STAFF REPORT ON FINAL PLAT APPLICATION ROCKY DETIENNE MINOR SUBDIVISION
|
|
- Florence Stokes
- 5 years ago
- Views:
Transcription
1 STAFF REPORT ON FINAL PLAT APPLICATION ROCKY DETIENNE MINOR SUBDIVISION Date: April 11, 2014 Type of Subdivision: Name of Subdivision: Minor Subdivision Rocky Detienne Minor Subdivision Number of Lots: 1 Legal Description: Land Owner(s): Name of Applicant: Preparer/Agent: Surveyor: Public Hearing: A Portion of the N ½, SW ¼, of Section 25, Township 21 North, Range 59 East P.M.M. in Richland County, Montana Victor Buxbaum, Inc. Route 1, Box 185 Sidney, MT Rocky Detienne Highway 200 South Sidney, MT Roger Meyer, Montana Land Surveys (for final application) P.O. Box 176 Lambert, MT Roger Meyer, Montana Land Surveys Not applicable Preliminary Plat Approval: The Richland County Commissioners granted approval subject to 10 conditions on July 8, Final Plat Application: Application received on March 20, 2014 Reviewer comments sent on March 28, 2014 Applicant s response received April 14, 2014 STAFF REPORT Rocky Detienne Minor Subdivision Final Plat Application Page 1 of 6
2 On July 8, 2013 the Richland County Board of Commissioners approved the preliminary plat of Rocky Detienne Minor Subdivision subject to 10 conditions. The subdivision is located in the SW ¼, of Section 25, Township 21 North, Range 59 East P.M.M in Richland County, Montana; the proposed subdivision is located about 13 miles southeast of Sidney, MT just south of the intersection of County Road 354 and County Road 116 (figure 1). The project proposal will create 1 residential lot (Figure 2). The final application was submitted on March 20, At the time of writing this the application has been found to be complete. Figure 1: Location of Subject Property SITE STAFF REPORT Rocky Detienne Minor Subdivision Final Plat Application Page 2 of 6
3 Figure 2: Final Plat STAFF REPORT Rocky Detienne Minor Subdivision Final Plat Application Page 3 of 6
4 COMPLIANCE WITH REQUIREMENTS OF CONDITIONS OF APPROVAL The conditions of preliminary approval are listed below. Following each condition is a statement indicating how the condition has been met. Final Plat Requirements 1. The final plat shall be in substantial compliance with the preliminary plat and plans reviewed and approved by the governing body, except as modified by these conditions. [RCSR II-B-1] The final plat is in substantial compliance with the preliminary plat. The final plat is to be signed and notarized by all necessary parties and filed in the Clerk and Recorders office. 2. The final plat and supplements shall comply with the Uniform Standards for Final Subdivision Plats and shall be reviewed by Richland County s Examining Land Surveyor and Subdivision Administrator prior to final approval. [RCSR II-B-2, MCA and MCA ] The final plat is in compliance with the Uniform Standards for Final Subdivision Plats. 3. Prior to filing of the final plat, the developer shall: Provide proof that all real property taxes and special assessments assessed and levied on the property are paid for the current tax year; including any past delinquencies; [ (1)(b), MCA] and, Provide documentation showing that the Applicant is the lawful owner of the property with the apparent authority to subdivide the same, and showing the names and written consent of lien holders or claimants of record. [ , MCA] The final application packet includes a title report stating that all taxes and assessments have been paid, and showing that Victor Buxbaum, Inc. are the owners of the property. 4. The approval period for the preliminary plat is three years. [RCSR III-A-6(f)] Preliminary plat was conditionally approved July 8, 2013; the final application was submitted on March 20, 2014, which is less than the three (3) years. STAFF REPORT Rocky Detienne Minor Subdivision Final Plat Application Page 4 of 6
5 Addressing 5. The developer shall provide documentation from the Richland County Public Works Department assigning addresses for each lot. [RCSR VI-H (a)(xiii)] The final application packet includes documentation of the addresses for the new lot from Richland County Public Works. Approach onto County Roads 6. A Driveway approach permit shall be obtained from the Richland County Public Works Department for accesses to County Road 354. Installation of the driveway approach shall be completed in accordance with the approved permit and the installation inspected and approved by the County Public Works Department. [RCSR VI-F(c)] The final application packet includes a copy of the approach permits. Marcy Hamburg and Terry Murphy inspected the approach on April 11, 2014 and the approach was completed. Marcy talked with Russ Huotari on April 14, 2014, Russ made the comment that the approach was built to county standards. Weeds 7. A Noxious Weed Control Plan Agreement shall be approved and signed by the County Weed District. This agreement shall be signed and notarized by the subdivider and recorded with the final plat. [RCSR VI-T] The final application includes the