An Independent Evaluation of the Engineer Proving Ground

Size: px
Start display at page:

Download "An Independent Evaluation of the Engineer Proving Ground"

Transcription

1 Lgistics Management Institute An Independent Evaluatin f the Engineer Prving Grund CE411MR1 Karen M. Dahut Marguerite E. Mss Thmas A. Müller n i tr'r K.V-) Jm am m i

2 REPORT DOCUMENTATION PAGE Frm Apprved OPM N Public reprting burden fr this cllectin f infrmatin Is estimated t average 1 hur per respnse, including the time fr reviewing instructins, searching existing data surces gathering, and maintaining the data needed, and reviewing the cllectin f Infrmatin. Send cmments regarding this burden estimate r any ther aspect f this cllectin f infrmatin, including suggestins fr reducing this burden, t Washingtn Headquarters Services, Directrate fr Infrmatin Operatins and Reprts, 1215 Jeffersn Davis Highway, Suite 1204, Arlingtn, VA , and t the Office f Infrmatin and Regulatry Affairs, Office f Management and Budget, Washingtn, DC AGENCY USE ONLY (Leave Blank) 2. REPORT DATE March TITLE AND SUBTITLE An Independent Evaluatin f the Engineer Prving Grund 3. REPORT TYPE AND DATES COVERED Final 5. FUNDING NUMBERS C MDA C-0006 PE D 6. AUTHOR(S) Karen M. Dahut, Marguerite E. Mss, Thmas A. Müller 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Lgistics Management Institute 2000 Crprate Ridge McLean, VA PERFORMING ORGANIZATION REPORT NUMBER LMI- CE411MR1 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) U.S. Army Crps f Engineers Directr, Cnstructin Divisin Pulaski Building CEMP-C Washingtn, D.C SPONSORING/MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES 12a. DISTRIBUTION/AVAILABILITY STATEMENT A: Apprved fr public release; distributin unlimited 12b. DISTRIBUTION CODE 13. ABSTRACT (Maximum 200 wrds) The Army Prgram Manager fr Ttal Develpment in the Natinal Capital Regin has prpsed a "public-private venture" t develp the 805-acre Engineering Prving Grund (EPG) site near Frt Belvir in Fairfax, Va. The EPG jint venture cncept is that the Army will prvide the land, and the develper will build ffice space fr the Army, cnstruct the necessary infrastructure, and build ther space fr private use. Revenues generated by the sale r lease f the private-sectr space that the develper builds wuld be expected t pay fr the cst f cnstructing the required infrastructure and the Army space. That arrangement wuld allw the Army t btain "rent-free" space in which it culd cnslidate peratins nw lcated in leased space thrughut the Natinal Capital Regin, thus reducing its lng-term ccupancy csts. The EPG develpment plan as cnceived in 1990 was ratinal and feasible given what were, at that time, several reasnable assumptins: the slwdwn in the ffice building bm in Fairfax Cunty was seen as a shrt-term cnditin; residual rent payments were cntemplated as the mechanism t ensure that develpers culd affrd t prvide the Army space at belw-market rates; and it was expected that the Army culd guarantee a large Department f Defense anchr tenant in Phase 1. Hwever, since 1990, market and ther cnditins have changed cnsiderably. As a final check, the Army Crps f Engineers asked the Lgistics Management Institute t assess the ecnmic feasibility f the plan given current market cnditins. 14. SUBJECT TERMS Engineer Prving Grund, Market analyses, Frt Belvir, Fairfax Cunty, rent-free space, appraisal 15. NUMBER OF PAGES PRICE CODE 17. SECURITY CLASSIFICATION OF REPORT 18. SECURITY CLASSIFICATION OF THIS PAGE 19. SECURITY CLASSIFICATION OF ABSTRACT 20. LIMITATION OF ABSTRACT Unclassified Unclassified Unclassified UL NSN Standard Frm 298, (Rev. 2-89) Prescribed by ANSI Std

3 March 1995 An Independent Evaluatin f the Engineer Prving Grund CE411MR1 Karen M. Dahut Marguerite E. Mss Thmas A. Müller jutic QUALITY INSPECTED 5 lesaln fr HTIS QRAtI DTIC TAB Unannunced Justificatin. D D Prepared pursuant t Department f Defense Cntract DACW31-94-D The views expressed here are thse f the Lgistics Management Institute at the time f issue but nt necessarily thse f the Department f Defense. Permissin t qute r reprduce any part except fr gvernment purpses must be btained frm the Lgistics Management Institute. By Availability?flbdea Avail and/r Lit Speftd.,,* \ Lgistics Management Institute 2000 Crprate Ridge McLean, Virginia

4 CE411MR1/March 1995 LOGISTICS MANAGEMENT INSTITUTE An Independent Evaluatin f the Engineer Prving Grund Executive Summary The Army Prgram Manager fr Ttal Develpment in the Natinal Capital Regin has prpsed a "public-private venture" t develp the 805-acre Engineer Prving Grund (EPG) site near Frt Belvir in Fairfax Cunty, Va. The EPG jint venture cncept is that the Army will prvide the land, and the develper will build ffice space fr the Army, cnstruct the necessary infrastructure, and build ther space fr private use. Revenues generated by the sale r lease f the private-sectr space that the develper builds wuld be expected t pay fr the cst f cnstructing the required infrastructure and the Army space. That arrangement wuld allw the Army t btain "rent-free" space in which it culd cnslidate peratins nw lcated in leased space thrughut the Natinal Capital Regin, thus reducing its lng-term ccupancy csts. The 1990 Defense Authrizatin Act, which prvided enabling legislatin fr the venture, specifies that the fair market value f the land cnveyed t the develper may nt exceed the value f the ffice space built fr the Army. That is, the amunt f rent-free space that the Army gets depends n the value f the land. Thus, the Army planned the EPG develpment s that it wuld maximize that value. As part f the planning prcess, the Army requested that Fairfax Cunty rezne the land. In exchange fr the rezning, the Army made several tentative cmmitments, r prffers, t Fairfax Cunty, that must be signed befre the Cunty will apprve the EPG rezning applicatin. The EPG develpment plan as cnceived in 1990 was ratinal and feasible given what were, at that time, several reasnable assumptins: the slwdwn in the ffice building bm in Fairfax Cunty was seen as a shrt-term cnditin; residual rent payments were cntemplated as the mechanism t ensure that develpers culd affrd t prvide the Army space at belw-market rates; and it was expected that the Army culd guarantee a large Department f Defense anchr tenant in Phase 1. Hwever, since 1990, market and ther cnditins have changed cnsiderably. As a final check, the Army Crps f Engineers asked the Lgistics Management Institute t assess the ecnmic feasibility f the plan given current market cnditins. We cncluded the fllwing: The EPG site wuld have difficulty attracting tenants fr ffice space bth because its prjected lease rates are high relative t thse f cmpeting sites in Fairfax Cunty and because its lcatin is less desirable. m

5 The Army culd expect t receive nly 550,000 square feet f rent-free space in exchange fr the land, r nly 25 percent f the free space riginally anticipated. It is unlikely that the Army will be able t attract an anchr tenant that wuld lease 1.2 millin square feet f space because the expected lease rates fr the EPG wuld be cnsiderably abve market rates. Prffers culd place the Army in a psitin f financial risk. The Army will be required t relinquish ver 300 acres f land regardless f the success f the verall develpment, and the Army will be respnsible fr infrastructure and ther prffers that are identified with rezning apprval. Given the risks assciated with the plan, we believe that the Army will be unable t attract ptential investrs r develpers fr the EPG develpment. In sum, ur analyses shw that the current EPG develpment plan can prvide, at best, nly a fractin f the space riginally anticipated. The Army Engineer District, Baltimre, appraisal, which was cmpleted in January 1995, cncurs with ur finding that the current EPG develpment plan is nt ecnmically viable. We recmmend that the Army refrain frm signing prffers that wuld cmmit future financial resurces and address the fundamental issue f whether it wants t act as the lng-term develper f the EPG site and assume the risks and liabilities assciated with that rle. IV

6 Cntents Chapter 1. Intrductin 1-1 Backgrund 1-1 The EPG Legislatin 1-2 The Task 1-2 Reprt Organizatin 1-3 Chapter 2. The Planned EPG Develpment 2-1 Lcatin and Site Descriptin 2-1 Overview f the Develpment Plan 2-1 Prffers 2-6 Status f EPG Develpment Plan 2-9 Next Steps 2-10 Chapter 3. Market Analysis f Planned EPG Land Uses 3-1 Office Space 3-1 Husing 3-10 Htels/Mtels 3-13 Retail Space 3-13 Chapter 4. Land Value f EPG Site 4-1 Backgrund 4-1 Estimates Using EPG Mdel 4-2 Fairfax Cunty Estimates 4-6 Baltimre District Estimates 4-6 Cmparisn f Estimates 4-7 Cnversin f Land Values t Army Rent-Free Space 4-8 Chapter 5. Plan Implementatin Issues 5-1 Title Cnveyance 5-1 Limited Develper Flexibility 5-2 Identificatin f Anchr Tenant fr Phase I 5-2 Prffers 5-3

7 Cntents (Cntinued) Chapter 6. Cnclusins and Recmmendatins 6-1 Cnclusins 6-1 Recmmendatins 6-3 Appendix. Assumptins Used t Estimate Land Values and Army Rent-Free Space at the EPG Site VI

8 Tables 2-1. Distributin f Space by Land Use Prjected Rent-Free Space Based n 1990 Army Cnsultant Market Analysis Amunt f Space by Land Use and Prject Phase Estimated Infrastructure Cst Fairfax Cunty Office Market Characteristics Full-Service Office Lease Rates in Fairfax Cunty, by Submarket Average Full-Service Office Lease Rates in Fairfax Cunty Prjectin f Demand fr Office Space in Fairfax Cunty Current Prjectin f Demand fr Office Space in Fairfax Cunty Cmparisn f Office Space Demand Prjectins Estimatin f Required EPG Capture Rate f New Office Demand in Fairfax Cunty Cmparisn f Current and Prjected Average Lease Rates in Fairfax Cunty and the Springfield Submarket Estimatin f Required EPG Capture Rate f Ttal Office Lease Activity in High-End Submarkets Planned Husing Units in Selected Planning Districts Near the EPG Area Estimatin f Required EPG Capture Rate f Husing Market in Fur Planning Districts and 1994 Values fr Updated Mdel Parameters EPG Land Value Estimates 4-7 vu

