Sec Master planned unit development district.

Size: px
Start display at page:

Download "Sec Master planned unit development district."

Transcription

1 Sec Master planned unit development district Purpose. The purposes of the MPUD master planned unit development districts are: A. To encourage innovations in residential and nonresidential development and redevelopment so that the growing demand for housing in the county may be met by greater variety in type, design, and layout of dwellings to encourage the thoughtful consideration and inclusion of supporting nonresidential uses where appropriate, and to encourage the effective use of open space and recreational areas. B. To provide greater opportunities for better housing and recreation for all who are or will be residents of the county, by encouraging a more efficient use of land and public services and to reflect changes in the technology of land development so that the economies so secured may inure to the benefit of those who need homes. C. To provide for residential cluster options and incentives that are designed to protect the rural character of the county's rural areas. D. To encourage more flexible land development which will respect and conserve natural resources such as streams, lakes, floodplains, groundwater, wooded areas, steeply sloped areas, and areas of unusual beauty or importance to the natural ecosystem. E. To encourage more efficient, flexible, and controlled employment centers, industrial, commercial, and other development under the MPUD master planned unit development concept. General requirements for master planned unit development. A. Calculation of density or intensity. 1. The general allowable gross density or intensity for an MPUD master planned unit development, a CS- MPUD, an EC-MPUD, or a commercial master planned unit development cannot exceed that determined by the land use designation of the Pasco County Comprehensive Plan. a. For an MPUD master planned unit development or an EC-MPUD, the computation of maximum gross density shall be the maximum density allowed by the land use classification applicable to the subject property, multiplied by the proposed developable residential acreage of the project, plus any density incentives as provided in the adopted comprehensive plan. Proposed developable residential acreage means that portion of the total site area which will be developed for residential use inclusive of street rights-of-way, utility rights-of-way, public and private parks, community facilities, etc. Proposed developable residential acreage does not include any lands within the project which are classified as wetlands, CON (conservation lands), or water bodies. The computation for the CS-MPUD is addressed in section b. The computation for nonresidential projects, or portions thereof, the maximum gross building square footage shall be the sum of the developable nonresidential project acreage multiplied by the maximum floor area ratio permitted in the applicable land use classification. Proposed nonresidential acreage means the upland portion of the site exclusive of nonmitigated wetlands and natural water bodies. No nonresidential intensity may be transferred from one parcel of land to another when the parcels are physically separated from each other, except by roadways, streams, rivers, or lakes. Along coastal areas, only land above mean high tide may be used in determining acreage size. 2. Blending of densities. a. For proposals in which project boundaries encompass more than one residential land use classification (RES-1 [residential 1 du/ga], RES-3 [residential 3 du/ga], RES-6 [residential 6 du/ga], RES-9 [residential 9 du/ga], RES-12 [residential 12 du/ga], RES-24 [residential 24 du/ga]), the county shall consider the blending of densities where an applicant can demonstrate by site plan within residential land use classifications, an equivalency of development rights, improvement in the overall master plan, and consistency with the goals, objectives, and policies in the comprehensive plan. b. For proposals in which project boundaries encompass more than one rural land use classification (AG [agricultural], AG/R [agricultural/rural], RES-1 [residential 1 du/ga] for lots one acre or greater) the county may consider the blending of densities where an applicant can demonstrate by site plan, an equivalency of development rights, improvement in the overall master plan, and consistency with the goals, objectives, and policies in the comprehensive plan. In addition, the location of residential development lots shall be arranged in a context-sensitive manner such that they preserve the integrity of the rural community by buffering or setbacks or a combination thereof to protect and preserve the rural appearance of land when viewed from public roads and from abutting properties. c. Size requirements: Master planned unit developments that contain only residential uses must be a minimum of five acres, except where located in the coastal high hazard area where there is no minimum size.

2 522.3 Permitted uses. When identified and approved on the master plan, the following uses shall be permitted individually or in combination in an MPUD master planned unit development district: A. B. C. D. All residential uses. Recreational vehicles and/or travel trailers. Parks, playgrounds, schools, day care centers, churches, government uses, and other related community facilities. Professional offices, local convenience, neighborhood, community, and regional shopping facilities in planned centers that are permitted in accordance with the master plan, are subject to the following standards: 1. The area, siting, intensity, and nature of such uses shall be governed by the following criteria: a. The MPUD master planned unit development shall include at least ten acres if both residential and nonresidential uses are to be located in the MPUD master planned unit development. b. Size/use limitations table: Floor Area Convenience Local Neighborhood Community Regional (sq. ft.) 2,500 30,000 30, , , , ,000 or greater Acres in site (min.) Typical uses (not limited to examples) Sale of convenience goods, personal services, and day care centers Sale of shoppers goods, banking facilities, business services, offices, all uses in Convenience Commercial, and professional service Junior and discount department stores, amusement facilities, automotive sales and service, automobile service stations and car wash, hotels/motels, and all uses in Neighborhood Commercial Major department stores, sale of general merchandise, and all uses in Community Commercial E. F. G. H. I. J. K. 2. Setback, height, and buffering requirements for convenience and neighborhood commercial shall be set forth in the C-1 neighborhood commercial zoning district, unless otherwise approved. 3. Setback, height, and buffering requirements for neighborhood community, and regional commercial shall be equivalent to the requirements in the C-2 general commercial zoning district unless otherwise approved. 4. Commercial uses: a. Commercial uses allowed within local convenience and neighborhood centers shall be equivalent to specific C-1 neighborhood commercial zoning district permitted uses, conditional uses, and special exception uses approved at the time of rezoning. Changes in local convenience and neighborhood center uses after rezoning approval shall be approved by the board of county commissioners upon recommendation by the development review committee. b. Commercial uses allowed in community and regional centers shall be equivalent to C-1 neighborhood commercial and C-2 general commercial zoning district permitted uses, conditional uses, and special exception uses approved at the time of rezoning. Changes in community and regional center conditional or special exception uses after rezoning approval shall be approved by the board of county commissioners upon recommendation by the development review committee. Bed and breakfast. A bed and breakfast that is permitted in accordance with the master plan is subject to the following standards: 1. The building shall maintain a residential character, style, and appearance. 2. The property shall meet the parking requirements in accordance with section 615 of this Code. 3. Use of the property for a bed and breakfast shall meet all applicable building and fire codes. Recreational facilities and structures, including clubhouses, tennis courts, country clubs, pools, and similar uses, when used and designed primarily to serve the residents of the development. Golf courses, which may be calculated as open space as is hereinafter required, provided the clubhouse and other structures are located over 150 feet from any dwelling structure, and: 1. All golf courses must be managed using Pasco County's best management practices for golf courses when adopted and shall provide industry-standard practices for review during the interim. 2. A golf course is subject to the specialized location and buffer requirements of the MPUD master planned unit development order. Marinas, subject to marina siting criteria set forth in the Pasco County Comprehensive Plan. Industrial. Colleges, universities, and schools, Residential treatment and care facilities.

