EPN Tenant Scrutiny Panel. Performance Management Framework (PMF) Report Quarter One. Gauge / Speedometer Key. Generated 25 July 2016

Size: px
Start display at page:

Download "EPN Tenant Scrutiny Panel. Performance Management Framework (PMF) Report Quarter One. Gauge / Speedometer Key. Generated 25 July 2016"

Transcription

1 EPN Tenant Scrutiny Panel Performance Management Framework (PMF) Report Quarter One Generated 25 July 2016 Gauge / Speedometer Key 1

2 EPNPMF AN Rent collected from current tenants as a % of rent owed (excl. arrears b/f) EPN (new calc. method) June % 99.59% 99.17% This new method of calculating income collected was signed off by CWAC in March 2016 and replaces EPN PMF A as it is a more accurate and auditable way of calculating this indicator. (A / B) * 100, A = The actual rent and service charges collected year-to-date on current GN & HfOP tenancies (excluding garages), B = The actual net rent and service charges due year-to-date for all tenanted GN & HfOP properties (excluding garages). = (C / (A - B)) * 100 (HRA Transactions Report) A = Rent collected in year from current tenants B = Rent loss due to empty properties (voids) C = Rent and service charges due for the period (whether property is occupied or not and excluding arrears brought forward) We have collected over 100% of rental income over four consecutive months which is a great start to the year. Team are working extremely well together, which included a patch change which went ahead smoothly with officers and co-ordinators which has seen them continuing to take a proactive approach to their work. We have also doubled the number of Allpay licenses meaning more users can use the system at the same time. This will reduce the number of times a member of staff logs in to take a payment but is unable to do so as all the licences are being used, meaning the customer either has to wait or be called back to take the payment. Anyday Direct Debit Update: Allpay agreed with our procurement mangers savings calculations so we are just waiting for approval to procure the contract then work will commence with the assistance of Allpay to undertake the migration exercise to upload existing Direct Debits to the Allpay system. Intro to Secure Process: Meeting to take place middle of July with the Housing Manager to look at processes and where responsibility lies when taking the decision to either extend an introductory tenant for a further 6 months or make them secure at the end of the 12 months. Agreed needs to be a joined up approach if there has been a breach of their tenancy agreement for either rent arrears or anti-social behaviour. This joined up approach will ensure that the procedures, management of the case and the level of evidence acquired stand up to scrutiny and possible judicial review if we are challenged. 2

3 Benefit Cap: In June CWaC estimated that at least 27 EPN tenants could be potentially affected by the Benefit Cap which is coming in late Autumn The data scan provided from CWaC was a snap shot based on information available at the point in time. Due to the frequency of the data refresh at CWaC there could be additional new cases where changes have occurred. CWaC Housing Benefit will be scheduling in a visit to these affected tenants over the next few months. A meeting has been set up middle of July to discuss this in greater detail with our in-house Income Maximisation Advisors so that we can also contact them to see if anyone has disabilities/vulnerabilities within the household that we could assist with via DLA/PIP which would exempt them. It is also an opportunity to do an income and expenditure so that we can look at maximising their income so that they can make payments on the potential shortfall in their housing benefit. We will also be linking in with Engagement to make a start with looking at employment opportunities for those affected. Training: During June the Income Team have received a refresher on Discretionary Housing Payments (DHP) and the HELP scheme. This refresher was provided by Craig Ellis, Senior Assessment Centre Officer who is based at CWaC s Benefits Corporate Assessment Centre. He advised on the budget for DHP this year, which is 550k for 2016/17 which is an increase on last year and encouraged the team to continue to make referrals for DHP/HELP. It is also hoped that going forward the DHP application form will be available online. The official launch date is October but it is likely CWaC will undertake a pilot before this date. The Senior Income Officer attended HQN seminar "The Edge". From this good practices were shared from other social landlords on future working practices that may be able to be implemented within the Income Team eg Agile working working/paperless processes/using external intelligence software such as Call2Collect and Mobysoft Rent Sense The Income Maximisation Advisor has also attended a 2 day conference run by the Institute of Money Advisers (IMA). The purpose of this course was to give money advisors from across the country the chance to network and to discuss good working practices. Following on from this it is hoped in the next quarter that the Income maximisation Advisor will be approved as a Debt Relief Order (DRO) intermediary. Regular meetings with CWac Housing Benefit continue to be undertaken on a monthly basis. There are currently 179 tenants known to be on Universal Credit 3

4 EPNPMF BDN Rent arrears of current and former tenants as a percentage of rent due (excluding voids) June % 4.89% 7.41% Rent arrears of both current and former tenants as a % of the total rent due (excludes void rent loss and arrears brought forward). Former arrears are net of any former arrears written off. (Current Tenant Arrears + Former Tenant Arrears) / (Gross Rent Debit - Void Rent Loss) * 100 No adjustments should be made for payments (including HB) We have maintained a rent collection rate of over 100% and reduced current arrears by 105,420 in the first quarter. In the same period former arrears increased by 38,433 and this is largely due to bailiff evictions and abandoned before a planned eviction which account for 63% of the former debt in quarter one, but only 18 of the 127 terminations. Over 50% of the tenants in this category had held their tenancy for 4+ years. We are finding courts are being more lenient by choosing to give tenants a last chance and during quarter one 34% (11/32) eviction applications resulted in the court approving the application to suspend and they were agreed upon terms. If they fail to keep up the payments the process of going back to court can take up to 12 weeks adding over 17K to former arrears, based on the 18 tenants and average rent of 80). An analysis of the main causes of former arrears between April 2014 and March 2016 is in its first draft but initial findings are clearly showing during 2015/16 tenants who were either evicted by the bailiff or abandoned before a planned eviction account for nearly 50% of the total former debt in that year but only 14% of all terminations. Further analysis of this cohort will inform what actions can be taken to reduce the number of failed tenancies, accounts taken to court and the level of arrears if the tenancy fails. To achieve the 8.02% target at the end of June we needed to collect an extra 27,680, and the delay in applying the Q4 ( ) and Q1 ( ) write-offs on the system will have had a negative impact on this indicator. 4

5 EPNPMF CN Former tenant arrears cash collected EPN (new calc. method) June 2016 This is the actual rent and service charge income received in the period from former tenants. Rent is considered to be collected from a former tenant when the tenancy has ended with arrears on the account, and a subsequent payment is made. Final payments made within one month of the end of the tenancy should be considered to be collected from current tenants The sum of all former income excluding garage and supporting people former income. We have had positive results from the former tenants incentive pilots with 5 new arrangements made bringing in an additional 83 per month. In line with the parameters approved at the last client contractor meeting the pilots will continue until the end of August and will be extended to include debts up to 1000, capped at 100 cases. Performance is currently 431 below what we collected during the same period last year and this lower collection rate could partially be attributed to the review of the terminated arrears progression rules implemented last year. This review increased the level of activity taken during the 4 week termination period to collect rent due up to the end of the tenancy and included the introduction of text messages. Our success in collecting rent during the 4 week termination period will have a downside on this measure because the rent collected during the 4 week termination period is classed as current income. Hence why this may be a contributory factor to the dip in former income collected compared to the same period last year, but would help contribute towards the increase in current income. 5

6 EPNPMF E Rent written off as a % of the annual rent debit June % 0.47% 0.83% This PI measures the rent written off as a proportion of the rent roll. Rent written off is based on the total amount of rent (including service charges eligible for housing benefit) which is written off during the period benchmarked as unrecoverable. The amount written off includes both current and former tenant arrears. The rent roll is the total amount of potential rent (including service charges) which would be collected in the year on all General Needs and Housing for Older People dwellings (excluding garages) if they had been occupied at all times. Note this indicator can only ever increase over the course of the year, or remain constant if no write-offs are made in any given quarter. As such the figure is 'cumulative incremental' and re-sets at the beginning of a new financial year (for HouseMark purposes this is 1st April). (A / B) * 100, A = The actual value of rent and service charges written off year-to-date, B = The annual gross rent roll for the year. No write-offs have been requested or approved so far this year as we are waiting until CWaC approve the write-off list submitted at the end of March 2016 before we generate a new list for approval. The amount we can automatically write-off without CWaC approval has been reduced with effect from March 2016 from 30 to 20. 6

