1 STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA October 14, 2015 Advice Letter 3266-E Russell G. Worden Director, State Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, CA SUBJECT: Request by SCE for Approval to Grant Easement and License Pursuant to G.O.173 Dear Mr. Worden: Advice Letter 3266-E is effective as of October 12, Sincerely, Edward Randolph Director, Energy Division
2 Russell G. Worden Managing Director, State Regulatory Operations August 28, 2015 ADVICE 3266-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Request by Southern California Edison Company for Approval to Grant Easement and License Pursuant to General Order 173 PURPOSE Pursuant to General Order 173, 1 Southern California Edison Company ( SCE ) respectfully requests an order from the California Public Utilities Commission ( Commission ) authorizing SCE to grant both an easement and a revocable license under Public Utilities Code Section 851 to Arizona Public Service Company ( APS ) and Central Arizona Water Conservation District (collectively, with APS, the Grantees ). The easement would, pursuant to conditions fully set forth in the proposed form of easement attached hereto as Exhibit A (the Easement ), grant the Grantees rights to construct, operate and maintain electrical facilities in an easement area located on the Palo Verde Nuclear Generating Station ( Palo Verde ) property. Palo Verde is coowned by SCE, APS, Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Public Service Company of New Mexico ( PSCNM ), The Department of Water and Power of the City of Los Angeles and Southern California Public Power Authority (collectively, the Co-Owners ). The revocable license, pursuant to conditions fully set forth in the proposed form of license attached hereto as Exhibit B (the License ), would allow the Grantees to enter onto the easement area to begin construction of their project while two of the Co-Owners seek the external approvals necessary for their granting of the Easement. The License will be terminated when the Easement is fully executed and becomes effective. 1 General Order 173 makes permanent the former pilot program regulations for Section 851 advice letters, as adopted or amended in CPUC Resolutions ALJ-186, ALJ-202, ALJ-244 and ALJ-272 (Section 851 Pilot Program). The General Order authorizes regulated utilities to request CPUC approval of Section 851 transactions transferring interests in utility property valued at $5 million or less by advice letter.
3 The easement and license area (the Easement Area ) consists of acres and is a 200-foot-wide corridor adjacent to the existing SCE Devers-Palo Verde No kilovolt ( kv ) transmission line on the Palo Verde site in Maricopa County, Arizona. A legal description and depiction of the Easement Area are set forth in the proposed form of the Easement attached hereto. SCE believes that the granting of the Easement and the License and the use of the Easement Area by the Grantees will not affect the Co-Owners and SCE s use and operation of their facilities on the Palo Verde property. SCE s utility service will not be affected as a result of Commission approval of the Easement and License. BACKGROUND SCE owns land, buildings and other facilities in connection with its provision of electric services to its customers in southern and central California. SCE owns 15.8 percent (15.8%) of the ownership interest in Palo Verde, where it is a tenant-in-common with the other Co-Owners. The Grantees have requested that the Co-Owners grant the Easement and License in order for Grantees to construct electric facilities as part of their planned Palo Verde to Delaney 500 kv transmission line (the Project ). The Project will provide the Phoenix metropolitan area with needed electrical power and will strengthen the entire APS Phoenix electrical system by providing an additional electrical transmission source to the area. The Project originates at the Palo Verde ANPP High Voltage Switchyard. The Easement, which SCE has executed, is effective only upon approval by the Commission. If the Commission authorizes SCE to grant the Easement and the License, SCE will execute the License. The License will be immediately effective, allowing the Grantees to begin construction of the Project on the Easement Area. APS s and PSCNM s interests in the Palo Verde property are subject to sale-leaseback agreements. Those agreements require that APS and PSCNM obtain consent to grant the Easement from each of their lessors, which they anticipate will take several months. Once they have obtained all of the required consents, they will execute the Easement. The Easement will become effective upon the execution of it by all the Co-Owners (and approval of it by the Commission) and, upon full execution, will then be recorded in the Official Records of Maricopa County, Arizona. The sale-leaseback agreements allow the execution of the License without lessor approval. The Easement would be issued in perpetuity as is customary for easements. The Easement and License reserve the right for the Co-Owners to cultivate, graze, use and occupy the Easement Area for any purpose consistent with the Easement and License, including the right to use portions of the Easement Area for utility or roadway purposes and for improvements such as paving, sidewalks, landscaping and curbing which do not interfere with Grantees facilities. SCE believes that the granting of the Easement and License to the Grantees is in the best interests of SCE s ratepayers and shareholders as doing so will provide additional
4 ratepayer revenue. It also will provide a public benefit by providing needed electrical power to the western Phoenix metropolitan area. INFORMATION AS REQUIRED UNDER RULES 3 AND 4 OF GENERAL ORDER 173 Rule 3 Requirements SCE is permitted to file this advice letter seeking CPUC approval under Section 851 because it believes it has satisfied the eligibility requirements set forth in Rule 3 of General Order 173: 3a: The activity proposed in the transaction will not require environmental review by the CPUC as a Lead Agency under California Environmental Quality Act (CEQA). CEQA is not applicable to this transaction as the physical effects of the Project are wholly within the State of Arizona. The Project has been reviewed by the Arizona Corporation Commission, which granted it a Certificate of Environmental Compatibility in its Decision dated August 17, The Bureau of Land Management also reviewed the Project s environmental assessment (AZ ) and issued a Finding of No Significant Impact dated October 26, b: The transaction will not have an adverse effect on the public interest or on the ability of the utility to provide safe and reliable service to customers at reasonable rates. This transaction is in the public interest because it will strengthen electric service for the greater Phoenix metropolitan area. It will not diminish the safety or reliability of SCE or Palo Verde electric systems operations. 3c: Any financial proceeds from the transaction will either be booked to a memorandum account for distribution between shareholders and ratepayers during the next general rate case or be immediately divided between shareholders and ratepayers based on a specific distribution formula previously approved by the Commission for that utility. The financial proceeds received by SCE from the granting of the Easement and License will be allocated between SCE s shareholders and ratepayers through the Gross Revenue Sharing Mechanism as described in SCE s response to Rule 4e below. 3d: If the transaction results in a fee transfer of real property, the property does not have a fair market value in excess of $5 million. Not applicable because this transaction does not involve the fee transfer of property.
