Record of Decision and Statement of Findings for Department of the Army (DA) Permit Application SAJ Attachment C

Size: px
Start display at page:

Download "Record of Decision and Statement of Findings for Department of the Army (DA) Permit Application SAJ Attachment C"

Transcription

1 Record of Decision and Statement of Findings for Department of the Army (DA) Permit Application SAJ Attachment C

2 Attachment C Figure 1 - No Action Uplands Only

3 Figure 2 - Upland mining with Crossings of WOUS

4 Figure 3 - Applicant's Preferred Alternative

5 Figure 4 - Original Mine Plan - Maximum Recovery/Minimal Avoidance

6 Figure 5 - UMAM-Based Avoidance

7 Figure 6 - Applicant s Preferred Plus Additional Avoidance

8 Figure 7 - Maximum Framework Avoidance

9 Record of Decision and Statement of Findings for Department of the Army (DA) Permit Application SAJ Attachment D

10 Special Conditions: 1. Reporting Address: The Permittee shall submit all reports, notifications, documentation and correspondence required by the general and special conditions of this permit, preferably in an electronic format, to the following address: a. For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Special Projects and Enforcement Branch, Princess Palm Avenue, Suite 120, Tampa, FL b. For electronic mail (preferred) (not to exceed 10 MB). c. For electronic submittals greater than 10 MB, the Corps recommends using an FTP site, such as the AMRDEC Safe Access File Exchange ( The Permittee shall reference this permit number, SAJ (SP - JPF), on all submittals. 2. Commencement Notification: Within 10 days from the date of the initial commencement of work authorized by this permit, and within 10 days from the date of commencement for each phase/mining unit thereafter, the Permittee shall provide a written notification of that date of commencement to the Corps. 3. As-Built Certification: Within 60 days of completion or cessation of a period of 1 year or more of authorized work within each phase/mining unit, the Permittee shall submit as-built drawings of the authorized work within that phase and a completed As-Built Certification By Professional Engineer form (Attachment C) to the Corps. Upon expiration of the construction window identified in General Condition 1, the Permittee shall submit a final as-built drawing and certification for all phases/mining units. The as-built drawings for each phase/mining unit and the final submittal shall be signed and sealed by a registered professional engineer and shall include the following: a. A plan view drawing of the location of the authorized work footprint, as shown on the permit drawings, with transparent overlay of the work as constructed in the same scale as the permit drawings on 8½-inch by 11-inch sheets. The plan view drawing should show all "earth disturbance," including wetland impacts and water management structures. b. A list of any deviations between the work authorized by this permit and the work as constructed. In the event that the completed work deviates, in any manner, from the authorized work, describe on the attached As-Built Certification By Professional Engineer form the deviations between the work authorized by this permit and the work as constructed. Clearly indicate on the as-built drawings any deviations that have been listed. Please note that the depiction and/or description of any deviations on the drawings and/or As-Built Certification By Professional Engineer form does not constitute approval of any deviations by the Corps.

11 c. the Department of the Army permit number on all sheets submitted. In addition to the signed and sealed paper as-built drawings, the Permittee shall also provide electronic copies in.pdf format (sized to 8½-inch by 11-inch sheets) and in.shp format for each phase/mining unit and for the final as-built. 4. Permit Compliance and Availability: The Permittee will require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and will provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, tables, figures and maps, will be available at the project site during mining and mitigation work of this project. 5. Cultural Resources/Historic Properties: a. No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP. b. If during the ground disturbing activities and construction work within the permit area, there are archaeological/cultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes, evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps within the same business day (8 hours). The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions. c. Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition ; and if deemed necessary by the SHPO, THPO(s), or Corps, in accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction, and from the Corps. d. In the unlikely event that unmarked human remains are identified on non-federal lands, they will be treated in accordance with Section Florida Statutes. All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archeologist within the same business day

12 (8-hours). The Corps shall then notify the appropriate SHPO and THPO(s). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part Such activity shall not resume without written authorization from the State Archeologist and from the Corps. 6. Notice of Permit: The Permittee shall complete and record the Notice of Department of the Army Permit form (Attachment D) with the Clerk of the Circuit Court, Registrar of Deeds or other appropriate official charged with the responsibility of maintaining records of title to or interest in real property within the county of the authorized activity. Within 90 days from the effective date of this permit, the Permittee shall provide a copy of the recorded Notice of Permit to the Corps clearly showing a stamp from the appropriate official indicating the book and page at which the Notice of Permit is recorded and the date of recording. 7. Permit Modifications: It is the Permittee s responsibility to request a modification of this permit, including to deviate from any of the terms and conditions, permit drawings, or attachments, from the Mining Team or other appropriate Jacksonville District Regulatory section. The Corps reserves the right to fully evaluate, amend, and approve or deny the request for modification of this permit. The Permittee agrees for the purposes of compliance with this DA permit, where the conditions of the FDEP and DA permits conflict, the DA permit shall apply. A modification of the FDEP environmental resource permit does not automatically constitute a modification of this DA permit. Should any other agency require and/or approve changes to the work authorized or obligated by this permit, the Permittee is advised a modification to this permit instrument is required prior to initiation of those changes. Once the Corps has completed its review of a modification request, the Permittee shall provide a revised copy of this DA permit to the Corps for review and approval that reflects the proposed modification, plus any previous modifications approved by the Corps. The revised copy will include a listing and description of all approved modifications by number beneath the Project Description on Page 1 of this DA permit, for example: Modification #1: A change in the boundaries of Wetland R-10W-02, as shown in revised drawing number 36 of 56 in Part 3, Attachment A to the Compensatory Mitigation Plan. Once the Corps approves the modification, the Permittee shall use that revised copy of the DA permit, including for the purpose of compliance with the Permit Compliance and Availability special condition. 8. Erosion Control: Prior to the initiation of any work authorized by this permit, the Permittee shall install erosion control measures along the perimeter of all work areas to prevent the displacement of fill material outside the work area into waters of the United States. Immediately after completion of the final grading of the land surface, all slopes, land surfaces, and filled areas shall be stabilized using sod, degradable mats, barriers, or a combination of similar stabilizing materials to prevent erosion. The erosion control measures shall remain in place and be maintained until all authorized work is completed and the work areas are stabilized. 9. Fill Material: The Permittee shall use only clean fill material for this project. The fill

13 material shall be free from items such as trash, debris, automotive parts, asphalt, construction materials, concrete block with exposed reinforcement bars, and soils contaminated with any toxic substance, in toxic amounts in accordance with Section 307 of the Clean Water Act. 10. Biological Opinion: This permit does not authorize the Permittee to take an endangered species, in particular the Audubon s crested caracara (Polyborus plancus audubonii), eastern indigo snake (Drymarchon corais couperi), and wood stork (Mycteria americana). In order to legally take a listed species, the Permittee must have separate authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or a Biological Opinion (BO) under ESA Section 7, with incidental take provisions with which you must comply). The enclosed United States Fish and Wildlife Service BO (Attachment E) contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with incidental take that is also specified in the BO. Authorization under this permit is conditional upon compliance with all of the mandatory terms and conditions associated with incidental take of the enclosed BO, which terms and conditions are incorporated by reference in this permit. Failure to comply with the terms and conditions associated with incidental take of the BO, where a take of the listed species occurs, would constitute an unauthorized take, and it would also constitute noncompliance with this permit. The United States Fish and Wildlife Service is the appropriate authority to determine compliance with the terms and conditions of its BO, and with the ESA. 11. Eastern Indigo Snake Protection Measures and Inspection: The Permittee shall comply with U.S. Fish and Wildlife Service's Standard Protection Measures for the Eastern Indigo Snake dated August 12, 2013, as provided in Attachment F of this permit. The Permittee shall evacuate all gopher tortoise burrows, active or inactive, prior to site manipulation in the vicinity of the burrow. If excavating potentially occupied burrows, active or inactive, individuals must first obtain state authorization via a Florida Fish and Wildlife Conservation Commission (FWC) Authorized Gopher Tortoise Agent permit. The excavation method selected shall minimize the potential for injury of an indigo snake. The Permittee shall follow the excavation guidance provided in the most current FWC Gopher Tortoise Permitting Guidelines found at If the Permittee encounters an eastern indigo snake, the Permittee must allow the snake to vacate the area prior to additional site manipulation in the vicinity. The Permittee shall inspect holes, cavities, and snake refugia other than gopher tortoise burrows each morning before planned site manipulation of a particular area, and if occupied by an indigo snake, no work shall commence until the snake has vacated the vicinity of the proposed work. 12. Spill or Release Reporting: In the event of a spill or unscheduled release, from a mine pipeline or other source associated with the authorized activity, that affects wetlands, streams, other waters of the United States, or a mitigation area required by a Department of the Army authorization, the Permittee shall include the Corps Mining Team in any reporting required by another agency. 13. Compliance Status Annual Report: Separately from the compensatory mitigation reporting required by Special Conditions 15 through 18 and the long-term management reporting required by the Compensatory Mitigation Plan, the Permittee shall submit an annual report for compliance status starting one calendar year from the date of permit