7 EPNPMF FN % of rent lost through dwellings being vacant June % 0.86% 1.17% Also referred to as void loss, this should include rent loss on all void types. The dwelling may have been vacant for any reason, and includes dwellings that are unavailable to let. A/B*100, A = void rent loss, B = gross rent debit Appendix A shows the number of properties becoming empty has continued to be higher than the previous year hence the increase in void rent loss. An analysis of the reasons for tenancy terminations between April 2014 and March 2016 is in its first draft and will be used to inform what action we can take to help reduce tenancy turnover, and therefore void rent loss. We are also holding a workshop on 16 August to review the end to end void process to identify if there is any waste we can remove or reduce the time taken between each step in the overall process. On 4 May West Cheshire Homes stopped carrying out verification checks and reference requests due to issues of the pricing agreement with other RSLs. This has not only had an impact on our resources as we are having to do this verification work at offer stage but we are currently quantifying the impact of any delays in obtaining references on the void time. The property types becoming empty are not significantly different to the previous 2 years so the increase is void rent loss is due to the increase in the number of properties becoming void and the potential delays in obtaining references leading to a slight increase in the average relet time. 7

8 EPNPMF01N Average re-let (calendar days) - standard voids only (cumulative) June Housemark Def: This indicator measures the average time (in calendar days) to re-let vacant properties during the period benchmarked. It is calculated by dividing the total number of days standard re-let properties were vacant in the period, by the number of standard re-lets in the period. The number of days vacant of a standard re-let is the number of days between the tenancy end date and the tenancy start date. Note that the day the property goes vacant does not count as one day. Hence if a tenancy ends on a Sunday and is let the following day, these counts are a 0 day re-let time. Negative re-let times cannot exist. Note that certain types of lettings are excluded from this indicator, in particular; first / new lets; mutual exchanges; successions; and other lettings excluded as per the COntinuous REcording guidance. Re-lets that have previously undergone major works are also EXCLUDED from this calculation. A/B*100, A = total number of days taken to let the property in standard works only, B = the number of standard work properties that were let in the period Covalent formula = EPNOPV40/EPNOPV39 The number of properties becoming empty has continued to be higher than the previous year and an analysis of the reasons for tenancy terminations between April 2014 and March 2016 is in its first draft and will be used to inform what action we can take to help reduce tenancy turnover. We are also holding a workshop on 16 August to review the end to end void process to identify if there is any waste we can remove or reduce the time taken between each step in the overall process. Appendix A shows the average time taken to turnaround standard void properties improved significantly since 2014/15 with a reduction of nearly 10 days and this improvement has been maintained so far this year. The increase in the number of properties becoming void has had a slightly negative impact on void turnaround times in quarter one of this year, but historical performance shows quarter one void turnaround times improve at yearend. 8

9 EPNPMF02 % of properties accepted on first offer June % 68.19% 51.99% This indicator measures the proportion of your properties that were accepted on the first offer, and is calculated by dividing re-lets to properties that were accepted on first offer by all lettings. Include only re-lets to properties that would require a core form as included in the most up-to-date core lettings guidance manual. Exclude first lets to new build properties and management lets. (A / B) * 100, Where A = The number of properties accepted on first offer. And where B = The total number of properties accepted. A property only counts in the denominator once it has been let, and only counts once no matter how many times it was refused. We continue to perform within the Top Quartile for the North West and All of England comparator groups and have only received 3 refusals so far this year. 9

10 EPNPMF03N % of repairs completed right first visit (M) June % 93.3% 89.33% This is the number of repair visits completed by the operative without the need to return a second time because the repair was inaccurately diagnosed and / or the operative did not fix the problem, as a percentage of all responsive repair visits completed (emergency, urgent and routine combined). A repair is considered fixed at first visit when the operative has attended the property, identified, diagnosed and remedied the fault (using van stock), and carried out any making good before then leaving the property. Multiple trades: Where the job requires multiple trades who may follow on from each other, then the work would still be considered completed at first visit so long as each of the trades were completed in one visit. Replacement parts: If the job required specific replacement parts and the operative needed to return a second time with the correct parts because they were not part of his/her van stock, then this would not count as completed at first visit. No access: Where the operative is unable to gain access to the property, this will not be counted as a visit and should be excluded from the figures. How its measured (A / B) * 100, A = number of repair visits completed in the first visit, B = total number of repair visits completed in period June 2016 outturn is within target and above the Housemark North West Top Quartile (97.42%) but as anticipated is showing a downward trend. It is acknowledged that the level of Right First Time (RFT) has been inflated historically due to way the operatives have been completing the outcome of their visits. The visit outcomes are used to calculate the RFT % for example an unplanned visit is classed as not right first time and vice versa. Actions contained within the Repairs Improvement Plan will achieve greater compliance with operatives selecting the right visit outcome to reflect if a 2nd visit was planned or unplanned. This has started to show and the number of unplanned follow on repairs is higher than reported previously. Therefore performance will continue to be on a downward trend as a direct outcome of the Responsive Repairs Improvement Plan but we will achieve better quality information to enable management by fact. 10

11 EPNPMF04 % of tenants satisfied with the most recent repair June % 96.4% 91.68% This indicator is to measure the percentage of residents who say they are very satisfied or fairly satisfied with the overall repairs service they received at their most recent responsive repair. (A/B)*100, A = the number of people very satisfied or fairly satisfied, B = The total number of people questioned We projected last month that we wouldn't see an upward trend in satisfaction with the most recent repair until July onwards because many of the new ways of working only came into effect from 1 June onwards. Peter Jones, Repairs and Maintenance Manager will present the Repairs Improvement Plan at the meeting. 11

12 EPNPMF05 % of emergency repairs completed within target (24 hrs.) June 2016 This indicator measures the number of emergency (priority 1) repairs completed within the landlord's target for repairs of this type, expressed as a percentage of the total number of emergency repairs completed. The repair time starts from the time the tenant first reports the repair not from the time it is ordered. The repairs time ends when the repair is actually completed, not when the completed repair is input into the computer. The definition of an emergency repairs is: Any defect that puts the health, safety or security of the tenant, or a third party, at immediate risk; or that affects the structure of the building adversely. Organisations should include all jobs that are treated locally as emergencies. We continue respond to every emergency repair within target. How its measured (A / B) * 100 A = The total number of emergency repairs completed yearto-date that were completed within target (e.g. within 24 hours of being raised). As with all reactive repairs with completion targets, the time must begin to elapse as soon as the resident has reported the repair to the landlord, NOT when the landlord raises the repair with a contractor. B = The total number of emergency repairs completed year-to-date. 12

13 EPNPMF08 Appointments kept as a % of appointments made June % 98.43% 96.99% This measure expresses the number of appointments kept as a percentage of the number that were actually made. (A / B) * 100, A = Number of repairs appointments kept, B = Number of repairs appointments made Two visits have been recorded as being missed in terms of their appointment slot, but evidence has been supplied to show that both were in fact attended to within their original appointment slot. This will mean that 100% of appointments made were kept in June 16 which is great performance and a result of improved Planning processes. Internal processes however could have been tightened up on one appointment which had been brought forward as this was done at Tenant's Request which is not considered a FALSE status. The system however had not been updated, only the Planner comments explained what had happened. We continue to be ahead of the stretching target and have been so for the whole of Q1. 13

14 EPNPMF09 % of all tenants who have been evicted for rent arrears June % 0.53% 0.66% This indicator measures the total (cumulative) number of evictions due to rent arrears over the period benchmarked expressed as a percentage of the average number of current tenancies for the period. (A / B) * 100, A = The number of tenants who have been evicted for rent arrears year-todate. B = The average number of current tenancies for the period, whether or not they are in arrears. This is calculated by; (The total number of current tenancies as at the beginning of the period PLUS the total number of current tenancies at the end of the period) divided by two. This denominator should remain relatively stable, unless there are significant changes to the tenanted stock profile throughout the course of the year. During the first quarter, 2 tenants have been evicted by the Bailiff (EVIC) and 14 tenants abandoned the property before the bailiff s appointment (EVAB). The team have been very proactive in taking early intervention in an effort to prevent evictions which are a last resort. They are continuing to work very closely with both internal and external partners so that we can offer support and help to vulnerable tenants to sustain their tenancies. An analysis of the main causes of former arrears between April 2014 and March 2016 is in its first draft but initial findings are clearly showing during 2015/16 tenants who were either evicted by the bailiff or abandoned before a planned eviction account for nearly 50% of the total former debt. Further analysis of this cohort will inform what actions can be taken to reduce the number of failed tenancies, accounts taken to court and the level of arrears if the tenancy fails. 14

