1 Pipeline Easement and Right-of-Way Agreements Mark Landefeld OSU Extension Monroe County Clif Little OSU Extension Guernsey County

2 In this presentation we will look at items related to oil and gas pipeline type developments in eastern Ohio.

3 Disclaimer: Don t sign anything without seeking the advice of an attorney. The information provided is intended for educational purposes only!

4 Pipeline Construction Standards ODNR-DSWC has developed a model pipeline standard and construction specification to provide guidelines for controlling and minimizing the adverse impacts of pipeline construction on Ohio s soil and water resources. Web Site: er/pdf/swcd/pipelinestandard_ pdf

5

6 Project Type: Production lines & Wellheads Siting Jurisdiction: Ohio Department of Natural Resources (ODNR) Safety Jurisdiction: ODNR

7 Project Type: Gathering lines Siting Jurisdiction: Local zoning authorities Safety Jurisdiction: Public Utilities Commission of Ohio (PUCO)

8 Project Type: Natural gas distribution/transmission (intrastate)* within Ohio Siting Jurisdiction: Ohio Power Siting Board (OPSB) Safety Jurisdiction: PUCO *OPSB jurisdiction is limited to intrastate lines greater than 500 feet in length and 9 inches in diameter with a Maximum Allowable Operating Pressure of greater than 125 psi.

9 Project Type: Natural gas transmission (interstate) across state lines Siting Jurisdiction: Federal Energy Regulatory Commission (FERC) Safety Jurisdiction: Pipeline and Hazardous Materials Safety Administration (PHMSA)

10 Project Type: Liquids lines (individual finished product such as ethane, propane, butanes etc.) Siting Jurisdiction: Local zoning authorities Safety Jurisdiction: PHMSA

11

12

13

14

15

16 Pipeline Right-of-Way through a forested area

17 Easements Generally An easement is a legal right to use the real property of another. Arises by agreement between property owner (grantor) and easement holder (grantee), and should be documented in a written legal instrument. Easement instrument should be filed with county recorder where property exists. Also referred to as a right-of-way.

18 Easements Generally Ownership of land remains with landowner. As does obligation of property taxes. Landowner s rights on the easement property can be entirely restricted. May be temporary or perpetual. Easement payment and income tax: Temporary: ordinary income Perpetual: capital gains

19 Easements and Oil and Gas Leases Have I already granted any pipeline easements in my oil and gas lease? Check language of the lease to clarify extent of rights granted. In future leasing, remove grants of easement rights and negotiate those by separate agreement.

20 Pipeline Easements and Eminent Domain Ohio law grants pipeline companies the power of eminent domain to obtain property for some pipeline projects. And also the power to enter onto and survey private property for pipeline projects. Ohio Revised Code But company must follow eminent domain process and procedures. Chapter 163, Ohio Revised Code.

21 Pipeline Easements: Initial Questions Are there potential conflicts with other agreements, contracts or programs? Does pipeline conflict with an existing easement on the land? Does pipeline violate an existing agreement for a government program--crp, EQIP, etc.? Fully consider landowner s individual situation and what s happening on the property.

22 Pipeline Easements: Initial Questions Should I involve an attorney? Highly recommended One with experience in oil and gas, property law Different roles for an attorney Review the easement agreement Actively negotiate the easement Represent in eminent domain proceeding Do a cost/benefit analysis

23 Pipeline Easements: Initial Questions Should I negotiate easement together with other landowners? Landowner group negotiation approach? Challenge Differences in properties, land uses. Benefit Compensation?

24 Two Easements in One Pipeline easement Perpetual Continues indefinitely unless there is an ending agreement. Temporary construction easement Exists during pipeline construction process and possibly also for maintenance, repairs, replacement of pipeline. Important to establish clear boundaries and scope for each easement.

25 Payment for the Easements Payment is based on length of pipeline run across the property. Price typically paid per linear foot How does width or total acreage factor into the payment? Doesn t, unless landowner raises it. Increase payment for higher width of easement?

26 Payment Considerations What is the amount for the easement, and what is the amount for damages to the property? What about other costs such as: Survey work Attorney fees Filing fees Other

27 Easement Location Minimize impacts on property, farm, sensitive areas, etc. May need to specifically exclude areas. Can it parallel property boundaries or other easements?

28 Easement Location Determine the location clearly. Avoid a blanket easement. Use legal descriptions and illustrations. Request a pre & post-construction survey for exact location.

29 Easement Width Typical width: 100 to150 feet- often includes construction area May shrink down to about feet after construction?

30 Pipeline(s): Number & Size(s) Limit the easement to a single pipeline? How to address the possibility of additional line(s) in the future: Additional easement or approval. Additional payment. Clarify size of the pipeline(s), or establish maximum size(s). Another factor to consider for payment.

31 Pipeline Depth Clarify the required depth of the pipeline when laid beneath the land surface. Minimum: 36 inches For agriculture, consider inches to avoid conflicts with surface use.

32 Other Structures or Facilities Restrict surface facilities or structures on the easement. Compressor/pump stations? Pig launchers, drips, valves, metering equipment Alternatively, could limit surface facilities to certain locations. Consider this in payment determination.

33 Substances in the Pipeline Limit to natural gas and constituents. Generally prohibit other substances. List specifically excluded substances like sewage, wastewater, etc.

34 Pressure in the Pipeline Establish maximum pressure for the line. Consider higher payment for higher pressure line. Due to higher risks.

35 Limitations on Easement Use Prohibit company s right to grant permission: To other companies. For other types of easement uses. Determine ingress or egress points onto the easement

36 Construction Timetable Establish a specific time period for the construction and installation of the pipeline. Include timetable for temporary construction easement. Include remedies for failing to meet timeline. Include restrictions on workers during construction period.

37 Crossings at Ditches, Waterways Will pipeline cross a ditch or waterway,? Consider impacts. Require company to construct temporary crossings.