14 issuance and on annual basis thereafter until the project has been completed or the construction window expires. The report shall include the following items: a. the status of compliance for each General and Special Condition of this DA permit, individually. If a condition of the permit is not in compliance the Permittee shall include a proposal to bring the project into compliance with the permit. b. a description of project completion at the time of the report, including: i. the acreage of Corps-jurisdictional wetlands and other surface waters, and the linear footage of Corps-jurisdictional streams, directly impacted (for example by filling, clearing, or demucking) during the reporting period and cumulatively, ii. the acreage of reclamation in progress or initially completed during the reporting period and cumulatively, iii. the acreage of wetland mitigation (by type) and the linear footage of stream mitigation (by type) initially implemented during the reporting period and cumulatively, iv. the functional value of wetland mitigation (using UMAM) and of stream mitigation (using the FDEP stream habitat assessment methodology) that achieved performance standards during the reporting period and cumulatively, and v. a comparison between the above information and the UMAM mitigation ledgers (herbaceous wetlands, forested wetlands, and streams), as provided in Attachment I. This report shall be submitted within one year of permit issuance and on an annual basis thereafter. The Permittee may include copies of reports required by other agencies, such as the Florida Department of Environmental Protection; however, the Corps annual report shall specifically address compliance with this DA permit. If the Corps determines that the Permittee is not in compliance with the terms and conditions of this permit, the Corps may exercise its discretion to suspend authorization to discharge dredged or fill material into waters of the United States pursuant to 33 C.F.R Compliance Status Five-Year Review: Every five years, starting from the date of issuance of this DA permit, the Permittee shall prepare a summary report of the project s compliance status, including the authorized work, schedule, monitoring program, reporting process, compensatory mitigation, and other aspects of the authorized work. The review will include consideration of the annual compliance reports required by Special Condition 12, the compensatory mitigation reports

15 required by Special Conditions 17 and 18, site inspections, and other information as available. The Permittee shall submit the summary report to the Corps, USEPA, USFWS, and FDEP. The USEPA, USFWS, and FDEP can provide comments on the summary report which the Corps will consider when reviewing whether or not the Permittee is in compliance with the terms and conditions of this permit. If the Corps determines that the Permittee is not in compliance with the terms and conditions of this permit and the plan for remediation is not acceptable to the Corps or the plan fails, the Corps may exercise its discretion to suspend authorization to discharge dredged or fill material into waters of the United States pursuant to 33 C.F.R Compensatory Mitigation Plan and Summary: The Permittee shall implement the approved final Compensatory Mitigation Plan included as Attachment G of this permit, including Attachment A Part 1 and Attachment A Part 2 (the Wetland and Stream Work Plans, respectively) as compensatory mitigation for the authorized impacts to waters of the United States. As summarized in Tables 1 and 2 of the Compensatory Mitigation Plan, the required compensatory mitigation includes: a acres of on-site wetland establishment (524.6 acres forested, herbaceous), providing units of wetland function ( units forested, units herbaceous), and 44.7 acres of off-site forested wetland establishment providing 13.5 units of wetland function, as specified in Table 8 of the Compensatory Mitigation Plan, along with associated upland buffers. b acres of Immediate Level I (completed prior to initiating the work authorized by this DA permit) on-site wetland preservation ( acres forested, herbaceous), providing units of wetland function (48.7 units forested, units herbaceous) as specified in Table 9 of the Compensatory Mitigation Plan, along with associated upland buffers. The preservation of these uplands did not provide direct compensation for the loss of aquatic resource functions; however, the Corps did consider the upland preservation s effect on WOUS in its review and approval of the functional analysis of the wetland preservation as compensatory mitigation. c acres of on-site wetland enhancement (20.61 acres forested, herbaceous), providing units of wetland function (4.03 units forested, units herbaceous) as specified in Table 10 of the Compensatory Mitigation Plan, along with associated upland buffers. d. 18,402 linear feet (lf)/3.5 miles on on-site stream establishment providing units of stream function as specified in Table 4C of the Compensatory Mitigation Plan, along with associated upland buffers. e. 55,501 lf/10.5 miles of Immediate Level I (completed prior to initiating the work authorized by this DA permit) on-site stream preservation providing units of stream function as specified in Table 4B of the Compensatory Mitigation Plan. Each stream segment shall have a minimum 120-foot wide (60 feet on either side of the channel) preserved riparian buffer.

16 In addition, the Permittee shall provide the specific wetland types by Florida Land Use and Cover Classification System (FLUCCS) and acreages for individual wetland establishment areas as shown in Table 8 of the Compensatory Mitigation Plan, unless the Corps approves adaptive management measures as described in the Mitigation Adaptive Management/Alternatives Special Condition of this permit. The Corps does not require compensatory mitigation above and beyond the minimum amount necessary to provide compensation for the loss of waters of the United States associated with the activities authorized by this permit. Although permit drawings, mitigation plan attachments, or other parts of this permit may reference additional wetland or stream establishment, enhancement, preservation, or other activities, the Permittee is not responsible for those additional activities under this permit. 16. Mitigation Commencement Timeframes: a. Wetland and Stream Preservation: As described in the Conservation Easement Preservation Mitigation Areas Special Condition of this permit, prior to initiating any work authorized by this DA permit the Permittee shall complete the Immediate Level I preservation mitigation. b. Wetland Enhancement: Prior to initiating any mining activities, the Permittee shall complete the ditch block installation for the enhancement of Wetland 06W-20P as shown on pages 88 and 89 of the permit drawings (Attachment A of this DA permit) and the impoundment removal for the enhancement of Wetland 12W-40P, as described in Sections 3.1 and 3.2 of the Wetland Work Plan (Part 1, Attachment A of the Compensatory Mitigation Plan). c. Wetland Establishment: As described in Section 5 of the Wetland Work Plan, the Permittee shall perform final grading of each wetland mitigation site, including muck placement, no later than 18 months after completion of mining operations, including backfilling with sand tailings. d. Stream Establishment: As described in Table SRO-7 of the Stream Work Plan (Part 2, Attachment A of the Compensatory Mitigation Plan), the Permittee shall perform final grading and initial planting of each stream mitigation site no later than 24 months after completion of mining operations, including backfilling with sand tailings. 17. Mitigation Performance Standards Preserved Wetlands: The Permittee shall achieve the performance standards for wetlands preserved as mitigation as identified in the Performance Standards section of the approved final Compensatory Mitigation Plan (Attachment G to this DA permit). 18. Mitigation Performance Standards Preserved Upland Buffers: The Permittee shall achieve the performance standards for uplands preserved as wetland buffers, both as part of the Immediate Level I preservation and as buffers for enhanced or established wetlands later, as identified in the Performance Standards section of the approved final Compensatory Mitigation Plan (Attachment G to this DA permit).

17 19. Mitigation Performance Standards - Enhanced Wetlands: The Permittee shall achieve the performance standards for wetlands enhanced as mitigation as identified in the Performance Standards section of the approved final Compensatory Mitigation Plan (Attachment G to this DA permit). In addition, the Permittee shall achieve the UMAM scores for individual enhanced wetland polygons, as described in Table 10 in the Compensatory Mitigation Plan, prior to being released from monitoring and reporting as described in the Release from Mitigation Implementation Monitoring and Reporting special condition of this DA permit. 20. Mitigation Performance Standards - Established Wetlands: The Permittee shall achieve the performance standards for wetlands established as mitigation as identified in the Performance Standards section of the approved final Compensatory Mitigation Plan (Attachment G to this DA permit). In addition, the Permittee shall achieve the UMAM scores for individual established wetland polygons, as described in Table 8 in the Compensatory Mitigation Plan, prior to being released from monitoring and reporting as described in the Release from Mitigation Implementation Monitoring and Reporting special condition of this DA permit. 21. Mitigation Performance Standards - Preserved Streams: The Permittee shall achieve the performance standards for streams and riparian areas (upland and wetland) preserved as mitigation as identified in the Performance Standards section of the approved final Compensatory Mitigation Plan (Attachment G to this DA permit). 22. Mitigation Performance Standards - Established Streams: The Permittee shall achieve the performance standards for streams and riparian areas (upland and wetland) established as mitigation as identified in the Performance Standards section of the approved final Compensatory Mitigation Plan (Attachment G to this DA permit). 23. Wetland Compensatory Mitigation Monitoring and Reporting Timeframes (Implementation): To document progress towards and achievement of the wetland performance standards identified in the Performance Standards section of the approved final Compensatory Mitigation Plan (Attachment G to this DA permit), the Permittee shall complete the following: Enhanced Wetlands a. Perform a time-zero monitoring event of each wetland enhancement area within 60 days of completion of the enhancement activities identified in the approved final Compensatory Mitigation Plan and the Wetland Work Plan. b. Submit the time-zero report to the Corps within 60 days of completion of the monitoring event. The report will include a detailed plan view drawing of the

