1 Nick Graham Financing Infrastructure for Housing Developments: Studies from Sub-Saharan Africa The Centre for Affordable Housing Finance in Africa (CAHF) is a not-for-profit company with a vision for an enabled affordable housing finance system in countries throughout Africa, where governments, business, and advocates work together to provide a wide range of housing options accessible to all. CAHF s mission is to make Africa s housing finance markets work, with special attention on access to housing finance for the poor. We pursue this mission through the dissemination of research and market intelligence, supporting cross-sector collaborations and a marketbased approach. The overall goal of our work is to see an increase of investment in affordable housing and housing finance throughout Africa: more players and better products, with a specific focus on the poor. Executive Summary This case study report provides examples of how infrastructure for housing projects is financed across sub- Saharan Africa. It describes and discusses alternative infrastructure financing mechanisms, their advantages and disadvantages, and the preconditions to their application in different contexts. It relies primarily on work done by the African Centre of Cities, funded by UK Aid. Infrastructure provision is an essential part of housing development. Housing can only satisfy basic needs if it is accompanied by the provision of basic services through infrastructure. The infrastructure deficits in African cities are well documented and result in vast areas of cities CONTENTS Executive Summary 2 1. Introduction 3 2. Property development case studies 3 3. Infrastructure provision for housing development 12. Analysis of the application of the various infrastructure financing approaches Evaluation Conclusion Reference list Suggested further reading 20 without access to services and constraints on further development. Over 200 million people, 62% of Sub-Saharan Africa s urban population, live in slums and high urbanisation rates result in the continuing growth of poorly serviced areas. While African countries are making progress with infrastructure provision, this is insufficient to make sufficient headway in reducing backlogs in access to urban infrastructure and associated services. One of the major problems with the provision of infrastructure is the financing thereof. In order to finance infrastructure, there needs to be an understanding of what types of infrastructure there are, as the financing arrangements for the different types of infrastructure differs. Broadly, infrastructure can be divided into social and engineered infrastructure. Social infrastructure consists of schools and other education facilities, health facilities, libraries, sports and recreation facilities, parks and squares and buildings for security and emergency services. Within engineered infrastructure there are three different subdivisions: bulk, connector and internal infrastructure. Bulk Across Africa, practitioners are grappling with the challenge of creating an enabled housing finance environment. While these challenges may seem insurmountable, there is a growing track record of novel solutions and initiatives, pioneered by policy makers, financiers, developers and households themselves, suggesting that there are new opportunities for making the housing finance sector work for the poor in Africa. This case study is part of a broader series that CAHF has commissioned in order to support professional development and inform a broader research and dialogue process. The case studies vary, addressing themes as diverse as housing microfinance, mortgage liquidity facilities, cement blockbanking, home loan guarantees for the informally employed, and infrastructure financing, highlighting experiences from countries across the continent. We hope this series contributes to more precise and successful endeavours that realise the opportunities in this market. This case study was produced with the support of FSD Africa.

2 and connector infrastructure includes water supply infrastructure from resource to distribution network in a town, wastewater treatment works and outfalls, electricity generation and transmission infrastructure, solid waste disposal infrastructure as well as larger scale road and public transport infrastructure. Internal infrastructure is that within a property development or suburb: the streets, pipes, sewers, on-site sanitation and low voltage powerlines. Infrastructure finance The conventional approach to funding middle to high income residential property development and associated infrastructure is that the developer provides and funds the building, land and internal infrastructure (effectively everything within the boundary of the area being developed) 1. The city, possibly with the assistance of national government and parastatals, provides and funds the bulk, connector, social and community infrastructure. Due to the survivalist nature of many cities in sub-saharan Africa, neither city nor state has the financial capabilities to pay for this infrastructure, and it is therefore either not provided, or provided in a substandard manner. The conventional approach therefore has its limitations. There are alternative methods of financing infrastructure associated with middle to high income residential property developments. To investigate these, 11 mini case studies 2 of residential property developments in sub-saharan Africa were undertaken in order to establish which financing techniques are used as part of the property development process. The property developments showed a range of different financing arrangements. They are categorised into one of four different groups. Conventional model Despite the infrastructure funding limitations of the public sector in sub-saharan Africa, the conventional model of infrastructure provision is widely applied. The reasons for this may be historical (the way it has always been), but in many cases the motivation seems to stem from the notion that the government can stimulate the middle to high income housing sector through the provision of bulk and connector infrastructure. This may even be taken a step further where developers are given access to subsidised land in addition to bulk and connector services, evident in number of the case study projects. Examples of the conventional model, or a slightly modified version thereof are found in Cameroon, Angola, Benin and Rwanda. The conventional approach for middle to high income developments needs to be seen in relation to that for low income housing where private property developers are not active and where the shortage of finance for infrastructure is even greater. This leads to questions as to where state and city financial resources should be best directed in order to balance social and economic objectives. In-kind contributions The In kind contribution approach is where the developer provides connector and bulk infrastructure themselves. In many cases this is because of the incapacity of the public sector to provide this infrastructure, leaving the developer with little choice. However, there may be other reasons for local government to require contributions in kind, including the expediency of using the contractor already on site and the avoidance of cumbersome procurement processes and bureaucracy involved in government infrastructure provision (in South Africa, for example). Therefore, in kind contributions, if well managed, can be an appropriate and effective land-based financing mechanism. Examples of in-kind contributions are found in Nigeria, Kenya, Rwanda and Zimbabwe. Lease The case of Ethiopia illustrates that land leasing is a viable means of infrastructure financing through land-based financing. However, the revenue raised from the leases contributes only 20% of infrastructure cost with the remainder coming from national transfers in the form of a tax sharing arrangement. This instrument is not widely applicable because in most countries land is not owned and controlled by national government. However, in addition to Ethiopia there is evidence that it is being applied in Cameroon but this is under-researched. Development charges The term development charge is used here for an up-front payment by the developer to cover the cost of bulk, connector and sometimes social infrastructure. The charge is calculated through a formula which aims to approximate the actual cost of the infrastructure. If correctly applied in terms of a policy and formula they have the potential to be equitable and transparent, as has been illustrated by widespread application internationally. While development charges have been applied with some success in South Africa, the case studies in Kenya and Zimbabwe indicate a more widely occurring situation where they are applied rather arbitrarily without a clear policy and often without ring-fencing of the funding for urban infrastructure. Often the charge is essentially a once-off tax as it is not related to the cost of infrastructure and neither are the funds raised used for infrastructure to serve the property developments to which the charge is related. Preconditions for application of land-based financing Land-based financing has the merit that it draws private finance into the funding of urban infrastructure, in contrast to the conventional approach. It also provides for a greater role of the private sector in building this infrastructure. Nevertheless, for land-based financing to be effective it does require a capable city backed by a capable state. There needs to be a sound plan for infrastructure in the city, appropriate engineering standards, sound land use management procedures and the ability to engage 1 In the case of low-income housing, the developer is often the city or state, in which case the internal infrastructure is provided with public funding as well. 2 The term mini is applied here as they case studies were undertaken with a small budget and provision for only 3 days of research time for each. 2

3 with developers to set up agreements regarding the scope, standards and timing of the infrastructure provision and any payment requirements. These requirements vary based on the type of land-based financing required, with the emphasis on technical factors in the case of in kind contributions as the developer is building infrastructure which needs to be integrated into city-wide infrastructure systems - and financing arrangements in the case of land leasing and development charges. 3 Conclusion The financing of infrastructure that serves housing developments is determined by arrangements well beyond the immediate scope of any particular housing project. In the case of finance, the arrangements relate to the health of the national fiscus as a determinant of the ability to use national transfers, to the balance sheet of local government as a determinant of the ability to borrow on the capital market and to the policies applied to use public funds to serve private sector property developments. The fundamental choice that a local government 3 makes is whether to follow the conventional approach of providing bulk connector and social infrastructure to facilitate development, or whether to use the development process to raise the required capital (or parts of it) through land-based financing. This choice is often about whether to use scarce public funds to provide infrastructure for poor households and hence meet social objectives or to use them for middle to high income residential and commercial property development with the argument that this stimulates the local economy and housing market. With regard to the market for middle to high income housing, the argument from developers and home buyers will consistently be for the conventional model as this avoids the inclusion of bulk and connector costs into the selling price of properties. However, with limited funding available and the importance of diverting this towards infrastructure for poor households, this price may have to be paid. The African Centre for Cities study, under which these case studies fall, found that land-based financing is being applied in many cities in sub-saharan Africa. However, it is seldom being applied properly and requires far greater attention than it has been getting to date. It has many advantages over the conventional approach but also requires capacity on the part of local and national government to set sound policy, plan for infrastructure and manage the relationship with developers. A specific recommendation of the study is to gain greater support for development charges as the intervention with the highest potential for relatively immediate, positive impact. 1. Introduction This report provides case study examples of how infrastructure for housing projects is financed across sub-saharan Africa to describe and discuss alternative infrastructure financing mechanisms, their advantages and disadvantages, and the preconditions to their application in different contexts. The report draws on work funded by the UK Department for International Development on Urban infrastructure in sub-saharan Africa harnessing land values, housing and transport, with additional supplementary research and analysis undertaken for this project. The report begins by presenting 11 case studies of housing developments in sub-saharan Africa in Section 2, focussing on who was responsible for financing which components of the infrastructure supporting the development. Section 3 defines the components on infrastructure and their relevance for housing projects before describing the financing mechanisms available. This sets up the analytical framework for evaluating the case studies in Section. The analysis of the various models of infrastructure financing is presented in Section 5 before conclusions are drawn. 2. Property Development Studies Overview This section will present an overview and an explanation of the infrastructure delivery process associated with the 11 different developments in Sub-Saharan Africa, listed in Table 1. Table 1: List of case studies Country City Project name Project type Geographic region in SSA Angola Luanda Kilamba Mixed use but primarily housing project Southern Africa Benin Cotonou Arcon Ville Housing intended for low to middle income but not affordable to low income households West Africa Cameroon Douala Sawa Beach Mixed use mainly housing mid-high income West Africa Cote d Ivoire Abidjan L opération les floraisons Housing some commercial West Africa Ethiopia Addis Ababa Lideta Mixed use, primarily residential East Africa 3 This decision is made at the local government level if local government has the responsibility for infrastructure provision and the land development approval process. If, however, the mandate for infrastructure provision lies with national government or a parastatal, then it is possible that the decision lies outside of local government. But local government will almost always be a player in the urban land development process. More detail on each case study is provided in the Appendix. 3

