Architects, Engineer & Consultant Pvt. Ltd.

Size: px
Start display at page:

Download "Architects, Engineer & Consultant Pvt. Ltd."

Transcription

1

2 Operation & Maintenance Inspection Report Month of July 2015 Project: - Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Jaipur to Deoli section of NH 12 (Km to Km ) in the state of Rajasthan under NHDP Phase III. National Highway Authority of India under NHDP Phase-III has awarded the project for the development of the Highway Project in Section of National Highway 12, which consist of four laning of Jaipur to Deoli from Km to Km on Design, Built, finance, Operate and Transfer basis to the Concessionaire, M/s IRB Jaipur Deoli Tollway Pvt. Ltd. The Concessionaire M/s IRB JAIPUR DEOLI TOLLWAY PVT LTD. is executing the above project in the name of EPC contractor M/s IRB Infrastructure Developer Ltd. The Concessionaire has appointed M/s Stup Consultants Pvt. Ltd. as the Project Management Consultant (PMC/Engineer) for the supervision of construction of the entire project. This project starts from Ch Km (Design Ch ) and ends at Ch km (design Ch ) of NH-12. National Highway authority has appointed M/s Architect, Engineers & Consultants Pvt. Ltd. as Independent Engineer in accordance to the Concessionaire Agreement, Schedule P signed between the Authority and the Concessionaire. The term of reference for independent engineer is well defined in Schedule Q of CA. Project Highway has been declared provisionally completed -1 and put on commercial use since at Pm after successful completion of length more than 75% i.e Km of total length i.e KM Project Highway has been declared provisionally completed -2 and put on commercial use since after successful completion of Km of total length i.e KM Project Highway has been declared provisionally completed and put on commercial use since after successful completion of Km of total length i.e KM

3 INDEPENDENT ENGINEER S MONTHLY INSPECTION FOR O & M For the Month of July 2015 Sl. No Description Remarks of Independent Engineer 1 2 Overview of the Status Quality and Safety Project Highway NH-12 from Km (Design Ch ) to Km (Design Ch ) has been developed by NHAI to four lane on DBFOT basis through Concessionaire. Project Highway has been provisionally commissioned for commercial use on 20 th May-2014 for the length of Km from total length of Km of Project Highway. Concessionaire have been authorized to collect the Toll for the completed length of highway i.e Km at Two Numbers of Toll Plaza located at (i) Km (Design Ch ) for the length of Km and (ii) Km (Design Ch ) for the length of Km as per approved Fee Notification of Authority in accordance to Schedule-R from the user of highway at the rate described for various categories. Concessionaire has to operate and maintain the completed length of the project highway in accordance to the Schedule-K along with completion of the balance length of Km Concessionaire has to operate and maintain the following sections of Highway: Chainage S# Length From To Total Concessionaire has to develop and complete the balance following sections of Highway: S# Chainage From To Length Total Independent Engineer has conducted monthly inspection of the project highway along with the Concessionaire on in accordance to Schedule-Q of CA. Quality During O&M During the Operation Period, the Concessionaire shall operate and maintain the Project Highway in accordance with this Agreement and obligations of the Concessionaire hereunder shall include: Permitting safe, smooth and uninterrupted flow of traffic on the Project Highway Collecting and appropriating the Fee Minimising disruption to traffic in the event of accidents or other incidents affecting the safety and use of the Project Highway by providing a rapid and effective response and maintaining liaison with emergency services of the State

4 The Concessionaire shall keep a copy of every FIR recorded by the Police with respect to any accident occurring on the Project Highway. In addition, the Concessionaire shall also collect data for all cases of accidents not recorded by the Police but where a vehicle rolled over or had to be towed away. The information so collected shall be summarised in the form prescribed by IRC/ MORTH for this purpose. The Concessionaire shall also record the exact location of each Carrying out periodic preventive maintenance of the Project Highway Undertaking routine maintenance including prompt repairs of potholes, cracks, joints, drains, embankments, structures, pavement markings, lighting, road signs and other traffic control devices Undertaking major maintenance such as resurfacing of pavements, repairs to structures, and repairs and refurbishment of tolling system and other equipment Preventing, with the assistance of concerned law enforcement agencies, any unauthorised use of the Project Highway Protection of the environment and provision of equipment and materials therefore Operation and maintenance of all communication, control and administrative systems necessary for the efficient operation of the Project Highway Maintaining a public relations unit to interface with and attend to suggestions from the Users, government agencies, media and other agencies. Safety During O&M The Concessionaire shall ensure safe conditions for the Users, and in the event of unsafe conditions, lane closures, diversions, vehicle breakdowns and accidents, it shall follow the relevant operating procedures including the setting up of temporary traffic cones and lights, and removal of obstruction and debris without delay The Concessionaire s responsibility for rescue operations on the Project Highway shall be limited to an initial response to any particular incident until such time that the competent authority takes charge and shall include prompt removal of vehicles or debris or any other obstruction, which may endanger or interrupt the smooth flow of traffic. The Concessionaire shall develop, implement and administer a surveillance and safety programme for Users, including correction of safety violations and deficiencies and all other actions necessary to provide a safe environment in accordance with this Agreement The Concessionaire shall establish a Highway Safety Management Unit (the HSMU ) to be functional on and after COD, and designate one of its officers to be in-charge of the HSMU. Such officer shall have specialist knowledge and training in road safety and traffic engineering by having attended a course conducted by a reputed organisation on the subject.