required Richland County Weed Plan. The original Weed Plan will need to be signed by the appropriate parties and filed with the final plat in the Clerk and Recorders Office. Utilities 8. Utilities shall be installed by the developer to each lot in the subdivision. The applicant shall submit letters from the power and cable/telephone providers indicating utilities have been installed underground to their specifications and within appropriate easements as shown on the final plat. [RCSR VI-M (b) and , effects on public health and safety and effects on local services] The final application includes a will-serve letter from the Lower Yellowstone Rural Electric Association stating they can serve the proposed lots and that utilities are installed so that the lot has access. STAFF REPORT Rocky Detienne Minor Subdivision Final Plat Application Page 5 of 6
6 9. In addition to showing the location of utility easements on the plat with dashed lines, the following statement shall be on the final plat: "The undersigned hereby grants unto each and every person, firm, or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water, or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair and removal of their line and other facilities, in, over, under and across each area designated on this plat as 'Utility Easement' to have and to hold forever." [RCSR VI-M(h)] This statement is modified but is included on the plat. The modified statement is sufficient to fulfill the requirement. Subdivision Improvements 10. Prior to filing of the final plat, all improvements shall be installed or otherwise guaranteed. All improvements shall be completed in place or the developer shall enter into a written subdivision improvements agreement with Richland County, guaranteeing the construction and installation of such improvements and shall provide an acceptable financial security guarantee, in accordance with the Richland County Subdivision Regulations. [RCSR II-B] The needed improvements have been installed onto the property and a subdivision improvements agreement is not required. Staff Recommendation: The Rocky Detienne Minor Subdivision is ready for final plat approval, assuming all certificates are signed and notarized as required. Submitted by: Kyle Osborne, Planner 1 April 14,2014 April 14, 2014 Marcy Hamburg County Planner ****************************************************************************** The following items are to be filed and recorded with the Final Plat Application: 1. Final Plat, 1 sheet (original) 2. Weed Control Plan (original) STAFF REPORT Rocky Detienne Minor Subdivision Final Plat Application Page 6 of 6
Planning Department st Avenue East Kalispell, MT Phone: (406) Fax: (406)
Planning Department 201 1 st Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning April 1, 2015 Doug Russell, City Manager City of Kalispell 201 1 st Ave
More informationMAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS
Lawrence-Douglas County MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Preliminary Plats The applicant shall schedule a Pre-Application meeting with Planning Staff at least seven (7) working days prior
More informationApplication for a Deminimus Development
Okeechobee County Community Development Department 1700 NW 9 th Avenue, Suite A Okeechobee, FL 34972 Phone (863) 763-5548 Fax (863) 763-5276 planning@co.okeechobee.fl.us A deminimus development is the
More information5: SUBDIVISION PLAN AND PLAT APPLICATION SUBMITTAL REQUIREMENTS
5) SECTION 5: SUBDIVISION PLAN AND PLAT APPLICATION SUBMITTAL REQUIREMENTS A. Submittal. All applications and supplemental material shall be bound in sets ready for distribution. All copies of plats, other
More informationCity of Palos Verdes Estates Requirements for a Minor Lot-Line Adjustment
City of Palos Verdes Estates Requirements for a Minor Lot-Line Adjustment Listed below is an outline covering the normal procedure for submitting and processing minor lot line adjustments. Please provide
More informationWESTON COUNTY FINAL PLAT APPLICATION
WESTON COUNTY FINAL PLAT APPLICATION Property Owner: Mailing Address of owner: Telephone Number(s) of owner: Property Owner: Mailing Address of owner: Telephone Number(s) of owner: (If subdivider/applicant
More informationSUBDIVISION APPLICATION
SUBDIVISION APPLICATION Preliminary Plat Minor Plat Final Plat Amended Plat Applicant Name: Owner (if different from applicant) Name: Company: Company: Address: Address: City, State, Zip City, State, Zip
More informationSketch Plan Pre-application Conference Submittal Packet
Submittal Packet 1. Application Packet. Be sure to complete and submit all the required materials that are a part of this Application Packet. Failure to do so will result in a delay in accepting your application
More informationFINAL PLAT. Community Development Department 8101 Ralston Road Arvada, Colorado 80002
FINAL PLAT Community Development Department 8101 Ralston Road Arvada, Colorado 80002 September 2015 FINAL SUBDIVISION PLAT Final Subdivision Plat Review Applications for a Final Plat shall be submitted
