METALLIC AND INDUSTRIAL MINERALS TENURE REGULATION

Size: px
Start display at page:

Download "METALLIC AND INDUSTRIAL MINERALS TENURE REGULATION"

Transcription

1 Province of Alberta MINES AND MINERALS ACT METALLIC AND INDUSTRIAL MINERALS TENURE REGULATION Alberta Regulation 145/2005 With amendments up to and including Alberta Regulation 174/2014 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park Plaza Avenue Edmonton, AB T5K 2P7 Phone: Fax: qp@gov.ab.ca Shop on-line at

2 Copyright and Permission Statement Alberta Queen's Printer holds copyright on behalf of the Government of Alberta in right of Her Majesty the Queen for all Government of Alberta legislation. Alberta Queen's Printer permits any person to reproduce Alberta s statutes and regulations without seeking permission and without charge, provided due diligence is exercised to ensure the accuracy of the materials produced, and Crown copyright is acknowledged in the following format: Alberta Queen's Printer, 20.* *The year of first publication of the legal materials is to be completed. Note All persons making use of this consolidation are reminded that it has no legislative sanction, that amendments have been embodied for convenience of reference only. The official Statutes and Regulations should be consulted for all purposes of interpreting and applying the law

3 (Consolidated up to 174/2014) ALBERTA REGULATION 145/2005 Mines and Minerals Act METALLIC AND INDUSTRIAL MINERALS TENURE REGULATION Table of Contents 1 Definitions 2 Agreement exemption, rental exemption 3 Prospecting Part 1 Permits 4 Application for permits 5 Rights conveyed by permit 6 Term of permit 7 Area and boundaries of location 8 Assessment work requirements 9 Mineral assessment appointee 10 Intent to file or mineral assessment report 11 Statement of intent to file 12 Submission of mineral assessment report 13 Grouping of permits 14 Timing of applying for a permit group 15 Amendment of permit group 16 Group permit expiry 17 Mineral assessment report specifications 18 Unacceptable mineral assessment expenditures 19 Mineral assessment report deficiencies 20 Selection of permits and allocation of expenditures 21 Retention of permits 22 Application of excess spending requirements 23 Expenditures of less than minimum requirements 24 Area reduction 25 Payment in lieu of expenditure 26 Extension of work period 27 Confidentiality of assessment work report

4 TENURE REGULATION Part 2 Licences Recreational Placer Mining 28 Definitions 29 Restriction on placer mining 30 Application for licence 31 Rights conveyed by licence 32 Terms of licence 33 Prohibitions re placer mining 34 Prohibited location 35 Operations re Class C and Class D water bodies 36 Operations re Class A and Class B water bodies Part 3 Leases 37 Issue of leases 38 Application for lease 39 Rights conveyed by lease 40 Area and boundaries of location 41 Term of lease 42 Notice respecting production or development Part 4 Secondary Mineral Leases Commercial Mining as a Secondary Activity 43 Interpretation 44 Application for secondary mineral lease 45 Rights conveyed by secondary mineral lease 46 Location 47 Term Part 4.1 Subsurface Reservoir Leases 47.1 Definitions 47.2 Subsurface reservoir lease 47.3 Application for reservoir lease 47.4 Issuance of subsurface reservoir lease 47.5 Obligations under lease 2

5 Section 1 TENURE REGULATION Part 5 General 48 Cores, cuttings requirements 49 Property of the Crown 50 Order in Council for mining Part 6 Repeal and Expiry 51 Repeal 52 Expiry Schedule Definitions 1 In this Regulation, (a) assessment work means a geological, geochemical, geophysical or geotechnical study, investigation, reconnaissance or survey undertaken to establish the geology of a given area or to ascertain the nature, quality or extent of a metallic and industrial mineral in the area, and includes any work leading to the development of a metallic and industrial mineral; (b) assessment work period means (i) a 2-year period of the term of a permit, or (ii) any portion of a 2-year period that remains at the end of an extended work period; (c) designated representative means a person designated as described in section 29 of the Act; (d) extended work period means an assessment work period that is extended by the Minister pursuant to section 26; (e) former lease means (i) a metallic mineral lease issued under Part 7 of the Mines and Minerals Act, RSA 1980 cm-15, and the Metallic Minerals Regulation (AR 246/84), and (ii) a lease issued under the Metallic and Industrial Minerals Regulation (AR 66/93); 3

6 Section 1 TENURE REGULATION (f) former permit means a metallic mineral exploration permit issued under the Metallic and Industrial Minerals Regulation (AR 66/93); (g) lease means a metallic and industrial minerals lease issued under this Regulation or under the Act; (h) lessee, permittee and holder of a secondary mineral lease include the designated representative for a lease, licence or permit unless, from the express wording of a provision, it is apparent that those terms are restricted to the holder of a lease, permit or secondary mineral lease; (i) licence means a metallic and industrial minerals licence issued under this Regulation or under the Act; (j) metallic and industrial minerals means minerals within the meaning of section 1(1)(p)(i) of the Act that are vested in or belong to the Crown in right of Alberta but does not include petroleum, asphalt, bituminous sands, oil sands, natural gas, coal or ammonite shell; (k) mineral assessment appointee means a person determined to be a mineral assessment appointee in accordance with section 9; (l) mineral assessment report means administrative and technical documents, writings, materials and data described in the Schedule that comply with the requirements of section 17 and the Schedule and are submitted in accordance with section 10(a); (m) permit means a metallic and industrial minerals permit issued under this Regulation, the Metallic and Industrial Minerals Regulation (AR 66/93), or the Act; (n) permit group means a grouping of permits that is approved by the Minister pursuant to section 13; (o) placer deposit means a surficial deposit contained in sand, gravel or similar material, formed by a natural mechanical concentration of mineral particles, and composed of heavy minerals including, but not limited to, gold, silver, platinum group metals or precious stones; (p) placer mineral means a metallic and industrial mineral that is being or may be obtained by placer mining; (q) placer mining means a method or technique of surface operation other than gold panning whereby a placer deposit is worked for the purpose of obtaining or 4

7 Section 2 TENURE REGULATION producing a placer mineral and the activities associated with such a surface operation including, but not limited to, the pumping of water, the discharge of water and the excavation of material; (r) prospect means to search for a metallic and industrial mineral using hand-held implements or instruments in a manner that does not, in the opinion of the Minister, cause significant surface disturbance; (s) secondary mineral lease means a lease issued under Part 4; (t) sluicebox means an inclined trough containing obstructions in the bottom that is used in placer mining to concentrate metallic and industrial minerals; (u) statement of intent to file means a statement described in sections 10 and 11; (v) work period means an assessment work period or an extended work period. Agreement exemption, rental exemption 2(1) This Regulation does not apply to any agreement made or entered into by the Minister under (a) section 9(a) of the Act, (b) section 13(2)(a) of the Mines and Minerals Act, RSA 1980 cm-15, as it read before the coming into force of the Mines and Minerals Amendment Act, 1983, or (c) section 14(b) of The Mines and Minerals Act, RSA 1970, c238. (2) Despite section 20(3) of the Mines and Minerals Administration Regulation (AR 262/97), no rental is payable in respect of a licence, a permit or a secondary mineral lease. Prospecting 3(1) Subject to subsection (2), a person may prospect for a metallic and industrial mineral without being the holder of a permit, licence, secondary mineral lease or lease. (2) No person shall prospect on land on or near an active well, mine, pit or quarry, including, but not limited to, 5

8 Section 4 TENURE REGULATION (a) within that part of the location of an agreement issued under the Mines and Minerals Act to which the holder of the agreement has been granted surface access to the mineral rights granted by the agreement under a disposition granted under the Public Lands Act or by an owner of private land or the owner s agent, (b) within the surface mineable area of the location of a scheme or operation approved by the Energy and Utilities Regulator under the Oil Sands Conservation Act, (c) at a site or location for which a licence to mine coal has been issued by the Energy and Utilities Regulator under the Coal Conservation Act, or (d) on public land within the location of a surface material lease or licence issued under the Public Lands Administration Regulation on which operations or work is being conducted under a detailed operating plan approved under that Regulation, unless that person is the holder of the agreement, licence, approval or lease or a person authorized by the holder. s3;187/2011;45/2014 Part 1 Permits Application for permits 4(1) A person may apply to the Minister for a permit. (2) The Minister may grant a permit to an applicant if the Minister receives from the applicant (a) an application in a form that is satisfactory to the Minister, and (b) the application fee prescribed in the Schedule to the Mines and Minerals Administration Regulation (AR 262/97). Rights conveyed by permit 5(1) Subject to subsection (2), a permit grants in accordance with the terms and conditions of the permit (a) the non-exclusive right to explore for metallic and industrial minerals on the surface of the location, 6

9 Section 6 TENURE REGULATION (b) the exclusive right to explore for metallic and industrial minerals in the subsurface strata within and under the location, and (c) the right to remove samples of metallic and industrial minerals from the location for the purposes of assaying and testing and of metallurgical, mineralogical and other scientific studies. (2) The Minister may (a) restrict the kind of metallic and industrial minerals in respect of which the right to explore is granted under a permit, and (b) limit the operations or activities that may be conducted under a permit to those operations or activities specified by the Minister in the permit. Term of permit 6(1) The term of a permit is 14 years from the term commencement date shown in the permit. (2) The term of a permit is divided into successive 2-year periods with the first period starting at the commencement of the permit. Area and boundaries of location 7(1) The area of the location of a permit must be not less than 16 hectares nor more than 9216 hectares. (2) The boundaries of the location of a permit must be acceptable to the Minister. (3) Subject to subsection (1), the Minister may reduce the area of a permit at any time during the term of the permit, if the permittee makes an application to the Minister indicating the area that is to be retained in the permit. Assessment work requirements 8(1) Subject to sections 25 and 26, a permittee must, with respect to the location of the permit, meet the following minimum spending requirements on assessment work on or attributed by this Regulation to the location during the following assessment work periods: (a) during the first assessment work period, not less in the aggregate than an amount equal to $5 for each hectare in the location; 7