5 accident on a road map. The aforesaid data shall be submitted to the Authority at the conclusion of every quarter and to the Safety Consultant as and when appointed. The Concessionaire shall submit to the Authority before the 31st (thirty first) May of each year, an annual report (in ten copies) containing, without limitation, a detailed listing and analysis of all accidents of the preceding Accounting Year and the measures taken by the Concessionaire pursuant to the provisions of Paragraph 6.1 of this Schedule-L for averting or minimising such accidents in future. 3 Conformity with Maintenance and Safety Requirements In addition of the above, the Concessionaire has to be complete All items in the Punch List as Annex-A shall be completed by the Concessionaire within 90 (ninety) days of the date of issue of the Provisional Certificate. In Confirmation of the above, Independent Engineer has inspected the Project Highway on and observed followings in respect of maintenance and safety Observation of Maintenance The traffic flow is smooth and uninterrupted in Km and Concessionaire has provided proper diversions and maintenance of existing highway for the balance section of highway. Concessionaire is collecting appropriate fee at Toll Plazas and submitting monthly fee statement to the Authority and not submitted to IE as informed by the concessionaire. Concessionaire has mobilizes 2 nos. of Cranes to remove disruption to the traffic in the event of the accident for rapid response, and provided Toll Free Helpline Number for the emergency services. Concessionaire has to start periodic preventive maintenance of the project highway in accordance to the Maintenance Manual. Concessionaire is doing routine maintenance for cleaning of the highway, restoration of rain cuts in shoulder and painting of Kerbs. Concessionaire has prevented unauthorized and overloaded vehicles to use of the project highway with assistance of concern law enforcement agencies. Unauthorized median opening is being closed by Concessionaire at ch , Ch , Ch , Chg , Ch & Ch work is under progress. Plantation work founded in progress but very slow. Instructed to concessionaire to provide more team for plantation to speed up the work. Rain cut were found in shoulder portion (MCW & Service road) at several locations and it was being maintained by Concessionaire. Road marking were observed faded at some stretches specially at overlay portion which has to be done. Concessionaire has done avenue plantation of along the highway to the protection of the environment and need to be maintain and watering to grow the trees. Concessionaire has provided Toll Free Helpline Number as above for

6 4 5 Lapses during O & M Defects during O & M operation of the project highway. Concessionaire has established public relation unit and not informed to the Independent Engineer. Safety During O&M Concessionaire is enforcing safety measure during operation by providing traffic cone in the event of accident. Concessionaire has to submit diversion plan to lane closures during maintenance. Concessionaire is doing rescue operation for the vehicles, which may endanger of interrupt the smooth flow of the traffic. Concessionaire has developed and implemented surveillance and safety programme for users and informed to the Independent Engineer. Concessionaire has established Highway Safety Management Unit (HSMU). Concessionaire has submitted weekly accident report and the information submitted to the Authority. Concessionaire has completed work of the Punch List within 90 days of the date of issue of Provisional Certificate. Concessionaire has to maintain the project highway in accordance to the Schedule-K of the Concession Agreement and IE is monitoring lapses and informed to Concessionaire. Concessionaire has to maintain the project highway for provisionally completed section and the balance section to be completed and all the defects during the O&M has to be rectified in accordance to the CA and Maintenance Manual. 6 Deficiencies during O & M It is being observed during inspection that concessionaire is maintaining median tree plantation, Concessionaire has enforced safe guard to the protection of the ROW and encroachment removal with association of local administration is in progress., 7 8 Final Remarks: Pending Submittal: Concessionaire has obtained CRS for construction of ROB. Concessionaire has completed ROB-1 at Shivdaspura both side and ROB-2 at Newai both side and opened to traffic. 1) As Built Drawing of Highway. Concessionaire has submitted As Built Drawing of Structures and reviewed and signed by IE.As built drawing has been submitted to NHAI.

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. Independent Engineer for Four Laning of Talegaon-Amravati Section of NH-6 from km 00.000 to km 66.725 (Length - km 66.73)

More information

The National Highway Authority of India (NHAI) and the Project Highway

The National Highway Authority of India (NHAI) and the Project Highway Chapter 3 The National Highway Authority of India (NHAI) and the Project Highway 3.1 Introduction. 3.2 Establishment. 3.3 Functions. 3.4 Projects of the NHAI. 3.5 The NHAI and the Project Highway. 3.5.1

More information

Annexure XI: Summary of Correspondence with Client and Concessionaire

Annexure XI: Summary of Correspondence with Client and Concessionaire Annexure XI: Summary of Correspondence with Client and Concessionaire INCOMING LETTERS FROM THE CONCESSIONAIRE SL. NO. SUBJECT REFERENCE NO. 1. Deteriorating condition of existing Junagadh Bypass DATE

More information

TRAFFIC SURVEYS FOR BOT ROAD PROJECT IN MADHYA PRADESH. Scope of Work Carrying out Traffic Surveys in MP

TRAFFIC SURVEYS FOR BOT ROAD PROJECT IN MADHYA PRADESH. Scope of Work Carrying out Traffic Surveys in MP Scope of Work Carrying out in MP Scope of work, Submission and payment will be as follows:. Scope of Work: Carrying out traffic surveys as described below in the Figure: location map and Table: summary

More information

TOWN OF MARANA W. CIVIC CENTER DRIVE MARANA, ARIZONA PHONE: (520) FAX: (520) GENERAL INFORMATION

TOWN OF MARANA W. CIVIC CENTER DRIVE MARANA, ARIZONA PHONE: (520) FAX: (520) GENERAL INFORMATION RE: RIGHT-OF-WAY PERMITS To Whom It May Concern: TOWN OF MARANA 11555 W. CIVIC CENTER DRIVE MARANA, ARIZONA 85653 PHONE: (520)382-1999 FAX: (520)382-2640 GENERAL INFORMATION Ordinance No. 2008.04 revised

More information

Report of Commissioning Director, Environment. Urgent No Key No Enclosures Appendix 1 Example of licence conditions. Summary

Report of Commissioning Director, Environment. Urgent No Key No Enclosures Appendix 1 Example of licence conditions. Summary Environment Committee 24 September 2015 Title Damage to the Public Highway Caused by Development Activities Report of Commissioning Director, Environment Wards All Status Public Urgent No Key No Enclosures

More information

Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific

Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific Investment Opportunities in Asian Highways/Highways Projects

More information

Cheshire East Highways

Cheshire East Highways Cheshire East Highways SCALE OF FEES AND CHARGES 2014/2015 2014/2015 HIGHWAYS Abnormal Load - Route Approval Provision of Data / Information to External Bodies Adopted Highway Extents Enquiries Type 1