4 Table 1: List of case studies continued Country City Project name Project type Geographic region in SSA Kenya Nairobi Two Rivers Mixed use commercial & high income residential East Africa Nigeria Lagos Carlton Gate Estate Mixed use mainly housing middle high income West Africa Rwanda Kigali Rwanda Kigali South Africa Cape Town Zimbabwe Harare Gacuriro Estate Phase I Gaposho Estate Phases I & II Housing Middle to high income Housing Middle to high income Central Africa Central Africa Riverstone Villas Housing Middle to high income Southern Africa Budiriro Housing Development Housing meant to be low income but more middle income Southern Africa The developments chosen represent a geographic spread of property developments in Sub-Saharan Africa, yet are not necessarily representative of what is happening on the sub-continent. Angola Luanda: Kilamba Kilamba is a mixed-use public housing development financed by a USD 3.5 billion Chinese credit line granted to the Angolan government. In 201, Kilamba housed residents in 2 multi-storey blocks and the local administration of Kilamba as well as 1 schools, shops, restaurants and a health centre. There are plans to construct an additional apartments and freestanding plots in two subsequent phases. Figure 1: Apartment blocks in Kilamba with signs indicating strengthening Sino-Angolan friendship in Portuguese and Mandarin and CITIC Construction (Picture taken by Sylvia Croese) Land in Kilamba was provided at no cost to the developers. The construction of Kilamba was initially to be financed through an oilbacked loan from a private agency called the China International Fund. However, the loan is now being repaid to the Chinese government with the state oil company Sonangol functioning as an intermediary and guarantor on behalf of the Angolan state. The installation of the bulk and connector infrastructure in Kilamba was part of the state funding package for the project as a whole. This bulk and connector infrastructure included a water treatment plant, a sewage treatment plant, electricity transformers, roads and stormwater infrastructure. Housing on the site was ultimately sold at subsidised rates to consumers, with the subsidies being carried by the State. Interestingly, as part of the construction company, the Chinese contractor is responsible for the ongoing maintenance of the infrastructure in Kilamba.

5 The project was part of the state mass housing programme to overcome the housing deficit in the capital. Apartments in Kilamba were initially put on sale by the state at market prices, presumably in an effort to get a return on investment. However, due to the absence of affordable mortgage finance in Angola very few people bought houses after Kilamba s inauguration in To remedy the situation, the government lowered the prices and proposed a state subsidized rent-to-buy scheme to be paid off over a period of 15 to 20 years. Benin Cotonou: Arcon Ville Arcon Ville is an area 15km from Cotonou airport in the Abomey Calavi local council. The development involves the construction of housing units as part of a government programme to build low cost houses, focused specifically at benefiting low and middle income earners. Due to a shortage of adequate housing across all markets, Arcon Ville has shifted from a low to middle income development to more of a middle income development. Arcon Ville is a subsidised housing development using a public private partnership to provide the required infrastructure and housing top structures. The institutions involved in the development are the private developers (Arcon Ville), commercial banks and the Benin Housing Bank. Figure 2: A completed unit at Arcon Ville (Picture taken by Bernard Tayoh) Access to land for Arcon Ville was facilitated by the national government of Benin while the local council provided road infrastructure to and within the site. The local council also provided bulk sewerage, water, electricity, telecommunications infrastructure and a public health facility. Initial financing of approximately USD 52.2 million was put in place for a pilot phase of 2,100 housing units by the government (via a Treasury bond) and involving direct contributions of two banks: the Benin Housing Bank (BHB) and the Atlantique Bank, a commercial bank. The private finance was to be repaid partly through sale of the units, but also through mortgages provided to the home buyers from the participating banks. However, the state input through the Treasury bond represents a subsidy to reduce the price of all housing types in Arcon Ville, estimated at 25 30% of the price of the units. This subsidy covered the costs associated with the land, bulk and internal services which were provided by the state. These subsidies are justified on the grounds of widening and strengthening the tax-revenue base of the local councils, both directly from the development, but also through increased land tax revenue from peripheral land due to increased land values as a result of the development. Immediately following the demarcation of the land for Arcon Ville, public utility companies proceeded to extend their networks to cover the new zone in anticipation of future demand. While Arcon Ville is regarded as the most successful housing project in Benin, it has been marred by an array of challenges, including the local councils not providing adequate public infrastructure and not setting aside adequate funds for the project. Cameroon Douala: Sawa Beach Sawa Beach is a hectare development with the objective of providing adequate housing to the rising population in Douala, as well as additional space for commercial activities. It is estimated that this development will have housing units targeted at middle to higher income households. The development has been financed through a complex public private partnership arrangement involving the Douala City Council, the state of Cameroon and a foreign private investment firm (of which Douala City Council is a shareholder) and is based on a build, operate and transfer (BOT) arrangement. 5

6 Land for the project was originally owned by the State, and a temporary transfer to the local City Council was arranged under a long-term lease agreement. This lease appears to have been transferred on to the developer or the ultimate occupants, because after 25 years the ownership of the houses will return to the City Council. The City Council is providing all road infrastructure, inside and outside the site, as well as the water treatment and sewerage treatment plants which serve the site. It is assumed that the electricity is being provided to the site at no cost to the developer. The roads were funded through an international loan taken out by the city, but with a state guarantee. The City Council s capital contribution to the infrastructure for the development represents 30% of the total development cost, with the remainder being funded by the private developer. The future revenues from the development over 25 years (presumably a combination of the property taxes, tariffs and rentals) will be shared by the private developer (75%) and the City council and the state (25%). Cote d Ivoire Abidjan: L opération les floraisons L opération les floraisons is a private development which consists of social (low to middle income) housing units on a total area of 90 hectares over three separate but adjacent sites. The development will also contain a medical centre, commercial centre and education centre. Land was acquired through a mix of State land provided to the developer for mass housing and the purchase of land by the developer from traditional land owners (although the purchase was exempt from government taxes). The State also facilitated finance to the developers from financing institutions at a preferential rate. The provision of public infrastructure occurs mainly through the state Ministry of Construction, Housing, Urban Affairs and Sanitation, who has designed and constructed bulk road, electricity, water and sewerage infrastructure. Secondary (connector) and tertiary (internal) roads within the housing complexes are constructed by the developer. Ethiopia Addis Ababa: Lideta The Lideta redevelopment is a 26 hectare area, strategically located in Addis Ababa between two large commercial areas. The site, which was previously occupied largely by unserviced informal dwellings, now contains nine hectares of State housing (low and middle income households) and five hectares of privately held land for commercial or residential activity. The remainder of the land is for roads, other infrastructure, green areas and social services. The State ownership of land in Ethiopia means that there was no problem accessing land for a City-run development like Lideta. Extensive consultation was held with existing residents, resulting in expropriation fees being paid to the residents. All bulk and connector infrastructure in the area was constructed by the City, State or Parastatal, depending on the service. However, it was financed by the revenue generated from the lease of commercial and high income residential land, which is auctioned to the highest bidder. This lease revenue also cross-subsidised the construction of low (and medium) income housing. The first 10% of the lease value collected up front was used to pay for the infrastructure on the site (roads, stormwater, electricity, broadband internet, parks, while the remaining 90% covers ongoing service provision, maintenance and renewal. Figure 3: Lideta Redevelopment site 6