9 Tables (Cntinued) Net Present Value f EPG Land Army Rent-Free Space 4-9 vm

10 CHAPTER 1 Intrductin BACKGROUND The Army Prgram Manager fr Ttal Develpment in the Natinal Capital Regin (PM, NCR) has prpsed a plan t enter int a unique "public-private venture" t develp the 820-acre Engineer Prving Grund (EPG) site. 1 The EPG site is lcated in Fairfax Cunty, Va., just west f Interstate 95 and suth f the Springfield Central Business District. Special cngressinal legislative authrity Sectin 2821 f the 1990 Defense Authrizatin Act (Public Law ) allws the Army t cnvey "all r any prtin" f the EPG site t a third party wh will cnstruct facilities fr the Army and make infrastructure imprvements t the site. Basically, the EPG cncept is that the Army will prvide the land, and the develper will build ffice space fr the Army, cnstruct the infrastructure, and build ther space fr private use. The develpment plan specifies the square ftage that will be cnstructed by the private develper fr each phase and fr each f fur land uses. Revenues generated by the sale r lease f the privatesectr space that the develper builds are expected t pay fr the cst f cnstructing the required infrastructure and the Army space, as well as generate a return r prfit fr the develper. 2 Based n Army space requirement prjectins, which take the current dwnsizing f Army peratins int accunt, the prjected ttal rental space requirement in the Natinal Capital Regin is 2 millin square feet. 3 The Army's bjective is t cnslidate peratins currently lcated in leased space within the Natinal Capital Regin int the rent-free space and thus reduce its csts. By ccupying wned rather than leased space, the Army culd reduce its lng-term ccupancy csts. ^he Army cnsultant mdel assumes 820 acres. A later submissin t the Cunty estimates the site t be 805 acres. 2 T distinguish the ffice space that the Army will receive in exchange fr the EPG land frm the speculative ffice space the private develper cnstructs n the EPG site, the Army space is referred t thrughut this reprt as Army "rent-free" space. 3 Initially, the Army estimated that it wuld need 2.9 millin square feet f ffice space t replace the space it is leasing. 1-1

11 THE EPG LEGISLATION The legislatin authrizing the EPG cncept is specific with regard t certain aspects f hw the public-private venture is intended t wrk. Belw are the key specificatins in the legislatin: The value f the cnstructed Army space must be n less than the fair market value f the prperty that is cnveyed t the develper. In ther wrds, the value f the space built by the develper fr the Army must be equal t the fair market value f the land that the Army cnveys t the develper. That specificatin is significant; it means that the greater the value f the land, the mre ffice space the Army gets. "The develpment and all such imprvements [must] cmply with the specificatins f the master plan" and must be "agreed t by the apprpriate fficials f the Cunty f Fairfax, Va., and the Cmmnwealth f Virginia." The develpment f the prperty shall "include imprvements t public transprtatin systems, utilities and telecmmunicatins." If the third-party develper is unable r unwilling t develp the real prperty in accrdance with the master plan, "all right, title, and interest in and t the real prperty cnveyed... shall autmatically revert t the United States, regardless f the reasn fr such inability r unwillingness." THE TASK The Army Crps f Engineers, prir t issuing a request fr prpsals (RFP) fr the EPG develpment, asked the Lgistics Management Institute (LMI) t cnduct an independent analysis f the EPG develpment plan. We were t determine the plan's feasibility given current ecnmic cnditins and assess the risks assciated with its implementatin. The Army specified that LMI shuld cnsider nly the current EPG develpment plan and nt ptential variatins f that plan. In ur evaluatin f the EPG develpment plan, we fcused n assessing the financial feasibility with regard t the cash flw that wuld be required t supprt the plan and the incme that culd be generated. As a part f that analysis, we identified changes in the real estate market that have ccurred since 1990 when the plan was riginally develped and assessed the impact f thse changes n the feasibility f the EPG develpment plan. We als evaluated issues that culd impede the successful implementatin f the EPG develpment plan. Thse issues cncern bth plicies and financial aspects f the plan that may pse a prblem fr the Army r create a risk fr ptential develpers, making it mre difficult fr the Army t attract a develper. 1-2

12 REPORT ORGANIZATION This reprt is rganized int six chapters. In Chapter 2, we describe the current EPG develpment plan. We identify hw the Army expects t implement the plan, the infrastructure csts assciated with each phase f the plan, and the status f that plan within the Cunty's apprval prcess. In Chapter 3, we review the current market cnditins in Fairfax Cunty and assess hw they have changed frm the prjectins made by the PM in In Chapter 4, we discuss ur financial analysis f the EPG develpment plan. That chapter specifies hw the analysis was cnducted and discusses key parameters. In Chapter 5, we address issues that may affect the successful implementatin f the plan. Finally, in Chapter 6, we draw cnclusins abut the likelihd f success f the EPG prject. We als make tw key recmmendatins regarding hw the Army shuld prceed in the near term. 1-3

13 CHAPTER 2 The Planned EPG Develpment This chapter describes the EPG develpment plan that was prpsed by the PM, NCR and is the basis f ur analysis and evaluatin. We discuss the initial cnceptin f the develpment plan and its prpsed land uses and densities. We als discuss Fairfax Cunty's requirements fr site develpment, including preliminary estimates f infrastructure csts. Finally, we discuss the current develpment plan status and the remaining steps that have t be cmpleted. LOCATION AND SITE DESCRIPTION The EPG site is lcated in Fairfax Cunty, Va., 16 miles suthwest f Washingtn, D.C., and apprximately 10 miles nrthwest f Frt Belvir. Figure 2-1 is a map shwing the lcatin f the EPG develpment site relative t the Washingtn metrplitan area. The Army expects that the prject will be develped in five sequential phases. Each phase crrespnds t ne f five separate land bays, r gegraphic areas, n the EPG site. OVERVIEW OF THE DEVELOPMENT PLAN Initial Develpment Plan Cncept T ensure that it culd get as much rent-free space as pssible, the PM planned the EPG develpment t maximize the land value. The plan was based n the results f a study cnducted fr the PM, NCR by cnsultants and cmpleted in That study, referred t here as the PM's study, included a detailed analysis f real estate market cnditins thrugh 1989, transprtatin impacts, and ther aspects f the develpment. Since a higher land value translates int mre rent-free space fr the Army, the PM's study prpsed maximizing the value f the EPG land by phasing the prject ver 20 years r mre t reduce the discunt in price that wuld be assciated with selling the entire prperty at nce, rezning the prperty t allw substantial high-density incme-prducing develpment, and acting as master develper t cntrl the timing f the prject phases t avid the effects f market dwnturns. 2-1

14 Figure 2-1. Lcatin fepg Develpment Site As authrized by the cngressinal legislatin, the Army can exchange the EPG land fr imprvements equal t the market value. 1 The Army is seeking t exchange the bulk f the EPG land fr ffice space that will be cnstructed n a small prtin f the EPG site that the Army will cntinue t wn. The Army will receive needed space, and the private develper will receive the wnership and develpment rights t the balance f the site fr a preplanned and preapprved high-quality, mixed-use develpment. As the Army space is cnstructed and ccupied, the land will be cnveyed t the develper fr further private 1 Refer t Chapter 1 fr details f the cngressinal legislatin. 2-2

15 develpment in accrdance with the EPG develpment plan. Once the Army ffice space is cnstructed accrding t their specificatins, the Army is respnsible fr the nging perating and maintenance expenses assciated with wnership f its building. T retain cntrl f the EPG develpment, the PM structured the develpment plan s that each phase wuld be cmpeted independently. Thus, a different develper culd be selected fr each f the five phases. In cnjunctin with the space cnstructed in each phase f the develpment, assciated infrastructure imprvements are required as a part f the develpment plan. (The cst f infrastructure imprvements will be discussed later in this chapter.) The Army, as the landwner, will be respnsible fr ensuring that each phase is cmpleted in accrdance with the riginal develpment plan and that the prffers agreed t as part f the rezning prcess r as a result f transprtatin studies are cmpleted and meet Fairfax Cunty requirements. Land Use The prpsed EPG develpment is a multiuse, multiphase prject. The Army envisins an urban village cnsisting f a series f high-quality, mixed-use centers situated amidst wide areas f pen space. Specifically, the EPG develpment plan calls fr fur high-density, multiuse ndes that are separated by pen space and by clusters f lwer density develpment. Each multiuse nde includes residential and ffice buildings gruped arund landscaped plazas and pen areas. In general, the mre incme-prducing space that the plan allws fr, the mre rent-free space the private develper is willing t prvide the Army. 2 Cnsequently, the EPG develpment has t be large enugh t generate sufficient incme s the develper is able t cnstruct significant rent-free space t meet Army bjectives. The develpment prgram includes a schedule fr the cnstructin f 17.5 millin grss square feet (GSF) f space. That space includes an estimated 2 millin square feet f Army rent-free space and 15.5 millin square feet f space privately develped fr varius uses. Cmmercial ffice space (including the Army space) accunts fr 48 percent f the ttal EPG develpment space, and residential space accunts fr an additinal 40 percent. The remaining 11 percent is dedicated t htel and retail space. The prpsed land use allcatin is currently under review by Fairfax Cunty. Table 2-1 summarizes the Army's prpsed develpment plan fr the EPG site. 2 This linkage ignres the infrastructure csts needed t supprt the given level f develpment, which may increase disprprtinately with an increase in incmeprducing prperty n the site. 2-3

16 Table 2-1. Distributin f Space by Land Use Land use Office Residential (abut 4,000 units) Retail Htel/ther Army rent-free space Space (millin GSF) Percentage f ttal develpment EPG ttal Estimate f Rent-Free Space Given the prpsed develpment plan, the Army cnsultants riginally prjected that, ver the 21-year develpment perid, a private develper wuld be willing t cnstruct abut 2 millin square feet f rent-free space in exchange fr the EPG land. Table 2-2 shws the Army cnsultant's prjectins fr the amunt f rent-free space t be cnstructed at the beginning f each phase. Underlying this estimate are assumptins regarding land value and future market cnditins based n the reginal and natinal ecnmy in Because it is impssible t predict changes in these cnditins, the actual amunt f space the Army will receive and the develpment time perid is uncertain. Chapter 3 examines the assumptins underlying the prjectin and prvides an assessment f their reasnableness in tday's market. Table 2-2. Prjected Rent-Free Space Based n 1990 Army Cnsultant Market Analysis (grss square feet) Phase Army Rent-free space 340, , , , ,000 Ttal 2,000,000 Surce: Preliminary Market Analysis f Engineering Prving Gunds, Basile Baummann Prst & Assciates, Inc. (BBPA) Team, April

17 Develpment Density As part f the EPG develpment prcess, the Army has undertaken the necessary steps t rezne the EPG land in accrdance with Fairfax Cunty's Cmprehensive Plan fr the area. 3 Zning is a key factr in determining what the Army can realize in value fr the EPG land since it prescribes what can be dne n the site. In additin, having the zning fr the prpsed develpment plan in place raises the value f the prperty. All ther factrs being equal, a prperty zned fr a prpsed use is cnsiderably mre valuable than ne withut zning because the buyer des nt incur the risk and uncertainty f the rezning prcess. The EPG land is currently zned fr residential develpment with a density f ne unit per five acres. The prpsed zning plan fr the EPG site nt nly defines the land use but als the average density, r flr area rati (FAR), f the develpment. The FAR is defined as the square ftage a builder is allwed t cnstruct n the site as a percentage f the acreage r size f the site itself. The prpsed EPG rezning plan calls fr an verall FAR f 0.49, but the FAR will vary with land use; sme prtins f the site will have a FAR f up t 2.O. 4 Since the EPG site is 820 acres, r 35.7 millin square feet, a ttal f 17.5 millin square feet f space can be cnstructed n the site given a FAR f A FAR f 0.49 is a relatively high density develpment fr Fairfax Cunty and particularly fr the EPG, as this area already incurs traffic cngestin. T supprt the level f prpsed develpment at the EPG site, the Cunty will require infrastructure imprvements as a cnditin f rezning apprval. In creating the prpsed EPG develpment plan, the PM's study attempted t balance the increased revenues that can be generated frm a higher density develpment and the reductin in value received by the Army fr the land as a result f increased infrastructure csts. The grss square ftage that is prpsed t be cnstructed fr each f the fur land uses in each phase is shwn in Table The current status f the rezning applicatin is discussed n page The FAR f 0.49 is determined by the ttal EPG site, including land that will be dedicated t the Cunty. 2-5