38 Restoration of Land Incorporate ODNR standards. And/or establish how company will restore easement area. After construction and after any future surface disturbance. Specify top soil removal and replacement methods (double ditching; original topsoil). Require soil enrichment manure, compost. Require reseeding may need future years, until established.

39 What if forage seeding did not take and the area is too rough for farm equipment? What if boulders are encountered?

40 What if the pipeline area becomes weed infested? How, Who and when will it be fixed? Who removes sedimentation devices?

41 Weeds can be a problem.

42 Water diversion bars prevented erosion but you can t run hay harvesting equipment over these.

43 Could there be some yield loss and if so how long?

44 Other Restoration or Repair Will there be impacts or repairs needed for: Field tile? Fences, gates (types and who maintains)? Livestock watering - Springs? Roads or driveways and how are these used? Timber, Tree tops ground, piled, burned? Other uses, structures, etc. on your property?

45 There are also temporary easements and water lines.

46 There can be damage even with temporary structures and lines.

47

48

49

50

51

52

53

54

55 Landowner s Rights of Use Retain broad rights to use the easement area. May farm in, on and around the easement. May graze animals. Permit temporary structures or accessories. What about driveways, landscaping, parking? Consider all potential future uses and needs Crossing the pipeline for timber harvest, etc.

56 Signage and Markers You may require that landowner agree to locations for required signage that the company must post. Will company mark the easement boundaries?

57 Easement Inspection and Maintenance Address how company will access the easement in the future, inspection schedule? Establish a routine maintenance, Identify times when company can t access, i.e., harvest, planting & provide notice of spraying, etc..

58 Disputes or Problems Address procedure for notifying company of a problem or for handling disputes. Where to direct problems. Time period for addressing or remedying the problem. Dispute resolution? Have it in your local area, and Options. Legal remedies if fail to address problem.

59 Indemnification Require company to indemnify landowner and hold harmless against any future lawsuits that may arise. Of or arising from the easement. Due to the pipeline, equipment or any facilities, etc. As a landowner you may want the right to hire legal representation.

60 Assignment Rights Address procedures for assignment of rights to other companies. Notice to landowner required. Compliance with easement terms required. As a landowner, be careful of granting Exclusive rights.

61 Amendments to Easement No verbal amendments. Establish that a written agreement is required to amend the easement terms.

62 Apportionment of Payment Require company to itemize payments for easement and damages. Income tax reporting advantages.

63 Warranting Title Do not agree to warrant or promise clear title to the property. Or to compensate company if a title issue arises.

64 Abandonment of Easement Define what constitutes an abandonment of the easement by the company. No construction occurs within X years of entering into easement agreement. No actual use of pipeline after X years. How long will this agreement last and how is my title cleared of this encumbrance?

65 Termination of Easement Define what constitutes termination of the easement. Require notice of termination to landowner. Determine company s obligations upon termination. Clarify landowner s rights upon termination. Address company s obligations: Remediation after removal & timeframe.

66 Final Thoughts If asked to grant an easement make certain you understand everything it includes While not mandatory, we recommend you consult with an attorney Review the agreement, Keep a log of conversations Actively negotiate the easement Get contact information Name(s) Address Phone Number(s)

67 For More Information Relating to Oil and Gas Development shalegas.osu.edu

Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210

Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series Understanding and Negotiating Pipeline Easements Peggy Kirk Hall Director,

More information

Texas Pipeline Easement Negotiation Checklist

Texas Pipeline Easement Negotiation Checklist EAG-009 6/14 Texas Pipeline Easement Negotiation Checklist Tiffany Dowell Assistant Professor and Extension Specialist Texas A&M AgriLife Extension Service In response to the oil and gas boom in Texas,

More information

Marcellus Education Fact Sheet

Marcellus Education Fact Sheet Marcellus Education Fact Sheet Negotiating Pipeline Rights-of-Way in Pennsylvania What Is a Pipeline Right-of-Way? A pipeline right-of-way is a strip of land over and around natural gas pipelines where

More information

Form of Easement and Right of Way Agreement For Gas Pipeline

Form of Easement and Right of Way Agreement For Gas Pipeline Form of Easement and Right of Way Agreement For Gas Pipeline This Easement and Right of Way Agreement ( Easement ) is entered by and between, with an address of ( Grantor ) and with an address of ( Grantee

More information

Right-of-Way and Easements for Electric Facility Construction

Right-of-Way and Easements for Electric Facility Construction Right-of-Way and Easements for Electric Facility Construction The Public Service Commission of Wisconsin (PSC) offers this overview to landowners who must negotiate easement contracts with utilities for

More information

EASEMENT AGREEMENT (Distributor Performance Non-Exclusive)

EASEMENT AGREEMENT (Distributor Performance Non-Exclusive) EASEMENT AGREEMENT (Distributor Performance Non-Exclusive) THIS EASEMENT AGREEMENT, effective the day of, 20, is made between WITNESSETH:, hereafter called Grantor, (whether grammatically singular or plural)

More information

AGRICULTURAL IMPACT MITIGATION PLAN CapX kv Electric Transmission Projects in Minnesota

AGRICULTURAL IMPACT MITIGATION PLAN CapX kv Electric Transmission Projects in Minnesota AGRICULTURAL IMPACT MITIGATION PLAN CapX2020 345 kv Electric Transmission Projects in Minnesota CapX2020 June 2009 AGRICULTURAL IMPACT MITIGATION PLAN CapX2020 Table of Contents Purpose... 1 General Provisions...