7 Kenya Nairobi: Two Rivers The Two Rivers Development is a mixed use development planned on a 100 acre site between two rivers in Nairobi. It will include 100 to 150 middle and high income apartments, a retail/office block, a stand-alone office block and two high-end diplomatic hotels. All of the internal infrastructure is provided by the developer. Bulk and connector infrastructure provided by the developer includes: n n n n Roads: An underpass and road interchange on a major arterial road. Water supply: To compensate for poor water supply from the City, the developer is providing an independent water supply system consisting of eight boreholes and, at a later stage, a water treatment plant. Sanitation: a wastewater treatment plant is provided with the hope that a connection to the City s sewer network will be possible in the future. Electricity: Initially the development s own generators are used. Ultimately development will receive power from national utility and would then only require its own transformer station. Figure : Artist s impression of Two Rivers complex Nigeria Lagos: Carlton Gate Estate Carlton Gate Estate is one of numerous new gated estates in Nigeria. It is 28.3 hectares, and is a private joint venture development between a developer and a local chieftaincy. It consists of 231 fully serviced plots and contains walkways, green areas and recreational areas. There are also plans to construct schools, banks and other commercial areas. The land was provided by the chieftaincy to the developer, who contributed all of the financing. The developer provided the majority of the bulk and connector infrastructure to the site, including transformers, street lights, internal roads, drains and walkways, telecommunication lines, a bore-hole with water treatment plant and internal gardens and other green amenities. One external bulk road was provided by a private company through a State tolling concession (thus a PPP), which was later bought back by the State. Other public transport infrastructure is provided by the State. 7

8 Figure 5: Typical housing typology with a typical access road within Carlton Gate Estate. Rwanda Kigali: Gacuriro Estate Phase I Gacuriro Estate is a middle to high income residential development consisting of approximately 100 units spread out over 21.8 hectares. The developer is the Rwanda Social Security Board, which is a parastatal entity. The land was expropriated by the national government, through the local government, from existing private land owners at a rate below the market value and subsequently given to the parastatal developer at no charge. The parastatal developer funded the bulk and connector infrastructure, with the cost being recouped through the sale of the houses to individual home buyers. There were spill-over benefits from the infrastructure development, stimulating further government investment in bulk road infrastructure to improve access between the development and the city centre. While this has unlocked further development in the area, the increased land value has not been captured as the state does not appear to charge value-based property taxes. Rwanda Kigali: Gaposho Estate Phases I & II Gaposho Estate is a development of middle to high income residential properties intended for re-housing genocide victims. It is being developed by a government agency acting as an umbrella developer, which has contractual arrangements with various private subsidiary developers. Land was expropriated by the main developer and provided at no cost to the subsidiary developers. All connector and bulk infrastructure was provided to the development by the State/City at no cost. The developer paid for all internal infrastructure, which is recouped from the house sales to the ultimate owners. South Africa Cape Town: Riverstone Villas Housing Development At Riverstone Villas, situated in the outlying suburb of Kraaifontein in Cape Town, a private developer is converting 1.17 hectares of undeveloped land into 51 semi-detached units on individual erven of around 200m2. It is the largest residential development approved using the new development charges policy and calculator introduced by the City of Cape Town in 201. According to the policy, the development charge is a calculation of the difference between the impact on bulk services between the previous and future land uses, which is then multiplied by standard unit costs for each service. The policy covers roads, transport, stormwater, sewerage, water and solid waste. Social infrastructure, electricity, and services provided by other spheres of government are excluded from this policy. Developers are charged under a separate, but similar policy for electricity, while social infrastructure is funded through property rates revenue and national transfers. The unit costs were derived from a comprehensive engineering modelling exercise that projected future growth and the resultant demand and cost of infrastructure to service this demand. The unit costs are city-wide averages and are applied universally to all developments. 8

9 While the policy allows for the developer to offset the development charge against bulk and connector infrastructure that the developer constructs himself, in this case the developer paid the development charge as a single payment prior to development approval being granted by the City. This charge would cover both the cost of historic investments in surplus capacity that the development could utilise, as well as dedicated infrastructure required to serve the development. The breakdown of the calculated demand (impact) of the development on each service, as well as the resulting development charge, is shown in Table 2. The total development charge works out to an average cost of USD per residential unit for bulk infrastructure. Table 2: Table of development impact and calculated development charge for Riverstone Villas (Source: City of Cape Town) Service Units Additional demand Contribution (USD) Roads Trips/day 139 USD Transport Person trips/peak period 58.3 USD Stormwater Ha*C 0.7 USD Sewerage kl/day 19.9 USD Water kl/day 2.5 USD Solid waste kg/day 329 USD Total bulk engineering services component of Development Charges payable USD Zimbabwe Harare: Budiriro Housing Development Budiriro is a unit housing development. It was originally intended as a low income residential development, but the entry requirements for residents (e.g. deposit required) dictate that it will likely be a medium income development. The developer is a joint venture between the City and a private developer, the Central African Building Society. Land was provided to the developer below market price. The developer then provided the infrastructure and developed the houses. The developer was tasked with providing on- and off-site infrastructure. The off-site infrastructure included seven schools, the servicing of commercial stands, service industry stands as well as church stands. The private developer also had to provide the water storage and distribution infrastructure, sewer infrastructure and the electricity connector infrastructure. The on-site infrastructure included the building of culverts and the provision and servicing of internal roads. The off-site infrastructure provided by the developer will also benefit the housing cooperative developing housing in the surrounding suburbs. In addition to the provision of bulk, connector and internal infrastructure, an endowment fee of 10% of the total value of the houses is required to be paid by the developer to the city council before registration and transfer of the houses. Figure 6: Plan and show house for the Budiriro Housing Development 9

10 Issues for Consideration The above case studies present a wide variety of infrastructure provision and financing arrangements. When categorising the different types of infrastructure provision and financing arrangements, the following questions should be asked of each case study: n n n What are the main categories of funding? What are the preconditions for each? What are the advantages and disadvantages of each? The remainder of this report attempts to answer these questions, and place the case studies within a conceptual framework developed by the African Centre for Cities (2015) which categorises and describes land-based financing techniques in sub-saharan Africa. 3. Infrastructure Provision for Housing Development Background Infrastructure provision is an essential part of housing development. Housing can only satisfy basic needs if it is accompanied by the provision of basic services through infrastructure. The infrastructure deficits in African cities are well documented and result in vast areas of cities without access to services and constraints on further development. Over 200 million people, 62% of Sub- Saharan Africa s urban population, live in slums and high urbanisation rates result in the continuing growth of poorly serviced areas (UN-Habitat, 201; Racelma, 2012). While African countries are making progress with infrastructure provision, this progress is insufficient to make sufficient headway in reducing backlogs in access to urban infrastructure and associated services. In the case of adequate electrification, for example, between 2005 and 2008, urban electrification decreased by about 1%, to 57% of people with adequate access, yet the absolute number increased by almost 10 million over the same time period (IEA, 201). In the case of water and sanitation, adequate access in urban areas of Sub-Saharan Africa was only 69% and 3% respectively (Jacobsen, Webster & Vairavamoorthy, 2012). Of equal concern is the limited access to public infrastructure such as public transport systems, parks and community facilities that are central contributors to the quality of life in cities, as well as to their economic efficiency. Defining Infrastructure For the purpose of this case study, infrastructure is defined in two categories: engineered infrastructure and social infrastructure. Engineered infrastructure provides engineering services (water, sanitation, electricity, transport and solid waste) at multiple scales, while social infrastructure (schools, health facilities etc.) provides social services to individuals. In order to understand how infrastructure is financed as part of the development process, it is necessary first to describe the components of engineered and social infrastructure, as presented in Table 3: below, because the finance mechanisms for each may vary. Table 3: Components of engineered and social infrastructure Service Component Description Engineered infrastructure Bulk infrastructure Bulk infrastructure is large scale infrastructure serving cities and towns as a whole. It includes: n The water supply infrastructure taking water from the resource, treating it and delivering it through pipelines and pumping stations to distribution reservoirs within cities and towns. n Wastewater infrastructure including outfall sewers transferring wastewater (sewage) from the city or town, treating it and returning the treated effluent to the river or other water body. n Electricity infrastructure to transmit and transform electricity from the national grid to sub-stations within cities and towns. n Distribution roads and public transport networks including the main arterial roads within a city linking nodes and linking to the periphery of the city. Typically they are dual carriageway or larger roads. n Solid waste landfills and recycling or alternative disposal facilities. Social infrastructure Connector infrastructure Internal infrastructure Social and community infrastructure The connector infrastructure is the infrastructure linking the bulk infrastructure to the individual suburb or property development. It includes water distribution reservoirs and connector pipelines; collector sewers; medium voltage powerlines and transformers; and collector roads (linking suburbs to the distributor road network). Pipelines, sewers, access roads and low voltage powerlines running within suburbs and property developments, including the connections to plots with meters and on site sanitation systems. Schools and other education facilities; health facilities; libraries; sports and recreation facilities; parks and squares; and buildings for security and emergency services