More information

Upper Bern Township, Berks County, Pennsylvania Street Occupancy Permit Application

Upper Bern Township, Berks County, Pennsylvania Street Occupancy Permit Application Upper Bern Township, Berks County, Pennsylvania Street Occupancy Permit Application Name of Project Name of Street Nearest Intersection Name of Applicant Name of Record Owner Name of Contractor Name of

More information

APPENDIX B1 EXECUTION OF PROJECT AGREEMENTS

APPENDIX B1 EXECUTION OF PROJECT AGREEMENTS APPENDIX B1 EXECUTION OF PROJECT AGREEMENTS 1. Project Agreements The Concessionaire shall enter into directly or through any Major Subcontractor, all such agreements as are necessary for the proper and

More information

Qualification Snapshot CIH Level 3 Certificate in Housing Maintenance (QCF)

Qualification Snapshot CIH Level 3 Certificate in Housing Maintenance (QCF) Qualification Snapshot CIH Certificate in Housing Maintenance (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is the leading

More information

DAM SAFETY RISK MANAGEMENT WORKSHOP DAM SAFETY INSPECTION SYSTEM

DAM SAFETY RISK MANAGEMENT WORKSHOP DAM SAFETY INSPECTION SYSTEM DAM SAFETY RISK MANAGEMENT WORKSHOP DAM SAFETY INSPECTION SYSTEM 1. ROLES AND RESPONSIBILITIES OF DAM OWNER 2. ROLES AND RESPONSIBILITIES OF THE NSW OFFICE OF WATER (NOW) DAM SAFETY UNIT 3. DAM INSPECTION

More information

Revised translation by legal affairs Department CIB/CDC

Revised translation by legal affairs Department CIB/CDC Revised translation 26.08.07 by legal affairs Department CIB/CDC Law on Concessions CHAPTER I GENERAL PROVISIONS Article 1. The purpose of this Law is to promote and facilitate the implementation of privately

More information

Section 8 Housing Voucher Program Guide

Section 8 Housing Voucher Program Guide HOUSING AUTHORITY OF THE COUNTY OF SAN MATEO Housing Authority of the County of San Mateo 264 Harbor Blvd. Bldg. A Belmont, CA 94002 Phone (650) 802-3300 Fax (650) 592-3187 www.smchousing.org Section 8

More information

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT Complete this form, print, and mail to: Minnehaha County Highway Dept. 2124 E 60 th St N, Sioux Falls, SD 57104, or Email: jmaras@minnehahacounty.org

More information

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570)

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570) PERMIT # - D SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA 18444 PHONE (570) 842-7028 FAX (570) 842-0633 Date: PART I APPLICATION DRIVEWAY INSTALLATION APPLICATION AND PERMIT Name:

More information

Section 1: US 19 Overlay District

Section 1: US 19 Overlay District Section 1: US 19 Overlay District Section 1.1 Intent and Purpose The purpose of the US Highway 19 Overlay District is to manage access to land development along US Highway 19 in a manner that preserves

More information

Inspection & Audit Procedure

Inspection & Audit Procedure Definitions: PAGE : 1 of 6 Annual Inspection and Audit Programme: means the annual programme for Audit and Inspection drafted by RGII and approved by the Commission for Energy Regulation ( CER ) and published

More information

Volume III SCHEDULES

Volume III SCHEDULES Request for Proposal for Development of Outer Ring Road (ORR) on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis at Chennai, in the State of Tamil Nadu International Competitive Bidding

More information

Validation Report. India: Surat Manor Tollway Project. Operations Evaluation Department

Validation Report. India: Surat Manor Tollway Project. Operations Evaluation Department Validation Report Reference Number: PCV: IND 2008 13 Project Number: 29250 Loan Number: 1747 July 2008 India: Surat Manor Tollway Project Operations Evaluation Department ABBREVIATIONS ADB Asian Development

More information

CHAPTER 620. [History: Repealed and Recreated by Ord ]

CHAPTER 620. [History: Repealed and Recreated by Ord ] CHAPTER 620 REGULATING INSTALLATION AND MAINTENANCE OF SIDEWALKS AND DRIVEWAY OPENINGS ONTO PUBLIC STREETS AND STANDARDIZING SPECIFICATIONS FOR CONCRETE SIDEWALKS, DRIVEWAY OPENINGS AND CURB AND GUTTER

More information

Rules & Regulations. Control and Operation of the Water Distribution System

Rules & Regulations. Control and Operation of the Water Distribution System Rules & Regulations (Adopted December 23, 1985) Control and Operation of the Water Distribution System AUTHORIZATION Section 22257 of the California Water Code states in part as follows: "Each District

More information

Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service

Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service www.ownersunion.net Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service Owners Union Community Manager was specifically created by Iong time strata

More information

Draft Model Access Management Overlay Ordinance

Draft Model Access Management Overlay Ordinance Draft Model Access Management Overlay Ordinance This model was developed using the City of Hutchinson and the Trunk Highway 7 corridor. The basic provisions of this model may be adopted by any jurisdiction

More information

Land Improvement Act

Land Improvement Act Issuer: Riigikogu Type: act In force from: 01.09.2015 In force until: 31.12.2017 Translation published: 04.09.2015 Amended by the following acts Passed 22.01.2003 RT I 2003, 15, 84 Entry into force 01.07.2003,

More information

Key records documenting the development and establishment of the institution's estate management strategy.