More informationCOUNTY OF ALBEMARLE APPLICATION FOR RURAL SUBDIVISION
Page 1 APPLICATION FOR RURAL SUBDIVISION The term rural subdivision means a type of subdivision that is located in the rural areas which results in two or more lots for the purpose of transfer of ownership
More informationPARK COUNTY ROAD WORK PERMIT APPLICATION
Internal Use Only: Received Reviewed By/ Preliminary Appv l Final Appv l PARK COUNTY ROAD WORK PERMIT APPLICATION Location of Work: Rural Address/Description: Name: Phone: Cell Phone: Fax: Owner/Applicant
More informationIV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS
IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS IV-A. General Minor subdivisions create five or fewer lots from a tract of record, each lot of which has legal and physical access. If the tract of record proposed
More informationFINAL PLAT SUBMITTAL CHECKLIST
FINAL PLAT SUBMITTAL CHECKLIST The submission requirements for a Final Plat Review are found beginning in Section 24-4-40 of the Weld County Code. The Weld County Code is available on line at www.co.weld.co.us
More informationFinal Plat Approval of a Minor Subdivision Application Packet
Final Plat Approval of a Minor Subdivision Application Packet 1. Application Packet. Be sure to complete and submit all the required materials that are a part of this Application Packet. Failure to do
More informationFACT SHEET MUNICIPAL SERVICE BENEFIT UNIT (MSBU) CREATION AND IMPLEMENTATION
FACT SHEET MUNICIPAL SERVICE BENEFIT UNIT (MSBU) CREATION AND IMPLEMENTATION Authority Florida Statutes Chapter 125.01(1)(a) authorizes the Board of County Commissioners to create Municipal Service Benefit
More informationBuildings for Lease or Rent
Buildings for Lease or Rent Table of Contents Page 1. Purpose 3 2. Authority & Administration 3 3. Applicability 3 4. Definitions 3 5. Requirements for Buildings for Rent or Lease 4 6. Application & Review
More informationApplication for Preliminary Plat Checklist
Application for Preliminary Plat Checklist Note: No portion of an existing parcel may be sold or transferred to another party without first legally subdividing the property according to the City of Richmond
More informationFinal Plat Approval of a Major Subdivision Application Packet
Final Plat Approval of a Major Subdivision Application Packet 1. Application Packet. Be sure to complete and submit all the required materials that are a part of this Application Packet. Failure to do
More informationTOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION
TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION This application shall conform in all respects to the Land Subdivision Standards of Chapter 41 of the Planning Board of the Town of Eliot code of ordinances.
More informationEL DORADO COUNTY PLANNING SERVICES. LOT LINE ADJUSTMENT, BOUNDARY LINE AGREEMENT, & MERGE (Revised 6/16)
EL DORADO COUNTY PLANNING SERVICES 2850 Fairlane Court, Placerville CA 95667 (530) 621-5355 http://www.edcgov.us/planning LOT LINE ADJUSTMENT, BOUNDARY LINE AGREEMENT, & MERGE (Revised 6/16) PURPOSE Lot
More informationCERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS
ARTICLE 9 FORMS AND CHECK LISTS 9.100 On preliminary layout & final subdivision plat CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS I hereby certify that the (...type: private or pubic...)
More informationAdopted August 22, 2013 by Sanders County Commissioners. Page 1 of 6
SANDERS COUNTY Buildings for Lease or Rent Review Process 1. Purpose The following regulations are intended to provide an administrative process for the acceptance and review of applications for the creation
More informationSUBDIVISION APPLICATION
SUBDIVISION APPLICATION City of Horn Lake Planning Department 3101 Goodman Road, W Horn Lake, MS 38637 662-342-3559 Fax: 662-342-3485 Applications due the 1st working day of the month. Submit application
More informationCOUNTY OF ALBEMARLE APPLICATION FOR FAMILY DIVISION. Family Division = $742 (Provide 5 copies of plat)
Page 1 APPLICATION FOR FAMILY DIVISION Family Division = $742 (Provide 5 copies of plat) Tier 2 Groundwater Review = $355 (Required for all plats showing lots less than 21 acres) Tier 3 Groundwater Review
More informationPLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION
CASE # PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION The undersigned Applicant hereby submits to the Plymouth Planning Board a completed application for a proposed minor
More informationSUBDIVISION EXEMPTION (SUBX) SUBMITTAL CHECKLIST
APPLICATION REQUIREMENTS: SUBDIVISION EXEMPTION (SUBX) SUBMITTAL CHECKLIST The applicant shall submit the Subdivision Exemption application fee and the required application materials as follows: One original
More informationSUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).
Office Use Only Preliminary Long Plat Long Subdivision Applicant Checklist PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT PRELIMINARY LONG PLAT LONG SUBDIVISION CHECKLIST Mailing Address: P.O.
More informationYELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT
YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT The City-County Planning staff has prepared the Findings of Fact for the Aspen Ridge Subdivision, 2 nd Filing. These findings are based on the preliminary
More informationAPPENDIX C: PLAT SPECIFICATIONS AND CERTIFICATES
APPENDIX C: PLAT SPECIFICATIONS AND CERTIFICATES A. Drawing. All plats for recording must be submitted on photographically reproducible and dimensionally stable polyester sheets such as Mylar, Cronar or
More informationOWNER S CERTIFICATE OWNER S NAME STATE OF NORTH DAKOTA ) ) SS COUNTY OF WILLIAMS )
OWNER S CERTIFICATE I, THE UNDERSIGNED, BEING THE SOLE OWNER OF THE LAND PLATTED HEREIN, DO HEREBY VOLUNTARILY CONSENT TO THE EXECUTION OF SAID PLAT, AND DO DEDICATE THE ROAD EASEMENTS, ALLEYS, PARKS,
More informationMINOR PLAT FILING APPLICATION
FILING APPLICATION Date of PC Meeting: Date of BCC Meeting: Fee Paid: 1. APPLICANT: DAYTIME PHONE: MAILING ADDRESS: LANDOWNER: DAYTIME PHONE: MAILING ADDRESS: AUTHORIZED AGENT: MAILING ADDRESS: RELATIONSHIP
More informationMINOR PLAT AMENDMENT APPLICATION CHECK APPLICABLE PERMIT ATTACHMENT:
240 East Gammon Road Vineyard, Utah 84058 (801) 226-1929 MINOR PLAT AMMENDMENT APPLICATION Please Note: Attachment of request specific documents is required prior to processing your application. APPLICATION
More informationCITY OF EL CENTRO COMMUNITY DEVELOPMENT DEPARTMENT APPLICATION FOR LOT LINE ADJUSTMENT
LLA No. Processing Fee:$315.00 Date Filed: Received By: CITY OF EL CENTRO COMMUNITY DEVELOPMENT DEPARTMENT APPLICATION FOR LOT LINE ADJUSTMENT Application is hereby made to the City of El Centro, County
More informationThe Filing Fee for a Minor Plat is $ PLUS $20.00 per lot created
DEPARTMENT OF COMMUNITY DEVELOPMENT MINOR PLAT PROCEDURE The Filing Fee for a Minor Plat is $250.00 PLUS $20.00 per lot created Description: The purpose of a Minor Plat is to allow property to be platted
More informationCity of Colleyville Community Development Department. Subdivision Application Packet
Community Development Department Subdivision Application Packet 1 Development Application Fees 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning Change $ 500 + $5 per acre Planned Unit Development
More informationFINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:
TOWNSHIP OF UPPER ST. CLAIR FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST Date Filed Plan Name PLC Applicant's Name: Phone Filing Date for Final Application Final Plat 114.22. FINAL APPLICATION
More informationCERTIFICATE OF RECOMMENDATION
DEPARTMENT OF PLANNING AND ZONING 308 Byers Ave P.O. Box 239 Hot Sulphur Springs Colorado 80451 970-725-3347 Ext 129 or Fax 970-725-3303 CERTIFICATE OF RECOMMENDATION TO: FROM: Grand County Board of Commissioners
More informationMINERAL COUNTY PLANNING STAFF FINDINGS OF FACT Proposed Elk Run at St. Regis. February 12, 2017
MINERAL COUNTY PLANNING STAFF FINDINGS OF FACT Proposed The proposed is a five-lot subdivision and is located approximately one mile east of St. Regis on Old Highway 10 East. The property is located in
More informationSPECIAL USE PERMIT APPLICATION FOR NATURAL DEPOSITS, EXTRACTION AND PROCESSING; CONCRETE BATCH PLANTS; HOT MIX (ROAD/ASPHALT) PLANTS
SPECIAL USE PERMIT APPLICATION FOR NATURAL DEPOSITS, EXTRACTION AND PROCESSING; CONCRETE BATCH PLANTS; HOT MIX (ROAD/ASPHALT) PLANTS PLEASE READ NOTE AND SIGN BELOW: THE SUBMITTED APPLICATION PACKAGE REQUIRES
More informationCONDOMINIUM REGULATIONS
ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion
More informationSUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).
Office Use Only Preliminary Long Plat Long Subdivision Applicant Checklist PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT FINAL LONG PLAT LONG SUBDIVISION CHECKLIST Mailing Address: P.O. Box 547,
More informationPlanning Department Filing Fee of $ up to 3 lots $75.00 per each additional lot (subject to change) payable to Archuleta County.
