT S SPECIALISED ASSETS... 75 I.1. The collection of sovereign

More information

Terms of Business, Landlord Insurances & Property Information (v2.0)

Terms of Business, Landlord Insurances & Property Information (v2.0) Terms of Business, Landlord Insurances & Property Information (v2.0) 1 General Agreements 1.1 By signing this document, The Landlord is appointing Belvoir! as The Agent. The Landlord confirms that he has

More information

Community Occupancy Guidelines

Community Occupancy Guidelines Community Occupancy Guidelines Auckland Council July 2012 Find out more: phone 09 301 0101 or visit www.aucklandcouncil.govt.nz Contents Introduction 4 Scope 5 In scope 5 Out of scope 5 Criteria 6 Eligibility

More information

VALUATION REPORTING REVISED Introduction. 3.0 Definitions. 2.0 Scope INTERNATIONAL VALUATION STANDARDS 3

VALUATION REPORTING REVISED Introduction. 3.0 Definitions. 2.0 Scope INTERNATIONAL VALUATION STANDARDS 3 4.4 INTERNATIONAL VALUATION STANDARDS 3 REVISED 2007 1.0 Introduction 1.1 The critical importance of a Valuation Report, the final step in the valuation process, lies in communicating the value conclusion

More information

Leasehold Management Policy

Leasehold Management Policy UNCONTROLLED WHEN PRINTED Policy Contents 1 Aims and Objectives 2 Definitions 3 Legal and regulatory framework 4 Key aspects of service delivery 5 Monitoring 6 Staff Training 7 Review 8 Equality Impact

More information

REQUEST FOR PROPOSAL FOR SERVICED APARTMENTS FOR: 1. CONCEPT DESIGN CONSULTATION AND/OR 2. OPERATION OF SERVICED APARTMENTS, FOR,

REQUEST FOR PROPOSAL FOR SERVICED APARTMENTS FOR: 1. CONCEPT DESIGN CONSULTATION AND/OR 2. OPERATION OF SERVICED APARTMENTS, FOR, REQUEST FOR PROPOSAL FOR SERVICED APARTMENTS FOR: 1. CONCEPT DESIGN CONSULTATION AND/OR 2. OPERATION OF SERVICED APARTMENTS, FOR, SERVICED APARTMENTS BRAND SPONSORED BY CYTONN INVESTMENTS MANAGEMENT LIMITED

More information