Key records documenting the development and establishment of the institution's estate management strategy. HERITAGE AND INFORMATION GOVERNANCE Records Retention Schedule for Estate Management This retention schedule is based on the recommendations made by the Joint Information Systems Committee. The letter

More information

STATUTORY COMPLIANCE REPORT

STATUTORY COMPLIANCE REPORT BOARD MEETING 25 JUNE 2014 AGENDA ITEM 2.7 STATUTORY COMPLIANCE REPORT Report of Interim Director of Planning Paper prepared by Head of Estates & Property Purpose of Paper To provide the Board with a summary

More information

GUIDELINES to SITE MANAGEMENT PROGRAM (Effective: August 15, 2006, Revised 08/2007, 05/2014, 12/2014)

GUIDELINES to SITE MANAGEMENT PROGRAM (Effective: August 15, 2006, Revised 08/2007, 05/2014, 12/2014) VILLAGE OF DOWNERS GROVE 801 Burlington Avenue, Downers Grove, IL 60515 Phone: 630-434-5515 GUIDELINES to SITE MANAGEMENT PROGRAM (Effective: August 15, 2006, Revised 08/2007, 05/2014, 12/2014) PERMIT

More information

ARTICLE IX.1. PRIVATE STREETS

ARTICLE IX.1. PRIVATE STREETS ARTICLE IX.1 PRIVATE STREETS PAGE 43 ARTICLE IX.1. PRIVATE STREETS SECTION A. GATED COMMUNITIES. (Entire Article Established by Ord. 2524, 06/06/00) 1. Residential subdivisions may be developed with private

More information

PITTSFIELD CHARTER TOWNSHIP WASHTENAW COUNTY, MICHIGAN ORDINANCE #294 COMPLETE STREETS ORDINANCE REMOVAL OF SNOW/ICE REVISIONS

PITTSFIELD CHARTER TOWNSHIP WASHTENAW COUNTY, MICHIGAN ORDINANCE #294 COMPLETE STREETS ORDINANCE REMOVAL OF SNOW/ICE REVISIONS PITTSFIELD CHARTER TOWNSHIP WASHTENAW COUNTY, MICHIGAN ORDINANCE #294 COMPLETE STREETS ORDINANCE REMOVAL OF SNOW/ICE REVISIONS ADOPTED AN ORDINANCE TO AMEND THE TOWNSHIP CODE TO CREATE ARTICLE I AND REVISE

More information

CHAPTER 3: TOWN ROADS AND RIGHT-OF-WAY 3.01 HIGHWAY EXCAVATION

CHAPTER 3: TOWN ROADS AND RIGHT-OF-WAY 3.01 HIGHWAY EXCAVATION CHAPTER 3: TOWN ROADS AND RIGHT-OF-WAY 3.01 HIGHWAY EXCAVATION A. EXCAVATION PROHIBITED. No person or corporation, either individually or by its agents, shall make any excavation or fill or install or

More information

Short Title: Performance Guarantees/Subdivision Streets. (Public) April 28, 2016

Short Title: Performance Guarantees/Subdivision Streets. (Public) April 28, 2016 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION S SENATE BILL Transportation Committee Substitute Adopted // House Committee Substitute Favorable // Fourth Edition Engrossed // Short Title: Performance Guarantees/Subdivision

More information

SCOPE OF SERVICES Appraisal Consultant Services For SR 710/Beeline Highway FM

SCOPE OF SERVICES Appraisal Consultant Services For SR 710/Beeline Highway FM SCOPE OF SERVICES Appraisal Consultant Services For SR 710/Beeline Highway FM 2298961 This project will be divided into two separate groups of parcels, identified as Group A and Group B. The specific parcel

More information

PARK COUNTY ROAD WORK PERMIT APPLICATION

PARK COUNTY ROAD WORK PERMIT APPLICATION Internal Use Only: Received Reviewed By/ Preliminary Appv l Final Appv l PARK COUNTY ROAD WORK PERMIT APPLICATION Location of Work: Rural Address/Description: Name: Phone: Cell Phone: Fax: Owner/Applicant

More information

AIRPORT DINING & RETAIL PREVENTIVE MAINTENANCE PROGRAM MANUAL

AIRPORT DINING & RETAIL PREVENTIVE MAINTENANCE PROGRAM MANUAL AIRPORT DINING & RETAIL PREVENTIVE MAINTENANCE PROGRAM MANUAL Procedures on Maintenance Services and Required Inspections for the ADR Tenants Seattle Tacoma International Airport 2017 edition TABLE OF

More information

ORDINANCE GOVERNING PRIVATE AND PUBLIC DRIVEWAY ROAD APPROACHES TO BECKER TOWNSHIP ROADS

ORDINANCE GOVERNING PRIVATE AND PUBLIC DRIVEWAY ROAD APPROACHES TO BECKER TOWNSHIP ROADS BECKER TOWNSHIP SHERBURNE COUNTY STATE OF MINNESOTA ORDINANCE NO 500 THE TOWN BOARD OF BECKER, SHERBURNE COUNTY, STATE OF MINNESOTA, DOES HEREBY ORDAIN: ORDINANCE GOVERNING PRIVATE AND PUBLIC DRIVEWAY

More information

OFFICE OF THE CITY AUDITOR

OFFICE OF THE CITY AUDITOR OFFICE OF THE CITY AUDITOR Paul T. Garner Assistant City Auditor Prepared by: Theresa A. Hampden, CPA Audit Manager James Ryan Auditor June 23, 2006 Memorandum June 23, 2006 CITY OF DALLAS Honorable Mayor

More information

City of Cedar Hill Gated Community, Private Street Development Guide

City of Cedar Hill Gated Community, Private Street Development Guide City of Cedar Hill Gated Community, Private Street Development Guide Definitions: Private Street - A private vehicular access way shared by and serving two or more lots, which is not dedicated to the public

More information

Chapter 46 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES*

Chapter 46 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES* Chapter 46 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES* * Cross References: Any ordinance dedicating, naming, establishing, locating, relocating, opening, paving, widening, repairing, vacating, etc., any

More information

JEFFERSON COUNTY, ALABAMA

JEFFERSON COUNTY, ALABAMA JEFFERSON COUNTY, ALABAMA Major Development Checklist, Notes and Information A Major Development is any proposed new structure or addition to an existing structure which will cause a change in the topography

More information

Void Management Policy

Void Management Policy Void Management Policy SMT Approval Date: 22 November 2018 Board of Management: 3 December 2018 Approval Date: 3 December 2018 Implementation Date: I January 2018 Review Date: 3 December 2021 Version V1