More information

ELEMENTS OF REAL PROPERTY

ELEMENTS OF REAL PROPERTY ELEMENTS OF REAL PROPERTY Real property consists of: Land: including the soil on the surface of the earth, all of the water, minerals, oil, and gas contained on or below the surface, and most of the airspace

More information

Easement Policy Agricultural Crown Land July 2018

Easement Policy Agricultural Crown Land July 2018 Easement Policy July 2018 A. Purpose This policy describes the terms and conditions associated with applications for easement agreements on land for the construction, laying down, maintenance, operation,

More information

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the: EASEMENT AGREEMENT THIS EASEMENT AGREEMENT made and entered into as of the day of,, by and between: hereinafter called Grantor, (whether grammatically singular or plural) and the: hereinafter called Distributor.

More information

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort

More information

Beltrami County Natural Resource Management Policy: Easements and Access Across County Lands

Beltrami County Natural Resource Management Policy: Easements and Access Across County Lands Page 1 Purpose Beltrami County Natural Resource Management Policy: Easements and Access Across County Lands The procedure and requirements for private, government, commercial, and utility entities to cross

More information

PRIVATE PROPERTY PUBLIC PURPOSE

PRIVATE PROPERTY PUBLIC PURPOSE PRIVATE PROPERTY PUBLIC PURPOSE Understanding Right-of-Way Acquisition for Transmission Lines At Progress Energy, we are committed to providing safe, reliable and affordable energy to our customers. As

More information

Section 6 Easements and Rights-of-Way

Section 6 Easements and Rights-of-Way Section 6 Easements and Rights-of-Way GENERAL REQUIREMENTS...6-1 I. EASEMENTS...6-1 6.1 ROADWAY EASEMENT...6-1 6.2 UTILITY EASEMENT...6-1 6.3 SEWER EASEMENT...6-1 6.4 WATER MAIN EASEMENT...6-2 6.5 CHANNEL

More information

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT Complete this form, print, and mail to: Minnehaha County Highway Dept. 2124 E 60 th St N, Sioux Falls, SD 57104, or Email: jmaras@minnehahacounty.org

More information

Forested Buffer Water Resource Easement Carroll County, Maryland

Forested Buffer Water Resource Easement Carroll County, Maryland Forested Buffer Water Resource Easement Carroll County, Maryland FORESTED BUFFER WATER RESOURCE EASEMENT THIS DEED OF EASEMENT, made this day of, in the year nineteen hundred and ninety-five, by and between,

More information

ALBERTA SURFACE LEASE AGREEMENT

ALBERTA SURFACE LEASE AGREEMENT CAPL 95 ALBERTA ALBERTA SURFACE LEASE AGREEMENT This Indenture of Lease made the day of A.D. 20 BETWEEN of. in the Province of Alberta, (hereinafter called the Lessor ) and (hereinafter called the Lessee

More information

Patrick L. Reznik

Patrick L. Reznik Patrick L. Reznik 512-894-5426 preznik@braungresham.com www.braungresham.com 1 LCRA/CTEC Blumenthal Substation Saturday, September 6, 2014 Hill Country Alliance, Fredericksburg, TX 2 Big Picture Phase

More information

It is necessary for the Board to adopt the attached resolution accepting the dedication of the easement.

It is necessary for the Board to adopt the attached resolution accepting the dedication of the easement. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i May 28, 2013 11. ACCEPTANCE OF A SANITARY SEWER EASEMENT FROM THE COMMONWEALTH OF VIRGINIA, DEPARTMENT OF TRANSPORTATION Attached for your review

More information

Published by: Alberta Agriculture and Rural Development Street Edmonton, Alberta T6H 5T6. Printed in Canada

Published by: Alberta Agriculture and Rural Development Street Edmonton, Alberta T6H 5T6. Printed in Canada Published by: Alberta Agriculture and Rural Development 7000-113 Street Edmonton, Alberta T6H 5T6 Printed in Canada Copies of this publication are available from: Publications Office Alberta Agriculture

More information

Wind Development in Montana: Leases, Options, and Update

Wind Development in Montana: Leases, Options, and Update Wind Development in Montana: Leases, Options, and Update I. General Introduction: What is a Wind Lease? A Wind Lease is a Contract to use the surface of the land for a term of years for a specific purpose.

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION Forest Conservation Law Amendments - Modifications MCPB Item No. 7 Date: 5/24/2018 SUMMARY Mark Pfefferle,

More information

MILLE LACS COUNTY DRAINAGE AUTHORITY DRAINAGE POLICY

MILLE LACS COUNTY DRAINAGE AUTHORITY DRAINAGE POLICY CONTENTS MILLE LACS COUNTY DRAINAGE AUTHORITY DRAINAGE POLICY 1. DEFINITIONS... 2 2. GENERAL INFORMATION... 2 3. INSPECTIONS... 3 4. MEETINGS... 3 5. RECORDS RETENTION... 3 6. ADDITIONAL DRAINAGE... 3

More information

C O U N T Y F A R M L E A S E

C O U N T Y F A R M L E A S E Prepared by: Timothy R. Kenyon, Union County Attorney, Union County Courthouse, Creston, Iowa 641.782.1730 C O U N T Y F A R M L E A S E Recorder s Cover Sheet Return Document To: Grantors: Timothy R.

More information

Transitioning from the Farmland Preservation Program to the Working Lands Initiative

Transitioning from the Farmland Preservation Program to the Working Lands Initiative Transitioning from the to the The table below describes differences between the Department of Agriculture, Trade and Consumer Protection s (DATCP) previous and the new. Contact: DATCPWorkingLands@wisconsin.gov

More information

FARM LEASE BID SHEET - CASH RENT

FARM LEASE BID SHEET - CASH RENT Owner: Des Moines County Conservation c/o Chris Lee, Executive Director 13700 Washington Road West Burlington, IA 52655 (319) 753-8260 Conservation@dmcounty.com Bids Due: FARM LEASE BID SHEET - CASH RENT

More information

PERMITTED ACTS and RURAL ENTERPRISES

PERMITTED ACTS and RURAL ENTERPRISES PERMITTED ACTS and RURAL ENTERPRISES Pennsylvania s Agricultural Area Security Law, known as Act 43, 3 P.S. 901. et seq., and the Regulations promulgated thereunder by the Pennsylvania Department of Agriculture