15 EPNPMF10 % of properties with a valid gas safety certificate (M) June % 100% 100% This measures the number of properties with a landlord owned gas appliance, for which the landlord holds a current, valid gas certificate to confirm that the annual safety check has been completed, when due, as a percentage of all properties with a landlord owned gas appliance. (A / B) * 100, A = The number of dwellings with a current valid gas safety certificate as at the end of the period. The landlord must hold a copy of the certificate. B = The number of dwellings for whom the landlord has a gas safety obligation under the Gas Safety (Installations and Use) Regulations Our 100% compliance with gas safety since December 2013 was broken in April when one property did not have a current gas safety certificate due to a data inputting error where the next service date was held against the decommissioned equipment and not the newly installed appliance. It was identified on a monthly report which showed both dates and as soon as this was spotted an appointment was made with the tenant and the gas safety check completed on 10 May 2016, it should have been done by 30 April. We are confident that no more Gas Safety Inspections will be missed as we have checked for discrepancies between the next service due and last service completion dates on keystone, the software the holds the servicing data. This exercise would have identified any dates held against decommissioned equipment 15

16 EPNPMF11 % of stage 1 complaints upheld June % 54.89% 82.87% This is the number of stage one complaints upheld or partially upheld divided by the total number of stage 1 complaints closed. The definition of upheld is that the complaint was justified i.e. it was found in favour of the complainant. Including both those complaints that were fully upheld and those that were partially upheld. (A / B) * 100, A = The number of stage 1 complaints upheld year-to-date, B = The total number of stage 1 complaints closed year-to-date. We understand that getting our services right first time and being clear about what we do will reduce the number of complaints upheld. To help achieve this all methods of customer feedback will be captured and reported quarterly to EPN Managers. This will give a wider view of the themes causing dissatisfaction and actions agreed and progress against these will be reported back to this group. To capture the voice of the customer and gain a deeper understanding of how are services are being delivered during the month of September frontline staff will be collecting all expressions of dissatisfaction and the results will be used to inform service improvement plans. 16

17 EPNPMF12 % of properties achieving Decent Homes Standard (includes tenant refusals) June % 100% 100% The number of General Needs, Supported Housing and/or Housing for Older People units/bed spaces meeting the Decent Homes Standard. Expressed as a percentage of the total stock. Landlords are not expected to make a home decent if this is against a tenant's wishes, as work can be undertaken when the dwelling is next void. These properties are not counted as non-decent until they are void. However, where works are required to maintain the structural integrity of the dwelling or prevent other components within the dwelling from deteriorating, or where a category 1 hazard must receive early attention, they should be counted as non-decent. A/B*100. Where A= the number of homes classified as decent and B = the total number of dwellings*100 Quarter 1 performance shows an improvement from the Year End position, Year End target exceeded, however, decency flow from decent to non-decent needs to be managed. Continual improvement against decency position has been achieved, despite not all contractors being on site during the first quarter; namely Bathrooms - Keepmoat and Electrical Rewires - Complete Electrics During the next quarter we will continue to encourage tenants who have previously refused to take up outstanding decency improvement work and target the 28 remaining Non Decent Dwellings. 17

18 EPNPMF13N % of properties with a SAP value less than 65 (2005 SAP methodology) June 2016 April 2015 onwards SAP methodology = Pre April 2015 SAP methodology 2005 was used. Number of properties with a SAP rating <65 (A) / total properties (B) (A/B)*100 During Quarter 1 we have reduced the number of properties with a SAP value less than 65 (which is deemed to be the fuel poverty line) from 802 to 707. This can be attributed to the impact of the performance of the newly appointed central heating contractor - Liberty Gas who are delivering above target and also to the continued re assessment of "rogue" SAP values held on IBS. We are comfortable that the Target for Quarter 2 (11/8% / 649 homes) will be achieved, however, Quarter 3 and Quarter 4 Targets will be challenging to achieve for the following reasons; Proposed External Wall Insulation programme for 2016/17 postponed; insufficient budget to allow this work to progress Insufficient budget to allow a Loft and Cavity Wall insulation programme Proposed 2016/17 Central Heating programme reduced from 480 installs to 410, The above programmes of work all have a positive impact on SAP values, and therefore will impact on the ability to achieve the Year End target. This will be raised with the Client Team at the next Monthly Capital Investment Programme meeting. 18

19 EPNPMF14 % of tenants satisfied with the landlords services overall (M) June % 86.3% 83.78% (A/B) *100, A = the number of tenants very satisfied or fairly satisfied, B = total number of tenants surveyed. This is indicator is derived from a questionnaire survey conducted by Voluntas through the monthly repairs satisfaction survey, 110 tenants are surveyed monthly, the question is also asked in the STAR survey which is carried out biannually. The corresponding question is Taking everything into account, how satisfied or dissatisfied are you with the service provided by Plus Dane? We continue to be in the Housemark Upper Quartile for customer satisfaction with our overall services. The monthly satisfaction result for both May and June was 89% which achieved the target. However, due the dip in April and the year to date calculation we continue to be below target and project it will take some months to catch-up and achieve target. The main reasons for dissatisfaction in June relate to ASB within the neighbourhood, communication and repairs and maintenance service which is the risk associated with asking this question at the end of the transactional repairs survey. We are predicting that once the actions contained within the RMU Improvement Plan are embedded we should see satisfaction levels increase from August onwards. 19

20 EPNPMF15 % of tenants satisfied that their views are taken into account June % 67.3% 57.43% This is indicator is derived from a questionnaire survey conducted by Voluntas through the monthly repairs satisfaction survey, 110 tenants are surveyed monthly, the question is also asked in the STAR survey which is carried out biannually. The corresponding question is How satisfied or dissatisfied are you that Plus Dane listens to your views and acts upon them"? (A/B)* 100, A =The number of very satisfied and fairly satisfied respondents, B = the total number of respondents to the question We continue to be exceed the upper quartile of Housing Providers in the Housemark Northwest Group with 84% of tenants telling us they are satisfied we take their views into account. The newly approved Tenant and Customer Engagement Group Strategy sets out Plus Dane s commitment to strengthen the voice of tenants and customers. We will monitor the impact of involvement from service improvement, customer satisfaction and value for money perspectives to ensure that involvement is productive and effective. 20

21 EPNPMF16 Average end to end time for all reactive repairs June This is defined as the average number of (calendar) days between the responsive repair being requested and its satisfactory completion including the day of request and the day of completion. Ultimately the date of satisfactory completion is decided by the landlord or its agent. All responsive repairs completed during the benchmarked period should be included. (A / B) * 100, A = the sum of the total number of calendar days taken to complete responsive repairs in the period, and B = the total number of responsive repairs completed in the period. Performance is within the Housemark Top Quartile when compared to all of England and 2nd Quartile when compared just to the North West. When agreeing appointments with customers who are in employment the appointment is usually made around their working patterns and we find this tends to prolong the length of the job as the first available appointment is not always the most convenient. The welfare reform changes has increased the number of customers in employment and we are finding those on low or zero hours contracts are reluctant to take time off work so its proving more difficult to agree the earliest available appointments with them. The impact of meeting our customer requirements is jobs are still being completed within the 20 day target but the appointment is being made 2-3 weeks in the future, which is extending the time taken to complete the repair. We are also naturally seeing an impact of the changes to Planner roles and responsibilities; the booking of follow on works from site; the keeping open of the same job number from end to end including the follow on visits; We believe that the overall benefits to customers to be achieved by making the changes to the management of follow on and job monitoring keeping the one job number will more than outweigh the perceived reduction in service that an upward shift in this outturn would indicate. 21

22 EPNPMF17 % customers satisfied with investment programme June 2016 Satisfaction of tenants with the capital investment programme provided by their landlord as defined as the percentage of all tenants, or a representative random sample of tenants, stating that they are: satisfied (that includes very satisfied or fairly satisfied) with the way their landlord delivers the Capital Programme. 2016/17 Quarter 1 Target % (A/B)*100, A = The number of very satisfied and fairly satisfied respondents, B =Total number of respondents Quarter 1 performance has exceeded target. A new customer satisfaction procedure and form has been implemented the impact of which needs to be monitored going forward to determine the impact on return rates, performance and the quality of customer insight obtained from the forms. 22