11 How does infrastructure fit into housing project costs? Although different housing projects in different locations may receive different levels of service, it is possible to define a typical housing package, including all infrastructure that enables the project to be integrated into a fully functional urban area. This package comprises: a) The building, sometimes referred to as top structure or dwelling unit. b) Land including the cost of purchase, sub-division and registration. c) Internal infrastructure. d) Bulk and connector infrastructure. e) Social and community infrastructure. The distinction of these components of the housing package is necessary because the responsibility and mechanism for financing each of these different components can, and often does, differ. Who provides and finances the property development and associated infrastructure? The conventional approach to funding property development is that the developer provides and funds the building, land and internal infrastructure (effectively everything within the boundary of the area being developed). The city, possibly with the assistance of national government and parastatals, provides and funds the bulk, connector, social and community infrastructure. In the case of low-income housing, the developer is often the city or state, in which case the internal infrastructure is provided with public funding as well. The rationale for this conventional approach is that bulk, connector and social infrastructure are public goods, resulting in positive externalities through its provision. In addition, it is important that this infrastructure is planned on a city-wide basis to function efficiently as complete, integrated and inter-dependent systems. The result of this conventional approach is that the city establishes the platform upon which developers build residential, commercial and industrial property. Cities will recoup this investment through revenues generated through rates and tariffs over time. Sources of infrastructure finance The conventional approach is only effective if the city and its partners can raise sufficient capital to fund the bulk, connector, social and community infrastructure and ensure sufficient future revenue to recover this cost. The reality is that in the majority, if not all, cities in Africa this does not happen: cities and parastatals cannot raise sufficient capital, either from reserves or through borrowing, even with the assistance of national government. Therefore, infrastructure is not provided where and when it is required. This stalls the property development process for middle to high income residential property and, of greater concern, means poor households do not get access to infrastructure and the associated services they need to survive. The figure below, drawn from ACC (2015), illustrates the four main sources of infrastructure finance and relates these sources to their applicability in cities in various stages of evolution: from survivalist cities with serious financial constraints on the left hand of the horizontal axis, to mature cities with surplus revenue for investment on the right hand side. Each of these sources is discussed in more detail below (ACC, 2015). Figure 7: Transition for main revenue-raising options for infrastructure investment Source: ACC (2015:12) 11

12 City s own finance (reserves and borrowing): Survival-stage cities cannot provide adequate capital funding although the situation improves progressively as a city evolves and more reliable and consistent future revenue streams are created. Cities have greater capacity to borrow for services for which consumers pay directly (e.g. water and electricity). Transfers and donations: Transfers include tax sharing, general-purpose grants and specific purpose grants. Also included in this category are donations (sometimes called grant funding) provided by international development agencies and other donors. Service provider funding (borrowing and equity): Service providers external to the city, such as a parastatal (utility) publicprivate partnerships (PPPs), are appointed by the city or mandated by national government to provide services, including the provision of capital funding, in return for capturing future revenue, or future national grant funding. In sub-saharan Africa, few PPPs provide urban infrastructure (Paulais, 2012), although the provision of services by parastatals is common (ACC, 2015). In most countries, national parastatals provide electricity with little or no private sector participation (Eberhard et al., 2008; Foster, 2008). Parastatals also provide water and wastewater services, with parastatals owned by local authorities being the most common (Banerjee et al., 2008). Land-based financing: Land-based financing is a means for transferring the obligation for funding and possibly provision of bulk and connector infrastructure from the city to the developer and property owners. It is a broad term that encompasses a range of instruments that can be used to cover different components of infrastructure. The important point to note from the shape of the graph in Figure 7 is that land-based financing can function even for cities in survival mode, because in some of these survival cities, pockets of very high-value land are found, mainly because they fall within areas that are both well located and have some access to infrastructure. Framework for understanding the mix of public and private infrastructure funding through land-based financing Land-based financing becomes an important funding option when considering the limited extent to which transfers, city ownsource revenues and service provider funding are able to cover the infrastructure investments required for cities in sub-saharan Africa to function effectively. Figure 8: Components of property developments and the land-based financing spectrum Source: ACC (2015:12) y Figure 8 indicates the concept of a shared responsibility for financing the full cost of a property to all parties involved. This is simplified to the sharing of costs between the private sector (above the diagonal line) and public sector (below the diagonal line). The conventional property package referred to above is the point of no land-based financing on the diagram as the property developer finances only the cost of building, land and internal infrastructure. Land-based financing, in the broadest interpretation applied here, takes place as one moves to the right of the diagram with the private sector (developer and property owners) progressively financing connector infrastructure, bulk infrastructure and social and community infrastructure components that would otherwise have had to be financed by the public sector. At the very left an assumption is made that the property development will also provide for a contribution towards the financing of infrastructure to support low income housing, whether this be part of the property development or external to it. 12

13 As one moves from the no land-based financing position towards the left of the diagram this becomes what could be called reverse land-based financing in the sense that the public sector, either the city or the state, is funding the internal infrastructure, land and ultimately the cost of buildings (typically housing units). More conventionally this can be considered a subsidy to the property owners. Finally it needs to be noted that the order in which the components of a property development are layered is not important. For example, it is possible for a property developer to cross subsidise low income housing (typically within the development) but not bulk and connector infrastructure. This remains a form of land-based financing. Financing instruments under the land-based financing umbrella The term land-based financing incorporates land value capture (LVC) which can be defined as a public financing method by which governments (a) trigger an increase in land values via regulatory decisions (e.g., change in land use or floor are ratio) and/or infrastructure investments (e.g., transit); (b) institute a process to share this land value increment by capturing part or all of the change; and (c) use LVC proceeds to finance infrastructure investments (Suzuki, et al 2015). In addition to the land value capture component, land based financing includes financing of infrastructure by property developers, regardless of whether this increases the value of properties. Land based financing can also be seen as an umbrella term for a number of financing instruments which are summarised in Figure 9. Figure 9: Diagram showing land-based financing instruments as they apply across the property development and infrastructure provision spectrum Source: ACC (2015:12) Some of the instruments are more effective for cities in the early stages of evolution and others become effective as cities evolve and have the more complex administrative arrangements in place to support these more sophisticated instruments on the right hand side of Figure 9. Advantages, disadvantages and preconditions for the various sources of infrastructure financing City s own finance (reserves and borrowing) Advantages Cities can plan and budget for infrastructure in a coordinated and strategic way with full control. They may be able raise finance at better rates than the private sector and pay for it over a longer period. In addition, cities are able to plan the total range of infrastructure, not only those that are specific to the development. Disadvantages Cities would need to build up substantial reserves to fund expensive infrastructure, resulting in a perception of cities as making profit, which is politically problematic. There is also an inter-generational problem where current ratepayers are funding investment in infrastructure for future ratepayers. 13

14 Preconditions The precondition for the use of city finance is general financial health and sufficient revenue to be reinvested in infrastructure. Although cities with minimal revenue may still choose to invest some of it in infrastructure, where finances are constrained, revenues tend to be prioritised to cover operating expenditure. Transfers and donations Advantages Depending on the conditions associated with the transfers or donations, national government or donors have some control over the investment. It is possible to direct significant sources of money (e.g. national tax revenue) into a strategic investment. There is no financial implication for the developer or ultimate beneficiary, which may be necessary to stimulate development or to benefit targeted groups. Disadvantages Transfers or donations introduce market distortions that may impact on other developments. The source of the transfer or donation (national or international taxpayers, usually) can be cross-subsidising private developers who may make a profit as a result of the subsidies. Preconditions The availability of transfers (from national government) and donations (from other governments or aid agencies) depends on the national policy and the policies of international development partners, but the level of transfers from national government to fund urban infrastructure is highly variable based on the health of the national fiscus. Service provider funding (borrowing and equity) Advantages Service providers may have stronger balance sheets or access to discounted finance that may not be accessible to other parties. Ring-fenced utility services can have reliable revenue streams that enable borrowing. The service provider also has the ability to plan and budget for their specific infrastructure service at a city-wide or even national scale. Disadvantages Cities or developers may be beholden to external parties (parastatals or private utilities) to budget and plan infrastructure. The priorities of the service provider may not align with those of the city or the development, resulting in stalling the development process. Preconditions The ability for service providers to provide either borrowing or equity depends on the reliability of the future revenue stream created by the infrastructure. PPPs only succeed where the private sector is guaranteed return on investment, or where state guarantees are provided to cover any shortfall. Typically, parastatals often do not have the fiscal resources or financial viability to raise their own finance and thus rely heavily on national government for finance. Land-based financing Advantages The financing is provided by the actual users of the infrastructure and the incidence of the cost is therefore more equitable. Disadvantages Different types of land-based finance instruments have different disadvantages. Some of the instruments (like property tax or Tax Increment Financing) require complex administrative systems and capacity, while others (like in kind contributions) provide an opportunity for abuse by either party. In addition, the financing of infrastructure by individual developers can result in infrastructure being provided in a fragmented manner that does not promote system integration and efficiency. Preconditions While individual land-based financing instruments can work even in cities where land use administrative processes are weak and fragile, they will work optimally in cities where the following preconditions are met (ACC, 2015:viii): n There is an effective demand for property, generated by the city s economy, as well as an effective supply of developable land, which is determined by the ease of access to land rights, the strength of the property development sector and access to property finance. n There is a sufficiently effective state, providing regulatory, governance and policy framework that is conducive to land-based financing, as well as effective cities with the legal status, political support, and financial and technical capacity to implement land-based financing. 1

Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport

Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport Guideline for Cities in Sub-Saharan Africa on applying Land-Based Financing for urban infrastructure finance Report

More information

Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport

Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport Sub-Saharan Africa property development overview with implications for land-based financing Report No 1.6 Final

More information

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows:

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows: 1 ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING Constitution Section 26 of the Constitution enshrines the right to housing as follows: Everyone has the right to have access to adequate housing The

More information

Planning for better housing delivery in Africa. Adelaide Steedley

Planning for better housing delivery in Africa. Adelaide Steedley Planning for better housing delivery in Africa Adelaide Steedley Agenda overview Who we are African story = growth Growth = importance of planning Planning in Africa Supporting that effort 2 Centre for

More information

REDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS

REDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS GUIDELINES FOR PREPARING PROJECT PROPOSALS INTRODUCTION SHELTER-AFRIQUE's major objective is to promote housing in Africa. In order to achieve this objective, the Company cooperates with private sector,

More information

BOROUGH OF POOLE BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016

BOROUGH OF POOLE BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016 BOROUGH OF POOLE AGENDA ITEM 7 BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016 DEVELOPING A COMMERCIAL APPROACH TO THE USE OF ASSETS REPORT OF THE STRATEGIC DIRECTOR

More information

Public Interventions in Urban Land Markets: An Overview with African Highlights. Part 1: Land Markets, Regulation and Welfare

Public Interventions in Urban Land Markets: An Overview with African Highlights. Part 1: Land Markets, Regulation and Welfare Public Interventions in Urban Land Markets: An Overview with African Highlights Presentation at the 4 th World Urban Forum, Nanjing, China November 2008 Robin Rajack World Bank Part 1: Land Markets, Regulation

More information

POLICY FOR THE DISPOSAL OF THE MUNICIPALITY S LAND AND

POLICY FOR THE DISPOSAL OF THE MUNICIPALITY S LAND AND POLICY FOR THE DISPOSAL OF THE MUNICIPALITY S LAND AND OTHER IMMOVABLE CAPITAL ASSETS Approved by Council on 1 September 2005 under item 38A14, with effect from 1 October 2005, and further amended by Council

More information

THE EFFECTS OF THE PUBLIC SECTOR SPENDING CUTS SINCE 2010 ON ASSET MANAGEMENT

THE EFFECTS OF THE PUBLIC SECTOR SPENDING CUTS SINCE 2010 ON ASSET MANAGEMENT THE EFFECTS OF THE PUBLIC SECTOR SPENDING CUTS SINCE 2010 ON ASSET MANAGEMENT Jane Taylor, CIPFA Property Jane Taylor is a Property Advisor within the CIPFA group with a remit for helping practitioners

More information

DRAFT REPORT. Boudreau Developments Ltd. Hole s Site - The Botanica: Fiscal Impact Analysis. December 18, 2012

DRAFT REPORT. Boudreau Developments Ltd. Hole s Site - The Botanica: Fiscal Impact Analysis. December 18, 2012 Boudreau Developments Ltd. Hole s Site - The Botanica: Fiscal Impact Analysis DRAFT REPORT December 18, 2012 2220 Sun Life Place 10123-99 St. Edmonton, Alberta T5J 3H1 T 780.425.6741 F 780.426.3737 www.think-applications.com

More information

in Sub-Saharan Africa harnessing land values, housing and transport

in Sub-Saharan Africa harnessing land values, housing and transport Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport Final report on land-based financing for urban infrastructure in sub-saharan African cities Chris Kirchhoff, MediaClubSouthAfrica.com

More information

B8 Can public sector land help solve the housing crisis?

B8 Can public sector land help solve the housing crisis? B8 Can public sector land help solve the housing crisis? Speakers: Chair: Claire O Shaughnessy Head of Land and Regeneration Homes and Communities Agency Clive Skidmore Head of Regeneration and Development

More information

INVENTORY POLICY For Real Property

INVENTORY POLICY For Real Property INVENTORY POLICY For Real Property (Broader Public Sector Entities) Page 1-12 CONTENTS 1. TITLE... 3 2. OVERVIEW... 3 3. PURPOSE... 3 4. POLICY STATEMENT... 3 5. APPLICATION... 7 6. EVALUATION AND REVIEW...

More information

Summary of Sustainable Financing of Housing Public Hearings November 2012

Summary of Sustainable Financing of Housing Public Hearings November 2012 Summary of Sustainable Financing of Housing Public Hearings November 2012 For an Equitable Sharing of National Revenue 10 December 2012 Financial and Fiscal Commission Montrose Place (2nd Floor), Bekker

More information

The Characteristics of Land Readjustment Systems in Japan, Thailand, and Mongolia and an Evaluation of the Applicability to Developing Countries

The Characteristics of Land Readjustment Systems in Japan, Thailand, and Mongolia and an Evaluation of the Applicability to Developing Countries ISCP2014 Hanoi, Vietnam Proceedings of International Symposium on City Planning 2014 The Characteristics of Land Readjustment Systems in Japan, Thailand, and Mongolia and an Evaluation of the Applicability

More information

Urban housing in Sub-Saharan Africa: pro-poor finance challenges and models

Urban housing in Sub-Saharan Africa: pro-poor finance challenges and models 1 Urban housing in Sub-Saharan Africa: pro-poor finance challenges and models World Habitat Day Conference on Urbanisation and Affordable Housing The Oslo School of Architecture and Design 2 October 2017

More information

Presenter: Arch. Emma Miloyo President (Architectural Association of Kenya)

Presenter: Arch. Emma Miloyo President (Architectural Association of Kenya) Presenter: Arch. Emma Miloyo President (Architectural Association of Kenya) Q2: Unlocking government s land bank to serve local and foreign investors - how will this roll out? There is no one single

More information

Business and Property Committee

Business and Property Committee Business and Property Committee Item No Report title: Direct Property Development Company Date of meeting: 20 June 2017 Responsible Chief Executive Director of Finance and Officer: Commercial Services

More information

Urban Land Policy and Housing for Poor and Women in Amhara Region: The Case of Bahir Dar City. Eskedar Birhan Endashaw

Urban Land Policy and Housing for Poor and Women in Amhara Region: The Case of Bahir Dar City. Eskedar Birhan Endashaw Urban Land Policy and Housing for Poor and Women in Amhara Region: The Case of Bahir Dar City Bahir Dar University, Institute Of Land Administration Eskedar Birhan Endashaw Session agenda: Land Policy

More information

Good Land Governance for the 2030 Agenda

Good Land Governance for the 2030 Agenda Good Land Governance for the 2030 Agenda Addis Ababa, Ethiopia 20-22 April, 2014 Role of Geospatial Information in Good Land Policy and Governance Oumar Sylla UN-Habitat/GLTN oumar.sylla@unhabitat.org

More information

Implementation of a PPP Transaction in the Rural Water Sector in Uganda. IFC - PPP Transaction Advisory Dakar, June 4, 2012

Implementation of a PPP Transaction in the Rural Water Sector in Uganda. IFC - PPP Transaction Advisory Dakar, June 4, 2012 Implementation of a PPP Transaction in the Rural Water Sector in Uganda IFC - PPP Transaction Advisory Dakar, June 4, 2012 Outline What is a small scale PPP and What are the Main characteristics? Main

More information

THE APPLICATION OF GIS AND LIS Solutions and Experiences in East Africa. Lenny Kivuti

THE APPLICATION OF GIS AND LIS Solutions and Experiences in East Africa. Lenny Kivuti Using GIS and LIS for Planning Sustainable Development Bepic Group CHOGM, Malta 2005 THE APPLICATION OF GIS AND LIS Solutions and Experiences in East Africa Lenny Kivuti 21 November, 2005 Presented by

More information

Statement of Proposal

Statement of Proposal Christchurch City Council Statement of Proposal that the Council Restructures its Social Housing Portfolio Contents 1 Statement of Proposal 7 Attachment A: Description of Options for Social Housing Portfolio

More information

Stocktaking of the housing sector in Sub-Saharan Africa CHALLENGES AND OPPORTUNITIES

Stocktaking of the housing sector in Sub-Saharan Africa CHALLENGES AND OPPORTUNITIES Stocktaking of the housing sector in Sub-Saharan Africa CHALLENGES AND OPPORTUNITIES » Why housing matters» Housing in Africa: key facts» Housing in Africa: trend-drivers» Recommendations for an inclusive

More information

The South Australian Housing Trust Triennial Review to

The South Australian Housing Trust Triennial Review to The South Australian Housing Trust Triennial Review 2013-14 to 2016-17 Purpose of the review The review of the South Australian Housing Trust (SAHT) reflects on the activities and performance of the SAHT

More information

Mark Napier, Remy Sietchiping, Caroline Kihato, Rob McGaffin ANNUAL WORLD BANK CONFERENCE ON LAND AND POVERTY