18 Table 2-3. Amunt f Space by Land Use and Prject Phase (square feet) Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Land use (4 years) (4 years) (4 years) (4 years) (4 years) Office 2,050,000 1,250,000 1,300,000 1,200, ,000 Residential 1,506,000 1,506,000 1,595,000 1,329,000 1,063,000 Retail 77,000 60,000 63,000 60,000 40,000 Htel/ther 50, , , , ,000 Ttal 3,683,000 3,266,000 3,408,000 3,039,000 2,103,000 Nte: The "ther" categry culd include numerus uses such as a sprts cmplex. PROFFERS Prffers are a frmal negtiated agreement between Fairfax Cunty and an applicant (in this case, the Army) that specifies certain cmmitments frm the applicant in exchange fr rezning. Prffers typically identify specific items that the landwner agrees t accmplish in exchange fr the rezning f the prperty and fr the right t develp the prperty in accrdance with the Fairfax Cunty Cmprehensive Plan. Typically, the attrneys and experts representing the applicant meet with the Cunty planning staff and wrk ut mutually acceptable language. Such an agreement specifies what is being cmmitted, wh will implement the cmmitment (usually the applicant as landhlder), and the timing f the cmmitment. Prffers cver such issues as the parameters f the develpment, land use, envirnmental issues, transprtatin issues, and public facilities. Prffers are usually agreed t at the pint when the rezning apprval is pending final apprval by the Cunty Bard f Supervisrs. In January 1995, the PM infrmally indicated agreement t sme prffers fr the EPG develpment. Frmal, legally binding prffers, hwever, will nt be finalized until the rezning actin is apprved, which is expected t be n earlier than June Since the Army will be the wner f the land when the rezning applicatin is apprved, the Army will be respnsible fr signing the prffer agreement, which then cmmits the Army t meet its requirements as lng as the Army retains wnership f the land. Each phase f the develpment plan will have specified prffers, and since the Army will initially retain wnership f all EPG land, it will be legally respnsible fr ensuring that the prffers are met. 5 Discussins with Fairfax Cunty indicate that the June 1995 date may be unrealistic since the transprtatin study being prepared by the Army cnsultants had nt been cmpleted as f January

19 Because the current prffer submissin t the Cunty is preliminary, these prffers are expected t be mdified and thers added during the negtiatin prcess with Fairfax Cunty. Typically, prffer statements fr a large develpment exceed 100 pages. The preliminary 26-page PM draft is nt sufficiently specific t meet all the requirements f a negtiated prffer agreement. Infrastructure-Related Prffers Infrastructure imprvements at the EPG site will cst an estimated $200 millin. Thse imprvements will include utilities and rads thrughut the site as well as sme imprvements required by Fairfax Cunty, including ffsite rad upgrades and the partial cst f a peple-mver mass transit system. The cst f the imprvements are expected t be brne by the private develper and paid fr frm the incme-prducing space. Table 2-4 shws the Army cnsultant's estimated csts fr infrastructure imprvements by phase. Table 2-4. Estimated Infrastructure Cst Amunt Phase ($000) 1 25, , , , ,868 Ttal 201,516 The size, land-use mix, and density f the develpment dictate the infrastructure and site imprvements that are required t btain rezning apprval frm Fairfax Cunty. Because f the Cunty's cncerns as t the impact n existing traffic cnditins, the Army has agreed that as a part f the EPG develpment, a peple mver (a light-rail mass transit system) will be cnstructed t supprt the traffic flws in and ut f the develpment. The Army (r designated develper) wuld fund 20 percent f the prject, r abut $70 millin. In additin t the peple mver, additinal infrastructure imprvements, specifically external rads, may be needed. Thse imprvements will be determined n the basis f transprtatin studies that will be cnducted at the end f each develpment phase. Imprvements identified in thse studies wuld have t be made befre the Army culd prgress t the next phase f the plan. Transprtatin imprvements will be required such that the rads surrunding 2-7

20 the site maintain a service level "D" 6 r better after each develpment phase is cmpleted. Develpment Restrictins As stated in the Amended Cmprehensive Plan, at least 80 percent f the nnresidential cnstructin and 100 percent f all majr infrastructure must be cmpleted during Phase 1 befre the next phase can be initiated. That means that at least 80 percent f all ffice space has t be ready fr ccupancy in rder t begin Phase 2. This cnditin f cmpletin refers nly t cmmercial develpment. Presumably, residential unit cmpletin rates are nt a cncern because the Cunty wants t ensure that cmmercial develpment is cnstructed t ffset the net fiscal cst f residential develpment. Therefre, Phase 2 culd be initiated even if prjected residential develpment is nt cnstructed in Phase 1. Land Dedicatin and Cnveyances As part f the prffer statement and cnsistent with the Amended Cmprehensin Plan, the Army agreed t dedicate t Fairfax Cunty 215 acres f the Acctink Creek valley fr an envirnmental quality crridr; 45 acres t the Fairfax Cunty Park Authrity fr parks and ther uses, including 25 acres fr such revenue-generating use as a stadium (the site is being cnsidered fr use as a baseball stadium); 25 acres fr schl/yuth sprts cmplex site; 2 acres fr fire and rescue statins; and right-f-way fr transprtatin facilities, mstly the Fairfax Cunty Parkway, estimated t be 76 acres n a map submitted by the Army cnsultants t Fairfax Cunty in January (The final number f acres required fr right-f-way will nt be determined until the mnitring and evaluatin prcess is cmpleted at the end f each develpment phase.) The amunt f dedicated land culd ttal up t 363 acres, r as much as 44 percent f the grss land area, depending n right-f-way needs. As nted earlier, thse land dedicatins have n impact n allwed maximum density fr the site, which was based n the grss density f 805 acres. The Army als agreed t dedicate the specified land, free f envirnmental hazards, within 60 mnths after Fairfax Cunty apprves the rezning 6 Service level "D" means that "at an intersectin there is a delay f 25 t 40 secnds per vehicle. The influence f cngestin becmes nticeable; lnger delay may result." In general, service level "D" is the minimum design standard acceptable t Fairfax Cunty. 2-8

21 applicatin. These land dedicatins are independent f ther activities. Fr example, even if n cnstructin fr Phase 1 were t take place within the first 60 mnths, land dedicatin wuld prceed unless Fairfax Cunty agreed t a delay. STATUS OF EPG DEVELOPMENT PLAN Fairfax Cunty Review and Apprval In Nvember 1991, the PM, NCR submitted t Fairfax Cunty a "cnditinal density prpsal" fr the develpment f the EPG site. During subsequent discussins with the Cunty, the PM indicated that the Army intends t enter int a "residual value lease" agreement with the develper(s) selected t implement the EPG plan. This agreement wuld require that the Army pay rent fr the amunt by which the cst f imprvements exceeds the value f the land. 7 In respnse t that submissin, the Fairfax Cunty Office f Cmprehensive Planning asked TAI Realty Advisrs t cnduct a market study and a feasibility analysis f the EPG develpment prpsal. Fllwing the cmpletin f the cnsultant reprt and a review by Cunty staff, Fairfax Cunty amended its Cmprehensive Plan t accmmdate the prpsed EPG plan. As part f this prpsed site plan mdificatin, the Army made several cmmitments, such as t dedicate a substantial share f EPG land, t design and cnstruct a peplemver transit system and t develp strategies that wuld result in 40 percent f the emplyees arriving by means ther than single-ccupancy vehicles. 8 That submissin cnstituted the basis fr amendments t the Fairfax Cunty Cmprehensive Plan t allw nnresidential develpment at the EPG site. The Cmprehensive Plan, which includes the Army cmmitments nted abve, was apprved in February Rezning Applicatin Fllwing the apprval f Cmprehensive Plan revisins in 1994, the Army and Fairfax Cunty began discussins n the submissin f a rezning applicatin. Their discussins, which began in March 1994, have cntinued. The size f the develpment dictates ther infrastructure imprvements and site imprvements that are required t get rezning apprval frm Fairfax Cunty. In January 1995, Fairfax Cunty received an initial draft f the transprtatin study prepared fr the Army by cnsultants. That study fcuses n traffic mdeling factrs, trip generatin factrs, and trip distributin. The rezning applicatin review cannt be cmplete until the transprtatin study is essentially cmplete. In additin, Fairfax Cunty was als given an initial draft f prffers. The 7 The ability fr the Army t enter int a "residual value lease" agreement has since been questined. 8 Office f Cmprehensive Planning, Fairfax Cunty, Va., Francnia-Springfield Area Plan, February

22 rezning applicatin was scheduled t be heard by the Fairfax Cunty Planning Cmmissin in May 1995, but the hearing is likely t be delayed. NEXT STEPS An applicatin fr rezning f a large site with multiple land uses, such as the EPG site, typically takes the Cunty staff up t six mnths t review. As f mid-january 1995, the Cunty had nt received all f the necessary data, s, it is uncertain whether the currently scheduled May 1995 date fr the Planning Cmmissin t hld public hearings n the rezning applicatin can be met. The Fairfax Cunty Bard f Supervisrs usually acts n rezning abut six weeks fllwing the Planning Cmmissin recmmendatin. Prffers have t be signed by the applicant befre the Fairfax Cunty Bard f Supervisrs will apprve the rezning applicatin. Fllwing the apprval f the rezning applicatin by the Bard, the Army wuld presumably issue an RFP that wuld incrprate the cnditins and terms f the rezning and request respndents t specify hw much ffice space the Army culd expect t receive. Initiating an RFP prir t rezning apprval wuld be premature, as ptential develpers culd nt estimate the net the value f the land withut detailed knwledge f the prffers. 2-10

23 CHAPTER 3 Market Analysis f Planned EPG Land Uses Determining the ecnmic feasibility f develping the EPG site requires an analysis f the cmpetitive market fr the prpsed land uses in this case, an evaluatin f the demand fr ffice space, husing, htels/mtels, and retail space at the EPG site given market cnditins in the area as a whle. In this chapter, we fcus n the ffice space market; ffice space (cmmercial and Army) accunts fr 48 percent f the space t be cnstructed at the EPG site, and it is the land use mst affected by changes in ecnmic cnditins. We als briefly discuss the markets fr husing, htels/mtels, and retail space. Husing accunts fr 40 percent f the space t be built at the EPG site, and htels/mtels and retail space tgether accunt fr the remaining 12 percent. OFFICE SPACE In ur analysis f the demand fr ffice space at the EPG site, we define the market area, characterize the current ffice market, and evaluate alternative estimates f market demand. 1 We then estimate the share f the ffice market that the EPG develpment is likely t capture. Market Area The definitin f an ffice market area depends n the characteristics f the businesses seeking space. A few business firms have n predetermined preference fr a site; they select a lcatin n the basis f such factrs as business climate, residence f the business wner, and quality f schls. Mst firms, hwever, have a particular area in mind when seeking ffice space: a business dealing primarily with a particular Federal agency prefers t lcate clse t that agency, cmpanies that interact clsely with the Department f Defense prefer t be within 30 minutes f the Pentagn, medical ffices prefer t lcate near majr hspitals, and law firms seek ffices near curts. Firms are als attracted t sites that already have a cncentratin f ffice space. This agglmeratin effect is partially the result f a preference t be clse t ther firms perfrming similar r cmplementary functins. Fr example, financial services firms and law firms tend t cluster. Tysns Crner in Fairfax lr rhe demand fr ffice space excludes Army rent-free space; it is limited t space that the private develper must lease. 3-1