10 Section 9 TENURE REGULATION (b) during the 2nd assessment work period, not less in the aggregate than an amount equal to $10 for each hectare in the location; (c) during the 3rd assessment work period, not less in the aggregate than an amount equal to $10 for each hectare in the location; (d) during the 4th assessment work period, not less in the aggregate than an amount equal to $15 for each hectare in the location; (e) during the 5th assessment work period, not less in the aggregate than an amount equal to $15 for each hectare in the location; (f) during the 6th assessment work period, not less in the aggregate than an amount equal to $15 for each hectare in the location; (g) during the 7th assessment work period, not less in the aggregate than an amount equal to $15 for each hectare in the location. (2) A permittee may claim as expenditures during any work period of a permit amounts that, in the opinion of the Minister, were spent in relation to assessment work on the location of the permit (a) during a previous assessment work period of that permit, or (b) during the one-year period prior to the term commencement date of that permit, if those amounts have not been claimed as expenditures in respect of any other work period of that permit or of any other permit. (3) The minimum spending requirement with respect to the locations of permits in a permit group is the sum of the minimum spending requirements calculated under subsection (1) or determined under section 26(3) for the work periods of the permits approved by the Minister under section 17(b)(ii). Mineral assessment appointee 9(1) A mineral assessment appointee is determined as follows: (a) the permittee is the mineral assessment appointee for that permit, unless otherwise specified by the permittee; 8

11 Section 10 TENURE REGULATION (b) the permittee may, by notifying the Minister, designate another person as the mineral assessment appointee in respect of the permit; (c) the permittees for the permits included in a permit group may, by notifying the Minister, designate one person to serve as the mineral assessment appointee for the permit group. (2) A mineral assessment appointee must, in respect of the permit or permit group for which it is the mineral assessment appointee pursuant to subsection (1), (a) fulfil all requirements related to a mineral assessment report and statement of intent to file in sections 10, 12, 17, 19(1), 20(1) and 26, and (b) submit to the Minister all applications required by sections 13, 15, 22, 23 and 25. (3) The authority of a mineral assessment appointee designated under subsection (1)(b) or (c) expires on the earlier of (a) the Minister receiving notification from the permittee or permittees that the authority is terminated, or (b) the Minister issuing final approval or final rejection of the mineral assessment report. Intent to file or mineral assessment report 10 The mineral assessment appointee must either (a) submit to the Minister a mineral assessment report that conforms with the requirements of sections 17, 19(1) and 20(1), within the period specified in section 12(2)(b), or (b) submit to the Minister a statement of intent to file a mineral assessment report in compliance with section 11. Statement of intent to file 11(1) A statement of intent to file may be submitted (a) during the 30 days before the end of the assessment work period in respect of which it is submitted, or (b) at any other time approved by the Minister in relation to a permit or any of the permits in a permit group. 9

12 Section 12 TENURE REGULATION (2) A statement of intent to file may be submitted in respect of a permit or in respect of a permit group. (3) A statement of intent to file must (a) contain a statement that a mineral assessment report will be filed within the period required by section 12(2)(a), (b) designate the group or project in respect of which the mineral assessment report will be filed, (c) contain for each permit in respect of which it is filed and (i) the number of the permit, (ii) the name of the designated representative for the permit, (iii) a legible map showing the location, boundaries and number of the permit, and (iv) an estimate of expenditures in respect of the permit during the assessment work period for which the mineral assessment report will be filed, (d) be signed by the mineral assessment appointee. (4) A statement of intent to file may also be accompanied by (a) surrender of a permit or a request to surrender a part of the location of a permit, (b) an application requesting payment in lieu pursuant to section 25(1), and (c) the designation of a mineral assessment appointee pursuant to section 9(1)(b) or (c) for the purpose of submitting a mineral assessment report in respect of a permit or a permit group. Submission of mineral assessment report 12(1) For the purpose of subsection (2) and sections 17, 26, 27(1) and 49, the last day of the assessment work period of the permit group is deemed to be the last day of the assessment work period for the permit with the earliest assessment work period end date in that permit group. (2) Subject to section 26(5), the following rules apply with respect to the submission periods for mineral assessment reports: 10

13 Section 13 TENURE REGULATION (a) a mineral assessment appointee who complies with section 10(b) must submit to the Minister a mineral assessment report not later than 60 days after the last day of the assessment work period of the permit or of the permit group, in respect of which the statement of intent to file was submitted; (b) if a mineral assessment appointee proceeds under section 10(a) or fails to comply with section 10(b), the mineral assessment appointee must submit to the Minister a mineral assessment report on or before the last day of the assessment work period of the permit or of the permit group, in respect of which the mineral assessment report is submitted. (3) A mineral assessment report may be submitted in respect of a permit or in respect of a permit group. Grouping of permits 13(1) The mineral assessment appointee for a permit may make an application requesting the grouping of the permit with one or more other permits (a) for the purpose of submitting one mineral assessment report to the Minister in respect of all of the permits in the permit group, and (b) for the purpose of attributing and allocating costs and expenditures on mineral exploration work performed on the location of any of the permits in the permit group to any other permit in the permit group. (2) A permit may not be included in more than one group at a time. (3) The location of permits within a permit group must be contiguous. (4) The Minister may approve an application for grouping of permits (a) if, in the opinion of the Minister, the work periods of the permits in the permit group are eligible for inclusion in the mineral assessment report, and (b) subject to subsections (2) and (3) and to any terms and conditions that the Minister may prescribe. 11

14 Section 14 TENURE REGULATION Timing of applying for a permit group 14 An application under section 13(1) may be made (a) as part of the statement of intent to file, pursuant to section 10(b), or (b) on, or at any time acceptable to the Minister before, the submission of a mineral assessment report. Amendment of permit group 15(1) The mineral assessment appointee for a permit group may make an application to amend the permit group on, or at any time acceptable to the Minister before, the submission of a mineral assessment report. (2) The Minister may amend a permit group in response to an application made under subsection (1). Group permit expiry 16 A permit group expires on the submission of a mineral assessment report for the group under section 12. Mineral assessment report specifications 17 A mineral assessment report is acceptable to the Minister if (a) it relates (i) to the location of a permit, or (ii) collectively to the location of permits in a permit group, (b) it relates (i) to the work period of a permit, or (ii) to the work periods of the permits in a permit group that should, in the opinion of the Minister, be reported on in that mineral assessment report, (c) it complies with the requirements for and contents of a mineral assessment report set forth in the Schedule, (d) it complies with the timelines for submitting a mineral assessment report under section 12(2) or 26(5), (e) geological, geochemical and geophysical surveys have been carried out under the supervision of a professional 12

15 Section 18 TENURE REGULATION engineer or professional geoscientist or by a prospector having qualifications acceptable to the Minister, and (f) all other matters respecting or contained in the mineral assessment report are satisfactory to the Minister. s17;170/2012 Unacceptable mineral assessment expenditures 18 The Minister may refuse to accept any expenditures on exploration or development work claimed in a mineral assessment report for the purpose of the minimum spending requirements of section 8 or 26(3) if (a) the work duplicates work previously submitted for credit against the expenditure requirements for the same agreement or another agreement, (b) the work duplicates results that have been previously published, (c) the mineral assessment report does not meet any of the requirements set forth in section 17, (d) the permittee fails to comply with any directions or instructions given by the Minister under section 48, or (e) for any other reason that the Minister considers that any of those expenditures should not be accepted. Mineral assessment report deficiencies 19(1) If, in the Minister s opinion, there are deficiencies in a mineral assessment report submitted under this Regulation, including, but not limited to, (a) non-compliance with the requirements of section 17, (b) failure to show adequate work for the work period of the permit or work periods of the permits to which the mineral assessment report relates, and (c) failure to show work that is adequate to support the statement of expenditures that is contained in the mineral assessment report, the Minister may require the mineral assessment appointee, within the time that the Minister considers appropriate in the circumstances, 13

16 Section 20 TENURE REGULATION (d) to furnish to the Minister a correction to or remedy of the deficiencies or non-compliances in the mineral assessment report, or (e) to submit to the Minister another mineral assessment report that corrects or remedies the deficiencies or non-compliances contained in the original mineral assessment report. (2) Sections 8(1) and (3) and 26(4) are considered not to have been complied with until the mineral assessment appointee complies with the Minister s requirements under subsection (1). Selection of permits and allocation of expenditures 20(1) A mineral assessment report submitted by a mineral assessment appointee under this Regulation (a) must indicate the permits and the parts of the locations of the permits that have been selected to be retained, and (b) may allocate and attribute expenditures on assessment work on the location of any permit in a permit group to the location of any other permit in the permit group. (2) Expenditures on assessment work on the location of any permit in a permit group may, for the purposes of sections 8 and 26, be applied only once against the minimum expenditures of the permits in the permit group. Retention of permits 21 A permittee may retain the permit if the total expenditures on assessment work on or attributed to the location of the permit that are approved by the Minister for the previous work period equal or exceed the minimum spending requirements calculated under section 8(1) or determined under section 26(3) for that previous work period. Application of excess spending requirements 22(1) This section applies if the total expenditures on assessment work for a work period of a permit or the work periods of permits in a permit group accepted by the Minister under this Part exceed the minimum spending requirement calculated under section 8(1) or determined under section 26(3) respectively for the work period of the permit or for the work periods of the permits in the permit group. (2) The Minister may, on application of the mineral assessment appointee, approve the application of expenditures in excess of the 14