18 enhanced mitigation areas, and at least one paragraph depicting baseline conditions of the mitigation site(s) prior to initiation of the compensatory mitigation objectives. c. Following completion of the initial enhancement activities, initially perform semiannual monitoring of each mitigation area for the first two years and then perform annual monitoring thereafter. d. Submit annual monitoring reports to the Corps within 60 days of completion of the monitoring event, or on a set schedule as approved by the Corps. The Permittee shall combine semi-annual monitoring into one annual monitoring report. e. Monitor each mitigation area(s) and submit annual monitoring reports to the Corps until the Corps determines that the mitigation area(s) have achieved their performance standards in accordance with the wetland performance standards identified in the approved final Compensatory Mitigation Plan (Attachment G) and provides notification that the Permittee can cease monitoring of such mitigation areas in accordance with the Mitigation Implementation Completion Special Condition of this permit. Established Wetlands a. Perform a time-zero monitoring event of each wetland establishment area within 60 days of completion of the compensatory mitigation construction and initial implementation activities identified in the approved final Compensatory Mitigation Plan and the Wetland Work Plan. b. Submit the time-zero report to the Corps within 60 days of completion of the monitoring event. The report will include a detailed plan view drawing of the established mitigation area(s). c. Following completion of the compensatory mitigation construction and initial implementation activities, initially perform semi-annual monitoring of each mitigation area for the first two years and then perform annual monitoring thereafter. d. Submit annual monitoring reports to the Corps within 60 days of completion of the monitoring event, or on a set schedule as approved by the Corps. The Permittee shall combine semi-annual monitoring into one annual monitoring report. e. Monitor the mitigation area(s) and submit annual monitoring reports to the Corps until the Corps determines that the mitigation area(s) have achieved their performance standards in accordance with the wetland performance standards identified in the approved final Compensatory Mitigation Plan (Attachment G) and provides notification that the Permittee can cease monitoring of such mitigation areas in accordance with the Mitigation Implementation Completion Special Condition of this permit.

19 24. Wetland Compensatory Mitigation Reporting Format (Implementation): The Permittee shall submit all monitoring documentation to the Corps on 8½-inch by 11-inch pages (preferably in an electronic format), and include the following: a. Project Overview: i. Department of the Army Permit Number ii. Name and contact information of Permittee and consultant iii. Name of party responsible for conducting the monitoring and the date(s) the inspection was conducted iv. A brief paragraph describing the purpose of the approved project, acreage and type of aquatic resources impacted, and mitigation acreage and type of aquatic resources authorized to compensate for the aquatic impacts. v. Written description of the location, any identifiable landmarks of the compensatory mitigation project including information to locate the site perimeter(s), and coordinates of the mitigation site (expressed as latitude, longitude, UTMs, state plane coordinate system, etc.). vi. Dates compensatory mitigation commenced and/or was complete. vii. Dates of any corrective or maintenance activities conducted since the previous report submission viii. Specific recommendations for any additional corrective or remedial actions. b. Requirements: List the monitoring requirements and performance standards, as specified in the approved mitigation plan and special conditions of this permit, and evaluate whether the compensatory mitigation project site is successfully achieving the approved performance standards or trending towards success. A table is a recommended option for comparing the performance standards to the conditions and status of the developing mitigation site. c. Summary Data: Summary data should be provided to substantiate the success and/or potential challenges associated with the compensatory mitigation project. Photo documentation may be provided to support the findings and recommendations referenced in the monitoring report and to assist the PM in assessing whether the compensatory mitigation project is meeting applicable performance standards for that monitoring period. Submitted photos should be formatted to print on a standard 8½-inch x 11-inch page, dated, and clearly labeled with the direction from which the photo was taken. The photo location points should also be identified on the appropriate maps.

20 d. Maps and Plans: Maps shall be provided to show the location of the compensatory mitigation site relative to other landscape features, habitat types, locations of photographic reference points, transects, sampling data points, and/or other features pertinent to the mitigation plan. In addition, the submitted maps and plans should clearly delineate the mitigation site perimeter(s). Each map or diagram should be formatted to print on a standard 8½-inch x 11-inch page and include a legend and the location of any photos submitted for review. As-built plans may be included. For electronic copies of maps and plans, the Permittee shall provide those copies in.pdf format (sized to 8½-inch by 11-inch sheets) and in.shp format. e. Conclusions: A general statement shall be included that describes the conditions of the compensatory mitigation project. If performance standards are not being met, a brief explanation of the difficulties and potential remedial actions proposed by the Permittee or sponsor, including a timetable, shall be provided. The District Commander will ultimately determine if the mitigation site is successful for a given monitoring period. 25. Stream Compensatory Mitigation Monitoring and Reporting Timeframes (Implementation): To document progress towards and achievement of the stream performance standards identified in the approved final Compensatory Mitigation Plan (Attachment G), the Permittee shall complete the following: Established Streams a. Perform a time-zero monitoring event of each stream establishment area within 60 days of completion of the compensatory mitigation construction and initial implementation activities identified in the approved final Compensatory Mitigation Plan and the Stream Work Plan. b. Submit the time-zero report to the Corps within 60 days of completion of the monitoring event. The report will include a detailed plan view drawing of the stream establishment area(s). c. Following completion of the compensatory mitigation construction and initial implementation activities, initially perform semi-annual monitoring of each stream establishment area for the first three years and then perform annual monitoring thereafter for a minimum of seven years. However, if a stream segment is not trending toward success after the initial three year semi-annual monitoring period, the Corps may require the Permittee to extend the semi-annual monitoring. d. Submit annual monitoring reports to the Corps within 60 days of completion of the monitoring event, or on a set schedule as approved by the Corps. The Permittee shall combine semi-annual monitoring into one annual monitoring report. e. Monitor the stream establishment area(s) and submit annual monitoring reports to the Corps until the Corps determines that the stream establishment area(s) have

21 achieved their performance standards in accordance with the stream performance standards identified in the approved final Compensatory Mitigation Plan (Attachment G) for five consecutive years and provides notification that the Permittee can cease monitoring of such mitigation areas in accordance with the Mitigation Implementation Completion Special Condition of this permit. In addition, the Permittee shall monitor each stream establishment area at least until it can be reconnected to its watershed. 26. Stream Compensatory Mitigation Reporting Format (Implementation): The Permittee shall submit all monitoring documentation to the Corps on 8½-inch by 11-inch pages (preferably in an electronic format), and include the following: a. Project Overview: i. Department of the Army Permit Number ii. Name and contact information of Permittee and consultant iii. Name of party responsible for conducting the monitoring and the date(s) the inspection(s) was conducted iv. Indication of stream type v. Current HAS score vi. A brief paragraph defining the purpose for the approved project, the linear foot and type of aquatic resources impacted, and the mitigation linear feet and type of aquatic resources authorized to compensate for the aquatic impacts vii. Written description of the location, any identifiable landmarks of the compensatory mitigation project including information to locate the site perimeter(s), and coordinates of the mitigation site (expressed as latitude, longitude, UTMs, state plane coordinate system, etc.) viii. Dates compensatory mitigation commenced and/or was completed ix. Dates compensatory mitigation commenced and/or was complete x. Dates of any corrective or maintenance activities conducted since the previous report submission xi. Supporting documentation such as general observations relative to existing conditions, rainfall data, readings, calculations, and benchmark data

22 xii. Photographs showing upstream and downstream views of the stream restoration and the buffers. xiii. General habitat assessment including documentation of wildlife or signs of wildlife observed and an evaluation of the buffer community type (by FLUCCS) xiv. Specific recommendations for any additional corrective or remedial actions (e.g., additional grading, abate undesirable plant species, etc.)