24 Cunty and Rsslyn in Arlingtn Cunty are examples f ffice cncentratins in Nrthern Virginia. The EPG site is within the Springfield ffice submarket f Fairfax Cunty, as defined by the Fairfax Cunty Ecnmic Develpment Authrity (FCEDA) and a private real estate firm. The Springfield ffice submarket cmprises small ffice buildings clustered near Interstate 95. The cnstructin f a metr statin t serve Springfield, which is clse t the EPG site, shuld imprve accessibility and increase the likelihd f attracting firms that are cnsidering lcating within Fairfax Cunty. Market Characteristics The Fairfax Cunty ffice market is diversified. It includes small, ne- and tw-stry ffice buildings as well as large, multistry, high-quality ffice cmplexes. The fllwing subsectins discuss the current and planned ffice inventry (in terms f square ftage), the vacancy rates, and the lease rates fr ffice space in Fairfax Cunty as a whle and in the Springfield submarket. Each f thse factrs affect the demand fr ffice space. The PM's study cnsiders Fairfax Cunty the apprpriate market area frm which EPG wuld draw ccupants. The Cunty ffice market is subdivided int smaller areas f ffice cncentratin, called submarkets. Mst submarkets are identified by a majr rad cmplex r a mass transit statin. Fr this analysis, we cnsidered Fairfax Cunty t be the market area even thugh this apprach prbably verstates the demand. CURRENT AND PLANNED INVENTORY In mid-1994, the Fairfax Cunty inventry f ffice space exceeded 74 millin square feet. Table 3-1 shws the distributin f that space amng Cunty submarkets. The tw largest submarkets are Tysns Crner and Restn; tgether they accunt fr 44.7 percent f the ttal inventry. The Springfield submarket (the submarket that includes the EPG site) ranks eighth in size, accunting fr 3.9 percent f all ffice space in the Fairfax Cunty inventry. An additinal 40 millin square feet f ffice space are planned (assuming a market demand) in Fairfax Cunty. Nearly 60 percent f that space will be built in Tysns Crner, Restn, Merrifield, and Fairfax Center. The Springfield submarket accunts fr nly 2.7 percent, r 1.1 millin square feet, f the planned ffice inventry (excluding ffice space planned fr the EPG site). VACANCY RATE The Fairfax Cunty vacancy rate in mid-1994, as cmputed by FCEDA, was 11.8 percent. At that time, 8.5 millin square feet f ffice space were available fr rent (Table 3-1). Nearly half f that space was in Tysns Crner and Restn. 3-2

25 The Springfield submarket had 600,000 square feet f ffice space available fr rent, r a vacancy rate f abut 21 percent. Table 3-1. Fairfax Cunty Office Market Characteristics 1994 inventry Planned space Submarket Square ftage (millins) Percentage f ttal Square ftage (millins) Percentage f ttal 1994 available space (millin sq. ft.) Tysns Crner Restn Merrifield Fairfax Center Herndn Baileys Crssrads McLean Springfield Vienna Dulles All thers Ttal Surce: FCEDA Business Reprt Midyear 1994 Real Estate Market Review. LEASE RATES The FCEDA estimated that mid-1994 full-service lease rates fr ffice space in Fairfax Cunty ranged frm $9.50 t $29.50 per square ft. Table 3-2 shws the ranges f lease rates in each submarket fr 1993 and The rents at the lw end f the market ranged frm $8.00 t $12.00 in 1993 and frm $9.50 t $14.50 in At the high end, rents ranged frm $18.00 t $29.50 in 1993 and frm $16.00 t $29.50 in Restn had the highest rent ($29.50), and Tysns Crner had the next highest ($26.00 in 1994, a reductin frm $28.00 in 1993). The rents in the Springfield submarket were relatively lw, ranging frm $9.65 t $ A smewhat different estimate f lease rates was made by Smithy-Braedn, a majr, private real estate firm. 2 That firm estimated that, in the third quarter f 1994, rents in Fairfax Cunty averaged $15.33 per square ft. Bth the FCEDA and Smithy-Braedn calculated lease rates frm asking prices. 3 The 2 Smithy-Braedn Third Quarter 1994 Market Reprt. 3 Typically, actual lease payments are smewhat lwer than the full-service asking price as a result f discunts and ther reductins ffered as inducements fr lngerterm leases. 3-3

26 Table 3-2. Full-Service Office "Lease Rates in Fairfax Cunty, by Submarket ($ per square ft) Mid-1994 Majr submarket Mid-1993 Range Midpint Tysns Crner Restn Merrifield Fairfax Center Herndn Baileys Crssrads McLean Springfield Vienna a Dulles Surce: FCEDA Business Reprt Midyear 1993 and Midyear 1994 Real Estate Market Review. " Lwer range includes net lease rates and is therefre excluded. variatin between the estimates may be attributable t differences in the definitin f "asking price" and differences in the ffice inventry data base. The U.S. Army Engineer District, Baltimre, estimated that rents in Fairfax Cunty fr Class A 4 full-service ffice space in 1994 ranged frm $13.00 t $24.00 per square ft. 5 The highest rent range fr Class A ffices was in Restn ($16.00 t $24.00); in the Springfield submarket, the rent fr quality space ranged frm $15.00 t $16.00 per square ft. Taking int accunt the varius estimates, we assume, fr purpses f this reprt, that ffice rents in Fairfax Cunty during 1994 averaged $15.00 t $17.00 per square ft. Prjected Demand fr Office Space Frm the perspective f financial institutins, expected demand fr new space is a majr criterin in determining whether a speculative building shuld be financed. Future demand fr ffice space depends n several factrs. The mst imprtant variable is emplyment grwth in sectrs that use ffice space business, financial, persnal service, gvernment service, etc. (Trade 4 Office space is usually gruped int three classes: A, B, and C. Class A is cnsidered prime, high-quality space and is leased at higher rates than ther ffice buildings. 5 Appraisal f Engineering Prving Grunds, Springfield, Va., U.S. Army Engineer District, Baltimre, January

27 and manufacturing accunt fr mst nnffice emplyment.) In Fairfax Cunty, an estimated 60 percent f all new jbs will be in sectrs ffering ffice emplyment. Since 1990, Cunty rents have been relatively stable because f a surplus f unleased space. The weighted average rent, based n FCEDA data, was abut $17.43 per square ft in mid As shwn in Table 3-3, average rents remained essentially unchanged frm mid-1993 t mid Table 3-3. Average Full-Service Office Lease Rates in Fairfax Cunty ($ per square ft) Year Average lw rent Average high rent Average midpint rent Average rent in highest quartile a b "Assumes nrmal distributin. b Data available fr first half f the year nly. A secnd factr affecting the prjected demand fr ffice space is the amunt f space allcated t each emplyee. Space allcatin can be attributed in part t industry characteristics. Fr example, medical ffices require mre space than real estate firms. Rent levels als affect space allcatin. As rents rise, businesses becme less willing t allcate a higher share f all revenue fr space; cnversely, when rents are relatively lw, businesses allcate mre space t their emplyees. Fr example, the typical ffice wrker in Manhattan, N.Y., has substantially less space than a wrker in the Washingtn, D.C., suburbs, where rents are ne-half f the New Yrk average. We fund that, in Fairfax Cunty between 1987 and 1993, the amunt f space allcated t each emplyee averaged 298 square feet. 6 The third factr affecting the demand fr new ffice space is the rate at which ld ffice buildings are being demlished r cnverted t anther use. In Fairfax Cunty, that factr is negligible, at least in the shrt run, because mst ffice space is less than 15 years ld. The apprach used by the PM t estimate the future demand fr ffice space in Fairfax Cunty was t prject emplyment levels and then t apply the tw primary factrs affecting the demand fr new ffice space in Fairfax Cunty: the percentage f ffice-related jbs and the amunt f space allcated per emplyee. Assuming mderate grwth, the 1990 PM's study estimated that the emplyment level wuld increase by 121,900 emplyees frm 1995 t 2000, by 6 The PM's analysis estimates 290 square feet per emplyee n the basis f ffice emplyment changes during the 1980s. The slight increase is prbably attributable t a relative decline in ffice rents between 1989 and 1993 (see the appendix). 3-5

28 133,700 emplyees frm 2001 t 2005, and by an additinal 140,900 wrkers between 2006 and (See Table 3-4.) Assuming that 60 percent f all emplyment is ffice related and that each new emplyee wuld require 290 square feet f space, the PM's study cncluded that Fairfax Cunty wuld need t add 4.2 millin square feet f ffice space annually between 1995 and The annual requirement fr new space wuld increase t 4.9 millin square feet between 2005 and (As a frame f reference, the PM's prjectin f annual demand exceeds the highest histrical level f new leased space in Fairfax Cunty 3.9 millin square feet, which was reached in The annual amunt f new leased space in Fairfax Cunty during the 1980s averaged 2.5 millin square feet.) Table Prjectin f Demand fr Office Space in Fairfax Cunty (thusands) Time perid Ttal number f new emplyees Ttal number f new ffice emplyees 3 Annual increase in ffice emplyees Annual space requirement (sq. ft.) b ,234 4,640 4,901 Surce: Preliminary Market Analyses Engineering Prving Grunds prepared fr U.S. Crps f Engineers, Baltimre District, April 1990 (Mderate Grwth Rate Assumptin). Assumes 60 percent f ttal emplyment grwth is in sectrs using ffice space. 'Assumes 290 square feet per emplyee. Because the estimates f the future demand fr ffice space were utdated, LMI recalculated the prjectins using the PM's apprach. Our prjectins were based n the latest available emplyment estimates derived by the Washingtn, D.C., area Cuncil f Gvernments (COG) in cperatin with Fairfax Cunty. The results are shwn in Table 3-5. Table 3-6 cmpares the 1990 PM prjectins with the current prjectins. Althugh the same apprach was used, the difference between the tw prjectins is substantial. The 1990 PM estimate exceeds current estimated annual demand fr new ffice space by abut 46 percent fr the time perid and by 68 percent fr the time perid. Tw factrs explain the difference. First, the PM prjectins were based n the high emplyment rates achieved in the late 1980s instead f n reginal frecasts. After the PM made thse prjectins, emplyment rates were reduced as a result f the ecnmic dwnturn in the regin. Secnd, PM prjectins fr were based n a 4.5 percent annual emplyment grwth rate, which exceeded COG frecasts. Because the lwer prjectins are mre realistic, we use them as a basis fr assessing the market share that the EPG site must capture. 3-6

29 Table 3-5. Current Prjectin f Demand fr Office Space in Fairfax Cunty (thusands) Time perid Ttal number f new emplyees Ttal number f new ffice emplyees 3 Annual increase in ffice emplyees Annual space requirement (sq. ft.)» ,552 b , , ,131 Surce: Fairfax Cunty Planning Department. Fairfax Cunty Emplyment Sectrs, Nvember 17,1993. a Assumes 60 percent f ttal emplyment grwth is ffice related. "Ttal annual demand shuld be reduced by 250,000 in this time perid t allw fr absrptin f existing available space. Thus, new demand is 2.3 millin. Table 3-6. Cmparisn f Office Space Demand Prjectins Time perid Annual space requirement (000 sq. ft.) PM 1990 Current Percentage difference ,240 2, ,653 1, ,901 1, Surce: Tables 3-4 and 3-5. Estimated EPG Market Share A crucial factr in determining the ecnmic viability f cnstructing an ffice cmplex in a cmpetitive market is the ability f that cmplex t capture a large enugh share f that market t fill the planned space. Fr the EPG cmplex, the plan in Phase 1 is t build abut 2 millin square feet f ffice space, r sme 410,000 square feet per year. As shwn in Table 3-5, the Cunty-wide annual net demand fr ffice space fr the next five years, adjusted t allw fr the absrptin f existing available space, is estimated t be 2.3 millin square feet. Assuming that it can cmpete fr all new ffice space demand in Fairfax Cunty, the EPG cmplex wuld have t capture 17.8 percent f the market in the perid, 16.1 percent in the perid, and 20.9 percent in the perid (see Table 3-7). Thse capture rates are substantially higher than thse prjected in the 1990 PM's reprt, primarily because the ttal demand fr ffice space in Fairfax Cunty has been shwn t be cnsiderably 3-7