23 EPNPMF18 % of customers satisfied with the way a complaint was handled June % 59.9% 52.93% This measure is sourced from a landlord s internal survey of complainants, carried out following closure of the complaint. Ideally all, as opposed to a sample, of complainants should be surveyed once their case has been closed. (N / D) * 100, where N = Number of respondents very satisfied or fairly satisfied with the way in which their complaint was handled. Neutral options such as neither satisfied nor dissatisfied should not be included. and where D = Number of respondents who answered the specific survey question During quarter one 13 complaints have been closed. So far only two complainants have been surveyed and both expressed dissatisfaction with the way their complaint was handled. Due to the low numbers this PI is reported with caution and we are looking at ways we can increase the volume of feedback received from complaints. We have asked Voluntas if they have any ideas on how this can be achieved and they have advised they will come back to us in August with some proposals. 23

24 EPNPMF19 % of new very serious ASB cases responded to within 24 working hours (M) June 2016 Data Source REACT Software - The figure is derived from an automated report which is ed automatically to nominated members of staff (Performance team - Mark Razbully) (Landlord s - Andrew Rooke). The report identifies all cases received within a date range (including the actual start and end date entered.) If the case has got no Actual date (date first contacted) this will also show on the report with a blank. It will show the target date the customer is to be contacted by. This is calculated by the system. When setting up the stages on the system it requires the number of days the officer has to take action. This takes into account weekends and bank holidays. The officer inputs the date the case was logged and the system calculates how long they have to respond and created this date. The report also shows the difference this is calculated by taking the date of response (actual date) and deducting the Target Date this gives the number of days difference.. The % has been calculated by. Count (In Target)/Total Number * 100. Count(Out Of Target)/Total Number *100 How its measured A = Total number of cases responded to in target in period (level 1 category), B = Total number of ASB cases received in period (level category 1), A/B*100 Excellent work by the team, not one case is out of target or unresolved. The processes we have in place are working. Relations with partner agencies continue to work well. 24

25 EPNPMF20 % of closed ASB cases that were resolved June % 94.19% 90.83% Closed resolved cases refer to those cases closed in year-to-date where, in the professional opinion of the landlord, the ASB reported by the complainant(s) has ended or is no longer a cause for concern. Cases that have been investigated but no breach of tenancy or evidence of ASB is found, should also be recorded as a closed resolved case. (A / B) * 100, A = The number of ASB cases resolved year-to-date. B = The number of ASB cases resolved year-to-date (as in the numerator) PLUS the number of ASB cases closed but unresolved. Excellent work by the team, not one case is out of target or unresolved. The processes we have in place are working. Relations with partner agencies continue to work well. 25

26 EPNPMF21 % of MP and formal Member enquires dealt with in target. June 2016 This is the number of MP and formal member enquiries that were received within the month analysed that were closed and resolved in target. A / B * 100, where A = Number of Stage 1 complaints responded to in full within target, B = Number of all Stage 1 complaints responded to in full in quarter All MP enquiries have been responded to within target during this quarter. This is a result of the diligent controls built into the process to ensure we achieve the targets. Performance has improved each month since January 2016 when the MP enquiry monitoring was returned to EPN office to be monitored locally. 26

27 EPNPMF22 Leaseholder arrears as a % of the leaseholder charges for the previous 12 months June 2016 This measure expresses the service charge arrears outstanding at the end of the period benchmarked as a percentage of the total service charges due. (A / B) * 100, A = charge arrears at the end of the period benchmarked, B = charges due in period benchmarked Arrears to 30/6/2016 = 8,361.27, 12 month debit = 105, Will aim to improve the collection rate during the second quarter through a combination of earlier invoicing, a direct debit review, completion of the adjusted service charge accounts in July (rather than September) which will enable payment of large debit adjustments to be spread over 3 quarters rather than two, and going after our high level debtors through the Council solicitors. 27

28 EPNPMF23 % of offensive graffiti removed within 24 hours of receiving a report June 2016 It measures the average time (in hours) to remove one occurrence of offensive graffiti during the period benchmarked. (A / B) *100, A = number of offensive graffiti jobs completed within the time limit, B = total number of occurrences over the period No reports of offensive graffiti have been received in the fist quarter of this year. 28

29 EPNPMF24 % of current tenancies with profiling data logged (snapshot) June 2016 The total number of all current tenancies who have returned a customer profiling form as a percentage of the total number of current tenancies. (Excludes garages and leaseholders) (A/B)*100, A= the number of tenancies with profiling data logged, B = the total number of current tenancies (excluding refusals and exemptions) Target exceeded. We have developed a new Customer Review form to refresh and add to the information we hold about our customers. We are piloting this in the Netherpool Neighbourhood before rolling out to all neighbourhoods. This information will be used to help inform decisions about what services we offer and how. 29

30 EPNPMF25N % of stage one complaints responded to within target June 2016 This indicator is measured through the Customer Complaints (CCS) Access Database. Report = Formal Complaints In Target (A/B)*100, A = the number of complaints responded to within target (10 working days from date of acknowledgement), B = the total number of complaints received. We have maintained 100% compliance with this measure all year as a result of having diligent monitoring processes in place to ensure the complaint responses are completed within timescale. We have achieved 100% compliance with this measure for the last 2 years. 30

31 EPNPMF26N (+/- %) Variance Actual Spend Against Target completions (Capital Programme) June 2016 Each expenditure stream is calculated: Fire risk assessments, Asbestos, Garage sites, Small scale improvements Void, contingency -capital repairs & voids and profit share. Each stream has an actual spend which is compared to its expenditure target. The figure displayed is the % of the total spent. The target is a stepped target. The upper and lower limit values are within a 5% range either side of the projected cumulative quarterly spend. Calculation method = (C / B) * 100 A = Actual spend B = Target spend C = (A - B) The underspend in the capital budget at the end of quarter 1 is due to a three week delay in starting on-site for bathroom, electrical rewires and electrical testing works as the contracts had to be procured. There were also delays in submitting invoices for payment from the contractors delivering the fire risk assessment and asbestos works. 31

32 With effect from 1 April 2016 we started to measure current and former arrears as one due to the close relationship between the two. The following 2 KPI s are operational EPNPMF B Current tenant arrears as a % of the annual rent debit (excl. HB adj) June % 3.2% 4.85% This indicator calculates the rent arrears of all current GN and HfOP tenants at the end of the period as a percentage of the annual rent debit (for the current financial year). This figure should include arrears due to late Housing Benefit payments and no adjustments should be made for this. This covers all General Needs and Housing for Older People rented stock (excluding garages). Court costs are separate sundry debts and should not be included in the calculation. Former tenant debts (even those which have followed a tenant to their current tenancy) are separate and should not be included in this calculation. (A / B) * 100, A = The actual value of current tenant rent and service charge arrears at the end of the reporting period, B = The annual rent debit for the current financial year. This is the net rent debit after deduction of rent loss due to voids. From this PI has been replaced in the PMF Framework with PMF BDN, current and former arrears. The working paper for the Income Targets projected current arrears will reduce by 130K during , thus making the target for current arrears 3.48%. 32

33 EPNPMF D Former tenant arrears as a % of the annual rent debit June % 1.69% 2.52% This indicator calculates the amount of former tenant arrears outstanding at the end of the period as a percentage of the total rent debit. It includes former tenant arrears from all GN & HfOP social rented dwellings (excluding garages). It includes former tenant s service charges, but would not include court costs or overpaid Housing Benefits which re sundry debts normally accounted for separately. This indicator does not include rent and service charge arrears that have been written off. As such this figure can reduce either through former tenant arrears being recuperated, or through them being written off. Note that 'set asides' should continue to be included as former arrears until they are formally written off. The delay in applying the Q4 ( ) and Q1 ( ) write-offs on the system has a negative impact on this indicator. (A / B) * 100, A = The actual value of former tenant rent and service charge arrears at the end of the reporting period, B = The total rent debit for the year. 33