17 Section 23 TENURE REGULATION minimum spending requirements against the minimum spending requirements of any subsequent work period of the permit or of any permit within the permit group. (3) If the mineral assessment appointee does not make an application under subsection (2) within a period of time specified by the Minister in an instruction to the mineral assessment appointee to make that application, the Minister may determine the application of expenditures in excess of the minimum spending requirements against the minimum spending requirements of any subsequent work period of the permit or of any permit within the permit group. Expenditures of less than minimum requirements 23(1) This section applies if the total expenditures on assessment work for a work period of a permit or the work periods of permits in a permit group accepted by the Minister under this Part including expenditures approved under section 22(2) for application to that work period or those work periods are less than the minimum spending requirements calculated under section 8(1) or (3) or determined under section 26(3) respectively for the work period of the permit or the work periods of the permits in the permit group. (2) The mineral assessment appointee may, on application to the Minister, retain that part of the area of the location of the permit or of the area of the locations of the permits in the permit group that is in the same proportion to the whole of that area as the expenditures on assessment work accepted by the Minister as described in subsection (1) for the work period or work periods are respectively to the minimum spending requirement or the minimum spending requirements for the work period or work periods to which they relate. (3) If the mineral assessment appointee does not make an application under subsection (2) within a period of time specified by the Minister in an instruction to the mineral assessment appointee to make the application, the Minister may determine in accordance with subsection (2) the part of the permit or permits that may be retained. (4) If the total expenditures for a work period of a permit as described in subsection (1) are less than the minimum spending requirement for that work period as described in subsection (1), the mineral assessment appointee may, with the approval of the Minister and on or before a date specified by the Minister, pay the difference determined by the Minister. (5) Payment of an amount in accordance with subsection (4) in respect of a work period, together with the total expenditures for the work period as described in subsection (1), is considered 15

18 Section 24 TENURE REGULATION fulfilment of the assessment work requirements for the work period. Area reduction 24 Notwithstanding sections 20, 21 and 23, the Minister may reduce the area of the location of a permit or of any of the permits in a permit group if the mineral assessment appointee for the permit or the permits in the permit group fails to comply with section 10, 12, 19 or 26(5). Payment in lieu of expenditure 25(1) On application to and with the approval of the Minister, the mineral assessment appointee for a permit may, once during the life of the permit, pay (a) the minimum amount determined by the Minister for a work period pursuant to section 8(1) or 26(3), or (b) an amount equal to the difference between that minimum amount and a lesser amount stated in the application and approved by the Minister, in lieu of spending the amount during the period in accordance with section 8(1) or 26(4). (2) An application under subsection (1) must be received by the Minister before the end of the work period to which it relates. (3) If the Minister approves an application under this section, payment of an amount referred to in subsection (1)(a) or (b) is considered fulfilment of the assessment work requirements for the work period in respect of which the payment is made. Extension of work period 26(1) Subject to subsection (2), the Minister may (a) extend an assessment work period, (b) determine the duration of the extended work period, and (c) specify the remainder of the assessment work period that next follows the extended work period. (2) The Minister shall not extend an assessment work period unless the Minister receives an application for extension from the mineral assessment appointee for a permit or a permit group on or before the last day of the assessment work period in respect of which the application for extension is being made. 16

19 Section 27 TENURE REGULATION (3) The Minister may determine the minimum expenditures on assessment work with respect to the location of a permit for an extended work period. (4) Subject to section 25, a permittee must, through expenditures on assessment work on or attributed under this Regulation to, the location of the permit, meet the Minister s minimum spending requirement determined under subsection (3). (5) The following rules apply to the submission of mineral assessment reports in respect of extended work periods: (a) the Minister determines and specifies a date on or before which a mineral assessment report must be filed in respect of an extended work period; (b) the mineral assessment appointee for a permit or a permit group must submit a mineral assessment report on or before the date determined and specified by the Minister under clause (a). Confidentiality of assessment work report 27(1) The Minister must keep confidential all technical information and data contained in a mineral assessment report (a) submitted in respect of a permit, for a period of one year after the last day of the assessment work period, or (b) submitted in respect of permits in a permit group, for a period of one year after the last day of the assessment work period of the permit group, in respect of which the mineral assessment report is submitted. (2) The Minister must, at the end of the confidentiality period referred to in subsection (1)(a) or (b), make the technical information and data available to the public. (3) The Minister, in making the technical information and data available under subsection (2), may recover only the costs, including overhead, associated with its copying or reproduction. Definitions 28 In this Part, Part 2 Licences Recreational Placer Mining 17

20 Section 29 TENURE REGULATION (a) Class A water body, Class B water body, Class C water body and Class D water body mean a water body class established and defined under the Code of Practice for Pipelines and Telecommunication Lines Crossing a Water Body adopted by the Water (Ministerial) Regulation (AR 205/98); (b) unclassified water body means a water body for which no class has been specified under the Code of Practice for Pipelines and Telecommunication Lines Crossing a Water Body adopted by the Water (Ministerial) Regulation (AR 205/98); (c) water body means water body as defined in the Code of Practice for Pipelines and Telecommunication Lines Crossing a Water Body adopted by the Water (Ministerial) Regulation (AR 205/98). Restriction on placer mining 29 No person shall conduct placer mining unless the person holds a lease, a licence or a secondary mineral lease. Application for licence 30(1) An individual may apply to the Minister for a licence. (2) The Minister may grant a licence to an applicant if the Minister receives from the applicant (a) an application in a form that is satisfactory to the Minister, and (b) the application fee prescribed in the Schedule to the Mines and Minerals Administration Regulation (AR 262/97). Rights conveyed by licence 31 Subject to sections 33 to 36, a licence grants in accordance with the terms and conditions of the licence the right to win, work and recover metallic and industrial minerals in and through placer mining. Terms of licence 32 The term of a licence is 5 years from the term commencement date shown in the licence. 18

21 Section 33 TENURE REGULATION Prohibitions re placer mining 33 No person shall, in the conduct of placer mining under a licence, (a) permit water to flow through the pump to the sluicebox or other equipment at a rate greater than 11 litres per second, (b) use a mesh of greater than 2.54 millimetres on the screening of the water intake to the sluicebox or other equipment, (c) use a suction dredge, front end loader or other mechanical method to move clay, marl, sand, gravel or topsoil into the sluicebox or other equipment, (d) occupy a site or location for a period of more than 14 consecutive days, (e) use mercury in or within 100 metres of a river, stream or watercourse or other body of water, or (f) discharge water into a river, stream or watercourse if the suspended sediment content of the discharge water exceeds the suspended sediment content of the water in the river, stream or watercourse. Prohibited location 34(1) No licensee shall conduct placer mining within the location of a lease without the consent of the lessee or of a person authorized by the lessee to give that consent. (2) No licensee shall conduct placer mining where operations for the recovery or processing of a surface material are being conducted pursuant to a surface material licence or a surface material lease without the consent of the licensee or lessee or of a person authorized by the licensee or lessee to give that consent. Operations re Class C and Class D water bodies 35(1) Subject to subsection (2) and to sections 33 and 34, a licensee may conduct placer mining at any time of the year within or adjacent to the active channel of the flowing water of a Class C water body, a Class D water body or an unclassified water body. 19

22 Section 36 TENURE REGULATION (2) No licensee shall excavate material within the active channel of the flowing water of a Class C water body, a Class D water body or an unclassified water body where the width of the active channel is less than 20 metres, unless the licensee has the written consent of the Minister of Environment and Sustainable Resource Development. s35;170/2012 Operations re Class A and Class B water bodies 36(1) Subject to subsections (2) and (3) and to sections 33 and 34, a licensee may conduct placer mining with respect to a Class A water body or a Class B water body from May 15 to September 15. (2) No licensee shall excavate material within the active channel of the flowing water of a Class A water body or a Class B water body. (3) No licensee shall conduct placer mining within or adjacent to the active channel of the flowing water of a Class A water body or a Class B water body where the width of the active channel of the flowing water is less than 20 metres, unless the licensee has the written consent of the Minister of Environment and Sustainable Resource Development. s36;170/2012 Part 3 Leases Issue of leases 37 The Minister may issue a lease (a) to a person who applies for the lease, if the Minister considers the granting of the lease to be warranted in the circumstances, (b) to a permittee who or (i) has complied with the requirements of Part 1, (ii) has held the permit for at least the 2-year period referred to in section 8(1)(a), and (iii) applies, at any time before the permit expires, for a lease in respect of all or part of the location described in the permit, (c) in any other manner provided for pursuant to section 16 of the Act. 20

23 Section 38 TENURE REGULATION Application for lease 38 The Minister may grant a lease to an applicant if the Minister receives from the applicant (a) an application in a form that is satisfactory to the Minister, (b) the application fee prescribed in the Schedule to the Mines and Minerals Administration Regulation (AR 262/97), (c) the rent for the first year of the term of the lease, and (d) evidence, satisfactory to the Minister, of a metallic and industrial mineral deposit in the location of the lease for which application is being made. Rights conveyed by lease 39(1) Subject to subsection (2) and section 50, a lease conveys the exclusive right to win, work and recover metallic and industrial minerals that are the property of the Crown (a) within the location, or (b) if the lease relates to one or more specified zones, in the specified zone or zones within the location, in accordance with the terms and conditions of the lease. (2) The Minister may (a) restrict the kinds of metallic and industrial minerals in respect of which rights are granted under a lease, and (b) limit the operations or activities that may be conducted under a lease to those operations or activities specified by the Minister in the lease. Area and boundaries of location 40 The boundaries and configuration of the location of a lease must be acceptable to the Minister, but the area of the location of a lease shall be not more than 2304 hectares. Term of lease 41(1) The term of a lease is 15 years computed from the term commencement date shown in the lease. (2) The Minister may renew a lease for a term of 15 years if the lessee applies for the renewal of the lease before the end of its 21