30 lwer than was estimated in We believe that the true capture rates wuld have t be even higher because it is unlikely that the EPG cmplex wuld be cmpetitive with all f Fairfax Cunty. One reasn fr limited cmpetitiveness is that the EPG cmplex is nt in a prime lcatin. Anther reasn is that EPG ffice rents are expected t be substantially higher than the estimated Fairfax Cunty average f $16 t $18 per square ft in Typically, lease rates in new buildings exceed the average f all rents, in part because tenants prefer the amenities available in a new building. Table 3-7. Estimatin f Required EPG Capture Rate f New Office Demand in Fairfax Cunty Measure Annual new Cunty demand (000) a 2,300 1,943 1,566 Annual EPG space (000) EPG space as percentage f Cunty demand EPG space (less anchr tenant space) 6 as percentage f Cunty demand 17.8% 16.1% 20.8% 7.4% 16.1% 20.8% a Frm Table 3-6. "Assumes anchr tenant will ccupy 1.2 millin square feet, r 240,000 square feet annually, in time frame. The estimated average Fairfax Cunty lease rates frm published reprts are cnsistent with the Baltimre District appraisal, which estimated Fairfax Cunty Class A full service rents t be between $13 and $24. In the Springfield submarket, lease rates fr Class A space negtiated in late 1994 averaged between $15 and $16 per square ft. The appraisal assessed full service rentals in the immediate EPG market and states that "we cncluded (fr EPG) a market rental f $16 per square ft, assuming a building f cmparable quality was cnstructed." 7 Lease rate estimates derived frm several surces fr Fairfax Cunty and the Springfield submarket are cmpared in Table 3-8. These rates are als cmpared t expected lease rates at the EPG site in The cmparisns shw a wide gap between the estimated 1995 and 1998 lease rates and the lease rates necessary at the EPG site t prvide the Army the quantity f rent-free space required t meet their needs. Specifically, there is a difference f $9, r 52 percent, between the EPG lease rates prjected in the Baltimre District appraisal and the lease rates prjected by the PM applying 1990 values. The difference using LMI1994 values is 64 percent. 'Appraisal f Engineering Prving Grunds, Springfield, Va., U.S. Army Engineer District, Baltimre, January

Board of Regents Meeting November 30-December 1, 2006 Agenda Item #32 Arizona State University EXECTIVE SUMMARY Page 1 of 8

Board of Regents Meeting November 30-December 1, 2006 Agenda Item #32 Arizona State University EXECTIVE SUMMARY Page 1 of 8 EXECTIVE SUMMARY Page 1 f 8 ACTION ITEM: ISSUE: Pursuant f ABOR Plicy 7-204 and 7-207, seeks apprval in the alternative (i) t sell, (ii) t lease fr a lng term r (iii) t lease with a sale prvisin the apprximately

More information

Implementing the New Lease Accounting Standard

Implementing the New Lease Accounting Standard The public entity 1 adptin deadline fr the new guidance in Accunting Standards Update (ASU) 2016-02, Leases (Tpic 842) is drawing clser. Implementatin and dcumentatin theref will be a significant undertaking

More information

Abstract Our project analyzes the water use of apartment complexes in the City of Davis. We

Abstract Our project analyzes the water use of apartment complexes in the City of Davis. We Apartment Cmplexes and Water Cnservatin in the City f Davis By Nicle Dunkley, Sam Mffitt, Janna Ortiz, and William Wang Abstract Our prject analyzes the water use f apartment cmplexes in the City f Davis.

More information

MOTION NO. M Beacon Hill Station TOD Property Final Transaction Agreements PROPOSED ACTION

MOTION NO. M Beacon Hill Station TOD Property Final Transaction Agreements PROPOSED ACTION MOTION NO. M2018-170 Beacn Hill Statin TOD Prperty Final Transactin Agreements MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Bard 12/20/2018 Final Actin Dn Billen, Executive Directr, PEPD Brke Belman,

More information

City of Surrey ADDITIONAL PLANNING COMMENTS File:

City of Surrey ADDITIONAL PLANNING COMMENTS File: City f Surrey ADDITIONAL PLANNING COMMENTS File: 7910-0151-00 PROPOSAL: Planning Reprt Date: April 18, 2011 Subdivisin within ALR under Sectin 946 f the Lcal Gvernment Act in rder t allw subdivisin f 4.16

More information

Lessor Presentation & Disclosure Requirements

Lessor Presentation & Disclosure Requirements Lessr Presentatin & Disclsure Requirements The public entity 1 adptin deadline fr the new guidance in Accunting Standards Update (ASU) 2016-02, Leases (Tpic 842), is drawing clser. This is the first majr

More information

The Bannister Team Prepared for: Compliments of:

The Bannister Team Prepared for: Compliments of: Prepared fr: Cmpliments f: The Bannister Team 2338 N. Lp 1604 W. Suite 120 San Antni, TX 78248 The fllwing infrmatin will assist yu in understanding hw t purchase a gvernment-wned hme. Anyne can buy a

More information

BOUNDARY LINE ADJUSTMENT

BOUNDARY LINE ADJUSTMENT BOUNDARY LINE ADJUSTMENT FORM Yakima Cunty Public Services 128 Nrth Secnd Street Furth Flr Curthuse Yakima, Washingtn 98901 (509) 574-2300 1-800 572-7354 FAX (509) 574-2301 www.c.yakima.wa.us Revised 01/06/2016

More information

Staff Report. Andrea Ouse, Director of Community and Economic Development

Staff Report. Andrea Ouse, Director of Community and Economic Development 7.a Staff Reprt Date: Nvember 13, 2018 T: Frm: Reviewed by: Prepared by: Subject: City Cuncil Valerie J. Barne, City Manager Andrea Ouse, Directr f Cmmunity and Ecnmic Develpment Abhishek Parikh, Transprtatin

More information

REQUEST FOR PROPOSAL DESIGN-BUILD Request for Proposal No Campbell Creek Estuary Natural Area: Wildlife Overlooks and Rustic Fence

REQUEST FOR PROPOSAL DESIGN-BUILD Request for Proposal No Campbell Creek Estuary Natural Area: Wildlife Overlooks and Rustic Fence REQUEST FOR PROPOSAL DESIGN-BUILD Request fr Prpsal N. 2013-01 Campbell Creek Estuary Natural Area: Wildlife Overlks and Rustic Fence Prpsal Deadline Due by: Mnday, July 8 at 4:00 PM Alaska Standard Time

More information

Subdivisions Made Easy. Subd ivisions. Checklist. By Dyrnphna Boholt

Subdivisions Made Easy. Subd ivisions. Checklist. By Dyrnphna Boholt Subdivisins Made Easy Subd ivisins Checklist By Dyrnphna Bhlt Subdivisins Made Easy WHA T TO LOOK FOR? Research Cnduct nline searches t determine yur areas f interest Obtain maps and zning infrmatin frm

More information

DRAFT 1. GENERAL INFORMATION 2. APPLICATION INSTRUCTIONS

DRAFT 1. GENERAL INFORMATION 2. APPLICATION INSTRUCTIONS Department f Cnsumer and Regulatry Affairs Instructins and General Infrmatin Fr Certificate f Inclusinary Zning Cmpliance (CIZC) Applicatin and Penthuse Affrdable Husing Addendum (last revised, 5.20.16)

More information

FACT SHEET Residential, Business, and Wind & Solar Resource Leasing on Indian Land Final Rule

FACT SHEET Residential, Business, and Wind & Solar Resource Leasing on Indian Land Final Rule FACT SHEET Residential, Business, and Wind & Slar Resurce Leasing n Indian Land Final Rule The Bureau f Indian Affairs (BIA) has finalized revisins t 25 CFR 162, Leases and Permits, t replace the nn-agricultural

More information

BUYER HANDBOOK. my purpose. I provide high-end service for the Nashville area home buyer.

BUYER HANDBOOK. my purpose. I provide high-end service for the Nashville area home buyer. BUYER HANDBOOK W E N DY M O N DAY R E A LT O R my purpse I prvide high-end service fr the Nashville area hme buyer. High-end desn t mean the mst expensive. It means delivering the best pssible service

More information

PROPOSAL Architectural Services

PROPOSAL Architectural Services McCarthy LePage Architects, PC 48 Wheeler Avenue, Flr 2 Pleasantville, New Yrk 10570 T. 914.747.1177 F. 914.747.0049 inf@fivecat.cm www.fivecat.cm This Agreement is the ffer f McCarthy LePage Architects,

More information

Procedure for an Permit Application For a Park Model Home or Mobile Home

Procedure for an Permit Application For a Park Model Home or Mobile Home Prcedure fr an Permit Applicatin Fr a Park Mdel Hme r Mbile Hme The fllwing items are required and frm part f a cmplete applicatin: 1. Letter f permissin frm the Park Owner. 2. If yu are ding any new cnstructin

More information

Nassau County Department of Planning & Economic Opportunity Nassau Place Yulee, Florida 32097

Nassau County Department of Planning & Economic Opportunity Nassau Place Yulee, Florida 32097 Nassau Cunty Department f Planning & Ecnmic Opprtunity 96161 Nassau Place Yulee, Flrida 32097 Tac E. Ppe, AICP Directr APPLICATION AND INSTRUCTIONS FOR FUTURE LAND USE AMENDMENT LESS THAN TEN (10) ACRES

More information

APB Mission Statement:

APB Mission Statement: APB Missin Statement: T frever preserve the beautiful farmland and prductive sils f Lancaster Cunty and its rich agricultural heritage; and t create a healthy envirnment fr the lng-term sustainability

More information

Ohio Department of Transportation Testimony to the Judiciary Committee of the Ohio House on House Bill 5 (Eminent Domain)

Ohio Department of Transportation Testimony to the Judiciary Committee of the Ohio House on House Bill 5 (Eminent Domain) Testimny t the Judiciary Cmmittee f the Ohi Huse n Huse Bill 5 (Eminent Dmain) April 19, 2007 DIRECTOR JAMES G. BEASLEY Chairman Blessing, ranking member Harwd and ther members f the Judiciary, my name

More information

Opportunity Description: Assistant Property Manager Location: Office in Menlo Park, CA

Opportunity Description: Assistant Property Manager Location: Office in Menlo Park, CA KILROY REALTY CORPORATION 12200 West Olympic Blvd., Suite 200 Ls Angeles, CA 90064 Opprtunity Descriptin: Assistant Prperty Manager Lcatin: Office in Menl Park, CA Abut Kilry Realty Crpratin Kilry Realty

More information

Barnes Walker, Chartered 3119 Manatee Avenue West, Bradenton, Florida Ph: (941) ; F: (941) SORTING OUT SHORT SALES:

