1 John S. Franden, President Mitchell A. Jaurena, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner November 25, 2014 TO: FROM: Subject: ACHD Board of Commissioners Bruce S. Wong, Director Dave Serdar, Right of Way Supervisor Authorization and Order of Condemnation ACHD Eagle Road and McMillan Road Project Property Owner/Address: Joshnik LLC 300 N. Orchard, Boise, ID REGULAR AGENDA ITEM December 10, 2014 Commission Meeting EXECUTIVE SUMMARY This action is for the Eagle Road and McMillan Road project. This action is necessary to complete the project. This project will help improve turn signal capacity and improve traffic flow in the area. ACHD Project No: Eagle Road and McMillan Road ( Project ) ACHD Parcel No: 9 Ada County Assessor: R Property Address: Property Owner: 4744 N. Eagle Road Boise, Idaho Joshnik LLC Attn: Charlie Jones 300 North Orchard Street Boise, ID Ada County Highway District 3775 Adams Street Garden City, ID PH FX
2 FACTS & FINDINGS The Eagle Road (SH55) and McMillan Road project is a public necessity and will help relieve congestion and improve circulation in the surrounding network. The Project was first included in ACHD s Capital Improvements Plan in 2006, and the need was reaffirmed in each subsequent update. The Project was first identified as a need in ACHD s Five Year Combined Plan (construction was initially programmed in preliminary development) and was further reaffirmed in each annual update with a construction year of The Project need, scope and development have been coordinated closely with the Idaho Transportation Department, City of Boise and with significant public involvement. 1. Property Locations: The property is located in the City of Boise on the southeast corner of North Eagle Road and McMillan Road, within the McMillan s Corner shopping center. The property is generally rectangular in shape and contains acres prior to the acquisition by ACHD. The property is currently located within a Residential Zoning District (R-1C) of Boise City. However, the Property is also located in the Lowell Plaza Subdivision; a commercial development allowed by various conditional use permits and accordingly the Subject is considered to be a commercial use site, and the highest and best use is retail use. See aerial maps (Attachments 2 & 3) and legal descriptions attached hereto as Exhibits A, B, and C to the Order of Condemnation) 2. Property Acquisition. The property necessary for the project is 203 square feet of Fee Simple Right of Way, 2,395 square feet of Permanent Easement, and 1,684 square feet of Temporary Easement. The taking of the Property is a public use authorized by law. (See the Order of Condemnation (Attachment 1), Exhibits A, B, C and D ) ( Property ). 3. Project Schedule: The Project is scheduled to begin construction in January Good Faith Negotiations: ACHD has attempted to negotiate, in good faith, to purchase from the property owner, Joshnik LLC the necessary and required Property without success. The property owner has been offered the appraised fair market value for lands, easements and just compensation for damages, if any. 2 P age January 13, 2014 A formal offer was sent to the property owner, by certified mail, which included a Summary of Rights of the property owner in accordance with Section 7-711A of the Idaho Code. January 15, 2014 The seller called and left a voice mail stating he wanted to meet and discuss his concerns with ACHD. The ACHD Agent called back and set up an appointment to meet. January 17, 2014 The ACHD agent met with the seller. The seller s biggest concern was the limited access to his store from the McMillan side due to the long median. The seller contends that his convenience store will no longer be convenient to customers since they will have to drive through Albertson s parking lot to reach the convenience store. The seller stated he would cooperate with the road project if ACHD would find a way to mitigate the
3 access issue. January 29, 2014 The ACHD agent sent an to the seller addressing the concerns he discussed on January 17, The agent also provided the intersection crash statistics, the majority of which were left turns out of the shopping center. February 13-March 7, 2014 No response from the seller. March 10, 2014 The seller responded by calling and stating he still had concerns on the access issue and the safety within the parking area. The ACHD agent explained that the west entrance will still remain right in, right out. April 1, 2014 No response from the seller. April 1, 2014 A 10-Day letter was mailed. April 21, 2014 The seller requested to meet with ACHD staff and other business owners in the center. May 8, 2014 ACHD agent spoke with the owner to confirm he is available to meet in the next two weeks. May 20, 2014 ACHD staff met with the seller to discuss and review the revised plan sheet. The ACHD staff reiterated that the median is necessary and cannot be