23 b. Requirements: List the monitoring requirements and performance standards, as specified in the stream mitigation plan and special conditions of this permit, and evaluate whether the compensatory stream mitigation project site is successfully achieving the approved performance standards or trending towards success. c. Summary Data: Summary data shall be provided to substantiate the success and/or potential challenges associated with the compensatory mitigation project. Photo documentation shall be provided to support the findings and recommendations referenced in the monitoring report and to assist the PM in assessing whether the compensatory mitigation project is meeting applicable performance standards for that monitoring period. Submitted photos shall be formatted to print on a standard 8½-inch x 11-inch page, dated, and clearly labeled with the direction from which the photo was taken. The photo location points should also be identified on the appropriate maps. d. Maps and Plans: Maps shall be provided to show the location of the compensatory mitigation site relative to other landscape features, habitat types, locations of photographic reference points, transects, sampling data points, and/or other features pertinent to the mitigation plan. In addition, the submitted maps and plans should clearly delineate the mitigation site perimeter(s). Each map or diagram should be formatted to print on a standard 8½-inch x 11-inch page and include a legend and the location of any photos submitted for review. As-built plans may be included. For electronic copies of maps and plans, the Permittee shall provide those copies in.pdf format (sized to 8½-inch by 11-inch sheets) and in.shp format. e. Conclusions: A general statement shall be included that describes the conditions of the compensatory mitigation project. If performance standards are not being met, a brief explanation of the difficulties and potential remedial actions proposed by the Permittee or sponsor, including a timetable, shall be provided. The District Commander will ultimately determine if the mitigation site is successful for a given monitoring period. 27. Rain Gauge Installation: Each phase/mining unit which contains established stream segments will have a rain gauge appropriately located and installed to collect and monitor daily rainfall data. The rain gauges will be used only until the subject stream reaches have experienced five bankfull rainfall events. 28. Bankfull Rainfall Event Monitoring: Monitoring after the first 5 bankfull rainfall events will be recorded within each proposed stream section. The Permittee shall include data from rain gages to the Corps in the annual compliance reporting. Post

24 bankfull event, the Permittee shall provide a narrative for any adaptations or changes made to the subject stream reaches. 29. Monitoring for un-mined stream segments: The Permittee shall monitor undisturbed stream segments located within the project site. Water table piezometers (outside the stream bank) or staff gauges (within the stream channel) will be installed and datum surveyed during all phases of mining and reclamation within the project site. The Permittee will submit a map indicating the exact locations of the piezometers and quarterly data to the Corps with the annual compliance reporting. 30. Release from Mitigation Implementation Monitoring and Reporting: For each mitigation area, the Corps will consider the Permittee s responsibility to complete implementation as set forth in this permit and the approved final Compensatory Mitigation Plan (Attachment G) fulfilled only after the Permittee meets all of the following requirements in a manner acceptable to the Corps: a. Demonstration of achievement of performance standards (as described in the Performance Standards section of the Compensatory Mitigation Plan) and in the Mitigation Performance Standards special conditions of this DA permit, b. Documentation of issuance of the approved long-term funding mechanism (surety bond) with sufficient funding to cover the completed area(s) (as described in the Long-Term Management Funding Special Condition of this DA permit), c. Documentation of execution of the associated revised standby trust agreement (as described in the Long-Term Management Funding and Long-Term Management Funding - Changes Special Conditions of this DA permit), and d. Documentation of the recorded conservation easement over the completed area(s), plat, and acceptance by the easement grantee (as described in the Conservation Easement Implementation Mitigation Areas Special Condition of this DA permit) After the Corps verifies that the Permittee has met these requirements, the Permittee shall no longer be responsible for the implementation monitoring of and reporting on the completed mitigation area(s) as required by this Permit. However, the Permittee, Successors and subsequent Transferees remain perpetually responsible to ensure that the mitigation area(s) remain successful by complying with the Long-term Management Special Conditions of this permit and by implementing the Long-Term Management Plan that is part of the approved final Compensatory Mitigation Plan (Attachment G). 31. Mitigation Adaptive Management/Alternatives: If the Corps determines that any compensatory mitigation area is not trending towards achievement of the wetland or stream performance standards identified in the approved final Compensatory

25 Mitigation Plan (Attachment G), the Permittee shall develop and implement sitespecific adaptive management actions to correct the mitigation deficiencies. Such actions may include but would not be limited to adjusting wetland hydrology, supplemental plantings, and increasing the frequency of exotic or nuisance species maintenance. The Permittee shall submit any such adaptive management plan to the USACE for approval prior to implementation, and include a description of the implementation and results in the annual monitoring reporting. Within 60 days of notification by the Corps that the compensatory mitigation is unsuccessful, the Permittee shall submit to the Corps an alternate compensatory mitigation proposal sufficient to create the functional lift required under this permit. This may include the purchase of mitigation credits from a Corps-approved mitigation bank. The alternate compensatory mitigation proposal may be required to include additional mitigation to compensate for the temporal loss of aquatic resource functions associated with the unsuccessful compensatory mitigation activities. The Corps reserves the right to fully evaluate, amend, and approve or reject the alternate compensatory mitigation proposal. Within 120 days of Corps approval, the Permittee will implement the alternate compensatory mitigation proposal. 32. Conservation Easement Preservation Mitigation Areas: Prior to initiating any work authorized by this DA permit, the Permittee shall preserve in perpetuity the Immediate Level I preservation mitigation areas referenced in the approved Compensatory Mitigation Plan which includes 1093 acres of wetlands and uplands, and 55,501 linear feet of streams and upland buffers by recording the attached conservation easement (Attachment H) within the boundaries and location shown as the No Mine Area in the attached permit drawings in the public records of Hardee County, with a legal description, survey, and scale drawings of the areas in question. Prior to initiating any work authorized by this DA permit, the Permittee shall record the conservation easement in the public records of Hardee County, Florida. A certified copy of the recorded document, plat, and verification of acceptance from the Grantee shall be forwarded to the Corps within 30 days of recording. The Permittee shall also provide to the Corps a copy of the title insurance policy issued consistent with the September 15, 2016 Commonwealth Land Title Insurance Company title insurance commitment for File No. H in the amount of $3,085, If the Permittee records the conservation easement more than 90 days from the effective date of the title insurance commitment (December 15, 2016), the Permittee will provide a gap report to the Corps for review. In the event that this DA permit is transferred, proof of delivery of a copy of the recorded conservation easement to the subsequent Permittee or Permittees shall be submitted to the Corps together with the notification of permit transfer within 30 days of the transfer. The Grantee shall not assign its rights or obligations under this conservation easement except to another organization qualified to hold such interests under the applicable state and federal laws, including Florida Statutes, and committed to holding this

26 conservation easement exclusively for conservation purposes. The Corps shall be notified in writing of any intention to reassign the conservation easement to a new grantee and shall approve the selection of the grantee. The new grantee shall accept the assignment in writing and a copy of this acceptance shall be delivered to the Corps. The conservation easement shall then be re-recorded and indexed in the same manner as any other instrument affecting title to real property and a copy of the re-recorded conservation easement furnished to the Corps. If the Permittee does not receive the Corps approval of the grantee, the Corps may determine that the compensatory mitigation site is no longer appropriate and may require alternative compensatory mitigation. Any other deviation from the established conservation easement cannot be performed without a modification to this permit instrument. The ability to modify or remove this conservation easement is neither implied nor guaranteed. If the conservation easement is removed for any reason, the Permittee shall provide appropriate mitigation to compensate for functional wetland loss. 33. Conservation Easement Implementation Mitigation Areas: After the Corps determines in writing that an enhanced or established mitigation area has met the DA permit performance standards described in special conditions 19, 20 and 22 of this DA permit and in the approved final Compensatory Mitigation Plan (Attachment G), the Permittee shall preserve in perpetuity that mitigation area and its associated upland or riparian buffer by recording the attached conservation easement (Attachment H) in the public records of Hardee County, with a legal description, survey, and scale drawings of the areas in question. Prior to recording the conservation easement, the Permittee shall submit a title insurance commitment in favor of the Grantee for the property which is being offered for preservation to show that the Permittee has clear title to the real property and can legally place it under a conservation easement. Any existing liens or encumbrances on the property shall be subordinated to the conservation easement or extinguished. The Permittee shall submit the legal description, survey, scale drawings, and title insurance commitment, together with copies of any encumbrances listed in the Schedule B of the title insurance commitment, to the Corps for review and approval prior to recording the conservation easement. If the Corps does not approve of the conservation easement because the Permittee has not demonstrated that it has clear title to the real property and can legally place it under a conservation easement, then the Corps may determine that the compensatory mitigation site is not appropriate and may require alternative compensatory mitigation. Within 30 days of the Corps approval of the conservation easement and title insurance commitment, the Permittee shall record the conservation easement in the public records of Hardee County, Florida. A certified copy of the recorded document, plat, and verification of acceptance from the Grantee shall be forwarded to the Corps within 30 days of recording. The Permittee shall also provide to the Corps a copy of the title insurance policy in an amount equal to the market value of the unencumbered property.