Barnes Walker, Chartered 3119 Manatee Avenue West, Bradenton, Florida Ph: (941) ; F: (941) SORTING OUT SHORT SALES: Barnes Walker, Chartered 3119 Manatee Avenue West, Bradentn, Flrida 34205 Ph: (941) 741-8224; F: (941) 708-3225 SORTING OUT SHORT SALES: USING PRELIMINARY TITLE SEARCHES TO DECIDE WHEN TO TAKE LISTINGS

More information

The Corporation of the City of Stratford

The Corporation of the City of Stratford The Crpratin f the City f Stratfrd Plicy Manual P.3 Municipal Prperty Dept: Crprate Services Cmmittee: Finance and Labur Relatins Sale and Other Dispsitin f Land Adpted: December 17, 2007 Amended: August

More information

COUNCIL STAFF REPORT. City Council Members

COUNCIL STAFF REPORT. City Council Members COUNCIL STAFF REPORT CITY COUNCIL f SALT LAKE CITY TO: City Cuncil Members FROM: Nick Tarbet Plicy Analyst DATE: September 11, 2018 Item Schedule: 1 st Briefing: April 10, Sept 11 2 nd Briefing: May 1,

More information

Reclaimed Land A guide for developers applying for an interest in reclaimed land under the Marine and Coastal Area Act 2011

Reclaimed Land A guide for developers applying for an interest in reclaimed land under the Marine and Coastal Area Act 2011 Reclaimed Land A guide fr develpers applying fr an interest in reclaimed land under the Marine and Castal Area Act 2011 February 2014 1 Intrductin This guide explains hw yu as a develper - can apply fr

More information

OFFICE OF THE CITY ATTORNEY

OFFICE OF THE CITY ATTORNEY OFFICE OF THE CITY ATTORNEY DATE: January 17, 2019 TO: FROM: SUBJECT: City Cuncil City Attrney s Office Legal Analysis f Prpsed POPs Charter Amendment The President f Cuncil has asked the City Attrney

More information

LEVEL 6 UNIT 17 - CONVEYANCING SUGGESTED ANSWERS JUNE 2011

LEVEL 6 UNIT 17 - CONVEYANCING SUGGESTED ANSWERS JUNE 2011 LEVEL 6 UNIT 17 - CONVEYANCING SUGGESTED ANSWERS JUNE 2011 Nte t Candidates and Tutrs: The purpse f the suggested answers is t prvide students and tutrs with guidance as t the key pints students shuld

More information

Chapter 6 Acquisition

Chapter 6 Acquisition Chapter 6 Acquisitin Intrductin The Unit f General Lcal Gvernment (UGLG) is required t cmply with the acquisitin and relcatin plicies and prcedures as set frth in the Unifrm Relcatin Assistance and Real

More information

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Public Reprt T: Frm: Reprt Number: Develpment Services Cmmittee Paul D. Ralph, BES, RPP, MCIP, Cmmissiner, Develpment Services Department DS-16-77 Date f Reprt: May 5, 2016 Date f Meeting: May 9, 2016

More information

University of Alberta: Don Hickey, Anastasia Lim (Chair), Emily Ball, Ben Louie, Pat Jansen, Doug Dawson

University of Alberta: Don Hickey, Anastasia Lim (Chair), Emily Ball, Ben Louie, Pat Jansen, Doug Dawson University f Alberta: Dn Hickey, Anastasia Lim (Chair), Emily Ball, Ben Luie, Pat Jansen, Dug Dawsn Cmmunity members: Frank Weichman (McKernan), Stephen Dbsn (Lendrum), Bernie Schwartz (Lansdwne), Paul

More information

Screening of Residential Land: Questions and Answers

Screening of Residential Land: Questions and Answers Screening f Residential Land: Questins and Answers Wh des the plicy apply t? 1. Wh des the plicy apply t? The plicy applies t all verseas persns, with sme exceptins. Specifically: New Zealand citizens

More information

Islington & Shoreditch Housing Association (ISHA) Relationship Breakdown Policy

Islington & Shoreditch Housing Association (ISHA) Relationship Breakdown Policy Islingtn & Shreditch Husing Assciatin (ISHA) Relatinship Breakdwn Plicy 1. Plicy Statement This plicy utlines Islingtn & Shreditch Husing Assciatin s (ISHA) apprach t dealing with relatinship breakdwn

More information

Residence Hall Room Lease & Board Contract,

Residence Hall Room Lease & Board Contract, Clby-Sawyer Cllege Residence Hall Rm Lease & Bard Cntract, 2018-19 1. Clby-Sawyer Cllege agrees t assign and lease t the student space fr living in a residence hall r ther cllege husing fr the academic

More information

STAFF REPORT - SUMMATION. South Park Estates 9 th Filing Final Plat Process. CASE NUMBER(s): UDC SUBDIVISION CODE: SPKE 09

STAFF REPORT - SUMMATION. South Park Estates 9 th Filing Final Plat Process. CASE NUMBER(s): UDC SUBDIVISION CODE: SPKE 09 STAFF REPORT - SUMMATION Suth Park Estates 9 th Filing Final Plat Prcess CASE NUMBER(s): UDC-16-00459 SUBDIVISION CODE: SPKE 09 PREPARED BY: Seth Llyd MEETING DATES: Planning Cmmissin: August 1, 2016 City

More information

GRADUATE HOUSING CONTRACTS

GRADUATE HOUSING CONTRACTS 2018-2019 GRADUATE HOUSING CONTRACTS IMPORTANT DATES & PROCESSES February 28 March 28, 2018 ONLINE GRADUATE HOUSING INTENTION (GINT) Between February 28 and March 28, 2018, ALL Graduate and Family Husing

More information

4 LIHTC ONLY, WITH AT LEAST 8 YEARS OF THE ORIGINAL 15-YEAR IRS COMPLIANCE PERIOD REMAINING (AKA NEW LIHTC)

4 LIHTC ONLY, WITH AT LEAST 8 YEARS OF THE ORIGINAL 15-YEAR IRS COMPLIANCE PERIOD REMAINING (AKA NEW LIHTC) Affrdable Husing Data Guidance Fr All Multifamily Prperties with Incme r Rent Restrictins (nt just units in prperties meeting Fannie Mae s Multifamily Affrdable Husing (MAH) definitin Table f Cntents Page

More information

MiFID II FAQs. For Advisers, Discretionary Portfolio Managers and Product Providers. Praemium Administration Limited

MiFID II FAQs. For Advisers, Discretionary Portfolio Managers and Product Providers. Praemium Administration Limited MiFID II FAQs Fr Advisers, Discretinary Prtfli Managers and Prduct Prviders Praemium Administratin Limited Praemium Administratin Ltd is authrised and regulated by the Financial Cnduct Authrity under reference

More information

Representative Alissa Keny-Guyer, Chair House Committee on Human Services and Housing Oregon State Legislature 900 Court Street Salem, OR 97301

Representative Alissa Keny-Guyer, Chair House Committee on Human Services and Housing Oregon State Legislature 900 Court Street Salem, OR 97301 PO Bx 28454 Prtland, OR 97228 PHONE: (503) 626-8197 apa@regnapa.rg http://www.regnapa.rg Mnday, March 13, 2017 Representative Alissa Keny-Guyer, Chair Huse Cmmittee n Human Services and Husing Oregn State

More information

CUBA CITY HOUSING AND WORKFORCE STUDY APRIL 2019

CUBA CITY HOUSING AND WORKFORCE STUDY APRIL 2019 CUBA CITY HOUSING AND WORKFORCE STUDY APRIL 2019 STAFF Try Maggied Executive Directr Michelle Cahill Data Analysis Intern Jaclyn Essandh GIS Specialist Steve Genway Ecnmic Develpment Specialist Matthew

More information

March 17, 2015 RICHLAND COUNTY RIGHT OF WAY POLICY

March 17, 2015 RICHLAND COUNTY RIGHT OF WAY POLICY March 17, 2015 RICHLAND COUNTY RIGHT OF WAY POLICY Dates f Adptin and Amendment Actins RICHLAND COUNTY RIGHT OF WAY POLICY Page 1 f 24 Adpted by Richland Cunty Cuncil March 17, 2015 Page 2 f 24 INTRODUCTION

More information

Strategic Planning for RAD Conversions. Thursday, April 6, 2017

Strategic Planning for RAD Conversions. Thursday, April 6, 2017 Strategic Planning fr RAD Cnversins Thursday, April 6, 2017 Presenters Tm Davis, Directr f the Office f Recapitalizatin, Office f Multifamily Husing Prgrams, U.S. Department f Husing and Urban Develpment

More information

LEGAL BRIEF FORECLOSURE ON RENTAL PROPERTY JANUARY 2016

LEGAL BRIEF FORECLOSURE ON RENTAL PROPERTY JANUARY 2016 LEGAL BRIEF FORECLOSURE ON RENTAL PROPERTY JANUARY 2016 PREPARED BY NELLIS LAW CENTER, 4428 England Ave (Bldg 18), Nellis AFB, Nevada 89191-6505 702-652-5407, Appt. Line 702-652-7531 If yu rent prperty

More information

THE PROCESS OF PURCHASE OF A PROPERTY IN SPAIN

THE PROCESS OF PURCHASE OF A PROPERTY IN SPAIN PRACTICAL GUIDE JANUARY 2014 THE PROCESS OF PURCHASE OF A PROPERTY IN SPAIN The acquisitin f prperties in Spain implies a number f legal bligatins. If yu decide t purchase a prperty in Spain, which is

More information

SAMPLE SELLER PROPERTY QUESTIONNAIRE ADDENDUM

SAMPLE SELLER PROPERTY QUESTIONNAIRE ADDENDUM SELLER PROPERTY QUESTIONNAIRE ADDENDUM This frm was created by the Greater San Dieg Assciatin f REALTORS and is intended fr use primarily in the San Dieg Cunty area. This frm is nt cvered by the C.A.R.