Archuleta County Development Services Building & Planning Departments 1122 Hwy 84 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-264-1390 Fax 970-264-3338 Lot Consolidation Submittal Checklist for the
More informationList of Property Owners within subdivision and deed restrictions (if Deed Restrictions exist)
Plat Submission Checklist Page 1 of 7 Preliminary Plat/ Development Plat/ Minor Plat/ Plat Vacation: Original Tax Certificates 15 Copies of Prints and one Digital copy of all drawings (see Section 2 of
More informationAPPLICATION PROCEDURES FOR A PLAT AMENDMENT OR REVISION
APPLICATION PROCEDURES FOR A PLAT AMENDMENT OR REVISION DEFINITION: Any revision or amendment to an approved recorded or unrecorded final plat. A revision (not recorded) does not require a public hearing
More informationFINDINGS OF FACT. Page 1 of 8
FINDINGS OF FACT The City/County Planning staff has prepared the Findings of Fact for the Emerald View Park Subdivision, Amended Lot 1A, Block 3. These findings are based on the preliminary plat application
More informationSPECIAL SERVICE AREA DISCLOSURE
SPECIAL SERVICE AREA DISCLOSURE All lots within this subdivision are included within the County of Will Special Service Area Number and are subject to an annual tax levy in accordance with the provisions
More informationELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO
ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO. 3-2011 AN ORDINANCE TO REPLACE THE SUBDIVISION CONTROL ORDINANCE WITH A NEW SUBDIVISION DEVELOPMENT ORDINANCE, IN ACCORD WITH THE LAND DIVISION
More informationWRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC
WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC Application of Hayden Signature, LLC, an Idaho limited liability company,
More informationCITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)
CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR FINAL PUD/TRANSITION DISTRICT
More informationDECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS BENNETT FARMS SUBDIVISION MADISON COUNTY, IOWA
DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS BENNETT FARMS SUBDIVISION MADISON COUNTY, IOWA We, Corkrean Homes, Inc., hereinafter referred to as ADeclarant@, are now the fee simple owners and
More informationLOT LINE ADJUSTMENT GENERAL INFORMATION AND
LOT LINE ADJUSTMENT GENERAL INFORMATION AND APPLICATION Mariposa County Planning Department 5100 Bullion Street, P.O. Box 2039 Mariposa, CA 95338 Telephone (209) 966-5151 FAX (209) 742-5024 www.mariposacounty.org
More informationMINOR SUBDIVISION PLAT
MINOR SUBDIVISION PLAT Community Development Department 8101 Ralston Road Arvada, Colorado 80002 MINOR SUBDIVISION PLAT Subdivisions consisting of five (5) or fewer lots are eligible for the minor subdivision
More informationA Final Plat will be reviewed concurrently with any other development review application(s) that is required.
RELATED FACTS TO KNOW: Adams County Recording Requirements, Annexation, Common Wall Subdivision, Development Plan (PUD Development Permit), Fees, Helpful Contact Information, Lot Line Adjustment, Neighborhood
More informationAPPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA
APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA Before subdividing any tract of land and previous to the filing of an Application for conditional approval of the Preliminary Plat, the subdivider
More informationCity State Zip City State Zip. 1. Proposed Amendment Modifies Article or Section Numbers. 4. Describe the purpose of the proposed amendment
APPLICATION FOR ZONING TEXT AMENDMENT (Subject to O.R.C. Section 519.12) Application # -ZC- Liberty Township Zoning Commission Date Filed: 2095 Reynoldsburg Baltimore Rd. NW Baltimore, OH 43105 Fee Paid:
More informationMINOR SUBDIVISION PLAT
MINOR SUBDIVISION PLAT Community Development Department 8101 Ralston Road Arvada, Colorado 80002 September 2015 MINOR SUBDIVISION PLAT Subdivisions consisting of five (5) or fewer lots are eligible for
More informationBOUNDARY LINE ADJUSTMENT SUPPLEMENTAL (This form to be accompanied by the General Land Use Application)
OFFICIAL USE ONLY Date: Case #: Received By: Planner: Related Cases: DEPARTMENT OF COMMUNITY DEVELOPMENT 420 College Street SE, Lacey, WA 98503 (360) 491-5642 BOUNDARY LINE ADJUSTMENT SUPPLEMENTAL (This
More informationAPPLICATION PROCEDURES FOR A MAJOR SUBDIVISION PRELIMINARY PLAT
APPLICATION PROCEDURES FOR A DEFINITION: The subdivision of a tract of land into at least three (3) residential, commercial, or industrial parcels, including the remainder of the original parcel, fronting
More informationMINOR SUBDIVISION PLAT
CHECKLIST HANCOCK COUNTY AREA PLAN COMMISSION A subdivider shall submit to the Plan Commission office an application and an accompanying plat for a minor subdivision. The plat shall be based on a boundary
More informationthese areas are compatible with such conditions. [Section (6) (c) C. R. S.]