changed. June 5, 2014 & July 1, 2014 The ACHD agent spoke with the seller, and he was still not willing to settle. August Oct 2014 Acquisition was redesigned to allow for sidewalk to be in the easement and remain outside the setbacks. A new appraisal was ordered. November 5, 2014 Updated offer was sent out. The negotiations for the purchase of this parcel have reached an impasse. In an effort to meet the project schedule for acquiring property necessary for the Project, Staff is presenting for your review and consideration a proposed Order of Condemnation for Property. FISCAL IMPACTS Project Delay POLICY IMPACTS The public necessity for this condemnation was generated by the Eagle/McMillan Capital Project, approved in the FY Integrated Five Year Work Plan adopted by the ACHD Commission on October 22, P age
4 ALTERNATIVES 1. Approve the Order to Condemnation and authorize its execution by the Board of all Commissioners. 2. Do not approve the Order of Condemnation. RECOMMENDATION 1. Authorize Staff to initiate an action in the Fourth Judicial District to condemn the Property necessary for the public right-of-way for the Project. 2. In accordance with the provisions of Section et. seq. and Section of the Idaho Code, the Board of Commissioners declare that the lands sought to be condemned are necessary for a public highway, sign the Order of Condemnation for the above-listed parcel and enter into the minutes of the meeting that the property to be acquired is necessary for a public highway and public use. 3. The Board of Commissioners executes two (2) duplicate originals of the Order of Condemnation for the Property. ATTACHMENTS: 1. Order of Condemnation and Exhibits Exhibit A Right of Way Requirement Legal Description Exhibit B Permanent Easement Legal Description Exhibit C Temporary Easement Legal Description Exhibit D Plan Sheets Showing Access 2. Site Map 3. Vicinity Map 4 P age
5 Project Name: Eagle Road and McMillan Road Project No: Name: Joshnik LLC R/W Parcel No: 9 T4N, R1E, Sec 33 APN: R ORDER OF CONDEMNATION WHEREAS, based on the facts and findings and other information presented in the Right of Way Staff Report dated November 25, 2014 which by this reference is hereby incorporated herein, as supplemented by the presentation of David Serdar, Right of Way Supervisor, presented at its regular meeting held on the December 10, 2014 and upon the recommendation of the Director, and being fully advised, the Board of Commissioners of the Ada County Highway District hereby makes the following findings of fact, conclusions and order: 1. The acquisition of public right of way for its highways is a public use for which the Ada County Highway District has the power of eminent domain under section 7-701, Idaho Code. 2. The above-designated highway project (hereinafter referred to as the Project ) is for a public use authorized by law. 3. Property Rights to be acquired Idaho Code 7-707: a. Fee Simple Right of Way: The fee requirement area consists of 203 square feet. The acquisition area is described on Exhibit A ; b. Permanent Easement: The temporary easement consists of 2,395 square feet. The permanent easement area is described on Exhibit B ; c. Temporary Easement: The temporary easement consists of 1,684 square feet. The temporary easement area is described on Exhibit C ; d. Access: Physical access control is the same, both before and after the project as depicted on the right-of-way plans Exhibit D ; e. Right of Entry: NONE Exhibits are attached hereto, and incorporated herein by this reference as if set out in full (hereinafter referred to as the Property ). 4. The Property is not already appropriated to a public use. 5. The location of the Property sought to be taken by the Ada County Highway District for the Project is most compatible with the greatest public good and the least private injury. 1 P age
6 Project Name: Eagle Road and McMillan Road Project No: Name: Joshnik LLC R/W Parcel No: 9 T4N, R1E, Sec 33 APN: R The names and addresses of the record title owner(s) of the Property, and any other owner(s) and tenants under long term leases known to the Highway District is set forth below: Name: Address: Charlie Jones Joshnik LLC 300 N. Orchard Boise, ID The Ada County Highway District commenced negotiations to purchase the Property and, by Certified Mail, postage prepaid, addressed to the owner(s) at the address shown in the official records of the Ada County Assessor, on the 13 th day of January, 2014 and on the 5 th of November, 2014 provided the owner(s) with a summary of rights form required by Chapter 7, Title 7, Idaho Code, and on the 13 th day of January, 2014 and the 5 th of November, 2014 provided the owner(s) with a written offer to purchase the Property and settle any severance and business damage claims related to the acquisition, and on the 13 th day of January, 2014 and the 5 th of November, 2014 provided the owner(s) with a copy of the Appraisal. A final purchase offer was sent to the owners on the 5 th of November, More than thirty (30) days has elapsed since the Ada County Highway District made its initial offer to purchase the Property. 