27 In the event that this DA permit is transferred, proof of delivery of a copy of the recorded conservation easement to the subsequent Permittee or Permittees shall be submitted to the Corps together with the notification of permit transfer within 30 days of the transfer. The Grantee shall not assign its rights or obligations under this conservation easement except to another organization qualified to hold such interests under the applicable state and federal laws, including Florida Statutes, and committed to holding this conservation easement exclusively for conservation purposes. The Corps shall be notified in writing of any intention to reassign the conservation easement to a new grantee and shall approve the selection of the grantee. The new grantee shall accept the assignment in writing and a copy of this acceptance shall be delivered to the Corps. The conservation easement shall then be re-recorded and indexed in the same manner as any other instrument affecting title to real property and a copy of the re-recorded conservation easement furnished to the Corps. If the Permittee does not receive the Corps approval of the grantee, the Corps may determine that the compensatory mitigation site is no longer appropriate and may require alternative compensatory mitigation. Any other deviation from the established conservation easement cannot be performed without a modification to this permit instrument. The ability to modify or remove this conservation easement is neither implied nor guaranteed. If the conservation easement is removed for any reason, the Permittee shall provide appropriate mitigation to compensate for functional wetland loss. 34. Mitigation Implementation Financial Assurances: The Corps has determined that the State-approved mitigation financial assurances included with the approved final Compensatory Mitigation Plan (Attachment G) provide sufficient financial resources to complete or replace the permittee s obligations to implement the required mitigation and meet specified performance standards in this DA permit in the event that the permittee proves unable or unwilling to meet those obligations. The permittee shall submit written proof that they have executed and funded the financial assurance instrument prior to initiating the authorized work. 35. Mitigation Implementation Financial Assurances - Changes: If, at any time, the Corps determines that the type or amount of the approved financial assurance mechanism is not sufficient to meet the Corps' mitigation requirements associated with this DA permit, or if the State financial assurance has been terminated, or partially released by the State prior to the Corps determination that any part of the mitigation is successful in accordance with the Wetland Performance Standards or the Stream Performance Standards Special Conditions of this permit and can be released from monitoring in accordance with the Mitigation Implementation Completion Special Condition of this permit, the Permittee shall provide the Corps with financial assurances to ensure a high level of confidence that the required mitigation will be successfully completed in accordance with applicable Corps performance standards. The Corps

APPLICATION. Telephone Fax Address. Telephone Fax Address FOR MARTIN COUNTY USE ONLY

APPLICATION. Telephone Fax  Address. Telephone Fax  Address FOR MARTIN COUNTY USE ONLY APPLICATION PRESERVE AREA MANAGEMENT PLAN/ ABBREVIATED PRESERVE AREA MANAGEMENT PLAN Growth Management Department Environmental Division PART 1: Applicant Information A. Land Owner(s) Name Title and Company

More information

Receiving Water Body:

Receiving Water Body: 62-330 ENVIRONMENTAL RESOURCE PERMIT INDIVIDUAL - TECHNICAL STAFF REPORT 23-Nov-2016 APPLICATION #: IND-005-9658-2 Applicant: Agent: Charles Commander CCSH, LLC 2708 Highway 77 Lynn Haven, FL 32444 850-819-5850

More information

September 6, 2017 ATTACHMENT E.2.

September 6, 2017 ATTACHMENT E.2. DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 10117 PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA 33610 REPLY TO ATTENTION OF Regulatory Division West Permits Branch Tampa Permits Section

More information

MODEL DEED RESTRICTION FOR THE PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-3 (PASPGP-3) DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION

MODEL DEED RESTRICTION FOR THE PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-3 (PASPGP-3) DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION MODEL DEED RESTRICTION FOR THE PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-3 (PASPGP-3) DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION THIS DECLARATION OF RESTRICTIVE COVENANTS FOR CONSERVATION

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2016-00384 Of Engineers Date Issued: 27 December 2018 Galveston District Comments Due: 29 January 2019 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

Honolulu District U.S. Army Corps of Engineers

Honolulu District U.S. Army Corps of Engineers Honolulu District U.S. Army Corps of Engineers Nationwide Permit Pre-Construction Notification (PCN) This PCN template integrates requirements of the U.S. Army Corps of Engineers (Corps) Nationwide Permit

More information

DECLARATION OF RESTRICTIVE COVENANTS

DECLARATION OF RESTRICTIVE COVENANTS STATE OF MARYLAND COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ( Declarant(s) ). RECITALS WHEREAS, Declarant(s) is/are the owner(s)

More information

IN-LIEU FEE ENABLING INSTRUMENT

IN-LIEU FEE ENABLING INSTRUMENT IN-LIEU FEE ENABLING INSTRUMENT MOUNTAINS RESTORATION TRUST IN-LIEU FEE PROGRAM This In-Lieu Fee Enabling Instrument ( Instrument ), dated this day of, 2013 ( Execution Date ), is made by and between Mountains

More information

SPECIAL PUBLIC NOTICE

SPECIAL PUBLIC NOTICE SPECIAL PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Coachella Valley In-Lieu Fee Program Public Notice/Application No.: SPL-2013-00324-TOB Project:

More information

MODOT STATEWIDE UMBRELLA WETLAND AND STREAM MITIGATION BANKING INSTRUMENT THE MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION

MODOT STATEWIDE UMBRELLA WETLAND AND STREAM MITIGATION BANKING INSTRUMENT THE MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION MODOT STATEWIDE UMBRELLA WETLAND AND STREAM MITIGATION BANKING INSTRUMENT By agreement between THE MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION Acting for its subordinate THE MISSOURI DEPARTMENT OF

More information

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS 105.11. Permit requirements. 105.12. Waiver of permit requirements. Title 25 Environmental Protection Part I. Department of Environmental Protection Subpart C. Protection of Natural Resources Article I.

More information

Mitigation Banking Instrument Outline For Proposed Mitigation Banks Within the State of Kansas (February 2015)

Mitigation Banking Instrument Outline For Proposed Mitigation Banks Within the State of Kansas (February 2015) Mitigation Banking Instrument Outline For Proposed Mitigation Banks Within the State of Kansas (February 2015) The U.S. Army Corps of Engineers (Corps) and U.S. Environmental Protection Agency joint regulation

More information

Department of the Army Permit

Department of the Army Permit DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS POST OFFICE BOX 4970 JACKSONVILLE, FLORIDA 32232-0019 Regulatory Division Department of the Army Permit Regional General Permit SAJ-105 Residential,

More information

DECLARATION OF RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS made this day of, 200_, by ( Declarant ). RECITALS

DECLARATION OF RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS made this day of, 200_, by ( Declarant ). RECITALS DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS made this day of, 200_, by ( Declarant ). RECITALS WHEREAS, Declarant is the owner of the surface of certain real property

More information

JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: Date: December 9, 2016 Comments Due: January 3, 2017

JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: Date: December 9, 2016 Comments Due: January 3, 2017 US Army Corps of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2016-00183-1 Date: December 9, 2016 Comments Due: January 3, 2017 TO WHOM IT

More information

IN-LIEU FEE ENABLING INSTRUMENT

IN-LIEU FEE ENABLING INSTRUMENT IN-LIEU FEE ENABLING INSTRUMENT RIVERSIDE-CORONA RESOURCE CONSERVATION DISTRICT RCRCD In-Lieu Fee Program IN-LIEU FEE PROGRAM This In-Lieu Fee Enabling Instrument ( Instrument ), dated this day of, 2012

More information

Description. Item # Type

Description. Item # Type SOUTH FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT NO. 56-03461-P DATE ISSUED: DECEMBER 23, 2016 Updated on July 10, 2017 Green = Complete; Red = Time Sensitive/Past Due; Orange= PERMIT

More information

ARTICLE 5 GENERAL REQUIREMENTS

ARTICLE 5 GENERAL REQUIREMENTS 5.1 SUITABILITY OF THE LAND ARTICLE 5 GENERAL REQUIREMENTS 5.1.1 Land subject to flooding, improper drainage or erosion, and land deemed to be unsuitable for development due to steep slope, unsuitable

More information

Mitigation Banking Instrument Outline For Proposed Mitigation Banks Within the State of Missouri (February 2015)

Mitigation Banking Instrument Outline For Proposed Mitigation Banks Within the State of Missouri (February 2015) Mitigation Banking Instrument Outline For Proposed Mitigation Banks Within the State of Missouri (February 2015) The U.S. Army Corps of Engineers (Corps) and U.S. Environmental Protection Agency joint

More information

AMENDED DEED OF CONSERVATION EASEMENT

AMENDED DEED OF CONSERVATION EASEMENT Prepared by: Wayne E. Flowers Lewis, Longman & Walker, P.A. 245 Riverside Ave. Suite 150 Jacksonville, FL 32202 Return recorded original to: Mitigation Marketing 1091 W. Morse Blvd. Suite 101 Winter Park,

More information

Mitigation and Conservation Banking

Mitigation and Conservation Banking Mitigation and Conservation Banking Ryan Orndorff Headquarters, Marine Corps Marine Corps Installations Command 571-256-2782 ryan.orndorff@usmc.mil Definitions, Policies & Guidelines Existing banks and

More information

ARTICLE I. IN GENERAL

ARTICLE I. IN GENERAL Adopted by City Council on December 7, 2009 AN ORDINANCE TO AMEND AND REORDAIN CHAPTER 10 (WATER PROTECTION) OF THE CODE OF THE CITY OF CHARLOTTESVILLE, 1990, AS AMENDED, BY DELETING SECTIONS 10-51 AND