SECTION 14-200 PRELIMINARY PLAT 14-201 INTENT A Preliminary Plat is one of the first documents utilized when owners of a property wish to subdivide their property in accordance with State Statutes and
More informationCity of Edwardsville, Kansas Special Benefit District Policy
City of Edwardsville, Kansas Special Benefit District Policy Date Adopted: September 12, 2011 Section 1. Objective The objective is to establish a policy to finance public streets, sanitary sewers, water
More informationMAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS
MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Final Plats The applicant shall schedule a Pre-Application meeting with Planning Staff at least seven (7) working days prior to submittal of the application.
More informationBOUNDARY LINE ADJUSTMENT APPLICATION PACKET
BOUNDARY LINE ADJUSTMENT APPLICATION PACKET City of Sedro-Woolley Building, Planning & Engineering 325 Metcalf Street, Sedro-Woolley, WA 98284 Phone 360-855-0771 Fax 360-855-0733 City of Sedro-Woolley
More informationDECLARATION OF RECIPROCAL ACCESS AND UTILITY EASEMENTS
ITEM 175-2701-C0517 Page 1 of 6 Return to: Grant Road LLC 1430 Country Manor Boulevard, Suite 3 Billings, MT 59102 DECLARATION OF RECIPROCAL ACCESS AND UTILITY EASEMENTS This Reciprocal Easement Declaration
More informationCOLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:
COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON 97051 (503) 397-1501 PARTITION General Information File No. APPLICANT: Name: Mailing address: City State Zip Code Phone
More informationPlanning and Community Services Department rd Ave. North, 4 th Floor
Planning and Community Services Department 282 3 rd Ave. North, 4 th Floor Billings, MT 59101 Phone: (406) 657-8246 or (406) 247-8676 Fax: (406) 657-8327 ZONING COMPLIANCE PERMIT INFORMATION PURPOSE: To
More informationMinor Subdivision Application
FOR PLANNING USE ONLY Application # SD Application Fee $1,000.00 Receipt No. Filing Date Completeness Date Minor Subdivision Application A. PROJECT INFORMATION 1. Project Name: 2. Address of Subject Property:
More informationRichmond County Code of Ordinance. Chapter 20 APPENDIX B ENDORSMENTS AND CERTIFICATIONS FINAL PLAT REQUIRMENTS
MINOR SUBDIVISION Certificate of Ownership Richmond County Code of Ordinance. Chapter 20 APPENDIX B ENDORSMENTS AND CERTIFICATIONS FINAL PLAT REQUIRMENTS I hereby certify that I am the owner of the property
More informationELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application
ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID 83647 (208) 587-2142 www.elmorecounty.org Preliminary Plat Application We are unable to accept facsimile copies. (Subdivisions
More informationSUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR MINOR REVISIONS TO PUD PLANS
WEST CHESTER TOWNSHIP, BUTLER COUNTY, OHIO COMMUNITY DEVELOPMENT DEPARTMENT 9577 Beckett Road, Suite 100, West Chester, Ohio 45069 TELEPHONE: (513) 777-4214 www.westchesteroh.org SUBMISSION REQUIREMENTS
More informationVACATING PLATS. The following documents are provided as required by the City of Conroe for use in the above titled platting submittals:
Public Works - Engineering Division CITY OF CONROE VACATING PLATS The following documents are provided as required by the for use in the above titled platting submittals: Submittal Questionnaire (1-page).
More informationCITY OF ALTAMONTE SPRINGS
CITY OF ALTAMONTE SPRINGS SUBDIVISION PLAT DRC REVIEW APPLICATION SUBMITTAL SUFFICIENCY CHECKLIST Note that a pre-submittal sufficiency review is mandatory. If your project also includes a site plan, your
More informationB. The proposed parcel(s) of land shall be in compliance with the current zoning requirements.
SECTION 14-900 SUBDIVISION EXEMPTION 14-901 INTENT To establish criteria and a review process whereby the Board of County Commissioners may grant Exemptions from the definition of the terms subdivision
More informationSTATE OF OKLAHOMA TEXAS COUNTY PUBLIC SERVICE/PIPELINE OWNER. LINE INSTALLATION (Revised May 14, 2015)
STATE OF OKLAHOMA TEXAS COUNTY PUBLIC SERVICE/PIPELINE CROSSING LINE INSTALLATION (Revised May 14, 2015) We, the undersigned, hereby petition the Texas County Board of County Commissioners to grant a permit
More informationA. Boundary lines and dimensions of parcels before lot line adjustment/merger.