5 3e: If the transaction results in the sale of a building, the building does not have a fair market value in excess of $5 million. Not applicable because no building is being sold in this transaction. 3f: If the transaction is for the sale of depreciable assets, the assets do not have a fair market value in excess of $5 million. Not applicable because the transaction does not involve the sale of depreciable assets. 3g: If the transaction is a lease or a lease-equivalent, the total net present value of the lease payments, including any purchase option, does not have a fair market value in excess of $5 million, and the term of the lease will not exceed 25 years. Not applicable because the transaction does not involve a lease or leaseequivalent of property. 3h: If the transaction conveys an easement, right-of-way, or other less than fee interest in real property, the fair market value of the easement, right-of-way, or other interest in real property, the fair market value of the easement, right-of-way, or other interest in the property does not exceed $5 million. The fair market value of the Easement is $41, SCE s pro-rata portion of the proceeds is $6, The fair market value of the Easement and the appraisal are described in SCE s response to Rule 4i below. 3i: The transaction does not materially impact the ratebase of the utility. The value of this transaction is low and will not materially impact SCE s ratebase. 3j: If the transaction is a transfer or change in ownership of facilities currently used in regulated utility operations, the transaction will not result in a significant physical and operational change in the facility. Not applicable because there will be no transfer or change in ownership of facilities currently used in SCE s operations in this transaction. 3k: The transaction does not warrant a more comprehensive review that would be provided through a formal Section 851 application. This transaction is typical of transactions for which General Order 173 was developed. This transaction does not contain any issues that would trigger a need for a more comprehensive review through a formal Section 851 application.
6 Rule 4 Requirements Rule 4 requires that the following information be included in advice letters submitted under General Order 173: 4a: Identity and addresses of all parties to the proposed transaction: Arizona Public Service Company Palo Verde Nuclear Generating Station P.O. Box 52034, MS 7602 Phoenix, AZ Central Arizona Water Conservation District P.O. Box Phoenix, AZ El Paso Electric Company P.O. Box 982 El Paso, TX Los Angeles Department of Water & Power P.O. Box 51111, Rm Los Angeles, CA Public Service Company of New Mexico 2401 Aztec NE Building A, MS Z120 Albuquerque, NM Salt River Project Agricultural Improvement and Power District P.O. Box 52025, POB 002 Phoenix, AZ Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA Southern California Public Power Authority P.O. Box 51111, Rm Los Angeles, CA b: A complete description of the property including present location, condition and use: A legal description of the Easement Area is attached to the proposed form of the Easement attached hereto. It is a 200 foot-wide corridor that totals
7 acres on the Palo Verde property, adjacent to SCE s Devers-Palo Verde No kv transmission line. The Easement Area is currently undeveloped, vacant land. The Easement will have no effect on existing transmission facilities. 4c: Transferee s intended use of the property: The Grantees intend to construct, operate and maintain a 500 kv transmission line on the Easement Area. 4d: Complete description of financial terms of the proposed transaction: The Easement is valued at $41, The compensation will be allocated prorata among the Co-Owners: Party Percentage Interest Payment APS 29.1% $12, Salt River Project 17.4% $7, El Paso Electric Company 15.8% $6, SCE 15.8% $6, PSCND.99-09M 10.2% $4, LA DWP 5.7% $2, So Cal Public Power Authority 5.91% $2, e: Description of how financial proceeds of the transaction will be distributed: D approved a settlement between SCE and the Office of Ratepayer Advocates ( ORA ) concerning SCE s application for a revenue sharing mechanism for certain other operating revenue. The adopted Gross Revenue Sharing Mechanism allocates revenues resulting from non-tariffed products and services between shareholders and ratepayers. In the settlement, SCE and ORA agreed to classify all existing non-tariffed products and services as either active or passive. The gross revenue from active products and services is allocated 90 percent to shareholders and 10 percent to ratepayers; passive products and services are allocated 70 percent to shareholders and 30 percent to ratepayers. The classifications are listed in Attachment A to the settlement agreement and
8 were subsequently affirmed in Resolution E-3639 (effective May 15, 2000, approving Advice Letter 1286-E/1286-E-A). They were also filed as Preliminary Statement G to SCE s tariffs. Products or services offered under the Secondary Use of Transmission Right of Ways and Land and the Secondary Use of Distribution Right of Ways, Land, Facilities and Substations categories have been deemed passive for revenue sharing purposes. Accordingly, the revenue from the proposed Easement will be treated as passive and will be split between SCE s shareholders and ratepayers on a seventy percent (70%) to thirty percent (30%) basis once the annual threshold of gross revenues has been met. In addition, all incremental costs associated with this activity will be paid for by shareholders. 4f: A statement on the impact of the transaction on ratebase and any effect on the ability of the utility to serve customers and the public: Due to the small amount of revenue derived from this transaction compared to SCE s ratebase, the transaction will not materially impact SCE s ratebase. SCE believes that the granting of the Easement and License will have no effect on SCE s ability to serve its customers or the public as the allowed uses under the Easement and License will have no effect on SCE s transmission or distribution facilities. 4g: For sales of real property and depreciable assets, the original cost, present book value, and present fair market value, and a detailed description of how the fair market value was determined (e.g. appraisal): Not applicable. 4h: For leases of real property, the fair market rental value, a detailed description of how the fair market rental value was determined, and any additional information necessary to show compliance with Rule 3(g): Not applicable. 4i: For easements or rights-of-way, the fair market value of the easement or right-ofway and a detailed description of how the fair market value was determined: The Co-Owners agreed to a value for the Easement based on an appraisal which had been completed for a 2014 purchase by APS of SCE surplus land located near Palo Verde (discussed further in Section 4j below). The appraisal was completed by Jeff Teplitsky, who is a certified General Real Estate Appraiser. The appraisal used the sales comparison approach to evaluate the subject property and compared the subject property to similar use property near the subject property. The appraiser determined that the estimated market value was $1,800 per acre.