More information

APRIL 30, ILL. ADM. CODE 2580 CH. I, SEC. 2580

APRIL 30, ILL. ADM. CODE 2580 CH. I, SEC. 2580 TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER f: ADMINISTRATIVE SERVICES PART 2580 CONSERVATION STEWARDSHIP PROGRAM Section 2580.10 Definitions 2580.20 Eligibility 2580.30

More information

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED BY BOARD OF COUNTY COMMISSIONERS ORDINANCE NO. AN ACT TO BE ENTITLED AN ORDINANCE AMENDING THE PASCO COUNTY LAND DEVELOPMENT CODE, ARTICLE 700, BY REPEALING EXISTING SECTION 702, ENVIRONMENTALLY SENSITIVE

More information

FRESHWATER WETLANDS LETTER OF INTERPRETATION (LOI) APPLICATION CHECKLIST AND FEE TABLE (Updated March 2016)

FRESHWATER WETLANDS LETTER OF INTERPRETATION (LOI) APPLICATION CHECKLIST AND FEE TABLE (Updated March 2016) State of New Jersey Department of Environmental Protection Land Use Regulation Program Mail Code 501-02A PO Box 420 Trenton, NJ 08625-0420 Fax# (609)-777-3656 www.nj.gov/dep/landuse/ FRESHWATER WETLANDS

More information

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS - Larimer County Planning Dept. Procedural Guide for 1041 PERMITS PLEASE NOTE: A PRE-APPLICATION CONFERENCE IS REQUIRED PRIOR TO SUBMITTING THIS APPLICATION. PURPOSE: State Statutes allow local governments

More information

DECLARATION OF RESTRICTIVE COVENANTS

DECLARATION OF RESTRICTIVE COVENANTS DECLARATION OF RESTRICTIVE COVENANTS The Declarant,, is the fee simple owner of the certain real property located in County, Kansas, as described on Exhibit A, which is attached hereto and incorporated

More information

Donation of Circle Pine Farm, Rural and Family Lands Protection Easement

Donation of Circle Pine Farm, Rural and Family Lands Protection Easement AGENDA BOARD OF TRUSTEES DEPARTMENT OF AGRICULTURE & CONSUMER SERVICES JANUARY 19, 2011 Attachments to the items below can be viewed at the following link: http://www.dep.state.fl.us/secretary/cab/public_notices.htm

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO ATTENTION OF: CECW-PM (10-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report

More information

THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS

THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by (Covenantor). RECITALS Model for Use with Permits Without Mitigation Plans STATE OF COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS

More information

APPLICATION FOR CLEARANCE OF SHORELINE VEGETATION AND

APPLICATION FOR CLEARANCE OF SHORELINE VEGETATION AND APPLICATION FOR CLEARANCE OF SHORELINE VEGETATION AND CONSERVATION AREA AUTHORIZATION* *This permit application is intended to be used when work is being proposed both within a conservation area or easement

More information

JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN

JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN CITY OF ESCONDIDO JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN June 2015 Utilities Department Environmental Programs Division 201 N. Broadway Escondido, CA 92025 760-839-4668 TABLE

More information

Walton County Planning and Development Services

Walton County Planning and Development Services Walton County Planning and Development Services 31 Coastal Centre Boulevard, Suite 100 47 N 6 th Street Santa Rosa Beach, Florida 32459 DeFuniak Springs, Florida 32433 Phone 850-267-1955 Phone 850-892-8157

More information

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No.

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No. Filing Date Petition No. SE Fee: (see fee schedule) Validation No. TO THE LEVY COUNTY PLANNING COMMISSION: Special exceptions are intended to provide for land uses and activities not permitted by right

More information

7) Contact information of the responsible design professional.

7) Contact information of the responsible design professional. SECTION 14 EROSION AND SEDIMENTATION CONTROL PLAN THE PURPOSE of an Erosion and Sedimentation Control Plan is to minimize soil erosion and sedimentation that is caused by construction activity. The intent

More information

A Minor Land Excavation Operating Permit is used to:

A Minor Land Excavation Operating Permit is used to: CHAPTER 400. SECTION 404. PERMIT TYPES AND APPLICATIONS OPERATING PERMITS 404.1. Minor Land Excavation A. Intent and Purpose The intent and purpose of this section is to protect the public health, safety,

More information

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 IMPORTANT NOTE: This document was created to accompany the City of Fort Collins

More information

Jurisdictional Determination Request

Jurisdictional Determination Request This form is intended for use by anyone requesting a jurisdictional determination (JD) from the U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all supporting information, as

More information

CONSERVATION EASEMENT INCLUDING MITIGATION

CONSERVATION EASEMENT INCLUDING MITIGATION After recording return to: GRANTOR: GRANTEE: GRANTEE (Trustee): LEGAL DESCRIPTION: TAX PARCEL I.D. #: REFERENCE # s: WHATCOM COUNTY N/A CONSERVATION EASEMENT INCLUDING MITIGATION This grant of a conservation

More information

CHESAPEAKE BAY PRESERVATION AREA EXCEPTION APPLICATION INSTRUCTIONS

CHESAPEAKE BAY PRESERVATION AREA EXCEPTION APPLICATION INSTRUCTIONS City of Chesapeake Department of Planning Post Office Box 15225 Chesapeake, Virginia 23328-5225 (757) 382-6176 FAX (757) 382-6406 CHESAPEAKE BAY PRESERVATION AREA EXCEPTION APPLICATION INSTRUCTIONS PURPOSE

More information

How Mitigation Banks and ILF Programs Can Help Conservation

How Mitigation Banks and ILF Programs Can Help Conservation How Mitigation Banks and ILF Programs Can Help Conservation Devin Schenk, Mitigation Program Manager Anthony Sasson The Nature Conservancy Mission: To conserve the lands and waters for which all life depends

More information

IMPLEMENTING AGREEMENT. for the EAST CONTRA COSTA COUNTY HABITAT CONSERVATION PLAN/ NATURAL COMMUNITY CONSERVATION PLAN.

IMPLEMENTING AGREEMENT. for the EAST CONTRA COSTA COUNTY HABITAT CONSERVATION PLAN/ NATURAL COMMUNITY CONSERVATION PLAN. IMPLEMENTING AGREEMENT for the EAST CONTRA COSTA COUNTY HABITAT CONSERVATION PLAN/ NATURAL COMMUNITY CONSERVATION PLAN by and between EAST CONTRA COSTA COUNTY HABITAT CONSERVANCY, COUNTY OF CONTRA COSTA,

More information

II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required:

II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required: I. What is a Site Plan Review? Site Plan Review is a process where the construction of new buildings, new additions, and certain types of canopies and/or tax-exempt institutions are reviewed by the City

More information

ORDINANCE NO WHEREAS, the Town of Jupiter ( Town ) has adopted a Comprehensive Plan

ORDINANCE NO WHEREAS, the Town of Jupiter ( Town ) has adopted a Comprehensive Plan 0 0 ORDINANCE NO. -0 AN ORDINANCE OF THE TOWN COUNCIL OF THE TOWN OF JUPITER, FLORIDA, AMENDING CHAPTER OF THE TOWN CODE TO AMEND SECTION -, ENTITLED INTENT TO ADD PERMITTING LANDGUAGE; TO AMEND SECTION

More information

Conservation Design Subdivisions

Conservation Design Subdivisions Conservation Design Subdivisions An excerpt from the Rules and Regulations Governing Division of Land in Sheridan County, Wyoming, November 5, 2010 Sheridan County Public Works Department 224 S. Main Street

More information

MINNESOTA POLLUTION CONTROL AGENCY GENERAL PERMIT FOR DISPOSAL OF UNCOMTAMINATED CONCRETE

MINNESOTA POLLUTION CONTROL AGENCY GENERAL PERMIT FOR DISPOSAL OF UNCOMTAMINATED CONCRETE MINNESOTA POLLUTION CONTROL AGENCY GENERAL PERMIT FOR DISPOSAL OF UNCOMTAMINATED CONCRETE ISSUANCE DATE: December 23, 2013 EXPIRATION DATE: December 23. 2018 This permit is a General Permit issued pursuant

More information

CONDITIONAL USE PERMIT Application Packet

CONDITIONAL USE PERMIT Application Packet CONDITIONAL USE PERMIT Application Packet Community Development Department 1020 East Pioneer Road, Draper, UT 84020 (801) 576-6539 Fax (801) 576-6526 Dear Applicant, This application packet has been developed

More information

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS IV-A. General Minor subdivisions create five or fewer lots from a tract of record, each lot of which has legal and physical access. If the tract of record proposed

More information

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION I. SUBMITTAL REQUIREMENTS: 1. Fees per current schedule. 2. Deed to property. 3. Pre-Application meeting is mandatory. Contact the Building Official

More information

Town of Middleborough Conservation Commission 2014 Policy

Town of Middleborough Conservation Commission 2014 Policy Approved February 20, 2014 Town of Middleborough Conservation Commission 2014 Policy The Wetland Protection Act under M.G.L. c. 131, sec. 40 and regulations 310 CMR 10.02(1)(a-f) & 310 CMR 10.02 (2)(a)

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 June 8, 2018 Regulatory Branch SAS-2018-00375 PUBLIC NOTICE Reissuance of

More information

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA Filing Date Petition Number SE Fee (See fee schedule) Validation Number TO THE LEVY COUNTY PLANNING COMMISSION: Special Exceptions are intended to provide for land use and activities not permitted By Right

More information

Part 72. Sec. 1. This ordinance shall be known and may be cited as the Clyde Township Wetlands Ordinance.