Mark Napier, Remy Sietchiping, Caroline Kihato, Rob McGaffin ANNUAL WORLD BANK CONFERENCE ON LAND AND POVERTY Mark Napier, Remy Sietchiping, Caroline Kihato, Rob McGaffin ANNUAL WORLD BANK CONFERENCE ON LAND AND POVERTY RES4: Addressing the urban challenge: Are there promising examples in Africa? Tuesday, April

More information

Community Housing Federation of Victoria Inclusionary Zoning Position and Capability Statement

Community Housing Federation of Victoria Inclusionary Zoning Position and Capability Statement Community Housing Federation of Victoria Inclusionary Zoning Position and Capability Statement December 2015 Introduction The Community Housing Federation of Victoria (CHFV) strongly supports the development

More information

Local Authority Housing Companies

Local Authority Housing Companies Briefing 17-44 November 2017 Local Authority Housing Companies To: All Contacts Key Issues There has been a rise in the number of Local Authority Housing Companies that have been established and APSE has

More information

IAG Conference Accounting Update Emerging issues in the public sector 20 November 2014 Michael Crowe Yannick Maurice

IAG Conference Accounting Update Emerging issues in the public sector 20 November 2014 Michael Crowe Yannick Maurice www.pwc.com.au IAG Conference Accounting Update Emerging issues in the public sector 20 November 2014 Michael Crowe Yannick Maurice Agenda Introduction Key topics o Fair value o PPP Projects Refinancing

More information

Saskatchewan Municipal Financing Tools

Saskatchewan Municipal Financing Tools Saskatchewan Municipal Financing Tools The following is a list of financing tools currently available to Saskatchewan municipalities. Authority for a municipality to use any of these tools is provided

More information

CENTRAL GOVERNMENT ACCOUNTING STANDARDS

CENTRAL GOVERNMENT ACCOUNTING STANDARDS CENTRAL GOVERNMENT ACCOUNTING STANDARDS NOVEMBER 2016 STANDARD 4 Requirements STANDARD 5 INTANGIBLE ASSETS INTRODUCTION... 75 I. CENTRAL GOVERNMENT S SPECIALISED ASSETS... 75 I.1. The collection of sovereign

More information

Strengthening the Capacity of the Housing Sector in Iraq

Strengthening the Capacity of the Housing Sector in Iraq STRENGTHENING SPECIALIZATION OF CAPACITY COVERED OF BOND HOUSING ISSUERS SECTOR IN EUROPE IN IRAQ Strengthening the Capacity of the Housing Sector in Iraq By Gabriel Nagy, UN-Habitat Iraq Programme Introduction

More information

In December 2003 the IASB issued a revised IAS 40 as part of its initial agenda of technical projects.

In December 2003 the IASB issued a revised IAS 40 as part of its initial agenda of technical projects. International Accounting Standard 40 Investment Property In April 2001 the International Accounting Standards Board (IASB) adopted IAS 40 Investment Property, which had originally been issued by the International

More information

In December 2003 the Board issued a revised IAS 40 as part of its initial agenda of technical projects.

In December 2003 the Board issued a revised IAS 40 as part of its initial agenda of technical projects. IAS Standard 40 Investment Property In April 2001 the International Accounting Standards Board (the Board) adopted IAS 40 Investment Property, which had originally been issued by the International Accounting

More information

Community & Infrastructure Services Committee

Community & Infrastructure Services Committee REPORT TO: DATE OF MEETING: September 12, 2016 Community & Infrastructure Services Committee SUBMITTED BY: Alain Pinard, Director of Planning, 519-741-2200 ext. 7319 PREPARED BY: Natalie Goss, Senior Planner,

More information

Lease modifications. Accounting for changes to lease contracts IFRS 16. September kpmg.com/ifrs

Lease modifications. Accounting for changes to lease contracts IFRS 16. September kpmg.com/ifrs Lease modifications Accounting for changes to lease contracts IFRS 16 September 2018 kpmg.com/ifrs Contents Contents Accounting for changes 1 1 At a glance 2 1.1 Key facts 2 1.2 Key impacts 3 2 Key concepts

More information

Some Possible Unintended Consequences of Land Use and Housing Policies: THE CASE OF ACCRA, GHANA

Some Possible Unintended Consequences of Land Use and Housing Policies: THE CASE OF ACCRA, GHANA Some Possible Unintended Consequences of Land Use and Housing Policies: THE CASE OF ACCRA, GHANA Robert Buckley Ashna Mathema Urban Land Use and Land Markets: Urban Symposium The World Bank May 14, 2007

More information

Settlement Pattern & Form with service costs analysis Preliminary Report

Settlement Pattern & Form with service costs analysis Preliminary Report Settlement Pattern & Form with service costs analysis Preliminary Report Prepared for Regional Planning Halifax Regional Municipality by Financial Services, HRM May 15, 2004 TABLE OF CONTENTS INTRODUCTION...

More information

BARNSLEY METROPOLITAN BOROUGH COUNCIL

BARNSLEY METROPOLITAN BOROUGH COUNCIL BARNSLEY METROPOLITAN BOROUGH COUNCIL This matter is a Key Decision within the Council s definition and has been included in the relevant Forward Plan. 1. Purpose of Report BMBC Housing Development Longcar

More information

Consultation Response

Consultation Response Neighbourhoods and Sustainability Consultation Response Title: New Partnerships in Affordable Housing Lion Court 25 Procter Street London WC1V 6NY Reference: NS.DV.2005.RS.03 Tel: 020 7067 1010 Fax: 020

More information

South African Council for Town and Regional Planners

South African Council for Town and Regional Planners TARIFF OF FEES South African Council for Town and Regional Planners PLEASE NOTE : THE TARIFF OF FEES WAS APPROVED BY THE COUNCIL CHAPTER 10 : TARIFF OF FEES 10.1 INTRODUCTION 10.1.1 General This tariff

More information

VUMELA PRODUCT. A Product for the Funding and Implementation of Municipal Bulk Infrastructure to Unlock Catalytic Property / Housing Developments

VUMELA PRODUCT. A Product for the Funding and Implementation of Municipal Bulk Infrastructure to Unlock Catalytic Property / Housing Developments VUMELA PRODUCT A Product for the Funding and Implementation of Municipal Bulk Infrastructure to Unlock Catalytic Property / Housing Developments Background and introduction The provision of the bulk infrastructure

More information

GLTN Tools and Approaches in Support of Land Policy Implementation in Africa

GLTN Tools and Approaches in Support of Land Policy Implementation in Africa GLTN Tools and Approaches in Support of Land Policy Implementation in Africa Jamal Browne (UN-Habitat), Jaap Zevenbergen (ITC), Danilo Antonio (UN-Habitat), Solomon Haile (UN-Habitat) Land Policy Development

More information

Progress on the government estate strategy

Progress on the government estate strategy Report by the Comptroller and Auditor General Cabinet Office Progress on the government estate strategy HC 1131 SESSION 2016-17 25 APRIL 2017 4 Key facts Progress on the government estate strategy Key

More information

Results of UN-Habitat s work in Angola, Ethiopia, Mozambique and Rwanda

Results of UN-Habitat s work in Angola, Ethiopia, Mozambique and Rwanda Country Presentation for the CPR Committee Meeting Results of UN-Habitat s work in Angola, Ethiopia, Mozambique and Rwanda Presented by the Regional Office for Africa 21 March 2018 Background The Regional

More information

Housing Costs and Policies

Housing Costs and Policies Housing Costs and Policies Presentation to Economic Society of Australia NSW Branch 19 May 2016 Peter Abelson Applied Economics Context and Acknowledgements Applied Economics P/L was commissioned by NSW

More information

Findings: City of Johannesburg

Findings: City of Johannesburg Findings: City of Johannesburg What s inside High-level Market Overview Housing Performance Index Affordability and the Housing Gap Leveraging Equity Understanding Housing Markets in Johannesburg, South

More information

AN OVERVIEW OF LAND TOOLS IN SUB- SAHARAN AFRICA: PAST, PRESENT AND FUTURE

AN OVERVIEW OF LAND TOOLS IN SUB- SAHARAN AFRICA: PAST, PRESENT AND FUTURE AN OVERVIEW OF LAND TOOLS IN SUB- SAHARAN AFRICA: PAST, PRESENT AND FUTURE BY CLARISSA AUGUSTINUS CHIEF, LAND AND TENURE SECTION UNHABITAT Nairobi, 11-11-2004 WHY UN-HABITAT HAS CO-SPONSORED THIS EGM UN-HABITAT

More information

The cost of increasing social and affordable housing supply in New South Wales

The cost of increasing social and affordable housing supply in New South Wales The cost of increasing social and affordable housing supply in New South Wales Prepared for Shelter NSW Date December 2014 Prepared by Emilio Ferrer 0412 2512 701 eferrer@sphere.com.au 1 Contents 1 Background

More information

Fair value implications for the real estate sector and example disclosures for real estate entities. Applying IFRS in Real Estate

Fair value implications for the real estate sector and example disclosures for real estate entities. Applying IFRS in Real Estate Applying IFRS in Real Estate IFRS 13 Fair Value Measurement Fair value implications for the real estate sector and example disclosures for real estate entities January 2013 Contents Introduction... 2 Section

More information

Mass Housing Development Blueprint: The Case of Namibia

Mass Housing Development Blueprint: The Case of Namibia Mass Housing Development Blueprint: The Case of Namibia Charl-Thom Bayer Department of Land and Property Sciences Governance in Africa 15-17 1. How is Policy Informed Nationally and Regionally? 2. How

More information

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005.