8. The Ada County Highway District, by and through its employees, contractors and agents, has sought in good faith to purchase the Property and property interests described above and to settle with the owner(s), or reputed owner(s) and any other claimants for severance damages, if any, to their remaining property where the Property is a part of a larger parcel, and for damages to any business located thereon which might result from said taking, but the Highway District has been unable to make any reasonable bargain therefore, or reasonable settlement of such damages. NOW, THEREFORE, IT IS HEREBY ORDERED, AND THIS DOES ORDER, that the Ada County Highway District acquires the Property and property interests hereinabove described through the exercise of its power of Eminent Domain, pursuant to Chapter 7, Title 7, Idaho Code. Dated this day of, P age
7 Project Name: Eagle Road and McMillan Road Project No: Name: Joshnik LLC R/W Parcel No: 9 T4N, R1E, Sec 33 APN: R ADA COUNTY HIGHWAY DISTRICT BOARD OF COMMISSIONERS: By: John S. Franden, President By: Mitchell A. Jaurena, Vice President By: Bruce S. Wong, Director By: Rebecca W. Arnold, Commissioner By: Sara M. Baker, Commissioner By: Jim Hansen, Commissioner 3 P age
8
9
10
11
12
13
14
15
16
17
18 W McMillan Rd Eagle Rd. & McMillan Rd. Intersection Project No Parcel 9 Required Right of Way Approx. 203 Sq. Ft. Permanent Eaesment Approx. 2,395 Sq. Ft. Parcel 9 Parcels 2013 Aerial Photo 1 inch = 40 feet This map is a general depiction intended for visual reference only Temporary Easement Approx. 1,685 Sq. Ft. Path: H:\Kathy\ROWDS\Dawn Battles\Eagle McMillan \Parcel 9\Map.mxd
19 1: 1,289
Property Owner/Address: Holiday Partners, LLC & Dawson-AZ, LLC 168 N. 9 th Street, Suite 200, Boise, ID 83702
John S. Franden, President Mitchell A. Jaurena, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner November 25, 2014 TO: FROM: Subject: ACHD Board of
More informationREGULAR AGENDA ITEM May 25, 2016 Commission Meeting
Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner May 13, 2016 TO: FROM; Subject: ACHD Board of Commissioners
More informationRegular Agenda / Public Hearing for Board of Commissioners meeting September 24, 2014
John S. Franden, President Mitchell A. Jaurena, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner TO: FROM: ACHD Board of Commissioners & Bruce S. Wong,
More informationRegular Agenda / Public Hearing for Board of Commissioners meeting May 4, 2016
Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner TO: FROM: ACHD Board of Commissioners & Bruce S. Wong, Director
More information4. Upon completion of the reconstruction of the road the applicant will dedicate a permanent rightof-way easement to ACHD.
Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner Development Services Department TO: ACHD Commission, Director
More informationPUBLIC AUCTION SEALED BID PACKET
Sara M. Baker, President Rebecca W. Arnold, Vice President Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner Paul Woods, Commissioner PUBLIC AUCTION SEALED BID PACKET FOR PUBLIC AUCTION SALE OF:
More informationCITY OF YUBA CITY STAFF REPORT
CITY OF YUBA CITY STAFF REPORT Agenda Item 5 Date: May 3, 2016 To: From: Presentation by: Honorable Mayor & Members of the City Council Department of Public Works Diana Langley, Public Works Director Summary
More informationRegular Agenda / Public Hearing for Board of Commissioners meeting January 7, 2015
Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner Paul Woods, Commissioner TO: FROM: ACHD Board of Commissioners & Bruce S. Wong, Director
More informationMetro. Board Report. File #: , File Type: Policy Agenda Number: 60.
Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2018-0331, File Type: Policy Agenda Number: 60. REGULAR BOARD
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 2, 2004 DATE: September 20, 2004 SUBJECT: Adoption of a Resolution Authorizing the Acquisition by Eminent Domain of a Fee Simple Interest
More informationCAR Judith Balkins
CAR14-00015 Judith Balkins Summary The applicant requests annexation of approximately 16.3 acres located at 6012 and 6050 N. Pierce Park Lane with R-1B (Single Family Residential) zoning. Prepared By David
More informationDate: March 16, Jake Centers ERD, LLC P.O. Box 1610 Eagle, ID Elevation Ridge Subdivision (SUB & PUD ) Street Address
Rebecca W. Arnold, President Sara M. Baker, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner David L. Case, Commissioner Date: March 16, 2012 To: Jake Centers ERD, LLC P.O. Box
More informationBOI / DRH Albertsons grocery market and fueling center & pad sites
Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner March 28, 2017 To: Mark Palmer Albertsons Companies 250 E.