More information

ADOPTION OF 2018/19 FEES AND CHARGES FOR REGULATORY SERVICES

ADOPTION OF 2018/19 FEES AND CHARGES FOR REGULATORY SERVICES RS-18-498 Mayor and Councillors COUNCIL 31 MAY 2018 Meeting Status: Public Purpose of Report: For Decision ADOPTION OF 2018/19 FEES AND CHARGES FOR REGULATORY SERVICES PURPOSE OF REPORT 1 This report proposes

More information

The Rent Shop Ltd. Prospectus. just a coffee a day. The finest Property Management for. the rent shop ltd licensed real estate agent

The Rent Shop Ltd. Prospectus. just a coffee a day. The finest Property Management for. the rent shop ltd licensed real estate agent The Rent Shop Ltd Property Management Prospectus The finest Property Management for just a coffee a day the rent shop ltd licensed real estate agent OUR Approach The Rent Shop Ltd has over 25 years experience

More information

WINDWARDS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES

WINDWARDS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES WINDWARDS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES Adopted by the Board of Directors Feb. 2009 WINDWARDS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES Table of Contents PURPOSE... 3 GUIDELINES...

More information

TABLE OF CONTENTS TABLE OF CONTENTS... 1 SCHEDULE - A... 2 SCHEDULE - B SCHEDULE C SCHEDULE D SCHEDULE E SCHEDULE F...

TABLE OF CONTENTS TABLE OF CONTENTS... 1 SCHEDULE - A... 2 SCHEDULE - B SCHEDULE C SCHEDULE D SCHEDULE E SCHEDULE F... TABLE OF CONTENTS TABLE OF CONTENTS... 1 SCHEDULE - A... 2 SCHEDULE - B... 14 SCHEDULE C... 43 SCHEDULE D... 49 SCHEDULE E... 50 SCHEDULE F... 51 SCHEDULE G... 59 SCHEDULE H... 61 SCHEDULE I... 64 SCHEDULE

More information

CHAPTER 153 RENTAL HOUSING

CHAPTER 153 RENTAL HOUSING CHAPTER 153 RENTAL HOUSING 153.01 Purpose 153.02 Effective Date 153.03 Definitions & Interpretations 153.04 Interpretation and Application of Ordinance 153.05 Scope 153.06 Severability 153.07 Rental Housing

More information

Developing Urban Infrastructure on PPP Model

Developing Urban Infrastructure on PPP Model Developing Urban Infrastructure on PPP Model Presentation by Gurdial Singh Sandhu Additional Chief Secretary Urban Development, Housing, and Local Self Government Government of Rajasthan 18 th July,2013

More information

Procedures on Maintenance Services and. Required Inspections for the ADR Tenants. Seattle Tacoma International Airport.

Procedures on Maintenance Services and. Required Inspections for the ADR Tenants. Seattle Tacoma International Airport. AIRPORT DINING & RETAIL PREVENTIVE MAINTENANCE PROGRAM MANUAL 2018 Procedures on Maintenance Services and Required Inspections for the ADR Tenants Seattle Tacoma International Airport 2018 edition TABLE

More information

SCHEDULE OF EASEMENTS

SCHEDULE OF EASEMENTS NOTE: THE SCHEDULE MUST BE SIGNED BY THE OWNERS & MORTGAGEES OF THE LAND AFFECTED. SIGNATURES MUST BE ATTESTED. PAGE 1 OF 6 PAGES EASEMENTS AND PROFITS Each lot on the plan is together with:- (1) such

More information

The OESC 27 th Edition Proposals for Ontario Amendments

The OESC 27 th Edition Proposals for Ontario Amendments Proposal Number: 2018-OA-003 Section 2 Description of Change: A) Change Application for Inspection to Notification B) Modify Rule 2-004(7) when a connection authorization is issued with individual or group

More information

CITY OFFICE USE ONLY

CITY OFFICE USE ONLY RIGHT-OF-WAY ENCROACHMENT PERMIT Public Works Department 213 North 900 East Saratoga Springs, UT 84045 Phone: (801) 766-6506 Fax: (801) 766-9872 Name of Grantee: Billing Address: City/State: Zip: Office

More information

SPRING LAKE TOWNSHIP SCOTT COUNTY STATE OF MINNESOTA ORDINANCE NO

SPRING LAKE TOWNSHIP SCOTT COUNTY STATE OF MINNESOTA ORDINANCE NO SPRING LAKE TOWNSHIP SCOTT COUNTY STATE OF MINNESOTA ORDINANCE NO. 06-002 ORDINANCE REGULATING THE CONSTRUCTION AND MAINTENANCE OF ACCESS PERMITS INCLUDING DRIVEWAYS AND CULVERTS WITHIN THE TOWNSHIP SPRING

More information

TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER

TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER ISSUED JUNE 8, 2011 Summit County Engineer Policy for Township Services The Summit County Engineer endeavors to provide

More information

RENTAL AGREEMENT 2. GENERAL

RENTAL AGREEMENT 2. GENERAL RENTAL AGREEMENT 1. DEFINITIONS In these rental conditions the following terms have the following meanings, unless explicitly stated otherwise or the context requires otherwise: A. Lessee: the natural

More information

2017 Amount (Dollars) Category Amount (Dollars) PUBLIC WORKS

2017 Amount (Dollars) Category Amount (Dollars) PUBLIC WORKS PUBLIC WORKS Blueprints, Xerographic, Reader-Printer, Copies 8 1/2x11 and 8 1/2x14 Paper copy per sheet 0.25 0.25 17x22 Paper copy per sheet 1.30 1.35 22x34 Paper copy per sheet 1.30 1.35 24x36 Paper copy

More information

CHAPTER 17 STREETS AND SIDEWALKS ARTICLE I TOWNSHIP ROAD OCCUPANCY PERMITS

CHAPTER 17 STREETS AND SIDEWALKS ARTICLE I TOWNSHIP ROAD OCCUPANCY PERMITS CHAPTER 17 STREETS AND SIDEWALKS ARTICLE I TOWNSHIP ROAD OCCUPANCY PERMITS History: Adopted by the Board of Supervisors of Center Township as Ordinance No. 26, July 5, 1978 and amended by Ordinance No.