34 PMF 1N: Average relet (Calendar days) Based on quarter one volumes the number of terminations is projected to be in line with previous years. Appendix A Number of terminations Q1 End of Year 2014/ / / / / /17 Projection Void turnaround time: Previous peformance shows the average relet time for standard voids at the end of Q1 improves over the year. 14/15 Q days: End of year days 15/16 Q days: End of year days 16/17 Q days: End of year target 23 days Legend: Number of voids Average days taken to relet 34

Report of Meeting Date Item No. Brian Moran CCH

Report of Meeting Date Item No. Brian Moran CCH Board Report Report of Meeting Date Item No. Brian Moran AHG Company Secretary/Group AHA 17 th September 2012 Director of Corporate BHA 8.1 Services CCH PERFORMANCE SCORECARD PURPOSE OF REPORT 1 To report

More information

Residents Annual Report 2016/17

Residents Annual Report 2016/17 Residents Annual Report 2016/17 Welcome to our annual round-up of how we performed last year. Radian has had a great year seeing our lowest arrears performance to date, our lowest average time to re-let

More information

Board Performance Report

Board Performance Report Page 1 of 17 Board Performance Report As at 31 December 2016 For Board meeting 1 March 2017 Page 2 of 17 Quarterly Board Performance Report Directors Summary for the period ending 31 December 2016 1. Recommendation

More information

Affordable Homes Service Plan 2016/17 and 2017/18

Affordable Homes Service Plan 2016/17 and 2017/18 Report To: Housing Portfolio Holder 15 March 2017 Lead Officer: Director of Housing Purpose Affordable Homes Service Plan 2016/17 and 2017/18 1. To provide the Housing Portfolio Holder with an update on

More information

Sector Scorecard. Proposed indicators for measuring efficiency within the sector have been developed for the following areas:

Sector Scorecard. Proposed indicators for measuring efficiency within the sector have been developed for the following areas: Registered Providers Working Group on Efficiency Sector Scorecard Proposed indicators for measuring efficiency within the sector have been developed for the following areas: A. Business Health B. Development

More information

Annual Report to South Cambridgeshire District Council Tenants [DRAFT TEXT]

Annual Report to South Cambridgeshire District Council Tenants [DRAFT TEXT] APPENDIX A Annual Report to South Cambridgeshire District Council Tenants [DRAFT TEXT] Welcome Welcome to our first annual report to tenants that sets out our performance as a landlord and the commitments

More information

Housemark Benchmarking Analysis Report 2014/15

Housemark Benchmarking Analysis Report 2014/15 Appendix 1 P a g e 1 Housemark Benchmarking Analysis Report 2014/15 Introduction This report summarises results from the HouseMark benchmarking exercise. It identifies how performance and cost compares

More information

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING HEATING SERVICES PROCEDURES SOLID FUEL SERVICING 13 th October, 2016 CUSTOMER CONSULTATION Introduction The consultation processes with regard to the service and safety check of the solid fuel appliances

More information

Updated Value for Money Performance based on the HouseMark Report 2015/2016. delivering promises, improving lives

Updated Value for Money Performance based on the HouseMark Report 2015/2016. delivering promises, improving lives Updated Value for Money based on the HouseMark Report 2015/2016 delivering promises, improving lives Updated Value for Money based upon the HouseMark Annual Report (November 2016) This document contains

More information

Scottish Social Housing Charter Indicators

Scottish Social Housing Charter Indicators Scottish Social Housing Charter Indicators Briefing Paper July 2012 Introduction This joint Tenants Information Service (TIS) / Tenant Participation Advisory Service (TPAS) briefing paper has been produced

More information

SELF EVALUATION

SELF EVALUATION SELF EVALUATION 2014-15 What is self-evaluation and why do we do it? Self Evaluation is the term used when we, as Housing Associations, have a good look at ourselves to see whether or not we are meeting

More information

Welsh Government Housing Policy Regulation

Welsh Government Housing Policy Regulation www.cymru.gov.uk Welsh Government Housing Policy Regulation Regulatory Assessment Report August 2015 Welsh Government Regulatory Assessment The Welsh Ministers have powers under the Housing Act 1996 to

More information

Tenure and Tenancy management. Issue 07 Board approved: February Responsibility: Operations/C&SH Review Date: February 2019

Tenure and Tenancy management. Issue 07 Board approved: February Responsibility: Operations/C&SH Review Date: February 2019 Operational Manual Tenure and Tenancy management Corporate Policy Issue 07 Board approved: February 2017 Responsibility: Operations/C&SH Review Date: February 2019 1.0 Introduction 1.1 Hightown provides

More information

Impact of welfare reforms on housing associations: Early effects and responses by landlords and tenants

Impact of welfare reforms on housing associations: Early effects and responses by landlords and tenants Impact of welfare reforms on housing associations: Early effects and responses by landlords and tenants For the National Housing Federation February 2014 Legal notice 2014 Ipsos MORI all rights reserved.

More information

Leasehold Management Policy

Leasehold Management Policy Author(s): Simon McCracken and Liz Evans Leasehold Management Policy Approved by: The Board Date: 3 rd December 2015 Date Published: 1 st January 2016 Version: Live 3.0 Review Date: December 2019 Contents

More information

POLICY: LETTINGS. 1.0 Introduction. 2.0 Background Legislation. 3.0 Definitions. 4.0 Objectives

POLICY: LETTINGS. 1.0 Introduction. 2.0 Background Legislation. 3.0 Definitions. 4.0 Objectives POLICY: LETTINGS 1.0 Introduction 1.1 Thames Valley Housing (TVH) supports Local Authorities (LAs) with their strategic housing functions and their duties to meet identified local housing needs. 1.2 We

More information

Consumer Code for Home Builders

Consumer Code for Home Builders Consumer Code for Home Builders This document contains the Consumer Code requirements together with non-mandatory good-practice guidance for Home Builders Third Edition April 2013 Contents Meaning of words...

More information

Extending the Right to Buy

Extending the Right to Buy Memorandum for the House of Commons Committee of Public Accounts Department for Communities and Local Government Extending the Right to Buy MARCH 2016 4 Key facts Extending the Right to Buy Key facts 1.8m

More information

National Standards Compliance Tenancy Standard Summary Report Quarter /15

National Standards Compliance Tenancy Standard Summary Report Quarter /15 National s Compliance Tenancy 1.1.1 Registered providers shall let their homes in a fair, transparent and efficient way. They shall take into account the housing needs and aspirations of tenants and potential

More information

Better homes, better lives. Report to tenants. Glasgow Housing Association How we performed in 2016/17

Better homes, better lives. Report to tenants. Glasgow Housing Association How we performed in 2016/17 Better homes, better lives Report to tenants Glasgow Housing Association How we performed in Glasgow Housing Association How we performed in This is our report to tenants on how GHA has performed on the

More information

Policy: FP022 Rent Accounting and Arrears

Policy: FP022 Rent Accounting and Arrears Policy: FP022 Rent Accounting and Arrears Trust Housing Association Limited Title of policy: Rent Accounting and Arrears Policy Date of adoption or last review: October 2013 Lead officer: Head of Financial

More information

The impact of the bedroom tax on stock management by social landlords March 2014

The impact of the bedroom tax on stock management by social landlords March 2014 The impact of the bedroom tax on stock management by social landlords March 2014 www.cihscotland.org If you have any questions about this survey please contact david.bookbinder@cih.org Tel: 0131 225 4544

More information

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF)

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF) Qualification Snapshot CIH Certificate in Housing Services (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is the leading

More information

Tenancy Policy Introduction Legal Framework Purpose Principles Policy Statement Tenancy Statement...