24 Section 42 TENURE REGULATION term, and if, during the term of the lease, the lessee has complied with this Part and the terms and conditions of the lease, and (a) has, in the opinion of the Minister, produced from the location in commercial quantity and on a sufficiently continuous basis a metallic and industrial mineral to which rights are granted by the lease, or (b) has submitted to the Minister a plan satisfactory to the Minister for the development of the minerals to which rights are granted by the lease. (3) The renewal of a lease under subsection (2) (a) may be as to a portion of its location or as to portions of its location or as to a zone or zones within the location determined by the Minister, and (b) is subject to any terms and conditions that the Minister prescribes at the time the renewal is granted. Notice respecting production or development 42(1) The Minister may, on application for a lease, on application for renewal of a lease or at any time during the term of a lease, require the prospective lessee or the lessee to submit to the Minister (a) a plan for the development in the location of the lease or of the proposed lease of a metallic and industrial mineral in respect of which rights are granted under the lease or are applied for under the proposed lease, or (b) documents or other materials that, in the opinion of the Minister, indicate an intent to develop in the foreseeable future in the location of the lease or of the proposed lease a metallic and industrial mineral in respect of which rights are granted under the lease or are applied for under the proposed lease. (2) If the Minister approves the plan of development or other documents and materials submitted under subsection (1), (a) the lessee must comply with it or them, or (b) the lessee must provide an explanation satisfactory to the Minister for not complying. 22

25 Section 43 TENURE REGULATION Interpretation 43 In this Part, Part 4 Secondary Mineral Leases Commercial Mining as a Secondary Activity (a) approved surface operation means an operation for the recovery and processing of surface materials, and the equipment, plant and facilities used or involved in that operation, for which all licences, approvals, permits or consents required, pursuant to the law of Alberta, have been obtained and are in force and effect; (b) secondary recovery operation means an operation for the winning, working and recovering, from surface materials recovered and processed through an approved surface operation, of metallic and industrial minerals that are contained in those surface materials; (c) surface materials means sand, gravel, clay, marl, topsoil, silt or peat. Application for secondary mineral lease 44(1) A person may apply to the Minister for a secondary mineral lease. (2) The Minister may grant a secondary mineral lease to an applicant if the Minister receives from the applicant (a) an application in a form that is satisfactory to the Minister, (b) the application fee prescribed in the Schedule to the Mines and Minerals Administration Regulation (AR 262/97), and (c) written proof that the applicant holds all licences, approvals, permits and consents required to conduct the approved surface operation or is authorized by the person who holds those licences, approvals, permits and consents to conduct the secondary recovery operation. Rights conveyed by secondary mineral lease 45(1) Subject to subsection (2), a secondary mineral lease grants in accordance with the terms and conditions of that lease the right 23

26 Section 46 TENURE REGULATION to win, work and recover metallic and industrial minerals in and through a secondary recovery operation. (2) The Minister may restrict the kinds of metallic and industrial minerals in respect of which rights are granted under a secondary mineral lease pursuant to subsection (1). (3) The recovery of metallic and industrial minerals pursuant to a secondary mineral lease must be accomplished through what is, in the opinion of the Minister, an ore processing or wash plant operation located in Alberta. Location 46(1) The location of a secondary mineral lease consists of the area determined by the Minister to encompass a secondary recovery operation. (2) The Minister may change or amend the location of a secondary mineral lease accordingly as the area determined under subsection (1) changes. Term 47(1) The term of a secondary mineral lease is 5 years from the term commencement date shown in the lease. (2) The Minister may renew a secondary mineral lease for a term of 5 years if (a) the holder of that lease applies for its renewal before the end of its term and pays the renewal fee prescribed in the Schedule to the Mines and Minerals Administration Regulation (AR 262/97), (b) during the term of that lease, the holder has complied with its terms and conditions and this Part, and (c) at the time of the renewal, the holder of that lease continues to hold (i) the licences, approvals, permits and consents required to conduct the approved surface operation, or (ii) the authority from the person who holds those licences, approvals, permits and consents to conduct the secondary recovery operation. (3) The renewal of a secondary mineral lease under subsection (2) 24

27 Section 47.1 TENURE REGULATION (a) may be as to the whole or as to a portion of its location determined by the Minister, and (b) is subject to any terms and conditions that the Minister prescribes at the time the renewal is granted. Part 4.1 Subsurface Reservoir Leases Definitions 47.1 In this Part, (a) subsurface reservoir means (i) a subsurface cavern that was created as a result of operations for the recovery of a mineral belonging to the Crown, (ii) an underground formation consisting of a mineral belonging to the Crown that will be removed pursuant to the lease to create a subsurface cavern, or (iii) an underground formation in which all mines and minerals belong to the Crown; (b) subsurface reservoir lease means a lease issued under this Part; (c) subsurface reservoir zone in respect of a subsurface reservoir lease means the subsurface reservoir described in the lease, to the extent that the subsurface reservoir is found within the location of the lease. AR 174/2014 s2 Subsurface reservoir lease 47.2 A subsurface reservoir lease grants to the lessee, in accordance with the terms and conditions of the lease, one or both of the following: (a) the right to conduct operations to remove a mineral in the subsurface reservoir zone to create a subsurface cavern; (b) the right to use a subsurface reservoir in the subsurface reservoir zone under the lease for the purpose of storage or sequestration. AR 174/2014 s2 25

28 Section 47.3 TENURE REGULATION Application for reservoir lease 47.3(1) A person may apply to the Minister for a subsurface reservoir lease in the form and manner determined by the Minister. (2) An application must include (a) a geological description of the subsurface reservoir to be included in the lease that is satisfactory to the Minister, (b) a description of the fluid or substance to be stored or sequestered in the subsurface reservoir, and (c) any other information required by the Minister. AR 174/2014 s2 Issuance of subsurface reservoir lease 47.4 The Minister may issue a subsurface reservoir lease subject to any terms and conditions the Minister considers appropriate, including but not limited to terms or conditions respecting any of the following matters: (a) respecting term expiry, term renewal and cancellation; (b) limiting the operations or activities that may be conducted under the lease and the fluids or substances that may be stored or sequestered; (c) respecting the exclusivity or non-exclusivity of the lease; (d) requiring the payment of an annual rental for the subsurface reservoir lease and of amounts for the use of the subsurface reservoir such as an amount per injection well drilled or used in connection with the lease or an amount per cubic metre of fluid or substance injected into the subsurface reservoir. AR 174/2014 s2 Obligations under lease 47.5(1) The lessee of a subsurface reservoir lease shall obtain a well licence and approval of the Alberta Energy Regulator under the Oil and Gas Conservation Act before drilling or using a well for the purposes set out in the lease. (2) The lessee may not transfer a subsurface reservoir lease without the consent in writing of the Minister. 26

29 Section 48 TENURE REGULATION (3) For greater certainty, section 56(2) of the Act applies where a right under a subsurface reservoir lease is exercised under section 56(1)(a) of the Act. AR 174/2014 s2 Part 5 General Cores, cuttings requirements 48(1) The Minister may request or accept from a lessee, a permittee or a holder of a secondary mineral lease a representative portion of mineral core, cuttings or samples for the purpose of making it available for viewing and use by any member of the general public. (2) The representative portion requested by the Minister under subsection (1) shall not exceed 2% of the core sample, rock sample or drill cuttings obtained pursuant to a lease, permit or secondary mineral lease. (3) A lessee, a permittee and the holder of a secondary mineral lease must follow all directions or instructions given by the Minister with respect to (a) a mineral core, cuttings or samples, (b) the retrieval, selection, labelling, delivery, transportation and storage of core samples, rock samples or drill cuttings, and (c) the records to accompany samples and cuttings. (4) A lessee, a permittee or the holder of a secondary mineral lease to whom the directions and instructions referred to in subsection (3) have been given must bear the cost of complying with the directions and instructions. (5) The Minister, on application by a lessee, permittee or holder of a secondary mineral lease, may waive compliance with all or any directions or instructions referred to in subsection (3). Property of the Crown 49 All core samples, rock samples or drill cuttings received by the Department pursuant to section 48(3) and all records accompanying the samples and cuttings (a) are thereafter, subject to clause (b), the property of the Crown in right of Alberta, and 27

30 Section 50 TENURE REGULATION (b) must be kept confidential as follows: (i) subject to subclauses (ii) and (iii), for a period of one year after the last day of the assessment work period of a permit, as defined in section 12(1), during which they are delivered to the Department; (ii) if the Minister is of the opinion that subclause (i) is not appropriate in the circumstances, for a period of one year after the receipt by the Government of a final plan for an approved exploration program pursuant to the Metallic and Industrial Minerals Exploration Regulation (AR 213/98); (iii) if the Minister is of the opinion that subclauses (i) and (ii) are not appropriate in the circumstances, for a period of one year after a date established by the Minister. Order in Council for mining 50(1) The Lieutenant Governor in Council may by order authorize a lessee to mine, work or remove a metallic and industrial mineral in the location of the lessee s lease in commercial quantities subject to any terms or conditions that the Lieutenant Governor in Council prescribes. (2) Notwithstanding Parts 1 and 4 of this Regulation, (a) a permit holder shall not mine, work or remove a metallic and industrial mineral in the location of the permit in commercial quantities, and (b) a lessee shall not mine, work or remove a metallic and industrial mineral in the location of the lease in commercial quantities unless he is authorized to do so pursuant to an order under subsection (1). (3) Subsections (1) and (2) do not apply to the recovery or production of (a) a metallic and industrial mineral pursuant to a licence or a secondary mineral lease, (b) a metallic and industrial mineral that is the subject of quarrying operations for which a permit or licence is issued, or (c) a metallic and industrial mineral that is extracted in brine form. 28