Part 72. Sec. 1. This ordinance shall be known and may be cited as the Clyde Township Wetlands Ordinance. Part 72 72.000 WETLANDS ORDINANCE Ord. No. 1 Adopted: June 12, 1991 Amended: April 13, 1994 72.001 SHORT TITLE. 72.002 PURPOSE. 72.003 DEFINITIONS. CLYDE TOWNSHIP ORDAINS: Sec. 1. This ordinance shall

More information

JOINT PUBLIC NOTICE PUBLIC NOTICE

JOINT PUBLIC NOTICE PUBLIC NOTICE Albuquerque District JOINT PUBLIC NOTICE PUBLIC NOTICE Application Number: SPA-2012-00299-ABQ Date: October 20, 2014 Comments Due: November 20, 2014 SUBJECT: The U.S. Army Corps of Engineers, Albuquerque

More information

Chapter HABITAT CONSERVATION PLAN / NATURAL COMMUNITY CONSERVATION PLAN IMPLEMENTATION ORDINANCE

Chapter HABITAT CONSERVATION PLAN / NATURAL COMMUNITY CONSERVATION PLAN IMPLEMENTATION ORDINANCE Chapter 15.108 HABITAT CONSERVATION PLAN / NATURAL COMMUNITY CONSERVATION PLAN IMPLEMENTATION ORDINANCE Sections: 15.108.010 Purpose. 15.108.020 Definitions. 15.108.030 Applicability 15.108.040 Responsibility

More information

MODEL DEED RESTRICTION

MODEL DEED RESTRICTION MODEL DEED RESTRICTION This type of Protective Covenant is the most commonly used. It is a legal agreement between the grantor, typically the property owner or applicant, and the Corps. Please view instructions

More information

Land Use Application

Land Use Application Land Use Application Check all permits you are applying for in the boxes provided. Submit this application form, the applicable materials listed in the corresponding permit application packet(s) and application

More information

CHAPTER 6 CHESAPEAKE BAY PRESERVATION AREAS AND STREAM PROTECTION AREAS

CHAPTER 6 CHESAPEAKE BAY PRESERVATION AREAS AND STREAM PROTECTION AREAS CHAPTER 6 CHESAPEAKE BAY PRESERVATION AREAS AND STREAM PROTECTION AREAS 6.1 INTRODUCTION Virginia s Chesapeake Bay Preservation Area (CBPA) Designation and Management Regulations (9VAC10-20 et seq.) require

More information

Easement Grant of Easement for Habitat Protection

Easement Grant of Easement for Habitat Protection Date: Grantor(s): XXXXXXXXXX Grantee: Tri-Basin Natural Resources District, (hereinafter referred to as Tri-Basin NRD)1308 2 nd St., Holdrege NE 68949 Protected Property: See Exhibit A attached for legal

More information

Receiving Water Body:

Receiving Water Body: 62-330 ENVIRONMENTAL RESOURCE PERMIT INDIVIDUAL - TECHNICAL STAFF REPORT 31-Oct-2017 APPLICATION #: IND-005-18150-1 Applicant: Agent: Nirav Banker BPS Partners, LLC 504 Parkwood Drive Panama City, FL 32405

More information

February 6, Operations Division Regulatory Branch (North) ID No. LRL dlz

February 6, Operations Division Regulatory Branch (North) ID No. LRL dlz DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, LOUISVILLE CORPS OF ENGINEERS INDIANAPOLIS REGULATORY OFFICE 8902 OTIS AVENUE, SUITE S106B INDIANAPOLIS, INDIANA 46216 February 6, 2013 Operations Division

More information

[Type e-signature] This document has been electronically signed.

[Type e-signature] This document has been electronically signed. Notice of Coverage - SW State Disposal System (SDS) Permit GCB000000 General Permit Authorization to Dispose of Uncontaminated Concrete Permittee (Owner): Various City or Township: Various County: Various

More information

WEST VIRGINIA DIVISION OF FORESTRY Cooperative Forest Legacy Program. Sample Conservation Easement

WEST VIRGINIA DIVISION OF FORESTRY Cooperative Forest Legacy Program. Sample Conservation Easement WEST VIRGINIA DIVISION OF FORESTRY Cooperative Forest Legacy Program Sample Conservation Easement This document is included in the forest legacy kit as an example for information and possible guidance

More information

Sabine River Authority, State of Louisiana

Sabine River Authority, State of Louisiana Sabine River Authority, State of Louisiana Policy for Administering the Shoreline Management Plan (SMP) Encroachments Adopted by SRA Board of Commissioners: Introduction The Federal Energy Regulatory Commission

More information

PRELIMINARY PLAT Application Packet

PRELIMINARY PLAT Application Packet PRELIMINARY PLAT Application Packet Community Development Department 1020 East Pioneer Road, Draper, UT 84020 (801) 576-6539 Fax (801) 576-6526 Dear Applicant, This application packet has been developed

More information

CHAPTER SHORT SUBDIVISIONS

CHAPTER SHORT SUBDIVISIONS CITY OF MOSES LAKE MUNICIPAL CODE CHAPTER 17.09 SHORT SUBDIVISIONS Sections: 17.09.010 Purpose 17.09.020 Scope 17.09.030 Preliminary Short Subdivision Conditions and Requirements 17.09.040 Referral to

More information

GENERAL CONDITIONS APPLYING TO SUBDIVISIONS APPROVED BY THE PLANNING BOARD OF THE TOWN OF BETHLEHEM ALBANY COUNTY - NEW YORK

GENERAL CONDITIONS APPLYING TO SUBDIVISIONS APPROVED BY THE PLANNING BOARD OF THE TOWN OF BETHLEHEM ALBANY COUNTY - NEW YORK GENERAL CONDITIONS APPLYING TO SUBDIVISIONS APPROVED BY THE PLANNING BOARD OF THE TOWN OF BETHLEHEM ALBANY COUNTY - NEW YORK February 1976 Revised September 1978 GENERAL CONDITIONS PERTAINING TO SUBDIVISION

More information

Josephine County, Oregon

Josephine County, Oregon Josephine County, Oregon PLANNING OFFICE 700 NW Dimmick Street, Suite C, Grants Pass OR 97526 (541) 474-5421 / Fax (541) 474-5422 E-mail: planning@co.josephine.or.us HOME OCCUPATION APPLICATION PRE-APPLICATION

More information

Wilmington District Process for Preservation of Mitigation Property

Wilmington District Process for Preservation of Mitigation Property November 25, 2003 Wilmington District Process for Preservation of Mitigation Property The Wilmington District Regulatory Branch (District), consistent with Corps of Engineers guidance, often accepts or

More information

1.1 Purpose. The purpose of this chapter is to summarize guidance on those requirements generally applicable to grant programs.

1.1 Purpose. The purpose of this chapter is to summarize guidance on those requirements generally applicable to grant programs. 523 FW 1 Summary FWM#: 061 (new) Date: December 17, 1992 Series: State Grant Programs Part 523: Federal Aid Compliance Requirements Originating Office: Division of Federal Aid 1.1 Purpose. The purpose

More information

A Mining Operating Permit is used to:

A Mining Operating Permit is used to: CHAPTER 400. SECTION 404. PERMIT TYPES AND APPLICATIONS OPERATING PERMITS 404.3. Mining Operating Permits A. Intent and Purpose The intent and purpose of this section is to protect the public health, safety,

More information

Thurston County Planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS. Chapter 24.