More information

NORTH ABINGTON TOWNSHIP LACKAWANNA COUNTY, PENNSYLVANIA. ORDINANCE NO. 1 of 2017

NORTH ABINGTON TOWNSHIP LACKAWANNA COUNTY, PENNSYLVANIA. ORDINANCE NO. 1 of 2017 NORTH ABINGTON TOWNSHIP LACKAWANNA COUNTY, PENNSYLVANIA ORDINANCE NO. 1 of 2017 AN ORDINANCE TO REGULATE THE LOCATION, CONSTRUCTION OR ERECTION OF ANY DRIVEWAY, REPAIR OF ANY DRIVEWAY INTERSECTING A NORTH

More information

Chapter 14 Technical Safety Authority of Saskatchewan Inspecting Elevating Devices 1.0 MAIN POINTS

Chapter 14 Technical Safety Authority of Saskatchewan Inspecting Elevating Devices 1.0 MAIN POINTS Chapter 14 Technical Safety Authority of Saskatchewan Inspecting Elevating Devices 1.0 MAIN POINTS The Technical Safety Authority of Saskatchewan (TSASK) administers Saskatchewan s safety programs for

More information

This is a sample form for information ONLY. UTILITY INFRASTRUCTURE CONVEYANCE AND SERVICE AGREEMENT

This is a sample form for information ONLY. UTILITY INFRASTRUCTURE CONVEYANCE AND SERVICE AGREEMENT This is a sample form for information ONLY. A CSA will be tailored to your project at the appropriate time during the development process. Please contact the Development Services Team for additional information.

More information

STANDARD TERMS AND CONDITIONS Equipment Lease Form DCR 309

STANDARD TERMS AND CONDITIONS Equipment Lease Form DCR 309 1 of 7 The parties hereto agree as follows: 1. LEASE STANDARD TERMS AND CONDITIONS The Lessor hereby leases to Lessee, and Lessee hereby leases from Lessor, the Equipment 2. TERM The term of this Lease

More information

Rental General Terms and Conditions Böcker AG and associated companies

Rental General Terms and Conditions Böcker AG and associated companies 1. General - Scope of application 1.1. The present General Terms of rental contracts of Boecker AG and its associate companies, hereinafter referred to as the lessor, apply to all offers and rental contracts

More information

Additional Terms and Conditions E-2D Advanced Hawkeye Low Rate Initial Production (LRIP) Lots 3 and 4 (Prime Contract No.

Additional Terms and Conditions E-2D Advanced Hawkeye Low Rate Initial Production (LRIP) Lots 3 and 4 (Prime Contract No. Additional Terms and Conditions E-2D Advanced Hawkeye Low Rate Initial Production (LRIP) Lots 3 and 4 (Prime Contract No. N00019-10-C-0044) All of the additional terms and conditions set forth below are

More information

Chapter 510 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES

Chapter 510 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES Chapter 510 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES ARTICLE I Streets, Sidewalks, Alleys and Driveways Regulations and Specifications Section 510.010. Conveyance of Land. [Ord. No. 224 1(60.010), 6-8-1998]

More information

Inspection of ZAO Deloitte & Touche CIS (Headquartered in Moscow, Russian Federation) Public Company Accounting Oversight Board

Inspection of ZAO Deloitte & Touche CIS (Headquartered in Moscow, Russian Federation) Public Company Accounting Oversight Board 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8433 www.pcaobus.org Inspection of ZAO Deloitte & Touche CIS (Headquartered in Moscow, Russian Federation) Issued

More information

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY COMPLIANCE DIVISION INDUSTRIAL PRETREATMENT PROGRAM ENFORCEMENT RESPONSE PLAN

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY COMPLIANCE DIVISION INDUSTRIAL PRETREATMENT PROGRAM ENFORCEMENT RESPONSE PLAN ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY COMPLIANCE DIVISION INDUSTRIAL PRETREATMENT PROGRAM ENFORCEMENT RESPONSE PLAN A. AUTHORITY The Authority of the Industrial Pretreatment Engineer to

More information

REQUEST FOR PROPOSALS PEST CONTROL MANAGEMENT SERVICES Issued: September 20, 2017

REQUEST FOR PROPOSALS PEST CONTROL MANAGEMENT SERVICES Issued: September 20, 2017 REQUEST FOR PROPOSALS PEST CONTROL MANAGEMENT SERVICES Issued: September 20, 2017 The Village of Hempstead Housing Authority (VHHA), Hempstead, New York is requesting proposals from qualified organizations

More information

TERMS AND CONDITIONS OF SALE RESIDENTIAL (the Contract of Sale )

TERMS AND CONDITIONS OF SALE RESIDENTIAL (the Contract of Sale ) TERMS AND CONDITIONS OF SALE RESIDENTIAL (the Contract of Sale ) In the following general conditions of sale, the term Company shall mean B.T. Commercial Limited (C- 25151) having its registered office

More information

12 & 13 April 11, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: BILLY W. CHAPLAIN

12 & 13 April 11, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: BILLY W. CHAPLAIN .. 12 & 13 April 11, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: BILLY W. CHAPLAIN STAFF PLANNER: Faith Christie REQUEST: Modification of Proffers approved by City Council August 14, 2001 Modification

More information

PURCHASE AGREEMENT FOR THE SUPPLY, DELIVERY, TESTING AND COMMISSIONING ON A TURNKEY BASIS OF ONE (1) AIRCRAFT PUSHBACK TRACTOR (LARGE)