LOT LINE ADJUSTMENT/MERGER PROCESS DEPARTMENT OF PLANNING AND BUILDING SERVICES 707 Nevada Street, Suite Susanville, CA 96130-3912 (530) 251-8269 Fax (530) 251-8373 www.co.lassen.ca.us A Lot Line Adjustment
More informationINSTRUCTIONS FOR APPLICANTS FILING APPLICATIONS BEFORE THE LOGAN TOWNSHIP PLANNING BOARD
INSTRUCTIONS FOR APPLICANTS FILING APPLICATIONS BEFORE THE LOGAN TOWNSHIP PLANNING BOARD The purpose of these instructions is to assist an Applicant who wishes to file an application before the Board.
More informationNON-EXCLUSIVE ROADWAY AND UTILITY EASEMENT DEED AND AGREEMENT
RETURN TO: STOGSDILL LAW OFFICE, P.C. 505 West Main, Suite 313 Lewistown, Montana 59457 (406) 538-2623 NON-EXCLUSIVE ROADWAY AND UTILITY EASEMENT DEED AND AGREEMENT THIS EASEMENT DEED AND AGREEMENT is
More informationFREMONT COUNTY WYOMING SIMPLE SUBDIVISION APPLICATION Fremont County, Wyoming. Name of Subdivision: Location: Section: Township: Range:
FREMONT COUNTY WYOMING SIMPLE SUBDIVISION APPLICATION Fremont County, Wyoming Name of Subdivision: Location: Section: Township: Range: Total Acres: Number of Lots: Name: Owner of Record Address: City:
More informationTo provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.
ARTICLE 5 FINAL PLAT 501 Intent DOUGLAS COUNTY SUBDIVISION RESOLUTION To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal
More informationPreliminary Plat/Final Plat Application
Melissa Municipal Center 3411 Barker Avenue Melissa, Texas 75454 Phone: (972) 838-2036 Applicant: Date: Address: Phone: Contact: Fax: E-mail: Propose Addition Name: Acres: Existing Zoning: Propose Zoning:
More informationPINELLAS COUNTY REAL ESTATE MANAGEMENT DEPARTMENT REAL PROPERTY DIVISION
PINELLAS COUNTY REAL ESTATE MANAGEMENT DEPARTMENT REAL PROPERTY DIVISION Application Process and Guidelines for Preparing to File a Petition to Release for: Easements, Roads, Right-of -Ways, or Alleys
More informationMIAMI SHORES VILLAGE
MIAMI SHORES VILLAGE 10050 Northeast Second Avenue Miami Shores, Florida 33138 Telephone (305)795-2207 Fax (305)756-8972 www.miamishoresvillage.com PLANNING & ZONING BOARD APPLICATION SUBDIVISION FINAL
More informationFINAL PLAT AMENDMENT APPLICATION Minor / Major / Administrative (Revised 3/1/2017)
FINAL PLAT AMENDMENT APPLICATION Minor / Major / Administrative (Revised 3/1/2017) Lana Gallegos, AICP, Senior Planner 970-524-1729 Cindy Schwartz, Assistant Planner 970-524-1750 DATE APPLICATION SUBMITTED:
More informationPETITION APPLICATION PROCEDURE
INSTRUCTIONS & EXPLANATIONS TO ABANDON/VACATE RIGHTS OF WAY, EASEMENTS AND PLATS UNDER THE JURISDICTION OF THE BOARD OF COUNTY COMMISSIONERS OF PALM BEACH COUNTY The following are explanations of the required
More informationMinor Plat Review Application 2017 FEE: $ The fee is payable upon application submittal.
Minor Plat Review Application 2017 FEE: $150.00. The fee is payable upon application submittal. Applicant Name: Agent Name: *Property owner must submit a notarized letter authorizing the agent to act on
More informationPlanning Department st St SE PO Box 5006 Minot, ND (701) Acknowledgment and Signature
Acknowledgment and Signature The undersigned applicant hereby represents upon all of the penalties of the law, for the purpose of inducing the City of Minot to take action herein requested, that all statements
More informationDiamond Falls Subdivision PROPOSED YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT
Diamond Falls Subdivision PROPOSED YELLOWSTONE COUNTY BOARD OF PLANNING FINDINGS OF FACT The City/County Planning Staff has prepared the Findings of Fact for the Diamond Falls Subdivision. These findings
More informationProcessing of a Notice of Non-Renewal is pursuant to Section of the Government Code.