9 The Co-Owners agreed that an easement such as the one being granted to the Grantees is valued at 75% of the fee property value. The Co- Owners multiplied acres by $1,800, which equaled $55,438.20, then multiplied it by.75, giving the Easement a valuation of $41, A copy of the APS letter describing the valuation process and the appraisal for the surplus property is attached hereto as Exhibit C. 4j: A complete description of any recent past (within the prior two years) or anticipated future transactions that may appear to be related to the present transaction, such as sales or leases of real property that are located near the property at issue or that are being transferred to the same transferee; or for depreciable assets, sales of similar assets or sales to the same transferee: SCE sold surplus property it owned near the Palo Verde property to APS in two separate transactions in The first was the sale of acres of vacant land (APN B) on July 30, The purchase price was $50,000. The second transaction was the sale of acres of vacant land (APN A) on August 14, The purchase price was $17,500. SCE had originally intended to have SCE s Devers-Palo Verde No. 2 transmission line built on the excess parcels, but the project route was eventually sited in a different location. The parcels had never been developed. Attached hereto as Exhibit D are depictions showing the location of the sale parcels. 4k: Sufficient information and documentation (including environmental documentation) to show that all of the eligibility criteria stated in Rule 3 have been met: As presented in the discussion on Rule 3, SCE believes that all applicable eligibility criteria stated in Rule 3 have been satisfied. 4l: The filing utility may submit additional information to assist in the review of the advice letter, including recent photographs, scaled maps, drawings, etc.: No additional information is being submitted. 4m: Environmental Information: If the applicant believes that the transaction is not a project under CEQA, the applicant shall include an explanation of its position. SCE believes that the granting of the Easement and License is exempt from review under CEQA because the Project has no physical effect within the State of California. As discussed in Section 3a, the Project has been reviewed by the Arizona Corporation Commission and the Bureau of Land Management.
10 TIER DESIGNATION Pursuant to Section 851, General Order 96-B, and General Order 173, this advice letter is submitted with a Tier 2 designation. EFFECTIVE DATE Pursuant to the review process outlined in General Order 173, SCE requests that this advice letter filing become effective thirty (30) days after filing. NOTICE Anyone wishing to protest this advice filing may do so by letter via U.S. Mail, facsimile, or electronically, any of which must be received no later than 20 days after the date of this advice filing. Protests should be submitted to: CPUC, Energy Division Attention: Tariff Unit 505 Van Ness Avenue San Francisco, California jnj@cpuc.ca.gov and mas@cpuc.ca.gov Copies should also be mailed to the attention of the Director, Energy Division, Room 4004 (same address above). In addition, protests and all other correspondence regarding this advice letter should also be sent by letter and transmitted via facsimile or electronically to the attention of: Russell G. Worden Managing Director, State Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, California Facsimile: (626) AdviceTariffManager@sce.com
11 Michael R. Hoover Director, State Regulatory Affairs c/o Karyn Gansecki Southern California Edison Company 601 Van Ness Avenue, Suite 2030 San Francisco, California Facsimile: (415) There are no restrictions on who may file a protest, but the protest shall set forth specifically the grounds upon which it is based and must be received by the deadline shown above. In accordance with General Rule 4 of GO 96-B, SCE is serving copies of this advice filing to the interested parties shown on the attached GO 96-B list and, in accordance with General Order 173, on the Energy Division, the Commission Division of Ratepayer Advocates, the Commission CEQA Team (clu@cpuc.ca.gov; jnr@cpuc.ca.gov; jmu@cpuc.ca.gov), and Maricopa County. Address change requests to the GO 96-B service list should be directed by electronic mail to AdviceTariffManager@sce.com or at (626) For changes to all other service lists, please contact the Commission s Process Office at (415) or by electronic mail at Process_Office@cpuc.ca.gov. Further, in accordance with Public Utilities Code Section 491, notice to the public is hereby given by filing and keeping the advice filing at SCE s corporate headquarters. To view other SCE advice letters filed with the Commission, log on to SCE s web site at For questions, please contact Claire Keane at (626) or by electronic mail at claire.keane@sce.com. Southern California Edison Company /s/ Russell G. Worden Russell G. Worden RGW:ck:cm Enclosures
12 CALIFORNIA PUBLIC UTILITIES COMMISSION ADVICE LETTER FILING SUMMARY ENERGY UTILITY MUST BE COMPLETED BY UTILITY (Attach additional pages as needed) Company name/cpuc Utility No.: Southern California Edison Company (U 338-E) Utility type: Contact Person: Darrah Morgan ELC GAS Phone #: (626) PLC HEAT WATER Disposition Notice to: EXPLANATION OF UTILITY TYPE ELC = Electric GAS = Gas PLC = Pipeline HEAT = Heat WATER = Water (Date Filed/ Received Stamp by CPUC) Advice Letter (AL) #: 3266-E Tier Designation: 2 Subject of AL: Request by Southern California Edison Company for Approval to Grant Easement and License Pursuant to General Order 173 Keywords (choose from CPUC listing): Compliance AL filing type: Monthly Quarterly Annual One-Time Other If AL filed in compliance with a Commission order, indicate relevant Decision/Resolution #: Does AL replace a withdrawn or rejected AL? If so, identify the prior AL: Summarize differences between the AL and the prior withdrawn or rejected AL: Confidential treatment requested? Yes No If yes, specification of confidential information: Confidential information will be made available to appropriate parties who execute a nondisclosure agreement. Name and contact information to request nondisclosure agreement/access to confidential information: Resolution Required? Yes No Requested effective date: 09/27/2015 No. of tariff sheets: -0- Estimated system annual revenue effect: (%): Estimated system average rate effect (%): When rates are affected by AL, include attachment in AL showing average rate effects on customer classes (residential, small commercial, large C/I, agricultural, lighting). Tariff schedules affected: Service affected and changes proposed 1 : Pending advice letters that revise the same tariff sheets: None 1 Discuss in AL if more space is needed.
13 Protests and all other correspondence regarding this AL are due no later than 20 days after the date of this filing, unless otherwise authorized by the Commission, and shall be sent to: CPUC, Energy Division Attention: Tariff Unit 505 Van Ness Avenue San Francisco, California Russell G. Worden Managing Director, State Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, California Facsimile: (626) Michael R. Hoover Director, State Regulatory Affairs c/o Karyn Gansecki Southern California Edison Company 601 Van Ness Avenue, Suite 2030 San Francisco, California Facsimile: (415)
14 EXHIBIT A Form of the Easement
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30 EXHIBIT B Form of the License
31
32
33
34
35
36
37
38
39
40
41
42
43 EXHIBIT C Appraisal Documents
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144 EXHIBIT D Depiction of the Previously Sold Parcels
145
146
147
SUBJECT: Request by Southern California Edison Company for Approval to Grant Easements to Praxair, Inc., a Delaware Corporation.
STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 6, 2018 Advice Letter 3771-E Russell G. Worden Director, State Regulatory
More informationJune 19, 2013 Advice Letter 2668-E
STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor June 19, 2013 Advice Letter 2668-E Akbar Jazayeri Vice President, Regulatory Operations Southern
More informationMarch 30, Advice Letter 3698-E
STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 March 30, 2018 Advice Letter 3698-E Russell G. Worden Director, State Regulatory
More informationSubject: Request for Approval of a Sale of Property Pursuant to Public Utilities Code Section 851 and General Order 173
Ronald van der Leeden Director Regulatory Affairs 555 W. Fifth Street, GT14D6 Los Angeles, CA 90013-1011 Tel: 213.244.2009 Fax: 213.244.4957 RvanderLeeden@semprautilities.com June 8, 2018 Advice No. 5308
More informationJune 1, Senate Bill (SB) 120 Compliance Filing
Akbar Jazayeri Vice President of Regulatory Operations June 1, 2010 ADVICE 77-W (U 338-W) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA WATER DIVISION SUBJECT: Senate Bill (SB) 120 Compliance
More informationAugust 2, Submetering Installation Clarification and Tariff Revisions Pursuant to Decision
Akbar Jazayeri Director of Revenue and Tariffs August 2, 2005 ADVICE 1907-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Submetering Installation Clarification
More informationAugust 19, Advice Letter 4340-E
STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 August 19, 2014 Advice Letter 4340-E Brian K. Cherry Vice President, Regulation
More informationMarch 18, Advice 3969-E (Southern California Edison Company U 338-E) Advice 4076-G/5497-E (Pacific Gas and Electric Company U 39 M)
Gary A. Stern, Ph.D. Managing Director, State Regulatory Operations March 18, 2019 Advice 3969-E (Southern California Edison Company U 338-E) Advice 4076-G/5497-E (Pacific Gas and Electric Company U 39
More informationJanuary 23, Advice Letter 3865-E
STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 January 23, 2012 Brian K. Cherry Vice President, Regulation and Rates Pacific
More informationAdvice Letter 2807-G/2983-E. September 20, 2007
STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Advice Letter 2807-G/2983-E September 20, 2007 Brian K. Cherry Vice President,
More informatione ç~;~t~~r~)a ISO September 28,2010
e ç~;~t~~r~)a ISO California Independent System Operator Corporation September 28,2010 Mr. Roy M. Kuga Vice President, Energy Supply Management Pacific Gas and Electric Company 77 Beale Street San Francisco,
More informationSUBJECT: Deed Restriction, Land Exchange and Grant of Easements to the Port of San Luis Harbor District -- Request for Approval Under Section 851
STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor July 12, 2013 Advice Letter 4235-E Brian K. Cherry Vice President, Regulation
More informationFYI For Your Information
TAXPAYER SERVICE DIVISION FYI For Your Information Gross Conservation Easement Credit OVERVIEW An income tax credit is available for tax years beginning on or after January 1, 2000, for the donation of
More informationThe City will pay to PG&E a one-time fee of $20, for the proposed easement.
Erik Jacobson Director Regulatory Relations Pacific Gas and Electric Company 77 Beale St., Mail Code B10C P.O. Box 770000 San Francisco, CA 94177 Fax: 415.973.1448 September 15, 2016 Advice 4916-E (Pacific
More informationAmendment Number 3. to the ANPP HASSAYAMPA SWITCHYARD INTERCONNECTION AGREEMENT AMONG ARIZONA PUBLIC SERVICE COMPANY
Amendment Number 3 to the ANPP HASSAYAMPA SWITCHYARD INTERCONNECTION AGREEMENT AMONG ARIZONA PUBLIC SERVICE COMPANY THE CITY OF LOS ANGELES BY AND THROUGH THE DEPARTMENT OF WATER AND POWER EL PASO ELECTRIC
More informationAMENDED AND RESTATED ELDORADO SYSTEM CONVEYANCE AND CO- TENANCY AGREEMENT BETWEEN NEVADA POWER COMPANY
Title Page Southern California Edison Company Tariff Title: Rate Schedule Tariff Record Title: First Revised Rate Schedule FERC No. 424 FERC FPA Electric Tariff AMENDED AND RESTATED ELDORADO SYSTEM CONVEYANCE
More informationTitle Page Southern California Edison Company Tariff Title: Rate Schedule Tariff Record Title: First Revised Rate Schedule FERC No. 424 FERC FPA Electric Tariff SECOND AMENDED AND RESTATED ELDORADO SYSTEM
More informationPLANNING COMMISSION RESOLUTION NO
Exhibit A PLANNING COMMISSION RESOLUTION NO. 2014-566 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CALABASAS RECOMMENDING TO THE CITY COUNCIL APPROVAL OF FILE NO. 140000288, GENERAL PLAN AMENDMENTS
More informationContact Person Applicants are encouraged to direct questions regarding this NOFA to:
New Mexico Affordable Housing Tax Credit Program Notice of Funding Availability Approved by the MFA Board of Directors April 21, 2010 (Effective July 1, 2010) Amended May 15, 2013 Background and Purpose
More information[Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner],
[Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner], We are writing to inform you about an important clean energy project in your area
More informationFebruary 25, 2016 Advice Letter 4736-E
STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor February 25, 2016 Advice Letter 4736-E Erik Jacobson Director, Regulatory
More informationRESOLUTION NO. OB 14-02
RESOLUTION NO. OB 14-02 A RESOLUTION OF THE OVERSIGHT BOARD OF THE SUCCESSOR AGENCY TO THE RANCHO CUCAMONGA REDEVELOPMENT AGENCY APPROVING THE AMENDED LONG-RANGE PROPERTY MANAGEMENT PLAN PREPARED BY THE
More informationIFRS-5: Non-current Assets Held for Sale and Discontinued Operations