More information

APPLICATION DEADLINE PINNACLE AWARDS CELEBRATION THURSDAY JANUARY 17, 2019, 5:00 PM THURSDAY. MARCH 21, 2019 Carlos Hellenic Center Ballroom

APPLICATION DEADLINE PINNACLE AWARDS CELEBRATION THURSDAY JANUARY 17, 2019, 5:00 PM THURSDAY. MARCH 21, 2019 Carlos Hellenic Center Ballroom Rules fr the 2018 Prductin Year APPLICATION DEADLINE THURSDAY JANUARY 17, 2019, 5:00 PM PINNACLE AWARDS CELEBRATION THURSDAY MARCH 21, 2019 Carls Hellenic Center Ballrm DeKalb Assciatin f REALTORS 1. ELIGIBILITY

More information

Plenary three: How to calculate and apportion service charges effectively

Plenary three: How to calculate and apportion service charges effectively Leasehlder and Tenant Service Charges Cnference Plenary three: Hw t calculate and apprtin service charges effectively Speaker: Chair: David Hunter Partner, Beevers and Struthers Steve Michaux Grup Directr

More information

I n v. e s t m e n t. i l d i n g. 3 - B u. Downtown Mixed-Use. o i. S a l. e P

I n v. e s t m e n t. i l d i n g. 3 - B u. Downtown Mixed-Use. o i. S a l. e P 3 - B u i l d i n g I n v e s t m e n t Dwntwn Mixed-Use S a l e P r t f l i Executive Summary CBRE, Inc., as exclusive advisr t the Seller, is pleased t ffer a cllectin f unique Prperties centered in

More information

PRE-DESIGN STUDY 6/26/ COLE PLACE ARSHIA ARCHITECTS 550 N LARCHMONT BLVD #100 LOS ANGELES, CA

PRE-DESIGN STUDY 6/26/ COLE PLACE ARSHIA ARCHITECTS 550 N LARCHMONT BLVD #100 LOS ANGELES, CA PRE-DESIGN STUDY 6/26/17 2401 COLE PLACE ARSHIA ARCHITECTS 550 N LARCHMONT BLVD #100 LOS ANGELES, CA 90002 310.786.7876. OFFICE@ARSHIA.NET Arshia Architects, ltd hereby prvides, withut any representatin

More information

Beecher Neighborhood Stabilization Plan

Beecher Neighborhood Stabilization Plan Beecher Neighbrhd Stabilizatin Plan Prepared fr Genesee Cunty Metrplitan Planning Cmmissin By Austen T. Ayres James E. Bnfigli Justin J. Dunn Gentjan Heqimi Ye Ji Kim Hanbing Liang Gin M. Piccirilli Raymnd

More information

Site Modification Process for Alcova Reservoir and Pathfinder Reservoir, Natrona County, Wyoming Leaseholders Revised October 6, 2016

Site Modification Process for Alcova Reservoir and Pathfinder Reservoir, Natrona County, Wyoming Leaseholders Revised October 6, 2016 Site Mdificatin Prcess fr Alcva Reservir and Pathfinder Reservir, Natrna Cunty, Wyming Leasehlders Revised Octber 6, 2016 PRIOR t any cnstructin r grund disturbance n a leased lt at Alcva Reservir r Pathfinder

More information

Approval to Sell Property at Glenmont Station to Montgomery County

Approval to Sell Property at Glenmont Station to Montgomery County Planning, Prgram Develpment and Real Estate Cmmittee Item V-C July 11, 2013 Apprval t Sell Prperty at Glenmnt Statin t Mntgmery Cunty Washingtn Metrplitan Area Transit Authrity Bard Actin/Infrmatin Summary

More information

TITLE CHANGE REQUEST CHECKLIST AND INSTRUCTIONS

TITLE CHANGE REQUEST CHECKLIST AND INSTRUCTIONS TITLE CHANGE REQUEST CHECKLIST AND INSTRUCTIONS Thank yu fr allwing Interval Servicing t assist yu with yur title change request. We want yur transactin t be prcessed smthly and efficiently. Please be

More information

ACCESSORY DWELLING UNIT ORDINANCE

ACCESSORY DWELLING UNIT ORDINANCE ACCESSORY DWELLING UNIT ORDINANCE Planning Cmmissin April 23, 2018 Presentatin by: J. Ritterbeck, Senir Planner Advance Planning Divisin 2 Purpse f Hearing Receive staff presentatin Prvide additinal input

More information

APPLICATION. Fee Simple Subdivision Bare Land Strata Conversion of Existing Building into Strata Units

APPLICATION. Fee Simple Subdivision Bare Land Strata Conversion of Existing Building into Strata Units 385 Birch Avenue P.O. Bx 340 100 Mile Huse British Clumbia Canada V0K 2E0 T: 250.395.2434 F: 250.395.3625 E: district@dist100milehuse.bc.ca APPLICATION Fee Simple Subdivisin Bare Land Strata Cnversin f

More information

REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES

REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES Cathedral Church f St Paul Site, 2 Cherry Street Burlingtn April 13, 2015 Cathedral Square (CSC) (Cnsultant) is wrking with the Cathedral Church f St Paul

More information

PRE-DESIGN STUDY 2401 COLE PLACE. Mixed Use Development. 10 Attached Residential Units Parking Garage. and Retail Space

PRE-DESIGN STUDY 2401 COLE PLACE. Mixed Use Development. 10 Attached Residential Units Parking Garage. and Retail Space PRE-DESIGN STUDY 2401 COLE PLACE Mixed Use Develpment 10 Attached Residential Units Parking Garage and Retail Space PROJECT DATA: Prject Descriptin: Prject Address: Mixed Use Develpment (Cmmercial/Residential)

More information

Annexation, Zoning, and Development Manual Updated December 2018

Annexation, Zoning, and Development Manual Updated December 2018 Annexatin, Zning, and Develpment Manual Updated December 2018 NOTE: Infrmatin cntained within this dcument is intended t assist the public with the City s annexatin, zning, and develpment prcesses. The

More information

CITY OF NANAI MO BYLAW NO A BYLAW TO AMEND THE CITY OF NANAIMO "ZONING BYLAW 2011 NO. 4500"

CITY OF NANAI MO BYLAW NO A BYLAW TO AMEND THE CITY OF NANAIMO ZONING BYLAW 2011 NO. 4500 CITY OF NANAI MO BYLAW NO. 4500.005 A BYLAW TO AMEND THE CITY OF NANAIMO "ZONING BYLAW 2011 NO. 4500" WHEREAS the Cuncil may zne land, by bylaw, pursuant t Sectins 890, 891, 903 and 904 f the Lcal Gvernment

More information

City of Surrey 3 RD ADDITIONAL PLANNING COMMENTS File:

City of Surrey 3 RD ADDITIONAL PLANNING COMMENTS File: City f Surrey 3 RD ADDITIONAL PLANNING COMMENTS Planning Reprt Date: March 23, 2015 PROPOSAL: Rezning frm RS (By-law N. 5942) and RA t RF and RF-12 in rder t allw subdivisin int 17 single family lts. LOCATION:

More information

TERMINATION OF TENANCIES FOR TENANT DEFAULT RESULTS OF FORFEITURE OF LEASES QUESTIONNAIRE

TERMINATION OF TENANCIES FOR TENANT DEFAULT RESULTS OF FORFEITURE OF LEASES QUESTIONNAIRE TERMINATION OF TENANCIES FOR TENANT DEFAULT RESULTS OF FORFEITURE OF LEASES QUESTIONNAIRE Overview In January 2004 the Law Cmmissin undertk a cnsultatin n the pssible refrm f a landlrd s means f terminating

More information

ACEP-ALE Program TIP SHEET FOR MICHIGAN APPLICANTS

ACEP-ALE Program TIP SHEET FOR MICHIGAN APPLICANTS ACEP-ALE Prgram TIP SHEET FOR MICHIGAN APPLICANTS ACEP-ALE At a Glance Agricultural Cnservatin Easement Prgram Agricultural Land Easements: ACEP-ALE is a vluntary prgram f the United States Department

More information

Homeowners Guide To Assignment of Mortgage Payments Sales

Homeowners Guide To Assignment of Mortgage Payments Sales Hmewners Guide T Assignment f Mrtgage Payments Sales America s leading netwrk f nn-traditinal real estate authrities! Prvided By: Sellers that NEED TO SELL a prperty, but CANNOT AFFORD TO, because f the

More information

TENANCY APPLICATION GUIDE TO COMPLETION

TENANCY APPLICATION GUIDE TO COMPLETION TENANCY APPLICATION GUIDE TO COMPLETION RAY WHITE REAL ESTATE WELCOMES YOUR APPLICATION AND ANY QUERIES YOU MAY HAVE. THE FOLLOWING INFORMATION AND CHECKLIST WILL ASSIST YOU TO COMPLETE THE TENANCY APPLICATION

More information

Workshop Session Stress-Free Securitisation

Workshop Session Stress-Free Securitisation Wrkshp Sessin Stress-Free Securitisatin CHC s Resurces Cnference 2014-10 th July 2014 Metrple Htel, Llandrindd Wells, Pwys Presented by Sharn Kirkham Partner and Head f Securitisatin THE DEVONSHIRES SECURITISATION

More information

1. Lowe s Home Centers, Inc. v. Washington Cty. Bd. of Revision, 2016-Ohio-372 (February 4, 2016)

1. Lowe s Home Centers, Inc. v. Washington Cty. Bd. of Revision, 2016-Ohio-372 (February 4, 2016) Abbreviatins: P/O = Prperty Owner BOE = Bard f Educatin BOR = Bard f Revisin BTA = Bard f Tax Appeals CAV = Cmplaint Against Valuatin TY = Tax Year 1. Lwe s Hme Centers, Inc. v. Washingtn Cty. Bd. f Revisin,

More information

MacroHomes Design Competition - Call for Submissions. Prize: $10,000 & potential collaboration on a large scale multifamily project

MacroHomes Design Competition - Call for Submissions. Prize: $10,000 & potential collaboration on a large scale multifamily project Ww - MacrHmes Design Cmpetitin 1 f 6 Wh We Are: MacrHmes Design Cmpetitin - Call fr Submissins Prize: $10,000 & ptential cllabratin n a large scale multifamily prject Ww (www.ww.cm) wants t prvide affrdable

More information

FEASIBILITY REPORT. For The Issuance of Not to Exceed $3,000,000 Principal ~mount

FEASIBILITY REPORT. For The Issuance of Not to Exceed $3,000,000 Principal ~mount FEASIBILITY REPORT Fr The Issuance f Nt t Exceed $3,000,000 Principal ~munt f PRONGHORN RANCH COMMUNITY FACILITIES DISTRICT (PRESCOTT VALLEY, ARIZONA) GENERAL OBLIGATION BONDS, SERIES 2002 February 15,

More information

DESCRIPTION STANDARDS, OBJECTIVES, AND INDICATORS REAL ESTATE (411) STUDENTS WILL UNDERSTAND THE ECONOMICS OF THE REAL ESTATE INDUSTRY.

DESCRIPTION STANDARDS, OBJECTIVES, AND INDICATORS REAL ESTATE (411) STUDENTS WILL UNDERSTAND THE ECONOMICS OF THE REAL ESTATE INDUSTRY. DESCRIPTION Students will be intrduced t real estate basics that include the scpe f the real estate business, usage f land, land descriptin, wnership, cntracts, deeds, mrtgages, title searches and clses,

More information

VENDOR REGISTRATION AND DISCLOSURE STATEMENT AND SMALL, WOMEN-, AND MINORITY-OWNED BUSINESS CERTIFICATION APPLICATION

VENDOR REGISTRATION AND DISCLOSURE STATEMENT AND SMALL, WOMEN-, AND MINORITY-OWNED BUSINESS CERTIFICATION APPLICATION WV-1 New Update REV. 09/26/18 STATE OF WEST VIRGINIA - PURCHASING DIVISION VENDOR REGISTRATION AND DISCLOSURE STATEMENT AND SMALL, WOMEN-, AND MINORITY-OWNED BUSINESS CERTIFICATION APPLICATION EXHIBIT

More information

Pinnacle Award Rules. [Type the document subtitle] 2018 Event. Pinnacle Award Rules. DeKalb Association of REALTORS

Pinnacle Award Rules. [Type the document subtitle] 2018 Event. Pinnacle Award Rules. DeKalb Association of REALTORS [Type the dcument subtitle] 2018 Event Pinnacle Award Rules DeKalb Assciatin f REALTORS 1. ELIGIBILITY Any emplyee r independent cntractr (fficer r therwise) f any real estate brker (individual r firm)

More information

TO LET. Town Centre Offices Flexible Terms. First & Second Floor Offices, Manchester Chambers, Oldham OL1 1LF.