More information

CHAPTER 154 RIGHTS OF WAY

CHAPTER 154 RIGHTS OF WAY CHAPTER 154 RIGHTS OF WAY 154.01 Purpose and Rule of Interpretation 154.09 City Construction and Paving 154.02 Franchise, License or Lease Required 154.10 Design Notice to City 154.03 Fees Required 154.11

More information

Stormwater Ordinance Appendix APPENDIX K EXAMPLE TAR-PAM CONVERSATION EASEMENT

Stormwater Ordinance Appendix APPENDIX K EXAMPLE TAR-PAM CONVERSATION EASEMENT APPENDIX K EXAMPLE TAR-PAM CONVERSATION EASEMENT Tax Parcel ID # NORTH CAROLINA FRANKLIN COUNTY CONSERVATION EASEMENT Franklin County, North Carolina THIS CONSERVATION EASEMENT (this "Conservation Easement")

More information

GRANT OF TRAIL ACCESS EASEMENT, COVENANTS AND RESTRICTIONS

GRANT OF TRAIL ACCESS EASEMENT, COVENANTS AND RESTRICTIONS This is a sample easement provided for discussion and illustrative purposes only. Easements for each property will be customized based upon the needs of each landowner and the Path. GRANT OF TRAIL ACCESS

More information

Sagamore Hills Township Valley View Rd. Sagamore Hills, OH (330) Phone (330) Fax

Sagamore Hills Township Valley View Rd. Sagamore Hills, OH (330) Phone (330) Fax Right-of-Way Excavation Rules & Regulations 1. PERMIT REQUIRED: A right-of-way excavation permit is required when placing, extending, or repairing any pipes, cables, wires, roadway structure or appurtenances,

More information

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the: EASEMENT AGREEMENT THIS EASEMENT AGREEMENT, made and entered into as of the day of,, by and between: hereinafter called Grantor, (whether grammatically singular or plural) and the: hereinafter called Distributor.

More information

What Do I Need to Know?

What Do I Need to Know? An Interstate Natural Gas Facility on My Land? What Do I Need to Know? Prepared by the Federal Energy Regulatory Commission Federal Energy Regulatory Commission Washington, DC www.ferc.gov An Interstate

More information

CHAPTER 2 RELATED DOCUMENTS AND FORMS

CHAPTER 2 RELATED DOCUMENTS AND FORMS CHAPTER 2 RELATED DOCUMENTS AND FORMS TABLE OF CONTENTS CHAPTER 2 RELATED DOCUMENTS AND FORMS Resolution R00- Establishing Public Improvement Design Standards Page 1 Current Plans Review & Construction

More information

Pipelines & Eminent Domain THE PROPOSED KINDER MORGAN PERMIAN HIGHWAY PIPELINE OCTOBER 29, 2018 JIM BRADBURY JAMES D.

Pipelines & Eminent Domain THE PROPOSED KINDER MORGAN PERMIAN HIGHWAY PIPELINE OCTOBER 29, 2018 JIM BRADBURY JAMES D. Pipelines & Eminent Domain THE PROPOSED KINDER MORGAN PERMIAN HIGHWAY PIPELINE OCTOBER 29, 2018 JIM BRADBURY JAMES D. BRADBURY, PLLC The Kinder Morgan Permian Highway Pipeline Project Permian Highway

More information

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III O DATE: December 12-13, 2012 ****************************************************************************** SUBJECT: Resolution

More information

Can the Landowner Ride the Wind? By: Brandon L. Jensen Budd-Falen Law Offices, LLC

Can the Landowner Ride the Wind? By: Brandon L. Jensen Budd-Falen Law Offices, LLC Can the Landowner Ride the Wind? By: Brandon L. Jensen Budd-Falen Law Offices, LLC There are a lot of reasons that western landowners love to hate the wind --- it s relentless, constant, never ceasing,

More information

Date Received: Application Complete? YES / NO

Date Received: Application Complete? YES / NO OFFICE USE ONLY Section 22 (Official Plan Amendment) Section 34 (Zoning Amendment), Section 36 (Holding Zone Removal), Section 41 (Site Plan Approval) and Section 45 (Minor Variance) of the Planning Act

More information

3. Have both parties sign both copies, or sign one lease and make a copy of the

3. Have both parties sign both copies, or sign one lease and make a copy of the Sample Maryland Crop-Share Rent Farm Lease Directions: 1. Complete two copies of this lease, one for the landlord and one for the tenant. 2. Cross out or delete any unnecessary clauses. 3. Have both parties

More information

DEED OF AGRICULTURAL CONSERVATION EASEMENT TO THE COMMONWEALTH OF PENNSYLVANIA IN PERPETUITY

DEED OF AGRICULTURAL CONSERVATION EASEMENT TO THE COMMONWEALTH OF PENNSYLVANIA IN PERPETUITY Prepared By: Return To: UPI# DPERSF (6-2006) EXHIBIT C DEED OF AGRICULTURAL CONSERVATION EASEMENT TO THE COMMONWEALTH OF PENNSYLVANIA IN PERPETUITY THIS DEED OF AGRICULTURAL CONSERVATION EASEMENT, made

More information

WEST CENTRAL STAKEHOLDERS

WEST CENTRAL STAKEHOLDERS WEST CENTRAL STAKEHOLDERS LANDOWNER GUIDE: UNDERSTANDING PIPELINES, SETBACKS OBJECTIVE This document is intended as a general guideline for landowners. West Central Stakeholders strongly encourages landowners

More information

HUSUM HILLSIDE PROTECTIVE COVENANTS

HUSUM HILLSIDE PROTECTIVE COVENANTS HUSUM HILLSIDE PROTECTIVE COVENANTS Section 1. Nature, Purpose and Enforcement a. The following are declared to be limitations, restrictions, and uses to which Husum Hillside may be put and specify that