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005. CITY CLERK Consolidated Clause in Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005. 3 Regent Park Revitalization - Financial Strategy (Ward 28) City Council on July 19, 20,

More information

Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport

Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport Urban infrastructure in Sub-Saharan Africa harnessing land values, housing and transport Inception Phase Document 3 of 3 Literature review on land value capture and infrastructure finance Version 2 Preliminary

More information

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes ) Assets, Regeneration & Growth Committee 17 March 2016 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Development of new affordable homes by Barnet Homes Registered Provider

More information

Key findings from an investigation into low- and medium-value property sales. National Audit Office September 2017 DP

Key findings from an investigation into low- and medium-value property sales. National Audit Office September 2017 DP from an investigation into low- and medium-value property sales National Audit Office September 207 DP 557-00 from an investigation into low- and medium-value property sales Contents 3 4 5 6 7 8 9 0 2

More information

Council 20 December Midlothian Strategic Housing Investment Plan 2017/ /22. Report by Eibhlin McHugh, Joint Director, Health & Social Care

Council 20 December Midlothian Strategic Housing Investment Plan 2017/ /22. Report by Eibhlin McHugh, Joint Director, Health & Social Care Council 20 December 2016 Midlothian Strategic Housing Investment Plan 2017/18 2021/22 Report by Eibhlin McHugh, Joint Director, Health & Social Care 1 Purpose of Report This Report summarises the key points

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Project name Country: Republic of the Union of Myanmar (Myanmar) Project name: Housing Finance Development Project L/A signing date: March 29, 2018 Approved

More information

PIP practice note 1 planning assumptions. How to use this practice note. Planning assumptions. What are planning assumptions? Type.

PIP practice note 1 planning assumptions. How to use this practice note. Planning assumptions. What are planning assumptions? Type. PIP PRACTICE NOTE 1 How to use this practice note This practice note has been prepared to support in the preparation or amending of planning assumptions within a priority infrastructure plan (PIP). It

More information

Douja Promotion Groupe Addoha. An African leader of Real Estate Development

Douja Promotion Groupe Addoha. An African leader of Real Estate Development Douja Promotion Groupe Addoha An African leader of Real Estate Development Summary I II III IV V Addoha Group: Strong fundamentals & a clear focus Development in Morocco Development in Africa Key highlights

More information

Housing for Tsunami Victims. Town House - A sustainable alternative to walk-up flats

Housing for Tsunami Victims. Town House - A sustainable alternative to walk-up flats Housing for Tsunami Victims. Town House - A sustainable alternative to walk-up flats 1 INTRODUCTION. Economic and Social sustainability is of paramount importance in any development plan. Re-housing the

More information

NSW Affordable Housing Guidelines. August 2012

NSW Affordable Housing Guidelines. August 2012 August 2012 NSW AFFORDABLE HOUSING GUIDELINES TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 DEFINITION OF KEY TERMS... 1 3.0 APPLICATION OF GUIDELINES... 2 4.0 PRINCIPLES... 2 4.1 Relationships and partnerships...

More information

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

OFFICE OF THE CITY ADMINISTRATIVE OFFICER REPORT FROM OFFICE OF THE CITY ADMINISTRATIVE OFFICER Date: To: From: Reference: October 28, 2014 The Honorable Members of the City Council Miguel A. Santana, City Administrative Officer Chair Municipal

More information

WORLD BANK/IFC 6 TH GLOBAL HOUSING FINANCE CONFERENCE, AFFORDABLE HOUSING FINANCE: THE ROLE OF GOVERNMENT MRS AKON EYAKENYI

WORLD BANK/IFC 6 TH GLOBAL HOUSING FINANCE CONFERENCE, AFFORDABLE HOUSING FINANCE: THE ROLE OF GOVERNMENT MRS AKON EYAKENYI WORLD BANK/IFC 6 TH GLOBAL HOUSING FINANCE CONFERENCE, 28-29 MAY, 2014, WASHINGTON DC, UNITED STATES OF AMERICA. PRESENTATION ON AFFORDABLE HOUSING FINANCE: THE ROLE OF GOVERNMENT BY: MRS AKON EYAKENYI

More information

7. IMPLEMENTATION STRATEGIES

7. IMPLEMENTATION STRATEGIES 7. IMPLEMENTATION STRATEGIES A. GENERAL APPROACH FOR IMPLEMENTATION Implementing the plan will engage many players, including the Municipality of Anchorage (MOA), the Government Hill Community Council,

More information

APPENDIX A BABERGH AND MID SUFFOLK JOINT AFFORDABLE HOMES 3-YEAR ROLLING DEVELOPMENT STRATEGY COMMENCING 2017

APPENDIX A BABERGH AND MID SUFFOLK JOINT AFFORDABLE HOMES 3-YEAR ROLLING DEVELOPMENT STRATEGY COMMENCING 2017 APPENDIX A BABERGH AND MID SUFFOLK JOINT AFFORDABLE HOMES 3-YEAR ROLLING DEVELOPMENT STRATEGY COMMENCING 2017 BABERGH AND MID SUFFOLK JOINT AFFORDABLE HOMES 3 YEAR ROLLING DEVELOPMENT STRATEGY COMMENCING

More information

Bending the Cost Curve Solutions to Expand the Supply of Affordable Rentals. Executive Summary

Bending the Cost Curve Solutions to Expand the Supply of Affordable Rentals. Executive Summary Bending the Cost Curve Solutions to Expand the Supply of Affordable Rentals Executive Summary Why Bending the Cost Curve Matters The need for affordable rental housing is on the rise. According to The

More information

Sri Lanka Accounting Standard LKAS 40. Investment Property

Sri Lanka Accounting Standard LKAS 40. Investment Property Sri Lanka Accounting Standard LKAS 40 Investment Property LKAS 40 CONTENTS SRI LANKA ACCOUNTING STANDARD LKAS 40 INVESTMENT PROPERTY paragraphs OBJECTIVE 1 SCOPE 2 DEFINITIONS 5 CLASSIFICATION OF PROPERTY

More information

INVENTORY POLICY For Real Property

INVENTORY POLICY For Real Property INVENTORY POLICY For Real Property (Consolidated Revenue Fund Entities) Page 1-10 CONTENTS 1. TITLE... 3 2. OVERVIEW... 3 3. PURPOSE... 3 4. POLICY STATEMENT... 3 5. APPLICATION... 7 6. EVALUATION AND

More information

Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES. Definitions

Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES. Definitions Chapter 8 VALUATION OF AND INFORMATION ON PROPERTIES Definitions 8.01 In this Chapter:- (1) carrying amount means, for an applicant, the amount at which an asset is recognised in the most recent audited

More information

Orange Water and Sewer Authority Water and Sewer System Development Fee Study

Orange Water and Sewer Authority Water and Sewer System Development Fee Study Orange Water and Sewer Authority Water and Sewer System Development Fee Study March 6, 2018 March 6, 2018 Mr. Stephen Winters Director of Finance and Customer Service 400 Jones Ferry Road Carrboro, NC

More information

Fact Sheet Downtown Wasaga Beach Community Improvement Plan

Fact Sheet Downtown Wasaga Beach Community Improvement Plan Fact Sheet Downtown Wasaga Beach Community Improvement Plan 1) What is a Community Improvement Plan ( CIP )? Answer: A Community Improvement Plan (CIP) is a planning tool under the Planning Act that allows

More information

Assets, Regeneration & Growth Committee 11 July Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Assets, Regeneration & Growth Committee 11 July Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes ) Assets, Regeneration & Growth Committee 11 July 2016 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Development of new affordable homes by Barnet Homes Registered Provider (

More information

COMPARISON OF THE LONG-TERM COST OF SHELTER ALLOWANCES AND NON-PROFIT HOUSING

COMPARISON OF THE LONG-TERM COST OF SHELTER ALLOWANCES AND NON-PROFIT HOUSING COMPARISON OF THE LONG-TERM COST OF SHELTER ALLOWANCES AND NON-PROFIT HOUSING Prepared for The Fair Rental Policy Organization of Ontario By Clayton Research Associates Limited October, 1993 EXECUTIVE

More information

Business Combinations

Business Combinations Business Combinations Indian Accounting Standard (Ind AS) 103 Business Combinations Contents Paragraphs OBJECTIVE 1 SCOPE 2 IDENTIFYING A BUSINESS COMBINATION 3 THE ACQUISITION METHOD 4 53 Identifying