Tenancy Policy Introduction Legal Framework Purpose Principles Policy Statement Tenancy Statement... 1 Tenancy Policy January 2014 Table of Contents Tenancy Policy... 1 Introduction... 2 Legal Framework... 2 Purpose... 3 Principles... 3 Policy Statement... 4 Tenancy Statement... 4 Tenancy Types... 5 Assured

More information

Home owner handbook. Contents. 1. Our team Leasehold explained Insurance Ground rent, rent and service charges 3

Home owner handbook. Contents. 1. Our team Leasehold explained Insurance Ground rent, rent and service charges 3 Home owner handbook Contents 1. Our team 2 2. Leasehold explained 2 3. Insurance 3 4. Ground rent, rent and service charges 3 5. Paying your rent and service charges 4 6. Information for shared owners

More information

Value for Money. Self Assessment Summary 2017

Value for Money. Self Assessment Summary 2017 Value for Money Self Assessment Summary 2017 Executive Summary Wythenshawe Community Housing Group Limited () was established in April 2013 when Parkway Green Housing Trust (PGHT) and Willow Park Housing

More information

Mutual Exchange Policy

Mutual Exchange Policy Mutual Exchange Policy Author I Jekyll Job Title Operations Director Approved by / Date Operations Committee October 2012 Approved by Challenge Group / Date October 2012 Review Date October 2016 Cross

More information

Allocations and Lettings Policy

Allocations and Lettings Policy Date approved TBC Date of Next Review May 2016 Date of Last Review May 2015 Review Frequency Annually Type of document Policy Owner Name Jenny Spoor, Group Head of Neighbourhoods Job Title Approved by

More information

HS/ Housing Solutions Localism Act 2012 Housing Act 2004 Data Protection Act 1998 Data Protection Policy Inclusion Strategy

HS/ Housing Solutions Localism Act 2012 Housing Act 2004 Data Protection Act 1998 Data Protection Policy Inclusion Strategy Reference: Scope: Legislation: Related Policies: HS/ Housing Solutions Localism Act 2012 Housing Act 2004 Data Protection Act 1998 Data Protection Policy Inclusion Strategy Approved: 16/02/16 Date of next

More information

NUMBER: 07/04 DATE FIRST ISSUED: July 2004 DATE REVISED: N/A

NUMBER: 07/04 DATE FIRST ISSUED: July 2004 DATE REVISED: N/A NUMBER: 07/04 DATE FIRST ISSUED: July 2004 DATE REVISED: N/A Note: housing association is used as a generic term for registered social landlords. Corporation means Housing Corporation. TITLE: SUMMARY:

More information

Private Sector Housing Fees & Charges Policy

Private Sector Housing Fees & Charges Policy APPENDIX C Private Sector Housing Fees & Charges Policy for the Regulation of Housing Standards Updated 1 August 2017 CONTENTS Page 1. Introduction 3 2. Purpose of the Fees & Charges Policy 3 3. Principles

More information

ABERTAY HOUSING ASSOCIATION TENANT SATISFACTION SURVEY 2016

ABERTAY HOUSING ASSOCIATION TENANT SATISFACTION SURVEY 2016 ABERTAY HOUSING ASSOCIATION TENANT SATISFACTION SURVEY 2016 Survey Report Report to: Ian Thomson Chief Executive Report by: Veronica Gray Operations Manager July 2016 Contents A. Background B. Aims & Objectives

More information

Practitioner Article Tenancy Sustainment not just the latest buzz word!

Practitioner Article Tenancy Sustainment not just the latest buzz word! Practitioner Article Tenancy Sustainment not just the latest buzz word! Written by Janice Conner, Housing Services Manager, Link Housing Association Ltd March 2011 www.shelter.org.uk. All rights reserved.

More information

TENANCY SUSTAINMENT STRATEGY

TENANCY SUSTAINMENT STRATEGY LANGSTANE HOUSING ASSOCIATION TENANCY SUSTAINMENT STRATEGY 2017-2020 C:\Users\ayesha.reid\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\GSBPYVBK\Tenancy Sustainment Strategy

More information

Rent Increase 2018/19. Briefing Paper

Rent Increase 2018/19. Briefing Paper Rent Increase 2018/19 Briefing Paper Consultation on Proposals January 2018 At this time of year we consult with our tenants on the rent increase proposal for implementation from April the following year.

More information

A short guide to housing management

A short guide to housing management A short guide to housing management This guide is about some of the core housing management issues and looks in more detail at the role of tenants in the management of social landlords. You will find about:

More information

December 2017 Website. Lettings Policy (General Needs Housing)

December 2017 Website. Lettings Policy (General Needs Housing) December 2017 Website Lettings Policy (General Needs Housing) 1. Introduction CHS GROUP (CHS) is a charitable Housing Association which has a duty to ensure its homes are allocated to people in housing

More information

LEASEHOLD MANAGEMENT POLICY

LEASEHOLD MANAGEMENT POLICY LEASEHOLD MANAGEMENT POLICY 1. Introduction 1.1 On the 21 st January 2008, all leasehold properties sold by Monmouthshire County Council under the Right to Buy legislation, were transferred to MHA. 1.2

More information

Welcome.

Welcome. ity l a u Q Pr id e Ca re th w o r G Welcome I am delighted to present this report on Cornerstone s recent performance in several areas of importance to our tenants, as well as our plans for the coming

More information

Discussion paper RSLs and homelessness in Scotland

Discussion paper RSLs and homelessness in Scotland Discussion paper RSLs and homelessness in Scotland From the Shelter policy library April 2009 www.shelter.org.uk 2009 Shelter. All rights reserved. This document is only for your personal, non-commercial

More information

Document control. Supercedes (Version & Date) Version 2 February 2017

Document control. Supercedes (Version & Date) Version 2 February 2017 Tenancy Policy Document control Document Reference / Version Number Version 3 November 2017 Title of Document Authors Name(s) Angela Havens Authors Job Title(s) Head of Income & Customer Support Directorate(s)

More information

GreenSquare Tenancy Policy

GreenSquare Tenancy Policy Date Approved November 2012 Date of Next Review November 2014 Policy owner(s) Heads of Neighbourhoods 1. Scope This policy applies to customers of Oxford Citizens H A, Oxbode H A, GreenSquare Community

More information

ORBIT VOLUNTARY RIGHT TO BUY POLICY

ORBIT VOLUNTARY RIGHT TO BUY POLICY Document Title Version Final v1.0 Release Date August 2018 Review Date August 2020 Extension Reason(s) Extension date approved Approver details Document Type Sponsor Author Voluntary Right to Buy Policy

More information

1 Adopting the Code. The Consumer Code Requirements and good practice Guidance. 1.1 Adopting the Code. 1.2 Making the Code available

1 Adopting the Code. The Consumer Code Requirements and good practice Guidance. 1.1 Adopting the Code. 1.2 Making the Code available The Non-mandatory Good Practice for Home Builders along The Consumer Code s and good practice 1 Adopting the Code 1.1 Adopting the Code Home Builders must comply with the s of the Consumer Code and have

More information

Tenancy Policy Dale & Valley Homes Durham City Homes and East Durham Homes

Tenancy Policy Dale & Valley Homes Durham City Homes and East Durham Homes Tenancy Policy Dale & Valley Homes Durham City Homes and East Durham Homes Version Author Date Review date Comments/amendments This policy outlines the way in which County Durham Housing Group and the

More information

Wandsworth Borough Council. Tenancy and Rent Strategy

Wandsworth Borough Council. Tenancy and Rent Strategy APPENDIX 1 TO PAPER NO. 19-08 Wandsworth Borough Council Tenancy and Rent Strategy CONTENTS Page Introduction 2 Tenancies for applicants who were not already social housing tenants as at 1st April 2012

More information

Voluntary Right to Buy Policy. Dan Gray, Executive Director, Property

Voluntary Right to Buy Policy. Dan Gray, Executive Director, Property Policy title: Scope: Policy owner & job title: Approver: Voluntary Right to Buy Policy Aspire Housing Alice Newman, Land and Stock Intelligence Manager Dan Gray, Executive Director, Property Date: 07/2018

More information

Tenancy Policy March 2016

Tenancy Policy March 2016 Tenancy Policy March 2016 0. DOCUMENT CONTROL 0.1 SUMMARY This policy provides a summary of the types of tenancy which Golden Gates Housing Trust may use, how changes to a tenancy may occur during the

More information

Radian RATE Programme STAR Survey Results April 2017 to March 2018 All Residents Report April 2018

Radian RATE Programme STAR Survey Results April 2017 to March 2018 All Residents Report April 2018 Radian RATE Programme STAR Survey Results April 2017 to March 2018 All Residents Report April 2018 Executive summary This report summarises the results of the continuous STAR survey of Radian s residents,

More information

STARTER TENANCY POLICY

STARTER TENANCY POLICY 1. BACKGROUND Manningham Housing Association (MHA) is a registered social housing provider. The Association provides general needs housing for rent and shared ownership. This policy describes how MHA will