More information

Welcome to the Easement Webinar Call-In Number for audio: Conference Code:

Welcome to the Easement Webinar Call-In Number for audio: Conference Code: Welcome to the Easement Webinar Call-In Number for audio: 1.866.422.4457 Conference Code: 2113365039 Easement Issues Ellen Kreifels BLANKENAU WILMOTH JARECKE LLP ellen@nebenergylaw.com christina@aqualawyers.com

More information

Whitewater Point & Barber Acres

Whitewater Point & Barber Acres MAXWELL COMMUNITIES Whitewater Point & Barber Acres OVERVIEW: Both Whitewater Point and Barber Acres are conveniently located in the West Harrison / Logan area of Dearborn County. Both are secluded areas,

More information

Wind Energy Easements

Wind Energy Easements Wind Energy Easements Prepared by Robert R. Nardi Willeke & Daniels 210 Ridgewood Avenue Minneapolis, MN 55403 (612) 870-4000 Presented by John H. Daniels, Jr. Willeke & Daniels 210 Ridgewood Avenue Minneapolis,

More information

ARTICLE 3 DEFINITIONS

ARTICLE 3 DEFINITIONS Sections: 3-1 Rules of Construction 3-2 Definitions ARTICLE 3 DEFINITIONS SECTION 3-1 RULES OF CONSTRUCTION 3-101. a. The language set forth in these regulations shall be interpreted in accordance with

More information

APPLICATION FOR RIGHT-OF-WAY EXCAVATION PERMIT VIOLET TOWNSHIP

APPLICATION FOR RIGHT-OF-WAY EXCAVATION PERMIT VIOLET TOWNSHIP Permit No. APPLICATION FOR RIGHT-OF-WAY EXCAVATION PERMIT VIOLET TOWNSHIP Applicant: (property owner or authorized agent) Phone No. Mailing Address: Contact Name and Phone Number: (must include 24-hour

More information

Implementation Tools for Local Government

Implementation Tools for Local Government Information Note #5: Implementation Tools for Local Government This Information Note is a guide only. It is not a substitute for the federal Fisheries Act, the provincial Riparian Areas Regulation, or

More information

{{t:t;r:n;o:"signer 2";l:"Date";}}

{{t:t;r:n;o:signer 2;l:Date;}} Application/File # Date Application Rec'd: Oct 13 2017 Fee Collected $ (for office use only) CONDITIONAL USE APPLICATION MOTLEY MN Site Address (E-911#): 164 MORRISON STREET WEST 410095000 Lake/River Name:

More information

Important aspects of an oil & gas lease Clif Little OSU Extension Agriculture and Natural Resources Guernsey and Noble Counties Feb.

Important aspects of an oil & gas lease Clif Little OSU Extension Agriculture and Natural Resources Guernsey and Noble Counties Feb. Important aspects of an oil & gas lease Clif Little OSU Extension Agriculture and Natural Resources Guernsey and Noble Counties Feb. 2011 Oil and gas exploration may have great economic implications for

More information

ONEOK Bakken Pipeline (Bear Creek) Staff Report Conditional Use Permit

ONEOK Bakken Pipeline (Bear Creek) Staff Report Conditional Use Permit ONEOK Bakken Pipeline (Bear Creek) Staff Report Conditional Use Permit Conditional use permit request for a 37.5 mile natural gas pipeline, known Application: as Bear Creek Pipeline. Hearing Date: October

More information

ISSUING AGENCY: Commissioner of Public Lands - New Mexico State Land Office. [ NMAC - Rp,

ISSUING AGENCY: Commissioner of Public Lands - New Mexico State Land Office. [ NMAC - Rp, TITLE 19 CHAPTER 2 PART 10 NATURAL RESOURCES AND WILDLIFE STATE TRUST LANDS EASEMENTS AND RIGHTS OF WAY 19.2.10.1 ISSUING AGENCY: Commissioner of Public Lands - New Mexico State Land Office. [19.2.10.1

More information

PERMANENT EASEMENT AGREEMENT. good and valuable consideration, the sufficiency and receipt of which is hereby acknowledged, The Esther Harrison

PERMANENT EASEMENT AGREEMENT. good and valuable consideration, the sufficiency and receipt of which is hereby acknowledged, The Esther Harrison PERMANENT EASEMENT AGREEMENT For and in consideration of the sum of Seven thousand thirty and 00/100 dollars ($7,030.00) and other good and valuable consideration, the sufficiency and receipt of which

More information

RECITALS. Page 1 of 9

RECITALS. Page 1 of 9 INTERLOCAL AGREEMENT BETWEEN THE COUNTY OF VOLUSIA AND THE CITY OF DEBARY FOR REIMBURSEMENT OF UTILITY CONSTRUCTION AND A UTILITY SERVICE AGREEMENT FOR POTABLE WATER THIS AGREEMENT is entered into by and

More information

Natural Gas Pipelines: The Role of Conservation Commissions MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS

Natural Gas Pipelines: The Role of Conservation Commissions MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS Natural Gas Pipelines: The Role of Conservation Commissions EUGENE B. BENSON, MACC EXECUTIVE DIRECTOR PRESENTED TO FRCOG REGIONAL PIPELINE ADVISORY COMMIT TEE MARCH 8, 2016 Presentation Topics 1. NATURAL

More information

UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION

UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION Case 1:16-cv-03297-ELR Document 1 Filed 08/31/16 Page 1 of 15 UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC, Plaintiff,

More information

DEED OF TEMPORARY EASEMENT

DEED OF TEMPORARY EASEMENT DEED OF TEMPORARY EASEMENT This DEED OF TEMPORARY EASEMENT ( Agreement ) is made this day of, 2005 by THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA, a body corporate ( Grantor ), and LEE GARDENS HOUSING

More information

Legal Aspects of Farm Leases under Missouri Law

Legal Aspects of Farm Leases under Missouri Law Legal Aspects of Farm Leases under Missouri Law Stephen F. Matthews Professor of Agricultural Law Department of Agricultural Economics University of Missouri 1 Legal Subtleties: Not All Farm Leases Are

More information

What Should I Know About Selling My Timber?