The journal is running a series of updates on IFRS, IAS, IFRIC and SIC. The updates mostly collected from different sources of IASB publication, seminars, workshop & IFRS website. This issue is based on
More informationREQUEST FOR EVALUATION FOR POTENTIAL HISTORIC SIGNIFICANCE
COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION 701 Laurel Street Menlo Park, CA 94025 phone: (650) 330-6702 fax: (650) 327-1653 planning@menlopark.org http://www.menlopark.org REQUEST FOR EVALUATION
More informationCOUNTY OF LOS ANGELES
COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 JAMES A. NOYES, Director ADDRESS ALL CORRESPONDENCE TO: P.O. BOX 1460
More informationRESOLUTION NO
ITEM 4 ATTACHMENT B RESOLUTION NO. 2014-1412 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS APPROVING GENERAL PLAN AMENDMENTS ASSOCIATED WITH THE WEST AGOURA ROAD TERRITORY IN CONFORMANCE WITH
More informationPreliminary Analysis
City of Manhattan Beach May 21, 2014 Rate Analysis Feasibility Report APPENDIX A DRAFT Preliminary Analysis for the For the City of Manhattan Beach June 18, 2014 Preliminary Analysis Introduction The City
More informationCIMARRON HILLS PUBLIC IMPROVEMENT DISTRICT SERVICE AND ASSESSMENT PLAN 2012 UPDATE
CIMARRON HILLS PUBLIC IMPROVEMENT DISTRICT SERVICE AND ASSESSMENT PLAN 2012 UPDATE Introduction Sections 372.013 372.014 of Chapter 372 of the Local Government Code known as the Public Improvement District
More informationFelicia Newhouse, Public Works Administrative Manager Russ Thompson, Public Works Director SUBJECT: WILDWOOD GLEN LANDSCAPING ASSESSMENT DISTRICT C-91
STAFF REPORT MEETING DATE: May 19, 2015 TO: FROM: City Council Felicia Newhouse, Public Works Administrative Manager Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900
More informationCOUNTY OF LOS ANGELES
COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 JAMES A. NOYES, Director ADDRESS ALL CORRESPONDENCE TO: P.O. BOX 1460
More information7-3. Engineering and Operations Committee. Board of Directors. 7/11/2017 Board Meeting. Subject. Executive Summary
Board of Directors Engineering and Operations Committee 7/11/2017 Board Meeting Subject Adopt CEQA determination and appropriate $1.85 million; authorize the General Manager to make offers of compensation
More informationJuly 16, Advice Letter 2912-G-A
STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 July 16, 2008 Brian K. Cherry Vice President, Regulatory Relations Pacific
More informationa. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996
SOUTHERN CALIFORNIA WATER COMPANY ORIGINAL Cal. P.U.C. Sheet No. 1005-E Page 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines 1 of Utility s standard voltages (less
More informationSouthern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 61573-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 60142-E Sheet 1 ADDED FACILITIES AGREEMENT APPLICANT-FINANCED Form 16-309
More informationCITY OF ELK GROVE CITY COUNCIL STAFF REPORT
CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.1 AGENDA TITLE: Adopt resolution declaring certain Cityowned real properties to be surplus, finding that disposition of the properties by
More informationCOUNTY OF LOS ANGELES
JAMES A. NOYES, Director COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 www.ladpw.org ADDRESS ALL CORRESPONDENCE TO:
More informationSale of a Gas Gathering Pipeline and Assignment of an Easement to Vintage Production California, LLC - Section 851 Transaction
Brian K. Cherry Vice President Regulatory Relations Pacific Gas and Electric Company 77 Beale St., Mail Code B10C P.O. Box 770000 San Francisco, CA 94177 415.973.4977 Fax: 415.973.7226 May 4, 2007 Advice
More informationThis report provides an update on real estate activities for the period October 1, 2014 through December 31, 2014.
RPDM Quarterly Report Ending December 31, 2014 Summary and Accomplishments This report provides an update on real estate activities for the period. During this reporting period: Fourteen transactions were
More informationSouthern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 24684-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 22978-E Rule 15 Sheet 1 APPLICABILITY: This rule is applicable to extension
More informationII. NEBRASKA INVESTMENT FINANCE AUTHORITY (NIFA) LOW INCOME HOUSING TAX CREDIT PROGRAM ALLOCATION PLAN
II. NEBRASKA INVESTMENT FINANCE AUTHORITY (NIFA) LOW INCOME HOUSING TAX CREDIT PROGRAM ALLOCATION PLAN 2004 LOW INCOME HOUSING TAX CREDIT PROGRAM 2004 Allocation Plan Table of Contents Page Available Low
More informationCERTIFICATE OF ACCEPTANCE (Form #)
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION EXHIBIT 8-EX-41 CERTIFICATE OF ACCEPTANCE (Form #) (CERTIFICATE OF ACCEPTANCE, GOVERNM ENT CODE SECTION 27281) THIS IS TO CERTIFY, That the State of California,
More informationBUYER'S DISCLOSURE STATEMENT
Marin County Below Market Rate Home Ownership Program BUYER'S DISCLOSURE STATEMENT Buyer(s): Property Address: Name of Development: Local Jurisdiction: Income Category of Unit: Purchase Price: NOTICE:
More informationAccounting for Amalgamations
Accounting Standard (AS) 14 (revised 2016) Accounting for Amalgamations Contents INTRODUCTION Paragraphs 1-3 Definitions 3 EXPLANATION 4-27 Types of Amalgamations 4-6 Methods of Accounting for Amalgamations
More informationGlossary. Water Trade Permanent and temporary. January 2015
Water Trade Permanent and temporary Summary Application Amalgamation Explanation Either for: Permanent water (shares, water entitlements or delivery entitlements) see www.murrayirrigation.com.au Customers
More informationRecommendation: The Public Works Director-Engineering recommends adoption of the following resolution.