LAND CONSERVATION ACT (WILLIAMSON ACT) CONTRACT NOTICE OF NON-RENEWAL GENERAL INFORMATION AND APPLICATION Mariposa County Planning Department 5100 Bullion Street, P.O. Box 2039 Mariposa, CA 95338 Telephone
More information1. NAME OF SUBDIVISION : DATE SUBMITTED: LOCATION OF SUBDIVISION : DATE OF PRELIMINARY APPROVAL BY TOWNSHIP SUPERVISORS:
1 RICHLAND TOWNSHIP PLANNING COMMISSION 322 SCHOOLHOUSE ROAD, SUITE 110 JOHNSTOWN, PA 15904 FINAL SUBDIVISION APPLICATION LAND DEVELOPMENT OR LAND MERGER OR MINOR SUBDIVISION THE UNDERSIGNED HEREBY APPLIES
More informationAPP. FEE: $ DATE & TIME LOCATION: 1/4 SECTION SECTION TOWNSHIP RANGE STREET ADDRESS AND GENERAL LOCATION OF PROPERTY CITY, STATE PHONE (DAY):
REVERSION TO ACREAGE PURSUANT TO N.R.S. 278.490 through 478.4965 Elko County Planning & Zoning 155 South 9th Street, Elko, NV 89801 (775) 738-6816 or 738-2266 APPLICATION MUST BE SUBMITTED WITH ALL REQUIRED
More informationINSTRUCTIONS FINAL PLAT APPROVAL APPLICATION
INSTRUCTIONS FINAL PLAT APPROVAL APPLICATION 1. The applicant/agent shall fill out the attached application. The attached application form must be completely filled in before it can be filed. Portions
More informationUNION COUNTY 5/17/01 Technical Design Standards Revised: 12/10/07 APPENDIX B Common Access Drive (CAD) Regulations
UNION COUNTY 5/17/01 Technical Design Standards Revised: 12/10/07 APPENDIX B Common Access Drive (CAD) Regulations Definition. A Common Access Drive (CAD) is a privately constructed, privately owned and
More informationMINOR SUBDIVISION INFORMATION
A. POINTS OF CONTACT: MINOR SUBDIVISION INFORMATION Surveyor: Address: Phone #: Fax # E-Mail Address: Representative (If different from applicant): Address: Phone #: Fax # E-Mail Address: B. GENERAL INFORMATION:
More informationSTONE COUNTY PRELIMINARY PLAT CHECKLIST. Note: Applications need to be in the office by 2 p.m. on the cutoff day.
STONE COUNTY PRELIMINARY PLAT CHECKLIST Note: Applications need to be in the office by 2 p.m. on the cutoff day. JOY WILSON, DIRECTOR Return form to: Planning & Zoning Administrator PO Box 301, Galena,
More informationSUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR REVISED PRELIMINARY DEVELOPMENT PLAN
WEST CHESTER TOWNSHIP, BUTLER COUNTY, OHIO COMMUNITY DEVELOPMENT DEPARTMENT 9577 Beckett Road, Suite 100, West Chester, Ohio 45069 TELEPHONE: (513) 777-4214 www.westchesteroh.org SUBMISSION REQUIREMENTS
More information19.12 CLUSTER RESIDENTIAL DISTRICT
Chapter 19.12 CLUSTER RESIDENTIAL DISTRICT (Adopted 12/22/2003; Ordinance #0061970). Amended 7/3/17, Ordinance #079100. Section 19.12.010 - Declaration of Intent. The Cluster Residential District provides
More informationCITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW
PRELIMINARY SUBDIVISION PLAT REVIEW Application Number: Date Plat Submitted: Name of Subdivision: Name of Owner: Owner Address: (Street or P.O. Box) Telephone #: (City) (State) (Zip) E-mail: Name of Authorized
More informationLincoln County Planning Department 512 California Ave. Libby, MT
Lincoln County Planning Department 512 California Ave. Libby, MT. 59923 Deb Blystone; Planning Manager P: (406) 283.2464 F: (406) 293-8577 Lisa Oedewaldt; Planner P: (406) 293-6295 F: (406) 293-2515 C:
More informationAPPLICATION FOR SUBDIVISION APPROVAL Summary of Application Review & Approval Process and Application Form April 1, 2009
Land Planning Branch, (K-320LP) Phone 667-8877 Fax 393-6340 APPLICATION FOR SUBDIVISION APPROVAL Summary of Application Review & Approval Process and Application Form April 1, 2009 THE SUBDIVISION APPLICATION,
More informationCITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) FAX: (513)
CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 FAX: (513) 346-5747 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR CONDITIONAL
More information