What Should I Know About Selling My Timber? Agriculture and Natural Resources FSA5014 What Should I Know About Selling My Timber? Tamara Walkingstick Extension Specialist - Forestry Kyle Cunningham Forestry Instructor Caroll Guffey Natural Resources

More information

Welcome! Sarpy Transmission Project. Public Hearing October 23, 2018

Welcome! Sarpy Transmission Project. Public Hearing October 23, 2018 Welcome! Sarpy Transmission Project Public Hearing October 23, 2018 Agenda Safety Introductions Purpose of Hearing Explain the project need Present the project timeline Describe rights of each property

More information

Honorable Mayor and Members of the City Council. Sewer Easement Deed Agreement at 2705 Walker Street

Honorable Mayor and Members of the City Council. Sewer Easement Deed Agreement at 2705 Walker Street Office of the City Manager CONSENT CALENDAR October 30, 2012 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Andrew Clough, Director, Public Works

More information

RESOLUTION NUMBER 2017-

RESOLUTION NUMBER 2017- RESOLUTION NUMBER 2017- RESOLUTION BY THE CITY COUNCIL OF THE CITY OF ORLANDO, FLORIDA, DETERMINING THE NECESSITY OF ACQUIRING CERTAIN REAL PROPERTY ALONG BOGGY CREEK ROAD FOR THE PURPOSE OF CONSTRUCTING

More information

PARTNERSHIP AGREEMENT

PARTNERSHIP AGREEMENT Agreement #_ WORKING GRASSLAND PARTNERSHIP AGREEMENT This agreement (with attachments) made this day of, 20, by and between Name and Address, herein after referred to as (whether one or more) and the North

More information

People, Property and Power Lines. Frequently asked questions about power lines on or near your property

People, Property and Power Lines. Frequently asked questions about power lines on or near your property People, Property and Power Lines Frequently asked questions about power lines on or near your property Great River Energy is a not-for-profit wholesale electric power cooperative which provides electricity

More information

PIPELINE RIGHT-OF-WAY EASEMENT

PIPELINE RIGHT-OF-WAY EASEMENT PIPELINE RIGHT-OF-WAY EASEMENT THIS RIGHT-OF-WAY EASEMENT made this day of March, 2014, by the City of Rochester Hills, a municipal corporation in the State of Michigan,, having an address at 1000 Rochester

More information

CORPORATION USE ONLY Date Approved: Service Classification: Cost: Work Order Number: Eng. Update: Account Number: Service Inspection Date:

CORPORATION USE ONLY Date Approved: Service Classification: Cost: Work Order Number: Eng. Update: Account Number: Service Inspection Date: RUS-TX Bulletin 1780-9 TX PN No. 56 (Rev. 1/09) Please Print: DATE CORPORATION USE ONLY Date Approved: Service Classification: Cost: Work Order Number: Eng. Update: Account Number: Service Inspection Date:

More information

3. Have both parties sign both copies, or sign one lease and make a copy of the

3. Have both parties sign both copies, or sign one lease and make a copy of the Sample Maryland Fixed Cash Rent Farm Lease Directions: 1. Complete two copies of this lease, one for the landlord and one for the tenant. 2. Cross out or delete any unnecessary clauses. 3. Have both parties

More information

Marin County Agricultural Land Conservation Program March 1, 2014

Marin County Agricultural Land Conservation Program March 1, 2014 Marin County Agricultural Land Conservation Program March 1, 2014 I. Purpose of this Document This document describes the Marin County Agricultural Land Conservation Program (County Program). The Marin

More information

STAFF REPORT. DATE: October 7, 2013

STAFF REPORT. DATE: October 7, 2013 STAFF REPORT DATE: October 7, 2013 TO: FROM: SUBJECT: The Honorable Mayor and City Council John Penrod, City Attorney CONSIDERATION OF APPROVING EASEMENT AGREEMENTS WITH THE CORPORATION OF THE PRESIDING

More information

STATEMENT OF CONDITIONS FOR USE OF

STATEMENT OF CONDITIONS FOR USE OF STATEMENT OF CONDITIONS FOR USE OF WATER FACILITY EASEMENT GRANTEE: PORTLAND WATER BUREAU of the CITY OF PORTLAND, a municipal corporation of the State of Oregon LEGAL DESCRIPTION: (Attached hereto) SITE

More information

AGENDA ITEM FORM INFORMATION ONLY PRESENTATION DISCUSSION ONLY ACTION ITEM

AGENDA ITEM FORM INFORMATION ONLY PRESENTATION DISCUSSION ONLY ACTION ITEM Town of Dumfries Council Meeting AGENDA ITEM FORM Meeting Date: Agenda Item# February 5, 2019 XIII-A TYPE OF AGENDA ITEM: PURPOSE OF ITEM: CONSENT AGENDA INFORMATION ONLY PRESENTATION DISCUSSION ONLY ACTION

More information

REGENTS POLICY PART V FINANCE AND BUSINESS MANAGEMENT Chapter Real Property

REGENTS POLICY PART V FINANCE AND BUSINESS MANAGEMENT Chapter Real Property REGENTS POLICY PART V FINANCE AND BUSINESS MANAGEMENT Chapter 05.11 Real Property P05.11.010. Purpose and Scope. A. This chapter establishes guidelines for the prudent management, including trust management,

More information

Crib Point Pakenham Pipeline Landowner Reference Material & Frequently Asked Questions

Crib Point Pakenham Pipeline Landowner Reference Material & Frequently Asked Questions Crib Point Pakenham Pipeline Landowner Reference Material & Frequently Asked Questions ISSUE DATE: September 2018 Introduction APA is committed to providing landowners and other project stakeholders with