More informationyjryly AGENDA REPORT Meeting Date: November 20, 2018 Item Number: To: From:
yjryly Meeting Date: November 20, 2018 Item Number: To: From: Subject: F i AGENDA REPORT Honorable Mayor & City Council Paula Gutierrez Baeza, Assistant City Attorney Logan Phillippo, Policy & Management
More informationRESOLUTION NUMBER 4678
RESOLUTION NUMBER 4678 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, CALIFORNIA, DECLARING THAT PUBLIC INTEREST AND NECESSITY REQUIRE ACQUISITION OF A FEE INTEREST IN A PORTION OF THE PROPERTY
More informationAmended in Board 7/27/10 RESOLUTION NO. 3 to J. -l0
FILE NO. 100837 Amended in Board 7/27/10 RESOLUTION NO. 3 to J. -l0 1 2 3 4 5 6 7 8 9 [Authorizing the Acquisition of Fee Simple Interest By Eminent Domain for Central SubwaylThird Street Light Rail Extension]
More informationTHE BOARD OF SUPERWSORS OF THE COUNTY OF STANISLAUS ACTION AGENDA SUMMARY. DEPT: Publ~c Works & BOARD AGENDA # *C-1 May 1,2007
THE BOARD OF SUPERWSORS OF THE COUNTY OF STANISLAUS ACTION AGENDA SUMMARY DEPT: Publ~c Works & BOARD AGENDA # *C-1 May 1,2007 Urgent Routine AGENDA DATE CEO Concurs with Recommendation YES NO 415 Vote
More informationRESOLUTION NO WHEREAS, CR 466A Road is recognized by Lake County and the Lake Sumter
RESOLUTION NO. 2014 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF LAKE COUNTY, FLORIDA, RELATING TO THE CR 466A ROAD PROJECT; ESTABLISHING A NEED FOR ACQUISITION OF A PORTION OF THE LAND IDENTIFIED
More informationBOROUGH OF CARLISLE CUMBERLAND COUNTY, PENNSYLVANIA ORDINANCE NO. 2324
BOROUGH OF CARLISLE CUMBERLAND COUNTY, PENNSYLVANIA ORDINANCE NO. 2324 AN ORDINANCE OF THE BOROUGH COUNCIL OF THE BOROUGH OF CARLISLE, CUMBERLAND COUNTY, PENNSYLVANIA, AUTHORIZING THE EXERCISE OF EMINENT
More informationBoard Agenda Wednesday, Dec. 13, 2017 LCRA Board Room Austin
LCRA Transmission Services Corporation Board Agenda Wednesday, Dec. 13, 2017 LCRA Board Room Austin Action/Discussion Items 1. Capital Improvement Project Approval Asphalt Mines Substation Addition...
More informationDate: August 29, Dave Scaggs (sent via ) Summit Development Inc th Ave. Rd. #384 Nampa, ID 83686
Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim Hansen, Commissioner Date: August 29, 2013 To: Dave Scaggs (sent via email)
More informationMetropolitan Transportation Authority One Gateway Plaza 213.g Tel Los Angeles, CA rnetro.net
0 Metro Metropolitan Transportation Authority One Gateway Plaza 213.g22.2000 Tel Los Angeles, CA 90012-2952 rnetro.net REGULAR BOARD MEETING February 24,201 1 SUBJECT: ACTION: PUBLIC HEARING RE: RESOLUTION
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of November 18, 2017 DATE: November 7, 2017 SUBJECT: Deed of Temporary Easement from Liberty Ventures, LLC, as Grantor, to the County Board of
More informationAttachment 1 R Page 1
Attachment 1 R15-101 Page 1 BACKGROUND REPORT The Board identified the completion of road improvements on Truslow Road (SR-652), between Berea Church Road (SR-654) and Plantation Drive (SR-1706), as a
More informationAcquiring Real Property for Federal and Federal-Aid Programs and Projects
Acquiring Real Property for Federal and Federal-Aid Programs and Projects Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 as Amended. Modified specifically for Alaska.
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 17, 2012
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of November 17, 2012 DATE: November 9, 2012 SUBJECT: Approval of an Agreement of Sale Between BREOF Thomas REO, LLC and the County Board of Arlington
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.5 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Requesting that the Board of Supervisors hold a public
More informationRESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension
RESOLUTION NO. R2018-07 To Acquire Real Property Interests Required for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 03/08/2018
More informationUNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION
Case 1:16-cv-03297-ELR Document 1 Filed 08/31/16 Page 1 of 15 UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC, Plaintiff,
More informationIf you have any questions, please feel free to contact me at (208)
Sara M. Baker, President John S. Franden, Vice President Rebecca W. Arnold, Commissioner Mitchell A. Jaurena, Commissioner Jim Hansen, Commissioner Date: March 21, 2013 To: Subject: Hornet Construction
More informationIN THE DISTRICT COURT OF THE FIRST JUDICIAL DISTRICT OF THE STATE OF IDAHO IN AND FOR THE COUNTY OF KOOTENAI ) ) ) ) ) ) ) ) ) )
STATE OF IDAHO County of KOOTENAI ss FILED AT O'clock M CLERK OF DISTRICT COURT Deputy IN THE DISTRICT COURT OF THE FIRST JUDICIAL DISTRICT OF THE STATE OF IDAHO IN AND FOR THE COUNTY OF KOOTENAI VERIZON
More informationMay 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH
Development Services Department May 21, 2013 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner II DRH13-00106/DRH13-00108 Executive Summary: This is a design review application
More informationPERPETUAL STORM WATER DRAINAGE EASEMENT (Non-Exclusive) This Non-Exclusive Perpetual Storm Water Drainage Easement (this Easement ) is
Magnolia Park COM15-0081 T4N, R1E, Section13 (Space Above Reserved for Ada County Recorder s Office) PERPETUAL STORM WATER DRAINAGE EASEMENT (Non-Exclusive) This Non-Exclusive Perpetual Storm Water Drainage
More informationBOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM
BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: July 20, 2017 # 12b SUBJECT: ELECTION DISTRICTS: Proposed Resolutions Authorizing Use of Eminent Domain Property of: Gem Ram LLC; Savoir
More informationCITY OF ELK GROVE CITY COUNCIL STAFF REPORT
CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 8.6 AGENDA TITLE: Adopt resolution authorizing the City Manager to execute an Agreement for Acquisition of Fee Interest, Pedestrian and Utility
More informationNOTICE OF INTENT TO ACQUIRE AND GOOD FAITH OFFER
Rev. 01/2011 NOTICE OF INTENT TO ACQUIRE AND GOOD FAITH OFFER June 19, 2010 Mike A. Smith, unmarried 1234 Main Street Columnus, Ohio 43223 Re: FRA-123-3.45 Parcel Number: 4 Interest Acquired: WL THE NOTICE
More informationRecommendation: The Public Works Director-Engineering recommends adoption of the following resolution.