PURCHASE AGREEMENT FOR THE SUPPLY, DELIVERY, TESTING AND COMMISSIONING ON A TURNKEY BASIS OF ONE (1) AIRCRAFT PUSHBACK TRACTOR (LARGE) Appendix C (Annex C) CONTRACT PRICE AND PAYMENT SCHEDULES PAGE 1 OF 1 PURCHASE AGREEMENT FOR THE SUPPLY, DELIVERY, TESTING AND COMMISSIONING ON A TURNKEY BASIS OF ONE (1) AIRCRAFT PUSHBACK TRACTOR (LARGE)

More information

Inspection of Goldstein Golub Kessler LLP. Public Company Accounting Oversight Board

Inspection of Goldstein Golub Kessler LLP. Public Company Accounting Oversight Board 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org Inspection of Goldstein Golub Kessler LLP Issued by the Public Company Accounting Oversight

More information

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING HEATING SERVICES PROCEDURES SOLID FUEL SERVICING 13 th October, 2016 CUSTOMER CONSULTATION Introduction The consultation processes with regard to the service and safety check of the solid fuel appliances

More information

CHAPTER 16 ELECTRICAL CODE PAGE NO.

CHAPTER 16 ELECTRICAL CODE PAGE NO. CHAPTER 16 ELECTRICAL CODE PAGE NO. 16.01 Definitions 16-1 16.02 State Regulations Adopted 16-1 16.03 Fees 16-1 16.04 Permits 16-1 16.05 Annual Plant Permit 16-2 16.06 Renewal, Suspension and Revocation

More information

Inspection of Berkovits, Lago & Company, LLP. Public Company Accounting Oversight Board

Inspection of Berkovits, Lago & Company, LLP. Public Company Accounting Oversight Board 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org Inspection of Berkovits, Lago & Issued by the Public Company Accounting Oversight Board THIS

More information

DESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED

DESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED DESIGN PUBLIC HEARING MAY 18, 2017 AT GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED GROVELAND COMMUNITY TRAIL PROJECT Roadway Project Management Section IN THE TOWN OF GROVELAND,

More information

Talquin Electric Cooperative, Inc. Rules and Regulations for Electric Service

Talquin Electric Cooperative, Inc. Rules and Regulations for Electric Service Talquin Electric Cooperative, Inc. Rules and Regulations for Electric Service 1. Application for Service. Each prospective Consumer desiring electric service will be required to execute and sign the Cooperative

More information

Barbados. Land. Governance. Assessment A N A L Y S I S

Barbados. Land. Governance. Assessment A N A L Y S I S Barbados Land Governance Assessment A N A L Y S I S Methodology - Activities Strengths widest participation across all spheres of land discipline. Through coverage of land administration and management.

More information

CHAPTER 58 DRIVEWAYS

CHAPTER 58 DRIVEWAYS ARTICLE I ARTICLE II Access Driveways Blacktopping of Driveways 58-1. Purpose and application. 58-9. General Policy. 58-2 Permit application procedures. 58-10. Permit application procedure. 58-3. Permit

More information

Inspection of Amper, Politziner & Mattia, P.C. Public Company Accounting Oversight Board

Inspection of Amper, Politziner & Mattia, P.C. Public Company Accounting Oversight Board 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org Inspection of Amper, Politziner & Mattia, P.C. Issued by the Public Company Accounting Oversight

More information

City of Chicago Department of Buildings RULES AND REGULATIONS FOR ANNUAL INSPECTION CERTIFICATION CONVEYANCE DEVICES

City of Chicago Department of Buildings RULES AND REGULATIONS FOR ANNUAL INSPECTION CERTIFICATION CONVEYANCE DEVICES City of Chicago Department of Buildings RULES AND REGULATIONS FOR ANNUAL INSPECTION CERTIFICATION OF CONVEYANCE DEVICES City of Chicago Rahm Emanuel Mayor Michael Merchant Commissioner of Buildings BY

More information

DESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING JANUARY 12, 2017 AT TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED REPLACEMENT OF BRIDGE NO. R-02-013 US ROUTE 44 OVER STATE

More information

Qualification Snapshot CIH Level 3 Award in Housing Practice (QCF)

Qualification Snapshot CIH Level 3 Award in Housing Practice (QCF) Qualification Snapshot CIH Award in Housing Practice (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is the leading awarding

More information

DESIGN PUBLIC HEARING NOVEMBER 15, 2017 CARLTON M. VIVEIROS ELEMENTARY SCHOOL COMMUNITY ROOM 525 SLADE STREET FALL RIVER, MA :00 PM

DESIGN PUBLIC HEARING NOVEMBER 15, 2017 CARLTON M. VIVEIROS ELEMENTARY SCHOOL COMMUNITY ROOM 525 SLADE STREET FALL RIVER, MA :00 PM DESIGN PUBLIC HEARING NOVEMBER 15, 2017 AT CARLTON M. VIVEIROS ELEMENTARY SCHOOL COMMUNITY ROOM 525 SLADE STREET FALL RIVER, MA 02724 7:00 PM FOR THE PROPOSED CARLTON M. VIVEIROS ELEMENTARY SCHOOL SAFE

More information

Inspection of Liebman Goldberg & Hymowitz LLP (Headquartered in Garden City, New York) Public Company Accounting Oversight Board

Inspection of Liebman Goldberg & Hymowitz LLP (Headquartered in Garden City, New York) Public Company Accounting Oversight Board 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8433 www.pcaobus.org Inspection of Liebman Goldberg & (Headquartered in Garden City, New York) Issued by the Public

More information

Preliminary Performance

Preliminary Performance 1 Preliminary Performance 2 Preliminary Estimation of Revenue and Traffic 8,000 80 6,000 60 THB M 4,000 40 PCU 2,000 20 0 2566 2567 2568 2569 2570 2571 2572 2573 2574 2575 2576 2577 2578 2579 2580 2581

More information

Electrical Safety Policy

Electrical Safety Policy Electrical Safety Policy Reference Compliance/Electrical Version 1 Safety Staff affected All staff Issue date April 2017 Approved by Arches Board Review June 2017 24 April 2017 Date Lead Officer John Hudson