More information

Torch Lake Township Antrim County, Michigan

Torch Lake Township Antrim County, Michigan Torch Lake Township Antrim County, Michigan Farmland and Open Space Development Rights Ordinance Ordinance No. 04-01 Effective September 3, 2004 AN ORDINANCE creating a farmland and open space protection

More information

VACANT LAND DISCLOSURE REPORT DISCLAIMER

VACANT LAND DISCLOSURE REPORT DISCLAIMER WISCONSIN REALTORS ASSOCIATION 4801 Forest Run Road Madison, Wisconsin 53704 VACANT LAND DISCLOSURE REPORT Page 1 of 5 DISCLAIMER THIS DISCLOSURE REPORT CONCERNS THE REAL PROPERTY LOCATED AT IN Lot 10,

More information

All roads developed to access four (4) or more parcels shall be constructed to Park County Road and Bridge Standards.

All roads developed to access four (4) or more parcels shall be constructed to Park County Road and Bridge Standards. P a r k C o u n t y P l a n n i n g a n d Z o n i n g 1002 Sheridan Avenue Cody, WY 82414 Phone: 307-527-8540 35-40 ACRE SUBDIVISIONS www.parkcounty.us/planandzone.htm May 2011 This is only intended as

More information

Terry E. Poole Principal Agent Emeritus University of Maryland Extension

Terry E. Poole Principal Agent Emeritus University of Maryland Extension Terry E. Poole Principal Agent Emeritus University of Maryland Extension What is a lease? Simply put, it s a contract by which one party (the landowner/landlord) gives another party (the tenant) the use

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM CITY COUNCIL AGENDA MEMORANDUM City and County of Broomfield, Colorado To: From: Prepared by: Mayor and City Council Charles Ozaki, City and County Manager Kenneth D. Rutt, Wastewater Division Superintendent

More information

PARTIAL SUBMITTALS WILL NOT BE ACCEPTED. REQUIRED MATERIALS FOR A COMPLETE APPLICATION ARE:

PARTIAL SUBMITTALS WILL NOT BE ACCEPTED. REQUIRED MATERIALS FOR A COMPLETE APPLICATION ARE: CITY OF MONROE Community Development Department 806 West Main Street Monroe, WA 98272 Phone: (360) 794-7400 Fax: (360) 794-4007 Land Clearing / Forest Practices Permit Requirements LAND CLEARING PERMIT

More information

Recitals. WHEREAS, Grantor owns real property ("Property"), under which Improvements (as defined in Section 1 below) will pass; and

Recitals. WHEREAS, Grantor owns real property (Property), under which Improvements (as defined in Section 1 below) will pass; and EASEMENT AGREEMENT This Easement Agreement ("Agreement") effective this 24 th day of April, 2017, by and between YMCA Community Campus, LLC, whose address is 3200 Spaulding Avenue, Pueblo, CO 81008 ( Grantor

More information

Conservation Easement Best Management Practices

Conservation Easement Best Management Practices Conservation Easement Best Management Practices Natural Resources Department April 2013 The mission of the Larimer County Natural Resources Department is to establish, protect and manage significant regional

More information

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed. Ordinance #68 AN ORDINANCE ENTITLED, AN ORDINANCE AMENDING ARTICLE II DEFINITIONS AND CHAPTER 5.22 (WIND ENERGY SYSTEMS) OF ARTICLE V GENERAL REQUIREMENTS OF ORDINANCE 65 AN ORDINANCE AMENDING ORDINANCE

More information

ARTICLE VI. SPECIAL EXCEPTION REGULATIONS

ARTICLE VI. SPECIAL EXCEPTION REGULATIONS ARTICLE VI. SPECIAL EXCEPTION REGULATIONS SECTION 601. GENERAL DESCRIPTION Special exceptions are deemed to be permitted uses in their respective districts, subject to the satisfaction of the requirements

More information

*SB0046* S.B. 46 S.B AGRICULTURE SUSTAINABILITY ACT. LEGISLATIVE GENERAL COUNSEL 6 Approved for Filing: V. Ashby :38 AM 6

*SB0046* S.B. 46 S.B AGRICULTURE SUSTAINABILITY ACT. LEGISLATIVE GENERAL COUNSEL 6 Approved for Filing: V. Ashby :38 AM 6 LEGISLATIVE GENERAL COUNSEL 6 Approved for Filing: V. Ashby 6 6 01-27-12 10:38 AM 6 S.B. 46 1 AGRICULTURE SUSTAINABILITY ACT 2 2012 GENERAL SESSION 3 STATE OF UTAH 4 Chief Sponsor: Scott K. Jenkins 5 House

More information

RESOLUTION NO. A RESOLUTION AUTHORIZING EXECUTION OF AN EASEMENT AGREEMENT TO ILLINOIS BELL TELEPHONE COMPANY D.B.A. AT&T ILLINOIS

RESOLUTION NO. A RESOLUTION AUTHORIZING EXECUTION OF AN EASEMENT AGREEMENT TO ILLINOIS BELL TELEPHONE COMPANY D.B.A. AT&T ILLINOIS RESOLUTION NO. A RESOLUTION AUTHORIZING EXECUTION OF AN EASEMENT AGREEMENT TO ILLINOIS BELL TELEPHONE COMPANY D.B.A. AT&T ILLINOIS BE IT RESOLVED by the Village Council of the Village of Downers Grove,

More information

WATAB TOWNSHIP, BENTON COUNTY, STATE OF MINNESOTA. ORDINANCE #4 (Amended November 2014) AN ORDINANCE REGULATING TOWN ROAD RIGHTS-OF-WAY