31 Section 51 TENURE REGULATION Part 6 Repeal and Expiry Repeal 51 The Metallic and Industrial Minerals Regulation (AR 66/93) is repealed. Expiry 52 For the purpose of ensuring that this Regulation is reviewed for ongoing relevancy and necessity, with the option that it may be repassed in its present or an amended form following a review, this Regulation expires on June 30, s52;174/ In this Schedule, Schedule (Section 10) Mineral Assessment Report (a) Part A means Part A of the mineral assessment report consisting of all administrative documents accompanying the technical report that are required (i) to meet mineral assessment report filing requirements under sections 17 and 20 of this Regulation, (ii) to authorize the allocation or attribution of expenditures to the location of a permit, (iii) to authorize, if applicable, the surrender of a permit or of a part or parts of the location of a permit, and (iv) to support the submission of Part B and Part C of the mineral assessment report; (b) Part B means Part B of the mineral assessment report consisting of the technical report describing the assessment work, results, analyses and conclusions with respect to the location and work period of each permit to which the mineral assessment report relates; (c) Part C means Part C of the mineral assessment report consisting of any supporting or supplementary technical appendices to Part B, the content of which may include, but is not limited to, data, results and information 29

MINERAL RIGHTS COMPENSATION REGULATION

MINERAL RIGHTS COMPENSATION REGULATION Province of Alberta MINES AND MINERALS ACT MINERAL RIGHTS COMPENSATION REGULATION Alberta Regulation 317/2003 With amendments up to and including Alberta Regulation 55/2015 Office Consolidation Published

More information

METRIC CONVERSION REGULATION

METRIC CONVERSION REGULATION Province of Alberta LAND TITLES ACT METRIC CONVERSION REGULATION Alberta Regulation 22/2000 With amendments up to and including Alberta Regulation 213/2010 Office Consolidation Published by Alberta Queen

More information

METRIC CONVERSION REGULATION

METRIC CONVERSION REGULATION Province of Alberta LAND TITLES ACT METRIC CONVERSION REGULATION Alberta Regulation 22/2000 With amendments up to and including Alberta Regulation 213/2010 Office Consolidation Published by Alberta Queen

More information

LAND AGENTS LICENSING REGULATION

LAND AGENTS LICENSING REGULATION Province of Alberta LAND AGENTS LICENSING ACT LAND AGENTS LICENSING REGULATION Alberta Regulation 227/2001 With amendments up to and including Alberta Regulation 225/2017 Office Consolidation Published

More information

DISPOSITION OF PROPERTY REGULATION

DISPOSITION OF PROPERTY REGULATION Province of Alberta SCHOOL ACT DISPOSITION OF PROPERTY REGULATION Alberta Regulation 181/2010 With amendments up to and including Alberta Regulation 28/2018 Office Consolidation Published by Alberta Queen

More information

RENT SUPPLEMENT REGULATION

RENT SUPPLEMENT REGULATION Province of Alberta ALBERTA HOUSING ACT RENT SUPPLEMENT REGULATION Alberta Regulation 75/1995 With amendments up to and including Alberta Regulation 144/2017 Office Consolidation Published by Alberta Queen

More information

CONSERVATION EASEMENT REGISTRATION REGULATION

CONSERVATION EASEMENT REGISTRATION REGULATION Province of Alberta ALBERTA LAND STEWARDSHIP ACT CONSERVATION EASEMENT REGISTRATION REGULATION Alberta Regulation 129/2010 With amendments up to and including Alberta Regulation 67/2015 Office Consolidation

More information

HOME INSPECTION BUSINESS REGULATION

HOME INSPECTION BUSINESS REGULATION Province of Alberta CONSUMER PROTECTION ACT HOME INSPECTION BUSINESS REGULATION Alberta Regulation 75/2011 With amendments up to and including Alberta Regulation 157/2017 Office Consolidation Published

More information

PLANNING EXEMPTION REGULATION

PLANNING EXEMPTION REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT PLANNING EXEMPTION REGULATION Alberta Regulation 223/2000 With amendments up to and including Alberta Regulation 184/2017 Office Consolidation Published by

More information

HOUSING ACCOMMODATION TENANCIES REGULATION

HOUSING ACCOMMODATION TENANCIES REGULATION Province of Alberta ALBERTA HOUSING ACT HOUSING ACCOMMODATION TENANCIES REGULATION Alberta Regulation 242/1994 With amendments up to and including Alberta Regulation 142/2017 Office Consolidation Published

More information

Province of Alberta PUBLIC HEALTH ACT HOUSING REGULATION. Alberta Regulation 173/1999. With amendments up to and including Alberta Regulation 38/2018

Province of Alberta PUBLIC HEALTH ACT HOUSING REGULATION. Alberta Regulation 173/1999. With amendments up to and including Alberta Regulation 38/2018 Province of Alberta PUBLIC HEALTH ACT HOUSING REGULATION Alberta Regulation 173/1999 With amendments up to and including Alberta Regulation 38/2018 Office Consolidation Published by Alberta Queen s Printer

More information

CONDOMINIUM PROPERTY REGULATION

CONDOMINIUM PROPERTY REGULATION Province of Alberta CONDOMINIUM PROPERTY ACT CONDOMINIUM PROPERTY REGULATION Alberta Regulation 168/2000 With amendments up to and including Alberta Regulation 151/2006 Office Consolidation Published by

More information

CANMORE UNDERMINING REVIEW REGULATION

CANMORE UNDERMINING REVIEW REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT CANMORE UNDERMINING REVIEW REGULATION Alberta Regulation 114/1997 With amendments up to and including Alberta Regulation 170/2012 Office Consolidation Published

More information

METIS SETTLEMENTS SUBDIVISION REGULATION

METIS SETTLEMENTS SUBDIVISION REGULATION Province of Alberta METIS SETTLEMENTS ACT METIS SETTLEMENTS SUBDIVISION REGULATION Alberta Regulation 363/1991 With amendments up to and including Alberta Regulation 58/2004 Office Consolidation Published

More information

The Crown Resource Land Regulations

The Crown Resource Land Regulations CROWN RESOURCE LAND P-31 REG 17 1 The Crown Resource Land Regulations Repealed by Chapter P-31.1 Reg 2 (effective March 13, 2017). Formerly Chapter P-31 Reg 17 (effective May 19, 2004) as amended by Saskatchewan

More information

The Subsurface Mineral Regulations, 1960

The Subsurface Mineral Regulations, 1960 1 The Subsurface Mineral Regulations, 1960 being Saskatchewan Regulations 541/67 (effective September 6, 1960) as amended by Saskatchewan Regulations 558/64, 536/67, 8/68, 167/70, 94/75, 271/86, 45/87,

More information

CAPITAL REGION SOUTHWEST WATER SERVICES COMMISSION REGULATION

CAPITAL REGION SOUTHWEST WATER SERVICES COMMISSION REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT CAPITAL REGION SOUTHWEST WATER SERVICES COMMISSION REGULATION Alberta Regulation 292/1984 With amendments up to and including Alberta Regulation 141/2016 Office

More information

The Subsurface Mineral Regulations, 1960

The Subsurface Mineral Regulations, 1960 Consolidated to September 7, 2011 1 The Subsurface Mineral Regulations, 1960 being Saskatchewan Regulations 541/67 (effective September 6, 1960) as amended by Saskatchewan Regulations 558/64, 536/67, 8/68,

More information

METIS SETTLEMENTS LAND PROTECTION ACT

METIS SETTLEMENTS LAND PROTECTION ACT Province of Alberta METIS SETTLEMENTS LAND PROTECTION ACT Revised Statutes of Alberta 2000 Current as of January 1, 2002 Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park Plaza

More information

BIG COUNTRY WASTE MANAGEMENT SERVICES COMMISSION REGULATION

BIG COUNTRY WASTE MANAGEMENT SERVICES COMMISSION REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT BIG COUNTRY WASTE MANAGEMENT SERVICES COMMISSION REGULATION Alberta Regulation 142/1986 With amendments up to and including Alberta Regulation 110/2007 Office

More information

Mining Act, Claims and Leases/ Aggregate Permits. Lands & Waters Aggregate & Petroleum Resources March 15, 2006

Mining Act, Claims and Leases/ Aggregate Permits. Lands & Waters Aggregate & Petroleum Resources March 15, 2006 Subject: Policy No.: New: Ministry of Natural Resources Ministère des Richesses naturelles, Claims and Leases/ s A.R. 5.00.06 Yes Compiled by Branch: Section: Date Issued: Lands & Waters & Petroleum Resources

More information

Province of Alberta LAND TITLES ACT FORMS REGULATION. Alberta Regulation 480/1981. With amendments up to and including Alberta Regulation 170/2012

Province of Alberta LAND TITLES ACT FORMS REGULATION. Alberta Regulation 480/1981. With amendments up to and including Alberta Regulation 170/2012 Province of Alberta LAND TITLES ACT FORMS REGULATION Alberta Regulation 480/1981 With amendments up to and including Alberta Regulation 170/2012 Office Consolidation Published by Alberta Queen s Printer

More information

ALBERTA OIL SANDS TENURE GUIDELINES Augus t 14, Two types of oil sands agreements are issued under the Oil Sands Tenure Regulation:

ALBERTA OIL SANDS TENURE GUIDELINES Augus t 14, Two types of oil sands agreements are issued under the Oil Sands Tenure Regulation: Agreement Types Two types of oil sands agreements are issued under the Oil Sands Tenure Regulation: permits, which can be converted to leases, and primary leases, which can be continued The regulation

More information

SPECIAL AREAS DISPOSITION REGULATION

SPECIAL AREAS DISPOSITION REGULATION Province of Alberta SPECIAL AREAS ACT SPECIAL AREAS DISPOSITION REGULATION Alberta Regulation 137/2001 With amendments up to and including Alberta Regulation 179/2014 Office Consolidation Published by