CITYol CHICO M 87 City Council Agenda Report Meeting Date: /5/5 TO: City Council FROM: Brendan Ottoboni, PWD-Engineering, 879-690 RE: CONSIDERATION OF A RESOLUTION DECLARING SURPLUS PROPERTY AND AUTHORIZING
More informationCommitted to Service
Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner August 25, 2017 Development Services TO:
More informationRight-of-Way & Development Services Planning Review Division Committed to Service This application is approved at the staff level on February 1, 2006.
Right-of-Way & Development Services Planning Review Division Committed to Service This application is approved at the staff level on February 1, 2006. Tech Review for this item was held with the applicant
More informationEasement Agreement--Ingress and Egress Camel s Back Park City of Boise/Alistair and Connie Macmillan
TO: FROM: RE: Mayor David H. Bieter Members of the City Council J. Patrick Riceci Assistant City Attorney R-127-12 Easement Agreement--Ingress and Egress Camel s Back Park City of Boise/Alistair and Connie
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 14, 2015
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of November 14, 2015 DATE: November 10, 2015 SUBJECT: Ordinance of Vacation to vacate portions of an Easement and Right of Way (Street and Utilities
More informationAccelerated ROW Process for Sidewalks FAQ s
Accelerated ROW Process for Sidewalks FAQ s General FAQs... 3 1. What is the Accelerated ROW Process for Sidewalks?... 3 2. When is the Process Available?... 3 3. Can the accelerated right-of-way process
More informationState Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects
Revised November 30, 2006 State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects I. Introduction: If an SRF financed project requires access to or acquisition
More informationCHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA. Meeting Date: November 18, Item Number: 8.D.5. Subject: Summary of Information:
CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA Meeting Date: November 18, 2009 Item Number: 8.D.5. Subject: Approval of Design, Authorization to Enter Into Agreements, and Award of Construction
More informationDOCUMENT VET SHEET for Karen McConnaughay Chairman, Kane County Board
DOCUMENT VET SHEET for Karen McConnaughay Chairman, Kane County Board Name of Document: Intergovernmental Agreement between Dundee Township and the County of Kane re: Floodprone Property Buyout in Richardson
More informationTHE WAIVER OF APPRAISAL
THE WAIVER OF APPRAISAL Succinct Explanation of the RW Process When rights of way are needed for a highway project, the owner of the property needed for the project is offered compensation (FMVE). Then
More informationCHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 2 AGENDA
CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 2 AGENDA Meeting Date: March 15, 2017 Item Number: 16.C. Subject: Public Hearing to Consider the Exercise of Eminent Domain for the Acquisition of Right-of-Way
More informationRESOLUTION NO. R To Acquire Real Property Interests Required for the Lynnwood Link Extension
RESOLUTION NO. R2017-40 To Acquire Real Property Interests Required for the Lynnwood Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 11/09/2017 11/16/2017
More informationSECTION 7000 LAND DEVELOPMENT REQUIREMENTS
SECTION 7000 LAND DEVELOPMENT REQUIREMENTS 7000 LAND DEVELOPMENT REQUIREMENTS... 1 7001 LEGISLATIVE AUTHORITY... 1 7001.1 LAND DEVELOPMENT... 1 7001.1.1 Title 40, Idaho Code... 1 7001.1.2 Idaho Code 40-1415
More informationDESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED
DESIGN PUBLIC HEARING MAY 18, 2017 AT GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED GROVELAND COMMUNITY TRAIL PROJECT Roadway Project Management Section IN THE TOWN OF GROVELAND,
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 14, 2013 DATE: November 12, 2013 SUBJECT: Deed of Dedication, Deeds of Easement and Deeds of Temporary Easement and Construction
More informationSETTLEMENT AGREEMENT. among, Debra L. Miller, in her capacity as the Secretary of Transportation for the State of Kansas
SETTLEMENT AGREEMENT THIS AGREEMENT is entered into on the day of, 2007, by and among, Debra L. Miller, in her capacity as the Secretary of Transportation for the State of Kansas ("KDOT"), Northland Venture,
More informationCommitted to Service
Committed to Service Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner July 18, 2016 Development Services TO:
More informationRESOLUTION NO. R To Acquire Real Property Interests Required for the Federal Way Link Extension
RESOLUTION NO. R2017-34 To Acquire Real Property Interests Required for the Federal Way Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/14/2017 09/28/2017
More informationRequest for Proposals
Request for Proposals On Call Right-of-Way and Easement Acquisition and Related Services Requested by: Charter Township of Shelby Department of Public Works 6333 23 Mile Road Shelby Township, MI 48316
More informationDWR REAL ESTATE COORDINATION PLAN
DWR REAL ESTATE COORDINATION PLAN Exhibit E DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5 10 18 DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5-10-2018 California WaterFix Real Estate Coordination
More informationCity of Norcross. 65 Lawrenceville Street Norcross, GA Meeting Agenda. Monday, April 20, :30 PM. Council Chambers. Special Called Meeting
City of Norcross 65 Lawrenceville Street Norcross, GA 30071 Meeting Agenda Monday, April 20, 2015 6:30 PM Council Chambers Special Called Meeting Mayor Bucky Johnson Mayor Pro Tem Josh Bare Council Member
More informationSOS / Waiver of Subdivision Standards / John Cashin
SOS15-00012 / Waiver of Subdivision Standards / John Cashin Summary John Cashin requests a Waiver of Subdivision Standards in the Boise Development Code that requires construction of new sidewalk for approval
More informationLOT LINE ADJUSTMENT APPLICATION GUIDE (BCC , ET SEQ.)
Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Planning Division Phone 530.552.3701 Fax 530.538.7785 Email dsplanning@buttecounty.net FORM NO PLG-02
More informationACTION ITEM #3 WSU Pullman, Approval of Pullman Moscow Regional Airport s
ACTION ITEM #3 (Pearson/Yang) September 22, 2017 TO ALL MEMBERS OF THE BOARD OF REGENTS SUBJECT: PROPOSED: SUBMITTED BY: BACKGROUND: That the Board of Regents approve the land acquisition offer from the
More informationCity Council Report 915 I Street, 1 st Floor Sacramento, CA
City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2017-00593 May 30, 2017 Public Hearing Item 20 Title: Resolution of Necessity: Ramona Avenue Extension
More informationCity of Scotts Valley INTEROFFICE MEMORANDUM
City of Scotts Valley INTEROFFICE MEMORANDUM DATE: December 3, 2014 TO: FROM: SUBJECT: Honorable Mayor and City Council Kirsten Powell, City Attorney Approval of Resolution and Agreement Accepting Grant
More informationTHE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE
BOARD AGENDA: 4/27/10 ITEM: 8.1 THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE MEMORANDUM TO: HONORABLE MAYOR, CITY COUNCIL, AND AGENCY BOARD SUBJECT: SEE BELOW FROM: HARRY S. MAVROGENES EXECUTIVE DIRECTOR
More informationExecutive Summary: This is a preliminary plat to construct 8 residential lots and 2 commons lots with a private road on 3.87-acres in Meridian, Idaho.
Development Services Department DATE: July 7, 2015 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Kentucky Villas/ MPP15-0012/ PP15-009 Executive Summary: This is a preliminary
More informationPrecondemnation Procedures: Acquiring Right of Way in a New World October 9, Presented by David Graeler and Brad Kuhn
Precondemnation Procedures: Acquiring Right of Way in a New World October 9, 2015 Presented by David Graeler and Brad Kuhn Pre-Litigation Phases Project Planning Engineering / Design Appraisal Offer /
More informationBOARD MEMBERS: Mr. Scott Brown; Mr. Jeffrey Guzy; Mr. John Kennedy; Mr. Tom Kohler; Ms. Jeannette Quirus; Ms. Allison Slizofski; Mr.
OFFICIAL MINUTES November 8, 2018 Approved: December 13, 2018 MONTGOMERY COUNTY TRANSPORTATION AUTHORITY NORRISTOWN, PA BOARD MEMBERS: Mr. Scott Brown; Mr. Jeffrey Guzy; Mr. John Kennedy; Mr. Tom Kohler;
More informationPipelines & Eminent Domain THE PROPOSED KINDER MORGAN PERMIAN HIGHWAY PIPELINE OCTOBER 29, 2018 JIM BRADBURY JAMES D.