CITYol CHICO M 87 City Council Agenda Report Meeting Date: /5/5 TO: City Council FROM: Brendan Ottoboni, PWD-Engineering, 879-690 RE: CONSIDERATION OF A RESOLUTION DECLARING SURPLUS PROPERTY AND AUTHORIZING
More informationREQUEST FOR PROPOSALS FOR REAL ESTATE MARKETING AND BROKERAGE SERVICES Citywide Properties
CITY OF PASO ROBLES TELEPHONE 805-237-3888 FAX 805-237-4032 Website: www.prcity.com DEADLINE: July 24, 2017 REQUEST FOR PROPOSALS FOR REAL ESTATE MARKETING AND BROKERAGE SERVICES Citywide Properties The
More informationCOUNTY OF LOS ANGELES
COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 JAMES A. NOYES, Director www.ladpw.org ADDRESS ALL CORRESPONDENCE TO:
More informationSan Carlos Wheeler Plaza Project, Disposal of Former Redevelopment Agency Property and Entry into Related Compensation Agreement
R-14-51 Meeting 14-08 March 12, 2014 AGENDA ITEM AGENDA ITEM 5 San Carlos Wheeler Plaza Project, Disposal of Former Redevelopment Agency Property and Entry into Related Compensation Agreement GENERAL MANAGER
More informationCity of Palos Verdes Estates Requirements for a Minor Lot-Line Adjustment
City of Palos Verdes Estates Requirements for a Minor Lot-Line Adjustment Listed below is an outline covering the normal procedure for submitting and processing minor lot line adjustments. Please provide
More informationAbout the Project. The project consists of two new high voltage transmission lines to be built by Sharyland Utilities, L.P. (Sharyland).
Sharyland Utilities, L.P. 1900 North Akard Street Dallas, Texas 75201 Toll-free: (866) 354-3335 Frequently Asked Questions Regarding Sharyland Utilities Proposed Wadsworth to New Oliver to Farmland 345
More informationCabarrus County, NC Adequate Public Facilities Ordinance. Contents
Contents Section 15. Adequate Public Facilities Standards.... 2 Section 15-1. Introduction.... 2 Section 15-2. How to Use this Chapter.... 3 Section 15-3. Basic Terms and Definitions... 4 Section 15-4.
More informationSHORT SALE AUCTION MARKETING AGREEMENT
SHORT SALE AUCTION MARKETING AGREEMENT This Short Sale Auction Marketing Agreement (this Agreement ), shall be effective as of the date that the Property is listed on the Website and shall expire thirty
More informationCITY OF HIAWATHA, IOWA TOWN VILLAGE CENTER URBAN REVITALIZATION PLAN. for the TOWN VILLAGE CENTER URBAN REVITALIZATION AREA
CITY OF HIAWATHA, IOWA TOWN VILLAGE CENTER URBAN REVITALIZATION PLAN for the TOWN VILLAGE CENTER URBAN REVITALIZATION AREA 2018 1 INTRODUCTION The Urban Revitalization Act, Chapter 404 of the Code of Iowa,
More informationAccounting for Amalgamations
198 Accounting Standard (AS) 14 (issued 1994) Accounting for Amalgamations Contents INTRODUCTION Paragraphs 1-3 Definitions 3 EXPLANATION 4-27 Types of Amalgamations 4-6 Methods of Accounting for Amalgamations
More informationJune 28, Technical Director File Reference No Financial Accounting Standards Board 401 Merritt 7 P.O. Box 5116 Norwalk, CT
Technical Director File Reference No. 2016-200 401 Merritt 7 P.O. Box 5116 Norwalk, CT 06856-5116 Comments by the Edison Electric Institute and the American Gas Association Regarding the Accounting for
More information2) All long-term leases should be capitalized in the accounts by the lessee.
Chapter 18 Leases 1) The principal attribute of finance leases is that the risks and rewards of asset ownership are deemed to remain with the lessor. LO: 18-02 List the criteria for classification of a
More informationF R E QUENTLY AS K E D QUESTIONS
F R E QUENTLY AS K E D QUESTIONS Mountain Home Substation and 138-kV Transmission Line Project Gillespie, Kerr and Kimble counties PROJECT OVERVIEW 1. What is the Mountain Home Substation and 138-kV Transmission
More informationOrange Water and Sewer Authority Water and Sewer System Development Fee Study
Orange Water and Sewer Authority Water and Sewer System Development Fee Study March 6, 2018 March 6, 2018 Mr. Stephen Winters Director of Finance and Customer Service 400 Jones Ferry Road Carrboro, NC
More informationHOUSE BILL lr1125 A BILL ENTITLED. St. Mary s County Metropolitan Commission Fee Schedule
L HOUSE BILL lr By: St. Mary s County Delegation Introduced and read first time: February, 0 Assigned to: Environmental Matters A BILL ENTITLED AN ACT concerning St. Mary s County Metropolitan Commission
More informationAdministration Report Fiscal Year 2016/2017. Hesperia Unified School District Community Facilities District No June 20, 2016.
Administration Report Fiscal Year 2016/2017 Hesperia Unified School District Community Facilities District No. 2006-2 June 20, 2016 Prepared For: Hesperia Unified School District 15576 Main Street Hesperia,
More informationPRELIMINARY PLANNED AREA DEVELOPMENT APPLICATION (PAD)
PRELIMINARY PLANNED AREA DEVELOPMENT APPLICATION (PAD) Preliminary Planned Area Development Fee: Date Paid SECTION 1.9.4.1 PRELIMINARY PAD APPLICATION A Master development plan (showing general land use
More informationEB Hydro One Networks' Section 99 Bruce to Milton Transmission Reinforcement project Application Filing
Hydro One Networks Inc. th Floor, South Tower Bay Street Toronto, Ontario MG P www.hydroone.com Tel: () -00 Fax: () -0 Cell: () - Susan.E.Frank@HydroOne.com Susan Frank Vice President and Chief Regulatory
More informationCRA/LA, A DESIGNATED LOCAL AUTHORITY (Successor Agency to the Community Redevelopment Agency of the City of Los Angeles, CA) M E M O R A N D U M
CRA/LA, A DESIGNATED LOCAL AUTHORITY (Successor Agency to the Community Redevelopment Agency of the City of Los Angeles, CA) M E M O R A N D U M 4 DATE: NOVEMBER 3, 2016 TO: FROM: STAFF: SUBJECT: GOVERNING
More informationDISTRICT. Huntington Beach. FIM 40-40C-3 APN and
RECORDING REQUESTED BY W HEN RECORDED MAIL TO SOUTHERN CALIFORNIA EDISON COMPANY 2131 WALNUT GROVE AVENUE 2 ND FLOOR GO3 ROSEMEAD, CA 91770 Attn: Title and Real Estate Services SPACE ABOVE THIS LINE FOR