More information

SUBDIVISION AND DEVELOPMENT REGULATION

SUBDIVISION AND DEVELOPMENT REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT SUBDIVISION AND DEVELOPMENT REGULATION Alberta Regulation 43/2002 With amendments up to and including Alberta Regulation 188/2017 Office Consolidation Published

More information

PUBLIC LANDS ADMINISTRATION REGULATION

PUBLIC LANDS ADMINISTRATION REGULATION Province of Alberta PUBLIC LANDS ACT PUBLIC LANDS ADMINISTRATION REGULATION Alberta Regulation 187/2011 With amendments up to and including Alberta Regulation 57/2017 Office Consolidation Published by

More information

The Parties own Royalty Interests and Working Interests, or either of them, in the Production Allocation Substances;

The Parties own Royalty Interests and Working Interests, or either of them, in the Production Allocation Substances; WHEREAS PRODUCTION ALLOCATION UNIT AGREEMENT (DEVIATED/SLANT WELL) [Name of Agreement] Commented [CB1]: A PAUA benefits the freehold and Crown royalty interest and Working Interest Owners that join it

More information

The Provincial Lands (Agriculture) Regulations

The Provincial Lands (Agriculture) Regulations PROVINCIAL LANDS (AGRICULTURE) P-31.1 REG 1 1 The Provincial Lands (Agriculture) Regulations being Chapter P-31.1 Reg 1 (effective March 13, 2017) as amended by Saskatchewan Regulations 136/2017. NOTE:

More information

The Parties own Royalty Interests and Working Interests, or either of them, in the Production Allocation Substances;

The Parties own Royalty Interests and Working Interests, or either of them, in the Production Allocation Substances; WHEREAS PRODUCTION ALLOCATION UNIT AGREEMENT (HORIZONTAL WELL) [Name of Agreement] Commented [CB1]: A PAUA benefits the freehold and Crown royalty interest and Working Interest Owners that join it by allowing

More information

The Helium and Associated Gases Regulations, 1964

The Helium and Associated Gases Regulations, 1964 1 The Helium and Associated Gases Regulations, 1964 being Saskatchewan Regulations 559/64 (effective November 6, 1964) as amended by Saskatchewan Regulations 50/87, 73/92 and 81/94; and by the Statutes

More information

Province of Alberta FACTORS ACT. Revised Statutes of Alberta 2000 Chapter F-1. Current as of January 1, Published by Alberta Queen s Printer

Province of Alberta FACTORS ACT. Revised Statutes of Alberta 2000 Chapter F-1. Current as of January 1, Published by Alberta Queen s Printer Province of Alberta FACTORS ACT Revised Statutes of Alberta 2000 Current as of January 1, 2002 Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park Plaza 10611-98 Avenue Edmonton,

More information

Notice of Coming into Force

Notice of Coming into Force Regulation to amend the Regulation respecting mineral substances, other than petroleum, natural gas and brine will come into force on December 31, 2015 Notice of Coming into Force The Regulation to amend

More information

CONDOMINIUM PROPERTY ACT

CONDOMINIUM PROPERTY ACT Province of Alberta CONDOMINIUM PROPERTY ACT Revised Statutes of Alberta 2000 Current as of January 1, 2018 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700,

More information

Province of Alberta PERPETUITIES ACT. Revised Statutes of Alberta 2000 Chapter P-5. Current as of December 11, Office Consolidation

Province of Alberta PERPETUITIES ACT. Revised Statutes of Alberta 2000 Chapter P-5. Current as of December 11, Office Consolidation Province of Alberta PERPETUITIES ACT Revised Statutes of Alberta 2000 Current as of December 11, 2015 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park

More information

MAGRATH AND DISTRICT REGIONAL WATER SERVICES COMMISSION REGULATION

MAGRATH AND DISTRICT REGIONAL WATER SERVICES COMMISSION REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT MAGRATH AND DISTRICT REGIONAL WATER SERVICES COMMISSION REGULATION Alberta Regulation 171/2012 With amendments up to and including Alberta Regulation 162/2013

More information

FORM F1 TECHNICAL REPORT TABLE OF CONTENTS

FORM F1 TECHNICAL REPORT TABLE OF CONTENTS FORM 43-101F1 TECHNICAL REPORT TABLE OF CONTENTS TITLE CONTENTS OF THE TECHNICAL REPORT Item 1: Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Item 11 Item 12 Item 13 Item 14 Item 15 Item

More information

SOIL DEPOSIT BYLAW

SOIL DEPOSIT BYLAW SOIL DEPOSIT BYLAW 5506-2015 THE FOLLOWING DOCUMENT HAS BEEN REPRODUCED FOR CONVENIENCE ONLY and is a consolidation of "District of Mission Soil Deposit with the following amending bylaws: Bylaw Number

More information

UNLOCKING OUR POTENTIAL ACQUIRING MINERAL RIGHTS

UNLOCKING OUR POTENTIAL ACQUIRING MINERAL RIGHTS UNLOCKING OUR POTENTIAL ACQUIRING MINERAL RIGHTS IN THE NORTHWEST TERRITORIES ITI Mining Rights 180611 (ENG).indd 1 May 2018 II ITI Mining Rights 180611 (ENG).indd 2 Introduction Establishing and maintaining

More information

MOBILE HOME SITES TENANCIES ACT

MOBILE HOME SITES TENANCIES ACT Province of Alberta MOBILE HOME SITES TENANCIES ACT Revised Statutes of Alberta 2000 Chapter M-20 Current as of June 13, 2016 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer

More information

OIL SANDS LEASE NO. Term Commencement Date: Lessee:

OIL SANDS LEASE NO. Term Commencement Date: Lessee: OIL SANDS LEASE NO. Term Commencement Date: Lessee: - 2 - WHEREAS Her Majesty is the owner of the minerals in respect of which rights are granted under this Lease; THEREFORE, subject to the terms and conditions

More information

EDMONTON INTERNATIONAL AIRPORT VICINITY PROTECTION AREA REGULATION

EDMONTON INTERNATIONAL AIRPORT VICINITY PROTECTION AREA REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT EDMONTON INTERNATIONAL AIRPORT VICINITY PROTECTION AREA REGULATION Alberta Regulation 55/2006 With amendments up to and including Alberta Regulation 185/2017

More information

UNLOCKING OUR POTENTIAL ACQUIRING MINERAL RIGHTS

UNLOCKING OUR POTENTIAL ACQUIRING MINERAL RIGHTS UNLOCKING OUR POTENTIAL ACQUIRING MINERAL RIGHTS IN THE NORTHWEST TERRITORIES II JULY 2016 Introduction Establishing and maintaining strong working relationships between the mineral industry and Northwest

More information

CONDOMINIUM PROPERTY ACT

CONDOMINIUM PROPERTY ACT Province of Alberta CONDOMINIUM PROPERTY ACT Revised Statutes of Alberta 2000 Current as of March 15, 2012 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer 5 th Floor,

More information

Senate Bill 644 Ordered by the Senate July 4 Including Senate Amendments dated June 29 and July 4

Senate Bill 644 Ordered by the Senate July 4 Including Senate Amendments dated June 29 and July 4 th OREGON LEGISLATIVE ASSEMBLY--0 Regular Session Sponsored by Senator GIROD B-Engrossed Senate Bill Ordered by the Senate July Including Senate Amendments dated June and July SUMMARY The following summary

More information

The Helium and Associated Gases Regulations, 1964

The Helium and Associated Gases Regulations, 1964 1 The Helium and Associated Gases Regulations, 1964 Repealed by Chapter C-50.2 Reg 31 (effective October 27, 2016). Formerly Saskatchewan Regulations 559/64 (effective November 6, 1964) as amended by Saskatchewan

More information

RESIDENTIAL TENANCIES ACT

RESIDENTIAL TENANCIES ACT Province of Alberta Statutes of Alberta, Current as of December 15, 2017 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park Plaza 10611-98 Avenue Edmonton,

More information

LEASING OF POTASSIUM, SULPHUR, SODIUM, PHOSPHORUS, AND SIMILAR MINERALS, AND THEIR SALTS AND COMPOUNDS EXCEPT SODIUM CHLORIDE

LEASING OF POTASSIUM, SULPHUR, SODIUM, PHOSPHORUS, AND SIMILAR MINERALS, AND THEIR SALTS AND COMPOUNDS EXCEPT SODIUM CHLORIDE TITLE 19 CHAPTER 2 PART 3 NATURAL RESOURCES AND WILDLIFE STATE TRUST LANDS LEASING OF POTASSIUM, SULPHUR, SODIUM, PHOSPHORUS, AND SIMILAR MINERALS, AND THEIR SALTS AND COMPOUNDS EXCEPT SODIUM CHLORIDE

More information

HOUSE BILL lr3434 A BILL ENTITLED. Department of the Environment Licensing and Permitting Prohibited for Mountaintop Removal Coal Mining

HOUSE BILL lr3434 A BILL ENTITLED. Department of the Environment Licensing and Permitting Prohibited for Mountaintop Removal Coal Mining M HOUSE BILL lr By: Delegate Hucker Introduced and read first time: March, 00 Assigned to: Rules and Executive Nominations A BILL ENTITLED 0 0 AN ACT concerning Department of the Environment Licensing

More information

METIS SETTLEMENTS LAND REGISTRY REGULATION

METIS SETTLEMENTS LAND REGISTRY REGULATION Province of Alberta METIS SETTLEMENTS ACT METIS SETTLEMENTS LAND REGISTRY REGULATION Alberta Regulation 361/1991 With amendments up to and including Alberta Regulation 45/2014 Office Consolidation Published