Pipelines & Eminent Domain THE PROPOSED KINDER MORGAN PERMIAN HIGHWAY PIPELINE OCTOBER 29, 2018 JIM BRADBURY JAMES D. BRADBURY, PLLC The Kinder Morgan Permian Highway Pipeline Project Permian Highway
More informationPROPOSED BOARD OF SUPERVISORS COUNTY OF STAFFORD STAFFORD, VIRGINIA RESOLUTION
Attachment 2 R16-348 PROPOSED BOARD OF SUPERVISORS COUNTY OF STAFFORD STAFFORD, VIRGINIA RESOLUTION At a regular meeting of the Stafford County Board of Supervisors (the Board) held in the Board Chambers,
More informationNeighborhood Meeting
Street Civic Center Dr. to Washington Ave. Neighborhood Meeting Washington Square Artesia Pilar Flower Park Thursday, September 3, 2015 1 Previous Informational Outreach Meetings Memorial, /Warner October
More informationCITY of NOVI CITY COUNCIL
CITY of NOVI CITY COUNCIL Agenda Item J November 24, 2014 SUBJECT: Approval of Resolution Concerning Acquisition and Approving Declaration of Necessity and Taking and authorization of Offer to Purchase
More informationEXHIBIT 2 NOTICE OF INTENTION OF THE BOARD OF SUPERVISORS. OF TilE COUNTY OF ORANGE, CALIFORNIA, ACTING AS
OF REAL PROPERTY DETERMINING THE NECESSITY OF ACQUISITION BY EMINENT DOMAIN DISTRICT, TO CONSIDER FOR ADOPTION A RESOLUTION THE GOVERNING BOARD OF THE ORANGE COUNTY FLOOD CONTROL OF TilE COUNTY OF ORANGE,
More informationTime Extension Staff Report
Time Extension Staff Report Subdivision Name Therrin Subdivision File Number SUB06-00020 Approval Time Extension for Lead Agency Boise City Certification Signature of Boise City Engineer Annexation Date
More informationVIRGINIA ASSOCIATION OF REALTORS Commercial Purchase Agreement
VIRGINIA ASSOCIATION OF REALTORS Commercial Purchase Agreement Each commercial transaction is different. This form may not address your specific purpose. This is a legally binding document. If not understood,
More informationMEMORANDUM CITY COUNCIL TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR ROBIN DICKERSON, CITY ENGINEER
MEMORANDUM TO: FROM: BY: CITY COUNCIL TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR ROBIN DICKERSON, CITY ENGINEER SUBJECT: CONSIDERATION TO ADOPT RESOLUTIONS ACCEPTING EASEMENTS AND PUBLIC IMPROVEMENTS;
More informationLEGAL PITFALLS OF RIGHT OF WAY : DELAYS IN ACQUISITION. Darby F. Venza, ROW Attorney
LEGAL PITFALLS OF RIGHT OF WAY : DELAYS IN ACQUISITION Darby F. Venza, ROW Attorney WHY NOT JUST GO OUT AND BUY THE LAND? The Acquisition of ROW for TxDOT projects, whether by voluntary purchase, donation,
More informationCOUNTY OF RIVERSIDE TRANSPORTATION AND LAND MANAGEMENT AGENCY
COUNTY OF RIVERSIDE TRANSPORTATION AND LAND MANAGEMENT AGENCY Juan C. Perez, P.E., T.E. Director of Transportation and Land Management Transportation Department Patricia Romo, P.E. Assistant Director of
More informationPAYMENT IN LIEU OF TAXES AGREEMENT
PAYMENT IN LIEU OF TAXES AGREEMENT THIS AGREEMENT is made and entered into this the day of, 2014, by and among MOUNDSVILLE POWER, LLC, a Delaware limited liability company ( Moundsville Power ), THE COUNTY
More informationMemphis City Council Summary Sheet
Memphis City Council Summary Sheet Resolution requesting a Special Use Permit (S.U.P. 12 203) to allow a pawn and jewelry shop at the southwest corner of S. Perkins Road and Knight Arnold Road: This item
More informationENVIRONMENTAL COVENANT. (Covenant on groundwater extraction - entire Mohave Site)
! ENVIRONMENTAL COVENANT (Covenant on groundwater extraction - entire Mohave Site) J THIS ENVIRONMENTAL COVENANT is entered into by and between: LOS ANGELES DEPARTMENT OF WATER AND POWER, a department
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 17, 2017 DATE: June 7, 2017 SUBJECT: Deed of Easement, Temporary Construction Easement and Construction Agreement For Parcel "A," Hurley's
More informationLOCAL PLANNING AGENCY MEETING Martin County Commissioner Chambers 2401 S.E. Monterey Road Stuart, Florida MEETING MINUTES- November 5, 2015
LOCAL PLANNING AGENCY MEETING Martin County Commissioner Chambers 2401 S.E. Monterey Road Stuart, Florida 34996 MEETING MINUTES- November 5, 2015 Present: Chairman Jim Moir Vice Chairperson Crystal Lucas
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 5, 2016
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of November 5, 2016 DATE: October 25, 2016 SUBJECT: Vacation of a Portion of an Easement for Public Sidewalk and Utilities Purposes Along the
More informationUNITED STATES DISTRICT COURT NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION
UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC, Plaintiff, v. CIVIL ACTION NO. 80 acres, more or less, in Land Lot 74 of the Sixteenth
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 21, 2017
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 21, 2017 DATE: January 19, 2017 SUBJECT: Deed of Temporary Easement and Construction Agreement and Deed of Easement on Portions of
More informationMINOR SUBDIVISION INFORMATION
A. POINTS OF CONTACT: MINOR SUBDIVISION INFORMATION Surveyor: Address: Phone #: Fax # E-Mail Address: Representative (If different from applicant): Address: Phone #: Fax # E-Mail Address: B. GENERAL INFORMATION:
More informationF R E QUENTLY AS K E D QUESTIONS
F R E QUENTLY AS K E D QUESTIONS Mountain Home Substation and 138-kV Transmission Line Project Gillespie, Kerr and Kimble counties PROJECT OVERVIEW 1. What is the Mountain Home Substation and 138-kV Transmission
More informationCOMMERICAL PURCHASE AGREEMENT
COMMERICAL PURCHASE AGREEMENT Each commercial transaction is different. This form may not address your specific purpose. This is a legally binding document. If not understood, seek competent advice before
More informationCITY OF MOUNTLAKE TERRACE ORDINANCE NO.