TO LET. Town Centre Offices Flexible Terms. First & Second Floor Offices, Manchester Chambers, Oldham OL1 1LF. TO LET Twn Centre Offices Flexible Terms First & Secnd Flr Offices, Manchester Chambers, Oldham OL1 1LF Twn Centre lcatin Offices available n tw flr levels Available either as a whle r in part Clse t the

More information

Architects in Victoria a view from the census

Architects in Victoria a view from the census Assciatin f Cnsulting Architects The Business f Architecture Architects in Victria a view frm the census Prepared by Gill Matthewsn an ACA resurce ACA SA PO Bx 354 Unley Adelaide, SA 561 T +61 13 653 26

More information

Shared Equity Ownership Initiative

Shared Equity Ownership Initiative Shared Equity Ownership Initiative Hmewnership remains a majr gal fr lw and mderate incme husehlds seeking t increase husing stability, independence and wealth. Affrdable hme wnership remains a majr gal

More information

US Route 15 & Monocacy Boulevard Northeast Bypass Interchange

US Route 15 & Monocacy Boulevard Northeast Bypass Interchange US Rute 15 & Mncacy Bulevard Nrtheast Bypass Interchange US Rute 15 & Mncacy Bulevard Frederick, Maryland The site is lcated at the State Apprved Interchange f US Rute 15 and the extensin f Mncacy Bulevard,

More information

Myra / Manzanita Neighborhood Coalition 939 Manzanita Street Los Angeles, California

Myra / Manzanita Neighborhood Coalition 939 Manzanita Street Los Angeles, California Myra Mananita Neighbrhd Calitin Ls Angeles, Califrnia 90029 3235334423 r CZ> iff \p February 7, 2018 VIA PERSONAL DELIVERY City f Ls Angeles, Office f the City Clerk Attentin: Planning and Land Use Cmmittee

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and Cunty f Brmfield, Clrad CITY COUNCIL STUDY SESSION MEMORANDUM T: Frm: Prepared by: Owner Applicant Prperty Size Mayr and City Cuncil Charles Ozaki, City and Cunty Manager Kevin Standbridge, Deputy

More information

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS CITY OF BLANCHARD 122 N. MAIN BLANCHARD, OKLAHOMA 73010 (405) 485-9392 RESIDENTIAL BUILDING PERMIT REQUIREMENTS Building permits are required fr all prperty imprvements including additins t existing structures.

More information

Orion Park, Northfield Avenue, Northfields, Ealing, London W13 9SJ

Orion Park, Northfield Avenue, Northfields, Ealing, London W13 9SJ Orin Park Nrthfield Avenue, Nrthfields, Ealing, Lndn W13 9SJ Orin Park, Nrthfield Avenue, Nrthfields, Ealing, Lndn W13 9SJ Prminent West Lndn Residential Develpment Opprtunity CGI f Permitted Scheme Orin

More information

ALAMO HEIGHTS INDEPENDENT SCHOOL DISTRICT. Teacher Appraisal Process

ALAMO HEIGHTS INDEPENDENT SCHOOL DISTRICT. Teacher Appraisal Process ALAMO HEIGHTS INDEPENDENT SCHOOL DISTRICT Teacher Appraisal Prcess ALAMO HEIGHTS INDEPENDENT SCHOOL DISTRICT General Prvisins TEACHER APPRAISAL PROCESS Beginning with the 2017-2018 schl year, teachers

More information

University of the Philippines Human Resource Information System

University of the Philippines Human Resource Information System University f the Philippines Human Resurce Infrmatin System Appraisal Overview I. SPMS Appraisal: Appraisee A. IPCR/OPCR with Set Targets B. IPCR/OPCR withut Set Targets (Fr Thse Withut Appraisal Available)

More information

404 South M Street. 2 Units at 404 South M Street, Lake Worth FL, Martin Goldstein Russell Goldstein

404 South M Street. 2 Units at 404 South M Street, Lake Worth FL, Martin Goldstein Russell Goldstein 404 Suth M Street 2 Units at 404 Suth M Street, Lake Wrth FL, 33460 404 Suth M Street Apts Overview Mere blcks frm beautiful dwntwn Lake Wrth and basting fully updated interirs, 404 Suth M Street is a

More information

DRAFT For Discussion Only

DRAFT For Discussion Only DRAFT Fr Discussin Only WESTERN SMa COMMUNITY PLAN Plicy, Zning and Prgram Recmmendatins fr Building a 21 st Century Cmmunity TABLE OF CONTENTS (A tracking tl will be used t make cnnectins t wrk f varius

More information

CITY OF LOS ANGELES CALIFORNIA

CITY OF LOS ANGELES CALIFORNIA MERCEDES M. MARQUEZ GENERAL MANAGER PUBLIC COUNTERS 3550 WILSHIRE BOULEVARD 15'"FLOOR Ls ANGELES, CA 90010 6640 VAN NUYS BOULEVARD VAN NUYS, CA 91405 3415 SUTH SEPULVEDA BOULEVARD SUITE 150 Ls ANGELES,

More information

How to Make Auctions of Public Land

How to Make Auctions of Public Land Hw t Make Auctins f Public Land Successful? Olga Kaganva, PhD, CRE, FRICS The Urban Institute kaganva@urban.rg THE WORLD BANK ANNUAL BANK CONFERENCE ON LAND POLICY AND ADMINISTRATION Washingtn, DC April

More information

Room Selection FAQ s

Room Selection FAQ s 2018 2019 Rm Selectin FAQ s What are the imprtant dates t knw? Residency Requirement: As a fur year residential liberal arts cllege, all students are required t live n campus. The release prcess t live

More information

I. GEOTHERMAL PERMITTING BLM EXPLORATION REGULATIONS

I. GEOTHERMAL PERMITTING BLM EXPLORATION REGULATIONS I. GEOTHERMAL PERMITTING BLM EXPLORATION REGULATIONS Definitin f explratin peratins (43 CFR 3200.1) Any activity that: requires physical presence n the land may cause damage t thse lands beynd casual use

More information

Architects in South Australia a view from the census

Architects in South Australia a view from the census Assciatin f Cnsulting Architects The Business f Architecture Architects in Suth Australia a view frm the census Prepared by Gill Matthewsn an ACA resurce ACA SA PO Bx 354 Unley Adelaide, SA 561 T +61 13

More information

Now That We re Poor: The New Economics of Land Use

Now That We re Poor: The New Economics of Land Use Nw That We re Pr: The New Ecnmics f Land Use 20 th RMLUI Cnference Denver, March 2011 Dn Ellitt, FAICP, Clarin Assciates The Regulatry Issue Affrdability is a lng-term structural prblem f the U.S. ecnmy

More information

HINDU AMERICAN RELIGIOUS INSTITUTE 301 Steigerwalt Hollow Road, New Cumberland PA (717)

HINDU AMERICAN RELIGIOUS INSTITUTE 301 Steigerwalt Hollow Road, New Cumberland PA (717) HINDU AMERICAN RELIGIOUS INSTITUTE 301 Steigerwalt Hllw Rad, New Cumberland PA 17070 (717) 774-7750 www.haritemple.rg haritemple@gmail.cm TEMPLE LOWER LEVEL HALL USE AGREEMENT Please cmplete the frm belw

More information

ICN Merger Working Group. Effective Remedies. 16 February 2017 Washington DC

ICN Merger Working Group. Effective Remedies. 16 February 2017 Washington DC ICN Merger Wrking Grup Effective Remedies Jsep Carpi Badia Head f Unit, Mergers Case Supprt and Plicy DG Cmpetitin, Eurpean Cmmissin 16 February 2017 Washingtn DC DISCLAIMER The views expressed are purely

More information

Habitat for Humanity Greater San Francisco Application Meeting: 1009 Mission Street, San Francisco

Habitat for Humanity Greater San Francisco Application Meeting: 1009 Mission Street, San Francisco Habitat fr Humanity Greater San Francisc Applicatin Meeting: 1009 Missin Street, San Francisc MISSION STATEMENT At Habitat fr Humanity Greater San Francisc ur missin is t prvide lcal families with a springbard

More information

W yoming M ultiple L isting S ervice

W yoming M ultiple L isting S ervice W yming M ultiple L isting S ervice 951 Werner Ct., Suite 290 Casper, WY 82601 Phne (307) 237-1670 Fax (307) 235-0018 Email: cmls@tribcsp.cm www.wymingmls.cm Subscriber Membership Applicatin Packet f the

More information

1309 N J St Apartments

1309 N J St Apartments 1309 N J St Apartments 2 Units at 1309 Nrth J St, Lake Wrth FL, 33460 1309 Nrth J Street Apts Overview 1309 Nrth J Street is nestled in a quiet residential Alcve f East Lake Wrth, near Flrida s intracastal

More information

Rental Assistance Demonstration Closing Overview & Checklist: Project Based Voucher (PBV) Conversions

Rental Assistance Demonstration Closing Overview & Checklist: Project Based Voucher (PBV) Conversions In the fllwing fur sectins, this dcument prvides an verview f the RAD clsing prcess and instructins n the dcument submissin requirements fr PBV cnversins: 1) General verview f the clsing prcess; 2) Quick

More information

1309 N J St Apartments

1309 N J St Apartments 1309 N J St Apartments 2 Units at 1309 Nrth J St, Lake Wrth FL, 33460 1309 Nrth J Street Apts Overview 1309 Nrth J Street is nestled in a quiet residential Alcve f East Lake Wrth, near Flrida s intracastal

More information

DES PLAINES ZONING BOARD MEETING SEPTEMBER 29, 2015 MINUTES

DES PLAINES ZONING BOARD MEETING SEPTEMBER 29, 2015 MINUTES Page 1 DES PLAINES ZONING BOARD MEETING SEPTEMBER 29, 2015 MINUTES The Des Plaines Zning Bard Meeting held its regularly scheduled meeting n Tuesday,, at 7:30 p.m. in Rm 102 f the Des Plaines Civic Center.

More information

Applications Skill Checks

Applications Skill Checks Applicatins Skill Checks Use these questins t understand hw t extract key issues and apply ptential slutins that will be similar t the Part II CAM exam. Present Cnditin Sample 1: A new prperty in the neighbrhd

More information

Town of Bargersville Application Kit Encroachment Request

Town of Bargersville Application Kit Encroachment Request Twn f Bargersville Applicatin Kit Encrachment Request APPLICATION A cmplete applicatin and all required attachments and frms are t be submitted by the date shwn n the Strm Water Bard Meeting Schedule.

More information

City of Richmond Rent Control and Just Cause for Eviction. Fact Sheet

City of Richmond Rent Control and Just Cause for Eviction. Fact Sheet Page 1 City f Richmnd Rent Cntrl and Just Cause fr Evictin Fact Sheet As f: Octber 15, 2015 NOTE: On September 3, 2015, prpnents f a referendum n the Rent Cntrl and Just Cause fr Evictin rdinance timely

More information

Accessory Dwelling Unit (ADU) Permanent Regulations (Revisions to TMC and 13.06)

Accessory Dwelling Unit (ADU) Permanent Regulations (Revisions to TMC and 13.06) Accessry Dwelling Unit (ADU) Permanent Regulatins (Revisins t TMC 13.05 and 13.06) Planning Cmmissin Findings f Fact and Recmmendatins Reprt Octber 17, 2018 A. Subject: The prpsal is t mdify zning regulatins

More information

Transportation/Utility Corridor (TUC) Program Policy

Transportation/Utility Corridor (TUC) Program Policy Transprtatin/Utility Crridr (TUC) Prgram Plicy April 2004 Land Planning Realty Services Branch Prperties Divisin Alberta Infrastructure Apprved by: Original signed by April 16, 2004 Eric J. McGhan Deputy

More information