Thurston County Planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS. Chapter 24. Thurston County Planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS Chapter 24.01 GENERAL PROVISIONS Chapter 24.01 6/4/2012 GENERAL PROVISIONS

More information

FLOOD HAZARD AREA LAND USE MANAGEMENT

FLOOD HAZARD AREA LAND USE MANAGEMENT FLOOD HAZARD AREA LAND USE MANAGEMENT Introduction Guidance For Selection of Qualified Professionals and Preparation of Flood Hazard Assessment Reports This document is intended to provide guidance for

More information

DRAFT FOR PUBLIC HEARING (rev. March, 2016)

DRAFT FOR PUBLIC HEARING (rev. March, 2016) Chapter 200. ZONING Article VI. Conservation/Cluster Subdivisions 200-45. Intent and Purpose These provisions are intended to: A. Guide the future growth and development of the community consistent with

More information

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES ABANDONED MINE LANDS RECLAMATION PROGRAM

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES ABANDONED MINE LANDS RECLAMATION PROGRAM RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES 0400-44-01 ABANDONED MINE LANDS RECLAMATION PROGRAM TABLE OF CONTENTS 0400-44-01-.01 Scope 0400-44-01-.09 Methods

More information

PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS

PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS City of Chesapeake Department of Planning Post Office Box 15225 Chesapeake, Virginia 23328-5225 (757) 382-6176 FAX (757) 382-6406 PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS PURPOSE A preliminary

More information

Article 2 Application Type and Standards Requirements

Article 2 Application Type and Standards Requirements Article 1 Article 2 Division 1 Application Type and Standards Requirements General Provisions Sec. 2.1.1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 Division 9 Sec. 2.9.1

More information

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete:

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete: CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $200.00-$800.00 Date Application Submitted: Date Accepted as Complete: Project Number: Public Hearing S-T-R: PP#: Zone: Please

More information

Validation Checklist. Date submitted: How to use this check-list. Ecosystem Credit Accounting System. Version 1.1&2. Project Information

Validation Checklist. Date submitted: How to use this check-list. Ecosystem Credit Accounting System. Version 1.1&2. Project Information Ecosystem Credit Accounting System Version 1.1&2 Last updated April 21, 2017 Validation Checklist Date submitted: Project Information Project Name Trading Area Name Trading Area Type (e.g., TMDL, TNC Ecoregion)

More information

Chapter XVIII LAND USE REGULATION A. ZONING. The most significant scheme for controlling land use in America is zoning, by which

Chapter XVIII LAND USE REGULATION A. ZONING. The most significant scheme for controlling land use in America is zoning, by which Chapter XVIII LAND USE REGULATION A. ZONING The most significant scheme for controlling land use in America is zoning, by which local authorities divide a municipality into various zoning districts for

More information

Thurston County Planning Department PUBLIC HEARING DRAFT. AMENDMENTS TO THE CRITICAL AREAS REGULATIONS Chapter /18/2011 GENERAL PROVISIONS

Thurston County Planning Department PUBLIC HEARING DRAFT. AMENDMENTS TO THE CRITICAL AREAS REGULATIONS Chapter /18/2011 GENERAL PROVISIONS Thurston County Planning Department PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS Chapter 24.01 11/18/2011 Chapter 24.01 GENERAL PROVISIONS GENERAL PROVISIONS Sections: 24.01.005 Short

More information

NOTICE DATE: August 19, Joint Public Notice. U.S. Army Corps of Engineers and State of Arkansas

NOTICE DATE: August 19, Joint Public Notice. U.S. Army Corps of Engineers and State of Arkansas US Army Corps of Engineers Memphis District Public Notice FILE NUMBER: MVM-2013-182 (RCW) NOTICE DATE: August 19, 2013 Attn: Postmaster, Please Post Until EXPIRATION DATE: September 18, 2013 Joint Public

More information

STANDARD CONDITIONS OF SALES FOR UNDERSIZED VACANT LOTS TO CONTIGUOUS PROPERTY OWNERS BIDDING PROCEDURE

STANDARD CONDITIONS OF SALES FOR UNDERSIZED VACANT LOTS TO CONTIGUOUS PROPERTY OWNERS BIDDING PROCEDURE Schedule B STANDARD CONDITIONS OF SALES FOR UNDERSIZED VACANT LOTS TO CONTIGUOUS PROPERTY OWNERS BIDDING PROCEDURE 1. In order to bid on properties, each prospective purchaser must submit with his/her

More information

VARIANCE PROCESS APPLICATION

VARIANCE PROCESS APPLICATION The Department is here to assist you with your development application pursuant to the Community Development Code (CDC). This publication outlines the Variance Process Development Application process of

More information

Article 5. Environmentally Sensitive Areas

Article 5. Environmentally Sensitive Areas Article 5. Environmentally Sensitive Areas This Article establishes standards and regulations governing environmental constraints. These regulations are intended to encourage preservation of lands designated

More information

Subdivision (Plat) Checklist

Subdivision (Plat) Checklist Subdivision (Plat) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the review. Incomplete

More information

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST Completed DRC Application for Review Required for Application Process DRC Processing Fee 1 Commercial $2,500.00 Fire Department Review Fee 150.00 Total $2,650.00

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation 5.0 Introduction This chapter summarizes the Town s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer

More information

RULE F: WETLAND ALTERATION

RULE F: WETLAND ALTERATION RULE F: WETLAND ALTERATION 1. POLICY. It is the policy of the Board of Managers to: (a) (b) (c) (d) (e) Maintain no net loss in the quantity, quality, and biological diversity of Minnesota's existing wetlands.

More information

Request For Proposals RFP Date of Issue: September 15, 2015 RFP DUE ON: October 2, 2015 at 3:00pm Alaska Time THIS IS NOT AN OFFER

Request For Proposals RFP Date of Issue: September 15, 2015 RFP DUE ON: October 2, 2015 at 3:00pm Alaska Time THIS IS NOT AN OFFER SITKA TRIBE OF ALASKA Department of Transportation 456 Katlian Street Sitka, AK 99835 RFP-15-002 Request For Proposals RFP 15-002 Date of Issue: September 15, 2015 RFP DUE ON: October 2, 2015 at 3:00pm

More information

Corte Madera Marsh Restoration Project Update

Corte Madera Marsh Restoration Project Update Corte Madera Marsh Restoration Project Update Building and Operating Committee Agenda Item No. 5 August 25, 2016 Photo credit: WRA Background of Site 1. 72 acre parcel carved out of larger property acquired

More information

Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land

Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land The baseline documentation report (BDR) provides a snap shot of the biophysical condition of a property

More information

ADMINISTRATIVE GUIDANCE

ADMINISTRATIVE GUIDANCE 11 ADMINISTRATIVE GUIDANCE ON CONTAMINATED SITES Effective date: April 1, 2013 Version 1.1 May 2013 Expectations and Requirements for Contaminant Migration Introduction This guidance focusses on the ministry

More information

EXHIBIT "A" THE PRESERVE AT WILDERNESS LAKE COMMUNITY DEVELOPMENT DISTRICT 5844 Old Pasco Road, Suite 100, Wesley Chapel, Florida 33544

EXHIBIT A THE PRESERVE AT WILDERNESS LAKE COMMUNITY DEVELOPMENT DISTRICT 5844 Old Pasco Road, Suite 100, Wesley Chapel, Florida 33544 EXHIBIT "A" THE PRESERVE AT WILDERNESS LAKE COMMUNITY DEVELOPMENT DISTRICT 5844 Old Pasco Road, Suite 100, Wesley Chapel, Florida 33544 NATURAL AREAS POLICY STATEMENT The following is the policy statement

More information

Guideline to Site Alteration in the Town of Whitby

Guideline to Site Alteration in the Town of Whitby Guideline to Site Alteration in the Town of Whitby Public Works Department The Corporation of the Town of Whitby 575 Rossland Road East Whitby, Ontario L1N 2M8 Telephone: 905.4307 Page 2 of 40 Table of

More information

INFORMATION REQUIRED FOR ALABAMA GENERAL PERMITS - BW&T LAKES

INFORMATION REQUIRED FOR ALABAMA GENERAL PERMITS - BW&T LAKES INFORMATION REQUIRED FOR ALABAMA GENERAL PERMITS - BW&T LAKES THE FOLLOWING COMPLETED DOCUMENTS MUST BE RETURNED BEFORE PERMIT CAN BE ISSUED: 1. DESCRIPTION INFORMATION LIST 2. JOINT APPLICATION FORM 1668-02

More information

Chapter 136. SOIL EROSION

Chapter 136. SOIL EROSION 1 of 8 12/19/2011 4:17 PM Township of Andover, NJ Monday, December 19, 2011 Chapter 136. SOIL EROSION [HISTORY: Adopted by the Township Committee of the Township of Andover by Ord. No. 77-11 (Ch. XVII

More information

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published on the Town s website or disclosed

More information

PERMITS, ENCROACHMENTS AND EASEMENTS

PERMITS, ENCROACHMENTS AND EASEMENTS CHAPTER SEVEN PERMITS, ENCROACHMENTS AND EASEMENTS I. REQUIRED PERMITS FOR CONSTRUCTION All water and sewer system extension plans and specifications must be approved by PWC and all necessary permits,

More information