More information

Report on the Scottish Housing Charter 2016

Report on the Scottish Housing Charter 2016 Report on the Scottish Housing Charter 2016 WELCOME TO THE THIRD ANNUAL TENANT REPORT ON THE SCOTTISH HOUSING CHARTER BY SOUTHSIDE HOUSING ASSOCIATION. Southside Housing Association is regulated by the

More information

Starter Tenancy Policy

Starter Tenancy Policy Starter Tenancy Policy Originator: Executive Management Team Approval Date: Policy and Strategy Team 12 September 2017 Review date: September 2018 1 Introduction 1.1 1.2 1.3 One Vision Housing (OVH) uses

More information

HAVEBURY HOUSING PARTNERSHIP

HAVEBURY HOUSING PARTNERSHIP HS0025 HAVEBURY HOUSING PARTNERSHIP POLICY HOME PURCHASE POLICY Controlling Authority Director of Resources Policy Number HS025 Issue No. 3 Status Final Date November 2013 Review date November 2016 Equality

More information

SHEPHERDS BUSH HOUSING ASSOCIATION UNDEROCCUPYING AND OVERCROWDING POLICY

SHEPHERDS BUSH HOUSING ASSOCIATION UNDEROCCUPYING AND OVERCROWDING POLICY (UNCONTROLLED WHEN PRINTED) SHEPHERDS BUSH HOUSING ASSOCIATION 1. INTRODUCTION Shepherds Bush Housing Association (SBHA) intend to avoid underoccupation of our properties and to minimise and avoid overcrowding

More information

PROJECT INITIATION DOCUMENT

PROJECT INITIATION DOCUMENT Project Name: Housing Futures Phase Two Project Sponsor: Steve Hampson Project Manager: Denise Lewis Date Issued: 15 February 2008 Version No: 1 Background: At Full Council on 31 January 2008 the following

More information

The Consumer Code Scheme

The Consumer Code Scheme The Consumer Code Scheme This document contains The Code Requirements, their Meaning and an Introduction to The Independent Dispute Resolution Scheme FOURTH EDITION / APRIL 2017 Contents Meaning of words...

More information

HOUSING REVENUE ACCOUNT BUDGET 2018/19 The Impact of Decreasing Dwelling Rents for the Council s Housing Stock.

HOUSING REVENUE ACCOUNT BUDGET 2018/19 The Impact of Decreasing Dwelling Rents for the Council s Housing Stock. HRA Budget Report 1 Name of the policy and briefly describe the activity being considered including aims and expected outcomes. This will help to determine how relevant the policy is to equality. HOUSING

More information

Sustaining Tenancies early intervention for rent arrears

Sustaining Tenancies early intervention for rent arrears Glasgow Housing Association www.gha.org.uk Andy Ashcroft Area Director (East) Sustaining Tenancies early intervention for rent arrears Better homes, better better lives lives 7 February 2012 Our Arrears

More information

Research report Tenancy sustainment in Scotland

Research report Tenancy sustainment in Scotland Research report Tenancy sustainment in Scotland From the Shelter policy library October 2009 www.shelter.org.uk 2009 Shelter. All rights reserved. This document is only for your personal, non-commercial

More information

CONTROLLING AUTHORITY: Head of Housing & Community Services. DATE: August AMENDED: Changes to Starter Tenancies.

CONTROLLING AUTHORITY: Head of Housing & Community Services. DATE: August AMENDED: Changes to Starter Tenancies. TENANCY POLICY CONTROLLING AUTHORITY: Head of Housing & Community Services ISSUE NO: 3 STATUS: LIVE DATE: August 2014 AMENDED: Changes to Starter Tenancies 1 Index 1.0 Purpose of the Policy 2.0 Tenancy

More information

Together with Tenants

Together with Tenants Together with Tenants Our draft plan Your feedback needed by 19 April 20 February 2019 About this plan The National Housing Federation is the membership body for housing associations in England. Our housing

More information

APPENDIX A DRAFT. Under-occupation Policy

APPENDIX A DRAFT. Under-occupation Policy APPENDIX A DRAFT Under-occupation Policy Published: August 2013 1 1 EXECUTIVE SUMMARY 1.1 The introduction of the Welfare Reform Act 2012 has led to cuts in the amount of housing benefit people receive

More information

Tenant s Scrutiny Panel and Designated Persons and Tenant s Complaints Panel

Tenant s Scrutiny Panel and Designated Persons and Tenant s Complaints Panel Meeting: Social Care, Health and Housing Overview and Scrutiny Committee Date: 21 January 2013 Subject: Report of: Summary: Tenant s Scrutiny Panel and Designated Persons and Tenant s Complaints Panel

More information

Rents for Social Housing from

Rents for Social Housing from 19 December 2013 Response: Rents for Social Housing from 2015-16 Consultation Summary of key points: The consultation, published by The Department for Communities and Local Government, invites views on

More information

Working with residents and communities to tackle ASB

Working with residents and communities to tackle ASB Working with residents and communities to tackle ASB Baseline findings 2011 www.cih.org 1 Introduction Over the last two decades tackling anti-social behaviour (ASB) and its underlying causes has become

More information

MOLENDINAR PARK HOUSING ASSOCIATION VOID MANAGEMENT POLICY

MOLENDINAR PARK HOUSING ASSOCIATION VOID MANAGEMENT POLICY MOLENDINAR PARK HOUSING ASSOCIATION VOID MANAGEMENT POLICY Date of Review: 18 th August 2015 Date of Next Review: August 2020 1 1. INTRODUCTION 1.1 This document outlines Molendinar Park Housing Association

More information

Right to Buy Policy SER-POL-18 Version 5.0 Date approved: February 2017 Approved by: Chief Executive

Right to Buy Policy SER-POL-18 Version 5.0 Date approved: February 2017 Approved by: Chief Executive Date approved: February 2017 Approved by: Chief Executive 1. Introduction 1.1 The objective of this policy is to allow Southway Housing Trust (Manchester) Limited (Southway) to maximise the availability

More information

Tenancy Policy. 1 Introduction. 12 September Executive Management Team Approval Date: Review date: September 2018

Tenancy Policy. 1 Introduction. 12 September Executive Management Team Approval Date: Review date: September 2018 Tenancy Policy Originator: Executive Management Team Approval Date: Policy and Strategy Team 12 September 2017 Review date: September 2018 1 Introduction 1.1 1.2 This Policy sets out how One Vision Housing

More information

D02 Assured Tenancy Rents

D02 Assured Tenancy Rents 1. It is policy to set Assured Social Tenancy rents and Affordable Fixed Term Assured Tenancy rents in accordance with HCA (Homes & Communities Agency) guidelines affecting these tenancy types and which

More information

Rent Policy. Approved on: 9 December 2010 Board of Management Consolidated November 2015

Rent Policy. Approved on: 9 December 2010 Board of Management Consolidated November 2015 Rent Policy Approved on: 9 December 2010 Board of Management Consolidated November 2015 BIELD HOUSING ASSOCIATION LIMITED Registered Office: 79 Hopetoun Street, Edinburgh EH7 4QF Scottish Charity No SC006878

More information

Registered as a Scottish Charity - No. SC030751

Registered as a Scottish Charity - No. SC030751 Registered as a Scottish Charity - No. SC030751 Foreword Welcome to SBHA s third Tenant Participation Strategy which has been produced through partnership working including members of Scottish Borders

More information

Annual Report 2011/12

Annual Report 2011/12 Annual Report 2011/12 Introduction from the Chief Executive Welcome to this year s annual report. In this report, we have 3 aims: to set out how we provide services to you, and meet the standards set by

More information

Briefing. Energy efficiency and the Green Deal: Q&A for housing associations. Neighbourhoods. Tel:

Briefing. Energy efficiency and the Green Deal: Q&A for housing associations. Neighbourhoods. Tel: Briefing Energy efficiency and the : Q&A for Contact: Team: Pippa Read Neighbourhoods Tel: 020 7067 1092 Email: pippa.read@housing.org.uk Date: October 2012 Ref: NS.EN.2012.BR.16 Disclaimer This note has

More information

REPAIRS & MAINTENANCE POLICY

REPAIRS & MAINTENANCE POLICY REPAIRS & MAINTENANCE POLICY Approved MAY 2006 30 Fassifern Road FORT WILLIAM PH33 6XQ Tel: 01397 702530 Fax: 01397 704141 1.0 Aims and Objectives 1.1 The central aim of Lochaber Housing Association s