More information

PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008

PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008 DEPARTMENT OF LOCAL GOVERNMENT & HOUSING PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008 Integrated Sustainable Human Settlement: Progress Report 7/8 and Annual Performance Plans for 2008/2009 Financial Year

More information

Making housing finance markets work for the poor A perspective on the role of big data. Illana Melzer

Making housing finance markets work for the poor A perspective on the role of big data. Illana Melzer Making housing finance markets work for the poor A perspective on the role of big data Illana Melzer Illana@71point4.com 2 Big data is generated everywhere. How much of it is justifiably in the line of

More information

RHLF WORKSHOP The National Housing Code

RHLF WORKSHOP The National Housing Code RHLF WORKSHOP The National Housing Code Outline 1. Statutory requirements 2. Background- why a new Code 3. The structure of the new Code 4. National Housing Programmes 5. National Housing Programmes under

More information

Status of HUD-Insured (or Held) Multifamily Rental Housing in Final Report. Executive Summary. Contract: HC-5964 Task Order #7

Status of HUD-Insured (or Held) Multifamily Rental Housing in Final Report. Executive Summary. Contract: HC-5964 Task Order #7 Status of HUD-Insured (or Held) Multifamily Rental Housing in 1995 Final Report Executive Summary Cambridge, MA Lexington, MA Hadley, MA Bethesda, MD Washington, DC Chicago, IL Cairo, Egypt Johannesburg,

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON OFFICIAL COMMUNITY PLAN AMENDMENT APPLICATION NO. OCP00108 REZONING APPLICATION NO. REZ00578 900 MCGILL

More information

2. The BSA welcomes the opportunity to respond to the Welsh Government s White Paper on the future of housing in Wales.

2. The BSA welcomes the opportunity to respond to the Welsh Government s White Paper on the future of housing in Wales. Homes for Wales: A White Paper for Better Lives and Communities Response by the Building Societies Association 1. The Building Societies Association (BSA) represents mutual lenders and deposit takers in

More information

ASSET TRANSFER REQUESTS Community Empowerment (Scotland) Act 2015 Guidance Notes

ASSET TRANSFER REQUESTS Community Empowerment (Scotland) Act 2015 Guidance Notes www.hie.co.uk ASSET TRANSFER REQUESTS Community Empowerment (Scotland) Act 2015 Guidance Notes January 2017 CONTENTS ABOUT THIS GUIDANCE 3 INTRODUCTION 4 About Highlands and Islands Enterprise 4 HIE s

More information

33 rd SHELTER AFRIQUE ANNUAL GENERAL MEETING ABIDJAN, GOLF HOTEL

33 rd SHELTER AFRIQUE ANNUAL GENERAL MEETING ABIDJAN, GOLF HOTEL 33 rd SHELTER AFRIQUE ANNUAL GENERAL MEETING ABIDJAN, GOLF HOTEL MINISTRY OF CONSTRUCTION, HOUSING, SANITATION AND URBAN PLANNING ----------------------- REPUBLIQUE DE COTE D IVOIRE Union Discipline Travail

More information

A Place for Everyone:

A Place for Everyone: A Place for Everyone: How a Community Land Trust could protect affordability and community assets in Parkdale November 2011 Executive Summary Parkdale is a neighbourhood that is changing rapidly. This

More information

PURPOSE This paper is to update the Audit and Risk Committee on a number of accounting issues that will impact the finalisation of the Annual Report

PURPOSE This paper is to update the Audit and Risk Committee on a number of accounting issues that will impact the finalisation of the Annual Report 6.3 ANNUAL REPORT 2018 Author: Authoriser: Lorraine Walmsley, Manager Finance Systems Kaiwhakahaere Pūnaha Pūtea Roy Baker, General Manager Corporate Services and Chief Financial Officer Kaiārahi Pūtea

More information

Viability and the Planning System: The Relationship between Economic Viability Testing, Land Values and Affordable Housing in London

Viability and the Planning System: The Relationship between Economic Viability Testing, Land Values and Affordable Housing in London Viability and the Planning System: The Relationship between Economic Viability Testing, Land Values and Affordable Housing in London Executive Summary & Key Findings A changed planning environment in which

More information

Filling the Gaps: Stable, Available, Affordable. Affordable and other housing markets in Ekurhuleni: September, 2012 DRAFT FOR REVIEW

Filling the Gaps: Stable, Available, Affordable. Affordable and other housing markets in Ekurhuleni: September, 2012 DRAFT FOR REVIEW Affordable Land and Housing Data Centre Understanding the dynamics that shape the affordable land and housing market in South Africa. Filling the Gaps: Affordable and other housing markets in Ekurhuleni:

More information

PROPERTY MANAGEMENT TRADING ENTITY

PROPERTY MANAGEMENT TRADING ENTITY PROPERTY MANAGEMENT TRADING ENTITY Mr Paul Serote - Head of PMTE November 2015 Property Management Trading Entity 1 ITEMS FOR DISCUSSION Economic Climate Property Management trading Entity Strategy going

More information

UK Housing Awards 2011

UK Housing Awards 2011 UK Housing Awards 2011 Excellence in Housing Finance and Development: Finalist North Lanarkshire Council: Building For The Future Summary North Lanarkshire Council has been proactive in establishing, developing

More information

Representation re: Sullivans Cove Planning Scheme /2015 Amendments - Macquarie Point Site Development: Affordable housing

Representation re: Sullivans Cove Planning Scheme /2015 Amendments - Macquarie Point Site Development: Affordable housing General Manager, Hobart City Council, GPO Box 503, Tas 7001 16 November, 2015 Representation re: Sullivans Cove Planning Scheme 1997-2/2015 Amendments - Macquarie Point Site Development: Affordable housing

More information

CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0

CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0 CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0 Contents 1. Purpose... 3 2. Scope... 3 3. Definitions... 3 4. Growth Plan... 4 5. Funding and delivery categories... 4 5.1

More information

FOR SCOTLAND. Response to the Land Reform Review Group

FOR SCOTLAND. Response to the Land Reform Review Group FOR SCOTLAND Response to the Land Reform Review Group 1. The Historic Houses Association for Scotland (HHAS) represents around 250 individually owned historic castles, houses and gardens throughout Scotland.

More information

Chapter 3: A Framework for a National Land Information Infrastructure

Chapter 3: A Framework for a National Land Information Infrastructure Chapter 3: A Framework for a National Land Information Infrastructure Brian Marwick Overview As a federated county, Australia s land administration systems are state and territory based. These systems,

More information

Governor of Lagos State

Governor of Lagos State His Excellency, Mr. Akinwunmi Ambode Governor of Lagos State 1 OUR VISION LAGOS MEGA CITY WITH ADEQUATE HOUSING FOR ITS CITIZENRY OUR MISSION TO ENSURE THE PROVISION OF ADEQUATE AND GOOD QUALITY HOUSING

More information

In December 2003 the Board issued a revised IAS 40 as part of its initial agenda of technical projects.

In December 2003 the Board issued a revised IAS 40 as part of its initial agenda of technical projects. IAS 40 Investment Property In April 2001 the International Accounting Standards Board (the Board) adopted IAS 40 Investment Property, which had originally been issued by the International Accounting Standards

More information

Creation Land Administration in Formal and Informal Environment. FIG Commission 7 Working Group 1

Creation Land Administration in Formal and Informal Environment. FIG Commission 7 Working Group 1 Creation Land Administration in Formal and Informal Environment András OSSKÓ, Hungary Key words: land administration, informal land tenure, customary tenure, sustainable Development. SUMMARY FIG Commission

More information

HM Treasury consultation: Investment in the UK private rented sector: CIH Consultation Response

HM Treasury consultation: Investment in the UK private rented sector: CIH Consultation Response HM Treasury Investment in the UK private rented sector: CIH consultation response This consultation response is one of a series published by CIH. Further consultation responses to key housing developments

More information

City of Brandon Development Charges FAQs

City of Brandon Development Charges FAQs City of Brandon Development Charges FAQs Residential, commercial and industrial growth requires municipal infrastructure. Development Charges are one way to pay for this new infrastructure. Development

More information

2. The Purpose of the Estates Strategy

2. The Purpose of the Estates Strategy Royal National Orthopaedic Hospital NHS Trust Trust Board - December 2012 Estates Strategy 2012 to 2017 - Executive Summary 1. Purpose of the Report The purpose of this report is to advise the Trust Board

More information

Monday July 29, :00 to 16:30 (local time) Pretoria, South Africa

Monday July 29, :00 to 16:30 (local time) Pretoria, South Africa Monday July 29, 2013 9:00 to 16:30 (local time) Pretoria, South Africa Topic In Southern Africa, land use and allocation is a highly political issue, central to urban economics and livelihoods, and a political

More information

Governing Body 332nd Session, Geneva, 8 22 March 2018

Governing Body 332nd Session, Geneva, 8 22 March 2018 INTERNATIONAL LABOUR OFFICE Governing Body 332nd Session, Geneva, 8 22 March 2018 Programme, Financial and Administrative Section Programme, Financial and Administrative Segment GB.332/PFA/INF/1 PFA FOR

More information