More information

LAW OF MONGOLIA ON MINERALS (REVISED) July 8, CHAPTER ONE General provisions

LAW OF MONGOLIA ON MINERALS (REVISED) July 8, CHAPTER ONE General provisions LAW OF MONGOLIA ON MINERALS (REVISED) State Palace. Ulaanbaatar city July 8, 2006 CHAPTER ONE General provisions Article 1. Purpose of the Law 1.1. The purpose of this Law is to regulate the relations

More information

The Corporation of the Township of Springwater. By-Law

The Corporation of the Township of Springwater. By-Law The Corporation of the Township of Springwater By-Law 2007 053 Being a by-law to prohibit or regulate the removal, placing or dumping of fill or the alteration of the grade of land. (Cut and Fill Regulation

More information

VULCAN DISTRICT WASTE COMMISSION REGULATION

VULCAN DISTRICT WASTE COMMISSION REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT VULCAN DISTRICT WASTE COMMISSION REGULATION Alberta Regulation 106/2004 Extract Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park

More information

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to May 13, 2016. It is intended for information and reference purposes only. This

More information

1. Introduction. 1. Formal Disposition 2. Authorization 3. Approval. ESRD, Public Land Management, 2014, No.2. Effective Date: January 30, 2014

1. Introduction. 1. Formal Disposition 2. Authorization 3. Approval. ESRD, Public Land Management, 2014, No.2. Effective Date: January 30, 2014 Title: Number: Program Name: ESRD, Public Land Management, 2014, No.2 Public Land Management Effective Date: January 30, 2014 This document was updated on: 1. Introduction 1.1 Purpose Environment and Sustainable

More information

PROVINCIAL SUBDIVISION REGULATIONS. Municipal Government Act

PROVINCIAL SUBDIVISION REGULATIONS. Municipal Government Act PROVINCIAL SUBDIVISION REGULATIONS Made under Section 270 of the Municipal Government Act Chapter 18 of the Statutes of Nova Scotia, 1998 Service Nova Scotia and Municipal Relations April 1, 1999 (with

More information

The Drainage Control Regulations

The Drainage Control Regulations 1 The Drainage Control Regulations Repealed by Saskatchewan Regulations 89/2015 (effective October 16, 2015) Formerly Chapter D-33.1 Reg 1 (effective August 18, 1981) as amended by Saskatchewan Regulations

More information

Listed below are some of the important pieces of legislation that govern mining operations.

Listed below are some of the important pieces of legislation that govern mining operations. Mining Law Zimbabwe Listed below are some of the important pieces of legislation that govern mining operations. Anyone involved in mining in Zimbabwe should be familiar with the provisions of these pieces

More information

Ministry of Energy, Mines and Petroleum Resources. Guide to BC Petroleum and Natural Gas Act Lease Continuations

Ministry of Energy, Mines and Petroleum Resources. Guide to BC Petroleum and Natural Gas Act Lease Continuations Ministry of Energy, Mines and Petroleum Resources Guide to BC Petroleum and Natural Gas Act Lease Continuations Approved by: Inés Piccinino Assistant Deputy Minister Upstream Development Division August

More information

MUNICIPALITY OF THE DISTRICT OF CLARE SUBDIVISION BY-LAW

MUNICIPALITY OF THE DISTRICT OF CLARE SUBDIVISION BY-LAW MUNICIPALITY OF THE DISTRICT OF CLARE SUBDIVISION BY-LAW 1 Table of Contents PART 1 - TITLE... 4 PART 2 - INTERPRETATION... 4 PART 3 - DEFINITIONS... 4 PART 4 - PROCEDURE FOR APPROVAL OF PLANS OR INSTRUMENTS

More information

(Consolidated up to 354/2003) ALBERTA REGULATION 168/2000. Condominium Property Act CONDOMINIUM PROPERTY REGULATION

(Consolidated up to 354/2003) ALBERTA REGULATION 168/2000. Condominium Property Act CONDOMINIUM PROPERTY REGULATION (Consolidated up to 354/2003) ALBERTA REGULATION 168/2000 Condominium Property Act CONDOMINIUM PROPERTY REGULATION Table of Contents Interpretation 1 Part 1 Registration of Condominium Plans and other

More information

Site Alteration By-law

Site Alteration By-law Site Alteration By-law C.P.-1363-381 Consolidated October 17, 2017 As Amended by: By-law No. Date Passed at Council C.P.-1363(a)-29 January 15, 2001 C.P.-1363(b)-53 February 5, 2001 C.P.-1363(c)-13 December

More information

LEGISLATIVE COUNSEL'S DIGEST

LEGISLATIVE COUNSEL'S DIGEST Senate Bill No. 209 CHAPTER 8 An act to amend Sections 607, 2207, and 2714 of, and to add Sections 2006.5, 2770.1, and 2773.1.5 to, the Public Resources Code, relating to surface mining. [ Approved by

More information

The Homesteads Act, 1989

The Homesteads Act, 1989 1 HOMESTEADS, 1989 c. H-5.1 The Homesteads Act, 1989 being Chapter H-5.1 of the Statutes of Saskatchewan, 1989-90 (effective December 1, 1989) as amended by the Statutes of Saskatchewan, 1992, c.27; 1993,

More information

Subdivision By-law No. 5208

Subdivision By-law No. 5208 No. 5208 Being a By-law to Control the Subdivision of Land THE COUNCIL OF THE CITY OF VANCOUVER in open meeting assembled, enacts as follows: 1 Short Title 1.1 This By-law may be cited as the. 2 Definitions

More information

DISCUSSION PAPER ON THE TENURE PROVISIONS OF THE PETROLEUM AND NATURAL GAS ACT AND REGULATIONS

DISCUSSION PAPER ON THE TENURE PROVISIONS OF THE PETROLEUM AND NATURAL GAS ACT AND REGULATIONS DISCUSSION PAPER ON THE TENURE PROVISIONS OF THE PETROLEUM AND NATURAL GAS ACT AND REGULATIONS September 15, 2011 To whom it may concern: Re: Discussion Paper on the Tenure Provisions of the Petroleum

More information

CHAPTERS 35 to 37 Reserved CHAPTER 38 PRIVATE WATER WELL CONSTRUCTION PERMITS

CHAPTERS 35 to 37 Reserved CHAPTER 38 PRIVATE WATER WELL CONSTRUCTION PERMITS , 8/18/04 Ch 38, p.1 TITLE III WITHDRAWAL, DIVERSION, STORAGE AND USE OF WATER DIVISION A WATER WELL CONSTRUCTION: GENERAL STANDARDS AND REGISTRATION OF CONTRACTORS CHAPTERS 35 to 37 Reserved, 8/18/04

More information

The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L AUTORITÉ DE L IMPRIMEUR DE LA REINE

The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L AUTORITÉ DE L IMPRIMEUR DE LA REINE THE SASKATCHEWAN GAZETTE, 17 MARS 2017 121 The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L AUTORITÉ DE L IMPRIMEUR DE LA REINE PART II/PARTIE

More information

The Reclamation Act. being. Chapter 246 of The Revised Statutes of Saskatchewan, 1940 (effective February 1, 1941).

The Reclamation Act. being. Chapter 246 of The Revised Statutes of Saskatchewan, 1940 (effective February 1, 1941). The Reclamation Act being Chapter 246 of The Revised Statutes of Saskatchewan, 1940 (effective February 1, 1941). NOTE: This consolidation is not official. Amendments have been incorporated for convenience

More information

FOR DISCUSSION PURPOSES ONLY

FOR DISCUSSION PURPOSES ONLY Condominium Property Act CONDOMINIUM PROPERTY AMENDMENT REGULATION 1 The Condominium Property Regulation (AR 168/2000) is amended by this Regulation. 2 Section 1 is amended (a) in subsection (1) by adding

More information

This Act has "Not in Force" sections. See the Table of Legislative Changes.

This Act has Not in Force sections. See the Table of Legislative Changes. This Act is current to 30 November 2016. This Act has "Not in Force" sections. See the Table of Legislative Changes. LAND ACT [RSBC 1996] CHAPTER 245 Contents 1 Definitions 1.1 Exclusions from Crown land

More information

The Reclamation Act. being. Chapter 203 of The Revised Statutes of Saskatchewan, 1930 (effective February 1, 1931).

The Reclamation Act. being. Chapter 203 of The Revised Statutes of Saskatchewan, 1930 (effective February 1, 1931). The Reclamation Act being Chapter 203 of The Revised Statutes of Saskatchewan, 1930 (effective February 1, 1931). NOTE: This consolidation is not official. Amendments have been incorporated for convenience

More information

CONTRACT ON SUBSURFACE USE No PV-245 FOR THE PURPOSE OF MINERAL EXTRACTION. Yerevan 26 September, 2012

CONTRACT ON SUBSURFACE USE No PV-245 FOR THE PURPOSE OF MINERAL EXTRACTION. Yerevan 26 September, 2012 CONTRACT ON SUBSURFACE USE No PV-245 FOR THE PURPOSE OF MINERAL EXTRACTION Yerevan 26 September, 2012 This contract on subsurface use (hereinafter referred to as Contract ) is made between the Ministry

More information

SOIL TRANSPORT, DEPOSIT, AND REMOVAL REGULATION (2011)

SOIL TRANSPORT, DEPOSIT, AND REMOVAL REGULATION (2011) Community Governance Act SOIL TRANSPORT, DEPOSIT, AND REMOVAL REGULATION (2011) Date Enacted: 17 August 2011 Order Number: O.041-2011 Last Amended: 8 May 2015 This version of the Regulation is not the

More information

Canlin Energy Corporation Bidding Guidelines Fee Title Assets November 15, 2017

Canlin Energy Corporation Bidding Guidelines Fee Title Assets November 15, 2017 Bidding Guidelines Fee Title Assets November 15, 2017 1. SCOPE Canlin Resources Partnership, by its managing partner, ( CEC ), is making its Saskatchewan fee title petroleum and natural gas rights available

More information

ALBERTA REGULATION 480/81 Land Titles Act FORMS REGULATION

ALBERTA REGULATION 480/81 Land Titles Act FORMS REGULATION (Consolidated up to 149/2007 ALBERTA REGULATION 480/81 1 The forms in the Schedule are the forms prescribed for the purposes of the sections indicated on the forms. AR 480/81 s1 2 For the purpose of ensuring

More information

Alberta Aggregate (Sand and Gravel) Allocation Directive for Commericial Use on Public Lands

Alberta Aggregate (Sand and Gravel) Allocation Directive for Commericial Use on Public Lands Title: Alberta Aggregate (Sand and Gravel) Allocation Directive for Commercial Use on Public Land Number: Program Name: Public Land Management Effective Date: September 1, 2017 This document was updated

More information

MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY. 1. This Act shall be called the Mines and Minerals Management Act 1995.

MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY. 1. This Act shall be called the Mines and Minerals Management Act 1995. MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY 1. This Act shall be called the Mines and Minerals Management Act 1995. 2. The Act shall come into force on the First Day of September 1995.

More information

Sections 8 and 10 of the Act and the Condominium Property Regulation (Alberta Regulations 168/2000), govern the preparation of a condominium plan.

Sections 8 and 10 of the Act and the Condominium Property Regulation (Alberta Regulations 168/2000), govern the preparation of a condominium plan. Procedure # SUR-4 Land Titles Procedures Manual Subject: SURVEYS - EXAMINATION OF CONDOMINIUM PLANS Page 1 of 13 Date Issued 2018 10 16 BACKGROUND The Condominium Property Act ("Act") provides for the

More information

Closing at Noon, Mountain Time on May 17, 2005

Closing at Noon, Mountain Time on May 17, 2005 2005 CENTRAL MACKENZIE VALLEY CALL FOR BIDS Closing at Noon, Mountain Time on May 17, 2005 The management of oil and gas resources North of 60 0 latitude offshore and in the Northwest Territories and Nunavut

More information

Chapter 136. SOIL EROSION

Chapter 136. SOIL EROSION 1 of 8 12/19/2011 4:17 PM Township of Andover, NJ Monday, December 19, 2011 Chapter 136. SOIL EROSION [HISTORY: Adopted by the Township Committee of the Township of Andover by Ord. No. 77-11 (Ch. XVII

More information

SEC MINERAL DEVELOPMENT LANDS AVAILABLE FOR PURCHASE.

SEC MINERAL DEVELOPMENT LANDS AVAILABLE FOR PURCHASE. Note in the language below I have boldfaced key problematic phrases that allow people other than miners to slip through. Red font is of special note. Navy is my comments. Ralph Maughan H.R.4241 Deficit

More information

OIL AND GAS LEASE for UMBERACRE

OIL AND GAS LEASE for UMBERACRE OIL AND GAS LEASE for UMBERACRE This lease, executed, between Leif Lindstrom, hereinafter called "lessor," and Hexetron Petroleum West LLP hereinafter called "lessee." 1. Lessor, in consideration of $,

More information

By-Law of The Corporation of the City of Oshawa

By-Law of The Corporation of the City of Oshawa By-Law 85-2006 of The Corporation of the City of Oshawa being a by-law to control the dumping of fill, removal of topsoil and alteration of grades. WHEREAS s. 142 of the Municipal Act, 2001, S.O. 2001,

More information

Natural Resources Mineral Lands Division CLAIM STAKING, LICENSE MANAGEMENT AND ASSESSMENT REPORTING

Natural Resources Mineral Lands Division CLAIM STAKING, LICENSE MANAGEMENT AND ASSESSMENT REPORTING CLAIM STAKING, LICENSE MANAGEMENT AND ASSESSMENT REPORTING MINERAL RIGHTS LEGISLATION Mineral Act Mineral Regulations DEFINITION OF MINERAL mineral means a naturally occurring inorganic substance including

More information

LTSA Customer Fee Listing

LTSA Customer Fee Listing LTSA Customer Listing Searches ordered or applications filed using the myltsa portal are subject to a service charge (see Administrative s below). If the application includes a form signed using a Juricert

More information

Retail Leases Amendment Act 2005 No 90

Retail Leases Amendment Act 2005 No 90 New South Wales Retail Leases Amendment Act 2005 No 90 Contents Page 1 Name of Act 2 2 Commencement 2 3 Amendment of Retail Leases Act 1994 No 46 2 4 Amendment of Fines Act 1996 No 99 2 Schedule 1 Amendment

More information

New and renewal leases for shellfish cultivation; termination of leases issued prior to January 1, (a) To increase the use of suitable

New and renewal leases for shellfish cultivation; termination of leases issued prior to January 1, (a) To increase the use of suitable 113-202. New and renewal leases for shellfish cultivation; termination of leases issued prior to January 1, 1966. (a) To increase the use of suitable areas underlying coastal fishing waters for the production

More information

The Condominium Property Act, 1993

The Condominium Property Act, 1993 1 The Condominium Property Act, 1993 being Chapter C-26.1* of the Statutes of Saskatchewan, 1993 (consult Table of Statutes of Saskatchewan for effective dates) as amended by the Statutes of Saskatchewan,

More information

Province of Alberta LAND TITLES ACT. Revised Statutes of Alberta 2000 Chapter L-4. Current as of December 15, Office Consolidation

Province of Alberta LAND TITLES ACT. Revised Statutes of Alberta 2000 Chapter L-4. Current as of December 15, Office Consolidation Province of Alberta LAND TITLES ACT Revised Statutes of Alberta 2000 Current as of December 15, 2017 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park Plaza

More information

The Assessment Management Agency Act

The Assessment Management Agency Act Consolidated to March 15, 2013 1 The Assessment Management Agency Act being Chapter A-28.1 of the Statutes of Saskatchewan, 1986 (consult Table of Saskatchewan Statutes for effective date) as amended by

More information

The Religious Societies Land Act

The Religious Societies Land Act 1 RELIGIOUS SOCIETIES LAND c. R-19 The Religious Societies Land Act being Chapter R-19 of The Revised Statutes of Saskatchewan, 1978 (effective February 26, 1979) as amended by the Statutes of Saskatchewan,

More information

LIHPRHA, Pub. L. No , Title VI (1990), codified at 12 U.S.C et seq.

LIHPRHA, Pub. L. No , Title VI (1990), codified at 12 U.S.C et seq. LIHPRHA, Pub. L. No. 101-625, Title VI (1990), codified at 12 U.S.C. 4101 et seq. TITLE VI--PRESERVATION OF AFFORDABLE RENTAL HOUSING Subtitle A--Prepayment of Mortgages Insured Under National Housing

More information

Crown Land Use Operational Policy: Mining APPROVED AMENDMENTS: Summary of Changes: /Approval

Crown Land Use Operational Policy: Mining APPROVED AMENDMENTS: Summary of Changes: /Approval APPROVED AMENDMENTS: Effective Date Briefing Note /Approval Summary of Changes: June 1, 2011 BN 175892 Policy and Procedure update to reflect reorganization of resource ministries April 2011 September

More information

International Financial Reporting Standards (IFRS)

International Financial Reporting Standards (IFRS) FACT SHEET February 2011 IAS 17 Leases (This fact sheet is based on the standard as at 1 January 2011.) Important note: This fact sheet is based on the requirements of the International Financial Reporting

More information

2012 No LAND REGISTRATION, ENGLAND AND WALES. The Land Registration Fee Order 2012

2012 No LAND REGISTRATION, ENGLAND AND WALES. The Land Registration Fee Order 2012 STATUTORY INSTRUMENTS 2012 No. 1969 LAND REGISTRATION, ENGLAND AND WALES The Land Registration Fee Order 2012 Made - - - - 24th July 2012 Laid before Parliament 27th July 2012 Coming into force - - 22nd

More information

Schedule A. Citation 1 These regulations may be cited as the Land Registration Administration Regulations. Definitions 2 (1) In these regulations,

Schedule A. Citation 1 These regulations may be cited as the Land Registration Administration Regulations. Definitions 2 (1) In these regulations, Schedule A Regulations Respecting Administration of the Land Registration Act made by the Minister of Service Nova Scotia and Municipal Relations under Section 94 of Chapter 6 of the Acts of 2001, the

More information

Treaty Claims Settlement Acts General Guideline

Treaty Claims Settlement Acts General Guideline Treaty Claims Settlement Acts General Guideline LINZG 20701 2 August 2016 linz.govt.nz Contents 1 Background... 3 1.1 Introduction... 3 1.2 Purpose, scope and use... 3 2 Landonline settings to prevent

More information

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to May 30, 2009. It is intended for information and reference purposes only. This

More information

The Subdivisions Act

The Subdivisions Act The Subdivisions Act being Chapter 144 of The Revised Statutes of Saskatchewan, 1940 (effective February 1, 1941). NOTE: This consolidation is not official. Amendments have been incorporated for convenience

More information

LOCAL LAW NO. 2, 1987 A LOCAL LAW REGULATING EXCAVATION AND TOPSOIL REMOVAL WITHIN THE TOWN OF CAMBRIA

LOCAL LAW NO. 2, 1987 A LOCAL LAW REGULATING EXCAVATION AND TOPSOIL REMOVAL WITHIN THE TOWN OF CAMBRIA LOCAL LAW NO. 2, 1987 A LOCAL LAW REGULATING EXCAVATION AND TOPSOIL REMOVAL WITHIN THE TOWN OF CAMBRIA PASSED BY TOWN OF CAMBRIA TOWN BOARD SEPTEMBER 3, 1987 Be it enacted by the Town Board of the Town

More information