More informationFelicia Newhouse, Public Works Administrative Manager Russ Thompson, Public Works Director
STAFF REPORT MEETING DATE: June 16, 2015 TO: FROM: City Council Felicia Newhouse, Public Works Administrative Manager Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900
More informationORDINANCE NO AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PORT ARANSAS, TEXAS, BY ADOPTING A NEW CHAPTER
ORDINANCE NO. 2008-09 AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PORT ARANSAS, TEXAS, BY ADOPTING A NEW CHAPTER TWENTY-SIX CONCERNING IMPACT FEES FOR ROADWAY FACILITIES; INCORPORATING
More informationUPN PacifiCorp Notice of Property Disposition Sewer Line Easement
November 7, 2018 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: UPN PacifiCorp Notice of Property Disposition Sewer
More informationENGINEER'S REPORT FOR CITY OF WESTLAKE VILLAGE LIGHTING MAINTENANCE ASSESSMENT DISTRICT NO. 1 FISCAL YEAR
ENGINEER'S REPORT FOR CITY OF WESTLAKE VILLAGE LIGHTING MAINTENANCE ASSESSMENT DISTRICT NO. 1 FISCAL YEAR 2017-18 A. BACKGROUND Until July 1979, the County of Los Angeles financed street lighting maintenance
More informationSubject: Authorizes Los Angeles Department of Water and Power File P Grant of a No-Build Easement to Studio Lending Group, LLC
,. Los Angeles rc~~ Department of Water & Power ERC GARCET Mayor Commission MEL LEVNE, President WLLAM W. FUNDERBURK JR., Vice President JLL BANKS BARAD MCHAEL F. FLEMNG CHRSTNA E. NOONAN BARBARA E. MOSCHOS,
More informationJune 29, 2011 TO THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
June 29, 2011 Advice Letter 403-A U337W TO THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA San Gabriel Valley Water Company ("San Gabriel") hereby requests ministerial review of the following
More informationDRAFT LONG-RANGE PROPERTY MANAGEMENT PLAN
DRAFT LONG-RANGE PROPERTY MANAGEMENT PLAN CITY OF MODESTO REDEVELOPMENT SUCCESSOR AGENCY OCTOBER 2013 Prepared By: KOSMONT COMPANIES 865 S. Figueroa Street, #3500 Los Angeles, CA 90017 Telephone: (213)
More information2017 Uniform Multifamily Application Templates
2017 Uniform Multifamily Application Templates 221 East 11 th Street Austin, TX 78701 Table of Contents Template Overview... 3 Using the Templates... 4 Public Notification Template... 5 Twice the State
More informationADMINISTRATIVE SERVICES DEPARTMENT REAL ESTATE DIVISION REQUEST FOR BID (RFB) NUMBER TDR1212 SALE OF TRANSFERABLE DEVELOPMENT RIGHTS
ADMINISTRATIVE SERVICES DEPARTMENT REAL ESTATE DIVISION REQUEST FOR BID (RFB) NUMBER TDR1212 SALE OF TRANSFERABLE DEVELOPMENT RIGHTS RFP Submittal Deadline: Contract Administrator: Real Estate Division
More informationExposure Draft. Accounting Standard (AS) 40 Investment Property. Last date for the comments: November 10, 2018
Exposure Draft Accounting Standard (AS) 40 Investment Property Last date for the comments: November 10, 2018 Issued by Accounting Standards Board The Institute of Chartered Accountants of India 1 Exposure
More informationMIKE FEUER CITY ATTORNEY
MIKE FEUER CITY ATTORNEY REPORT RE: REPORT NO. R 1 3-0 2 0 1 JUl 1 II 2013 DRAFT ORDINANCE AUTHORIZING THE APPROVAL OF SUBDIVISION PARCEL MAP AFFECTING MOHAVE GENERATING STATION PROPERTY (Real Estate File
More informationRENTAL, LEASE AND SALE OF REAL PROPERTY
RENTAL, LEASE AND SALE OF REAL PROPERTY Policy No. 6882 October 3, 2018 Page 1 of 7 Because of changes in enrollment, student assignment policies and other characteristics of the district from time-to-time,
More informationPOWAY UNIFIED SCHOOL DISTRICT ADMINISTRATION REPORT FISCAL YEAR 2017/2018 IMPROVEMENT AREA NO. 1 OF COMMUNITY FACILITIES DISTRICT NO.
POWAY UNIFIED SCHOOL DISTRICT ADMINISTRATION REPORT FISCAL YEAR 2017/2018 IMPROVEMENT AREA NO. 1 OF COMMUNITY FACILITIES DISTRICT NO. 2 JUNE 29, 2017 PREPARED FOR: Poway Unified School District Planning
More informationWYOMING DEPARTMENT OF REVENUE CHAPTER 7 PROPERTY TAX VALUATION METHODOLOGY AND ASSESSMENT (DEPARTMENT ASSESSMENTS)
CHAPTER 7 PROPERTY TAX VALUATION METHODOLOGY AND ASSESSMENT (DEPARTMENT ASSESSMENTS) Section 1. Authority. These Rules are promulgated under the authority of W.S. 39-11-102(b). Section 2. Purpose of Rules.
More informationCOUNTY OF EL DORADO, CALIFORNIA DEPARTMENT OF TRANSPORTATION NOTICE TO BIDDERS
COUNTY OF EL DORADO, CALIFORNIA DEPARTMENT OF TRANSPORTATION NOTICE TO BIDDERS NOTICE IS HEREBY GIVEN by the, State of California, that sealed bids for Work in accordance with the Project Plans (Plans)
More informationIMPACTS OF NEW LEASE ACCOUNTING STANDARD WHAT DOES IT MEAN TO ME? Jessica Richter, CPA.CITP, CISA Jamie Becker June 11, 2018
IMPACTS OF NEW LEASE ACCOUNTING STANDARD WHAT DOES IT MEAN TO ME? Jessica Richter, CPA.CITP, CISA Jamie Becker June 11, 2018 3 AGENDA ASC 842 Leases, ASU 2016-02 What s new Comparison with today s rules
More informationRule No. 15. Distribution Line Extensions Page 1 of 14
GOLDEN STATE WATER COMPANY (U 913-E) Revised Cal. P.U.C. Sheet No. 2103-E SAN DIMAS, CALIFORNIA 91773-9016 Canceling Revised Cal. P.U.C. Sheet No. 1005-E Page 1 of 14 APPLICABILITY: This rule is applicable
More informationNEM GENERATOR TRANSFER GUIDE
NEM GENERATOR TRANSFER GUIDE Purpose AEMO has prepared this document to provide information about the process for becoming a registered as a participant in the National Electricity Market, as at the date
More informationC O N F I D E N T I A L
00320540000001 Bexar Appraisal District COMMON ACCT.# PID: RETURN COMPLETED RENDITION BY 1 APRIL 2018 NAME OF BUSINESS (DBA) AND LOCATION OF PROPERTY: IF OUT OF BUSINESS GIVE DATE (OPTIONAL) C O N F I
More informationMARKETING AND REDISTRIBUTION CHAPTER 8 DEPARTMENT OF FINANCE AND ADMINISTRATION Marketing and Redistribution of state personal property.