WATAB TOWNSHIP, BENTON COUNTY, STATE OF MINNESOTA. ORDINANCE #4 (Amended November 2014) AN ORDINANCE REGULATING TOWN ROAD RIGHTS-OF-WAY WATAB TOWNSHIP, BENTON COUNTY, STATE OF MINNESOTA ORDINANCE #4 (Amended November 2014) AN ORDINANCE REGULATING TOWN ROAD RIGHTS-OF-WAY The Board of Supervisors of Watab Township, Benton County, hereby

More information

F R E QUENTLY AS K E D QUESTIONS

F R E QUENTLY AS K E D QUESTIONS F R E QUENTLY AS K E D QUESTIONS Mountain Home Substation and 138-kV Transmission Line Project Gillespie, Kerr and Kimble counties PROJECT OVERVIEW 1. What is the Mountain Home Substation and 138-kV Transmission

More information

SANILAC COUNTY ROAD COMMISSION ROAD POLICIES. A. Drainage, Base and Grade Construction (NON BITUMINOUS)

SANILAC COUNTY ROAD COMMISSION ROAD POLICIES. A. Drainage, Base and Grade Construction (NON BITUMINOUS) I. LOCAL ROADS SANILAC COUNTY ROAD COMMISSION A. Drainage, Base and Grade Construction (NON BITUMINOUS) 1. Cost Sharing: Sanilac County Road Commission Share 17% Township Share 83% 2. A Notice of Construction

More information

PERMANENT EASEMENT AGREEMENT

PERMANENT EASEMENT AGREEMENT PERMANENT EASEMENT AGREEMENT This Permanent Easement Agreement ("Agreement") effective this day of, 2016, by and between Goin Straight, LLC, a Colorado limited liability company (Grantor"), whose mailing

More information

GUIDANCE FOR LANDOWNERS AND OCCUPIERS ON CONTRIBUTIONS TOWARDS PROFESSIONAL COSTS

GUIDANCE FOR LANDOWNERS AND OCCUPIERS ON CONTRIBUTIONS TOWARDS PROFESSIONAL COSTS GUIDANCE FOR LANDOWNERS AND OCCUPIERS ON CONTRIBUTIONS TOWARDS PROFESSIONAL COSTS In order to meet the growing demand for reliable electricity supplies, we at Northern Powergrid are continually working

More information

UNDERGROUND CABLE EASEMENT AGREEMENT

UNDERGROUND CABLE EASEMENT AGREEMENT Page 1 of 10 This instrument was prepared by: Marie Andrée Hammond Real Estate Officer Public Works/Facilities Management Division Real Property Section 115 South Andrews Avenue, Room 501 Fort Lauderdale,

More information

GENESIS PIPELINE CANADA LIMITED AGREEMENT FOR EASEMENT PROVINCE OF ONTARIO

GENESIS PIPELINE CANADA LIMITED AGREEMENT FOR EASEMENT PROVINCE OF ONTARIO EASEMENT AGREEMENT GENESIS PIPELINE CANADA LIMITED Property Identification No.: GST #: Yes No GST# AGREEMENT FOR EASEMENT PROVINCE OF ONTARIO I, (We), (the "Owner(s)"), being registered as owner(s) or

More information

This is the Schedule referred to in Easement in Gross in Form 9 dated the day of 200. Title Reference:

This is the Schedule referred to in Easement in Gross in Form 9 dated the day of 200. Title Reference: Page 2 of 7 This is the Schedule referred to in Easement in Gross in Form 9 dated the day of 200. Item 8 Title Reference: 1.0 OBJECTS OF THE GRANT OF EASEMENT 1.1 The objects of this Instrument of Easement

More information

Surface Use Agreements

Surface Use Agreements Leasing Issues Modern Lease Should Include: Royalty payment should be a condition of the lease Royalty valuation should be free of cost and valued at the higher of market value or proceeds at the point

More information

PARTNERSHIP AGREEMENT

PARTNERSHIP AGREEMENT Agreement #_ WORKING GRASSLAND PARTNERSHIP AGREEMENT This agreement (with attachments) made this day of, 20, by and between Name (Husband/Wife) and Address, herein after referred to as (whether one or

More information

Sabine River Authority, State of Louisiana

Sabine River Authority, State of Louisiana Sabine River Authority, State of Louisiana Policy for Administering the Shoreline Management Plan (SMP) Encroachments Adopted by SRA Board of Commissioners: Introduction The Federal Energy Regulatory Commission

More information

BVCLT Ground Lease Simple Version

BVCLT Ground Lease Simple Version BVCLT Ground Lease Simple Version Parties to the Ground Lease: Land Trust (CLT) & Tenant Parties the Ground Lease affects: Tenant s Lender, Property Manager& Subtenants Leasehold Financing: Tenant s interest

More information

CHAPTER 9 ANIMAL WASTE STORAGE

CHAPTER 9 ANIMAL WASTE STORAGE CHAPTER 9 ANIMAL WASTE STORAGE 9.01 Authority 9.02 Title 9.03 Findings and Declaration of Policy 9.04 Purpose 9.05 Interpretation 9.06 Severability Clause 9.07 Applicability 9.08 Effective Date 9.09 Definitions

More information

LEGISLATIVE PURPOSES. 2. Provide sources of agricultural products within the state for the citizens of the state

LEGISLATIVE PURPOSES. 2. Provide sources of agricultural products within the state for the citizens of the state LEGISLATIVE PURPOSES 1. Assist in sustaining the farming community 2. Provide sources of agricultural products within the state for the citizens of the state 3. Control the urban expansion which is consuming

More information

CASH BOND AGREEMENT. WHEREAS, Developer desires to satisfy said requirement by submitting a cash bond.

CASH BOND AGREEMENT. WHEREAS, Developer desires to satisfy said requirement by submitting a cash bond. CASH BOND AGREEMENT This Cash Bond Agreement ("Agreement") is made as of, 201_, between the City of East Lansing, a Michigan municipal corporation, whose address is 410 Abbot Road, East Lansing, MI 48823