CITY OF MOUNTLAKE TERRACE ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF MOUNTLAKE TERRACE, WASHINGTON, AUTHORIZING THE ACQUISITION OF REAL PROPERTY UNDER THREAT OF CONDEMNATION OR BY CONDEMNATION
More informationStenberg Annexation Legal Diagram Exhibit "B" W Subject Property Annexed to the City of Red Bluff VICINITY MAP "1:3:
Stenberg Annexation Legal Diagram Exhibit "B" W Subject Property Annexed to the City of Red Bluff VICINITY MAP "1:3: ORDINANCE NO. 991 REZONE NO. 210 AN ORDINANCE AMENDING SECTION 25.13 OF THE RED BLUFF
More informationCity of Apache Junction, Arizona Page 1
Monday, November 16, 2015 City of Apache Junction, Arizona Agenda City Council Work Session 7:00 PM Meeting location: City Council Chambers at City Hall 300 E Superstition Blvd Apache Junction, AZ 85119
More informationPROPERTY ACQUISITION AND TRANSFER AGREEMENT
STATE OF ALABAMA ) ) JEFFERSON COUNTY ) PROPERTY ACQUISITION AND TRANSFER AGREEMENT THIS PROPERTY ACQUISITION AND TRANSFER AGREEMENT (the Agreement ) is made this day of, 2017, by and between the BIRMINGHAM
More informationBoard Agenda Wednesday, Aug. 22, 2018 LCRA Board Room Austin
LCRA Transmission Services Corporation Board Agenda Wednesday, Aug. 22, 2018 LCRA Board Room Austin Items from the Chief Executive Officer CEO Update 1. Appointment of Vice President and Chief Operating
More informationORDINANCE NO
ORDINANCE NO. 2010-18 ORDINANCE OF THE TOWNSHIP OF BARNEGAT, COUNTY OF OCEAN, STATE OF NEW JERSEY, AUTHORIZING ACQUISITION OF PERMANENT EASEMENT AND ROADWAY ACQUISITION AFFECTING PROPERTY ALONG PORTIONS
More informationBUY/SELL AGREEMENT. 4. Possession will be given to Buyer at closing. Exceptions: None
BUY/SELL AGREEMENT THIS BUY/SELL AGREEMENT made this 13 th day of March, 2018, by and between the undersigned, Zing Real Estate, LLC, of 310 Blue Star Highway, Douglas MI 49406, hereinafter called the
More informationAAAA. Planning and Zoning Staff Report Lake Shore Land Holdings, LLC CU-PH Analysis
AAAA Planning and Zoning Staff Report Lake Shore Land Holdings, LLC CU-PH2016-28 Hearing Date: April 21, 2016 Development Services Department Applicant: BRS Architects/Cindy Huebert Staff: Kyle McCormick,
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 15, 2017
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 15, 2017 DATE: July 7, 2017 SUBJECT: Deed of Easement from Highland Holdings, LLC, to the County Board of Arlington County, Virginia
More informationDepartment Planning. Meeting Date June 14, Staff Recommendation Authorize the execution of the IGA. Previous Commission Action N/A
Planning Agenda Item R-8 Recommendation to Authorize the Execution of an IGA between the FPDDC and the County of DuPage for the Conveyance of an Easement for the Relocation of the Existing Path and Construction
More informationBLUEPRINT REAL ESTATE POLICY
DATE September 19,2007 TITLE BLUEPRINT REAL ESTATE POLICY ORG. AGENCY Blueprint Intergovernmental Agency APPROVED.01 STATEMENT OF POLICY The purpose of this administrative regulation is to establish a
More information19. ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of May 19, DATE: May 11, 2018
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of May 19, 2018 DATE: May 11, 2018 SUBJECT: Ordinance of Vacation to Vacate a Portion of a Sanitary Sewer Easement Running Over, Across and Through
More informationMOBILE CITY PLANNING COMMISSION
MOBILE CITY PLANNING COMMISSION Mailing Address: Location Urban Development Department Mobile Government Plaza Land Use Administration 205 Government Street P. O. Box 1827 Third Floor - South Tower Mobile,
More information