More information

Community Occupancy Guidelines

Community Occupancy Guidelines Community Occupancy Guidelines Auckland Council July 2012 Find out more: phone 09 301 0101 or visit www.aucklandcouncil.govt.nz Contents Introduction 4 Scope 5 In scope 5 Out of scope 5 Criteria 6 Eligibility

More information

Inspection of Amisano Hanson, Chartered Accountants. Public Company Accounting Oversight Board

Inspection of Amisano Hanson, Chartered Accountants. Public Company Accounting Oversight Board 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org Inspection of Amisano Hanson, Issued by the Public Company Accounting Oversight Board THIS IS

More information

TRANSPORTATION AND CAPITAL IMPROVEMENTS IMPACT FEES

TRANSPORTATION AND CAPITAL IMPROVEMENTS IMPACT FEES Effective September 1, 2016 Chapter 15.74 TRANSPORTATION AND CAPITAL IMPROVEMENTS IMPACT FEES Article I General Provisions 15.74.010 Purpose. 15.74.020 Findings. 15.74.030 Definitions. 15.74.040 Applicability.

More information

NOTICE FOR PREQUALIFICATION OF CONTRACTOR

NOTICE FOR PREQUALIFICATION OF CONTRACTOR 301, Centre Point, Dr. Babasaheb Ambedkar Road, Parel, Mumbai 400 012 Phone No. 6177 9400 09 Fax No.61779058 Website: www.stockholding.co.in NOTICE FOR PREQUALIFICATION OF CONTRACTOR Pre-qualification

More information

City of East Providence

City of East Providence City of East Providence 145 TAUNTON AVENUE, EAST PROVIDENCE STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS 02914-4505 TEL. (401) 435-7521 FAX (401) 438-1719 TDD (401) 431-1633 CITY MANAGER PETER GRACZYKOWSKI

More information

Inspection of Kingery & Crouse, P.A. Public Company Accounting Oversight Board

Inspection of Kingery & Crouse, P.A. Public Company Accounting Oversight Board 1666 K Street, N.W. Washington, DC 20006 Telephone: (202) 207-9100 Facsimile: (202) 862-8430 www.pcaobus.org Inspection of Kingery & Crouse, P.A. Issued by the Public Company Accounting Oversight Board

More information

Plan of Survey (Feature Plans)

Plan of Survey (Feature Plans) October 4, 2014 Plan of Survey (Feature Plans) NOTE: This document is a Controller of Surveys Policy manual to be used as a general guideline for the preparation and examination of plans. Reference should

More information

CASTLE ROCK TOWNSHIP DAKOTA COUNTY, MINNESOTA ORDINANCE NO.

CASTLE ROCK TOWNSHIP DAKOTA COUNTY, MINNESOTA ORDINANCE NO. CASTLE ROCK TOWNSHIP DAKOTA COUNTY, MINNESOTA ORDINANCE NO. AN ORDINANCE REGULATING TOWNSHIP ROAD RIGHT-OF-WAYS AND LARGE UTILITY PROJECTS IMPACTING TOWNSHIP RIGHT-OF-WAYS The Board of Supervisors of Castle

More information

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL SECTION I. OVERVIEW AND GENERAL INSTRUCTIONS INTRODUCTION A stormwater

More information

WELCOME TO JAL VAYU VIHAR COIMBATORE

WELCOME TO JAL VAYU VIHAR COIMBATORE WELCOME TO JAL VAYU VIHAR COIMBATORE PROJECT BRIEF THE CONTRACT FOR COIMBATORE PROJECT WAS AWARDED TO M/S SPCL FOR CIVIL WORK AT RS. 79.43 CR, EXTERNAL ELECTRICAL WORK FOR RS 3.59 CR TO M/S BK CONTROL,

More information

GUIDELINES. RESIDENTIAL ENTRANCES To COUNTY ROADS

GUIDELINES. RESIDENTIAL ENTRANCES To COUNTY ROADS GUIDELINES For RESIDENTIAL ENTRANCES To COUNTY ROADS Dept. of Public Works Roads Division 0 TABLE OF CONTENTS INTRODUCTION 2 REGULATIONS 1.0 General Policy 3 2.0 Procedure For Obtaining An Entrance Permit

More information

IAF/ILAC-A4:2004. Guidance on the Application of ISO/IEC 17020

IAF/ILAC-A4:2004. Guidance on the Application of ISO/IEC 17020 Guidance on the Application of ISO/IEC 17020 Copyright ILAC/IAF 2004 ILAC and IAF encourage the authorized reproduction of this publication, or parts thereof, by organisations wishing to use such material

More information

MEMORANDUM. 1. Approve additional expenses in the amount of $29,685 for additional work on the 2015 Street Repair project;

MEMORANDUM. 1. Approve additional expenses in the amount of $29,685 for additional work on the 2015 Street Repair project; MEMORANDUM TO: FROM: GEOFF ENGLISH, PUBLIC WORKS DIRECTOR SUBJECT: CONSIDERATION OF ACCEPTANCE OF THE 2015 STREET SURFACE REPAIRS AND BRISCO ROAD ASPHALT OVERLAY: EL CAMINO REAL TO WEST BRANCH STREET PROJECT,

More information

Attachment 2 Civil Engineering

Attachment 2 Civil Engineering A. Phase 1, Programming and Schematic Design: The CONSULTANT shall for each project: 1. Ascertain the project s requirements through a meeting with the COUNTY, and a review of an existing schematic layout

More information

(Res. No R003, ) NON-REGIONAL ROAD CAPITAL EXPANSION FEE [2] Footnotes: --- (2) Findings.

(Res. No R003, ) NON-REGIONAL ROAD CAPITAL EXPANSION FEE [2] Footnotes: --- (2) Findings. 9.5. - NON-REGIONAL ROAD CAPITAL EXPANSION FEE [2] Footnotes: --- (2) --- Editor's note Res. No. 12262006R003, adopted Dec. 26, 2006, deleted former 9.5, and enacted a new 9.5 as set out herein. The former

More information