MARKETING AND REDISTRIBUTION CHAPTER 8 DEPARTMENT OF FINANCE AND ADMINISTRATION 25-8-106. Marketing and Redistribution of state personal property. (a) The provisions of this section shall be applicable
More informationOFFICE OF THE CITY ADMINISTRATIVE OFFICER
REPORT from OFFICE OF THE CITY ADMINISTRATIVE OFFICER Date: April 26, 2017 To: The Mayor The Council From: Richard H. Llewellyn, Jr., Interim City Administrative Officer- Subject: REQUEST AUTHORIZATION
More informationCommunity Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA Napa (707)
Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA 94559-0660 Napa (707) 257-9530 PLANNING COMMISSION STAFF REPORT JUNE 16, 2016 AGENDA ITEM # 6.B. 16-0056-EXT;
More information1 H. 4702, 190th Gen. Ct (Mass. 2018). 2 H. 4297, 190th Gen. Ct (Mass. 2018).
Public Housing Provisions in the Economic Development Bill (H.4702), as Reported Out by House Committee on Bonding, Capital Expenditures & State Assets Prepared by Citizens Housing and Planning Association
More informationMEMORANDUM OF UNDERSTANDING
MEMORANDUM OF UNDERSTANDING THIS MEMORANDUM OF UNDERSTANDING (this "MOU"), dated as of, 0 (the "Agreement Date"), is by and among the City and County of San Francisco Recreation and Park Department ("RPD"),
More informationRESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE APPROVING A NEW COUNCIL POLICY No ENTITLED SURPLUS SALES
RD:PAD:LCP 1/20/2016 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE APPROVING A NEW COUNCIL POLICY No. 7-13 ENTITLED SURPLUS SALES WHEREAS, the City of San José ( City ) has an interest
More informationCITY OF TAMPA Stormwater Utility Funding Frequently Asked Questions 2017
CITY OF TAMPA Stormwater Utility Funding Frequently Asked Questions 2017 Q. What types of Stormwater Assessments are there? A. There are two types of Stormwater Assessments. A Service Assessment and an
More informationFILE: EFFECTIVE DATE: May 15, 2013 AMENDMENT: 1
APPROVED AMENDMENTS: Effective Date Briefing Note /Approval Summary of Changes: June 1, 2011 BN 175892 Policy and Procedure update to reflect reorganization of resource ministries April 2011 May 15, 2013
More informationDWR REAL ESTATE COORDINATION PLAN
DWR REAL ESTATE COORDINATION PLAN Exhibit E DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5 10 18 DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5-10-2018 California WaterFix Real Estate Coordination
More informationMAP. METHODS AND ASSISTANCE PROGRAM 2015 REPORT El Paso Central Appraisal District. Glenn Hegar Texas Comptroller of Public Accounts
MAP METHODS AND ASSISTANCE PROGRAM 2015 REPORT El Paso Central Appraisal District Glenn Hegar Texas Comptroller of Public Accounts El Paso Central Appraisal District Mandatory Requirements PASS/FAIL 1.
More informationMOBILEHOME PARK RENT STABILIZATION PROGRAM
CITY OF YUCAIPA MOBILEHOME PARK RENT STABILIZATION PROGRAM Application By Park Owner to the Yucaipa Mobilehome Rent Review Commission For Rent Increase Based on Maintenance of Net Operating Income/Fair
More informationProposition 218 Notification NOTICE TO PROPERTY OWNERS OF PUBLIC HEARING ON HILLSIDE ZONE ADDITIONAL SEWER RATE. Name Address City, State, Zip
100 East Sunnyoaks Ave. Campbell, CA 95008 Regarding APN Number: APN #, Street, City Proposition 218 Notification NOTICE TO PROPERTY OWNERS OF PUBLIC HEARING ON HILLSIDE ZONE ADDITIONAL SEWER RATE Name
More informationCITY COUNCIL SUMMARY REPORT. Agenda No. (,.J Key Words: Southwest Dixon, General Plan, Specific Plan Rezone Meeting Date: May 18, 2016
SUMMARY REPORT Agenda No. (,.J Key Words: Southwest Dixon, General Plan, Specific Plan Rezone Meeting Date: May 18, 2016 CITY COUNCIL PREPARED BY: Kristen Maze, Community Development Director.fU"._,./.JA
More informationRULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS
RIVERSIDE COUNTY RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS ADOPTED JUNE 10, 1980 BY RESOLUTION NO. 80-244 AMENDMENTS RESOLUTION NO. May 26, 1981 81-148 Nov. 9, 1982 82-320 July 3,
More informationDISPOSAL OF PROPERTY GUIDELINES Dutchess County Water and Wastewater Authority
DISPOSAL OF PROPERTY GUIDELINES Dutchess County Water and Wastewater Authority Adopted January 28, 2015 The Dutchess County Water and Wastewater Authority (the Authority ), a New York public benefit corporation,
More informationIntangible Assets IAS 38, IAS 36, IFRS 3
Intangible Assets IAS 38, IAS 36, IFRS 3 Agenda 1. Introduction 2. Recognition 3. Measurement 4. Impairment of intangible assets (IAS 36) Basic concept Cash-Generating Units 5. Disclosures 2 1 Introduction
More informationMARION COUNTY, FLORIDA AMENDED AND RESTATED INITIAL ASSESSMENT RESOLUTION
MARION COUNTY, FLORIDA AMENDED AND RESTATED INITIAL ASSESSMENT RESOLUTION ADOPTED JULY 7, 2015 TABLE OF CONTENTS Page SECTION 1. AUTHORITY... 1 SECTION 2. PURPOSE AND DEFINITIONS... 1 SECTION 3. CONFIRMATION
More information