More information

Supporting documents; Devon Home Choice policy and procedures, Rentplus lettings process and criteria

Supporting documents; Devon Home Choice policy and procedures, Rentplus lettings process and criteria Section; Housing Policy name; Lettings Policy Executive responsible; Housing Manager Review by; Housing Manager Tenant review: Yes Type of review; Exception Authority to amend; Board Frequency of review;

More information

Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service

Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service www.ownersunion.net Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service Owners Union Community Manager was specifically created by Iong time strata

More information

Horsham District Council Empty Homes Strategy

Horsham District Council Empty Homes Strategy Horsham District Council Empty Homes Strategy 2016-2020 Purpose of this Strategy Horsham District Council is committed to bringing long-term empty homes back into use across the District. The Empty Homes

More information

Leasehold Management Policy

Leasehold Management Policy UNCONTROLLED WHEN PRINTED Policy Contents 1 Aims and Objectives 2 Definitions 3 Legal and regulatory framework 4 Key aspects of service delivery 5 Monitoring 6 Staff Training 7 Review 8 Equality Impact

More information

Useful Information for home owners. Service Charge Accounts

Useful Information for home owners. Service Charge Accounts Useful Information for home owners Service Charge Accounts What is a service charge? Service charges are charges billed to home owners for the cost of any repairs and services we provide during the year.

More information

PLANNED AND RESPONSIVE MAINTENANCE POLICY

PLANNED AND RESPONSIVE MAINTENANCE POLICY PLANNED AND RESPONSIVE MAINTENANCE POLICY 1. Purpose 3. Policy Statement This Policy explains how Evolve Housing (Evolve) will provide repairs and maintenance services to its Tenants. Evolve believes that

More information

Meaning of words 3. Introduction 5. Further information 6. Scope of the Code 7

Meaning of words 3. Introduction 5. Further information 6. Scope of the Code 7 Contents Meaning of words 3 Introduction 5 Further information 6 Scope of the Code 7 1.0 Adopting the Code 8 1.1 Adopting the Code 8 1.2 Making the Code available 8 1.3 Customer service 8 1.4 Appropriately

More information

Consumer Code Requirements and Good Practice Guidance for Home Builders

Consumer Code Requirements and Good Practice Guidance for Home Builders Consumer Code s and Good Practice for Home Builders This document contains the Non-mandatory Good Practice for Home Builders along with an Introduction to The Independent Dispute Resolution Scheme FOURTH

More information

GOOD PRACTICE GUIDE JULY 2004 HOUSING ASSOCIATIONS AND MANAGING AGENTS

GOOD PRACTICE GUIDE JULY 2004 HOUSING ASSOCIATIONS AND MANAGING AGENTS GOOD PRACTICE GUIDE JULY 2004 HOUSING ASSOCIATIONS AND MANAGING AGENTS Performance assessment framework for housing associations working with managing agents ACKNOWLEDGEMENTS The Housing Corporation gratefully

More information

Radian RATE Programme STAR Survey Results April 2017 to December 2017 All Residents Report February 2018

Radian RATE Programme STAR Survey Results April 2017 to December 2017 All Residents Report February 2018 Radian RATE Programme STAR Survey Results April 2017 to December 2017 All Residents Report February 2018 Executive summary This report summarises the results of the continuous STAR survey of Radian s residents,

More information

Member briefing: The Social Housing Rent Settlement from 2015/16

Member briefing: The Social Housing Rent Settlement from 2015/16 28 May 2014 Member briefing: The Social Housing Rent Settlement from 2015/16 1. Introduction On Friday 23 May Government issued the final policy for Rents for Social Housing from 2015/16, following a consultation

More information

Annual Report on the Charter

Annual Report on the Charter 2014 Annual Report on the Charter Front Cover: Dewar Avenue, Kincardine Contents Chairman s Introduction........................................................4 About Us.......................................................................5

More information

Choice-Based Letting Guidance for Local Authorities

Choice-Based Letting Guidance for Local Authorities Choice-Based Letting Guidance for Local Authorities December 2016 Contents Page 1. What is Choice Based Lettings (CBL) 1 2. The Department s approach to CBL 1 3. Statutory Basis for Choice Based Letting

More information

The Ministry of Defence s arrangement with Annington Property Limited

The Ministry of Defence s arrangement with Annington Property Limited A picture of the National Audit Office logo Report by the Comptroller and Auditor General Ministry of Defence The Ministry of Defence s arrangement with Annington Property Limited HC 762 SESSION 2017 2019

More information

Supporting documents; DHC publications & HomeSwapper publications. Health & safety; Breach of this policy unlikely to have direct impact on H&S

Supporting documents; DHC publications & HomeSwapper publications. Health & safety; Breach of this policy unlikely to have direct impact on H&S Section; Housing Policy name; Lettings Policy Executive responsible; Housing Manager Review by; Housing Manager Tenant review: Not yet Type of review; Exception Authority to amend; Board Frequency of review;

More information

THE SCOTTISH SOCIAL HOUSING CHARTER

THE SCOTTISH SOCIAL HOUSING CHARTER HOUSING CHARTER REPORT THE SCOTTISH SOCIAL HOUSING CHARTER LOOKING BACK AT 2015/16 PLANNING AHEAD 2016/17 Chairperson Report A very warm welcome to our Annual Charter Report. As you will be aware, last

More information

Burnetts Assured Shorthold Tenant Eviction Scheme

Burnetts Assured Shorthold Tenant Eviction Scheme Burnetts Assured Shorthold Tenant Eviction Scheme Here at Burnetts we have a wealth of experience in dealing with the legal problems which both private and public landlords face on a daily basis. We are

More information

Ore Valley Housing Association

Ore Valley Housing Association SCOTLAND S HOUSING NETWORK, FIRST FLOOR, 19 HAYMARKET YARDS, EDINBURGH EH12 5BH T: 0131 466 3710 E: INFO@SCOTLANDSHOUSINGNETWORK.ORG W: SCOTLANDSHOUSINGNETWORK.ORG Ore Valley Housing Association PERFORMANCE

More information

A home of your own SHARED OWNERSHIP (PART BUY/PART RENT)

A home of your own SHARED OWNERSHIP (PART BUY/PART RENT) A home of your own SHARED OWNERSHIP (PART BUY/PART RENT) www.graingerplc.co.uk Shared Ownership Home ownership is something prior generations took for granted. Now, with rising house prices and rising

More information

ALLOCATIONS & LETTINGS POLICY

ALLOCATIONS & LETTINGS POLICY ALLOCATIONS & LETTINGS POLICY 1 Introduction 1.1 CHISEL is a registered housing association dedicated to the development and support of housing co-ops and to a high level of tenant participation in the

More information

Rent Arrears - Possession Action

Rent Arrears - Possession Action D3 Rent Arrears - Possession Action 1 Conditions 1.1 Before an application for a Court hearing can be made, the following conditions should be met; Every attempt to contact the tenants must have been tried,

More information

Scottish Social Housing Charter Report 2015/16

Scottish Social Housing Charter Report 2015/16 Social Housing Charter Report Introduction This report sets out how Housing Association is performing against the standards set in the Social Housing Charter. This is the third report we have published.

More information

Estate Management Policy

Estate Management Policy Estate Management Policy SMT Approval Date: 31 October 2016 BoM/Committee: Operational Services Approval Date: 13 May 2017 Implementation Date: Review Date: May 2020 Version: V2 Policy Version Version

More information

Welsh Government Housing Regulation

Welsh Government Housing Regulation www.gov.wales Welsh Government Housing Regulation Regulatory Opinion Family Housing Association Limited L002 December 2016 The Welsh Ministers have powers under Part 1 of the Housing Act 1996 to regulate

More information

Rent Setting Policy

Rent Setting Policy Rent Setting Policy 2016-2017 Contents 1. Scope 2. Policy statement 3. Monitoring and evaluation 4. Conditions and exceptions to policy 5. Policy equality and diversity statement 6. Resident/Tenant involvement

More information

Until there s a home for everyone

Until there s a home for everyone Until there s a home for everyone Private Landlord Support Project Laura Fairlie - Dundee, Bryan Powell - Highland Thursday, 1 29 September 16 Improving standards in the PRS A private rented sector that

More information