3 522.4 L. M. N. O. P. Q. Hospitals (including helipads when located no closer than 1,000 feet from the closest property line of a school that provides a curriculum of elementary or secondary academic instruction, including kindergarten, elementary, junior high, or high schools). Public or private utilities and utility substation, lift station, and other accessory uses, provided there is no open storage of trucks or materials on the site. Major utilities. Major utilities that are permitted in accordance with the master plan shall be subject to the following standards: 1. All new water or sewer plant structures shall be set back a minimum of 150 feet from any residential structure and be in compliance with state and local regulations and the master utility plan. For purposes of this section, mobile and manufactured homes shall be considered residential structures. 2. The reuse of reclaimed water and land application of effluent shall meet the requirements of the Florida Administrative Code, Chapter , which in addition to other criteria, defines setback distances and minimum system-size requirements. 3. All major utility plant sites (where the actual site is located) and polishing ponds shall be enclosed with a minimum six-foot-high fence, wall, or other screening approved by the board of county commissioners. 4. The landscaped buffer, in accordance with a minimum opacity of 0.75, shall be provided on all nonstreet property lines. 5. Vertical storage structures are expressly prohibited within the open space, with the exception of water tanks that have a rural design in keeping with the rural character of the area and that are necessary to serve a public purpose. Aircraft and helicopter landing field, subject to approval by the Federal Aviation Administration and compliance with appropriate state and local laws, provided that no aircraft landing field or helicopter pad shall be locater closer than 1,000 feet from the closest property line of a school that provides a curriculum of elementary or secondary academic instruction, including kindergarten, elementary, junior high, or high schools. This use must be requested in the original approval; otherwise, a conditional use will be required. Accessory uses. Conditional use. Resort condominiums may be allowed subject to the criteria and standards for review for rezoning and conditional uses in section 303 of this Code and subject to compliance with the notification and requirements for operation criteria in the short term rental ordinance in section of this Code. Development standards. A. Site design. Design shall accomplish the following primary objectives through site design: 1. Compatibility of use. Land uses near the periphery of the MPUD master planned unit development, the EC- MPUD, or the commercial master planned unit development shall be planned so as to be compatible with neighboring areas. Compatibility may be achieved through design that respects the context of the adjacent uses. Applicants must demonstrate through lot sizes, buffers between uses, or other information as identified by the zoning/code compliance administrator, that the project, as designed, transitions appropriately to adjacent uses, or effectively shields adjacent uses in the absence of lot/use compatibility. The zoning/code compliance administrator reserves the right to require additional information for projects where compatibility is not clearly demonstrated. 2. Residential setbacks. The land use standards as enumerated in article 500 of this Code shall be used as the baseline setback for each single-family detached residential housing type. Variations in setbacks from those standards enumerated in article 500 of this Code may be allowed for housing types other than single-family detached where permitted on the master plan. The county may impose standards that are greater than ordinance requirements where deemed necessary to mitigate a compatibility issue. Proposed urban design standards (TND [traditional neighborhood design]) for single-family detached uses, where allowed, shall only be permitted when the project is developed consistent with the Pasco County TND (Traditional Neighborhood Design) Ordinance. 3. Streets. a. Streets should be designed to maximize connectivity within an MPUD master planned unit development or EC-MPUD and surrounding areas. b. Roadways shall comply with the standard roadway typical sections for collectors and arterial roadway facilities as adopted by Resolution Nos and unless otherwise approved by the development review committee. c. Streets shall be designed in accordance with this Code. 4. Parking. All parking shall be landscaped and designed in accordance with this Code. 5. Signage. A master signage plan may be filed and approved with the master plan in accordance with section 601 of this Code. Any deviations from section 601 shall require a variance in accordance with this Code. 6. Utilities. Utilities shall be located underground to the maximum extent possible.

4 Design for refuse-disposal stations. Refuse stations shall be designed to maximize screening and shall be located away from residential areas, including residential areas that are adjacent to the subject site. Refusedisposal stations shall not front streets within the proposed MPUD Master Planned Unit Development or EC- MPUD to the maximum extent possible, and in the event that it is unavoidable, must provide a shielding plan that identifies the landscape proposed or wall treatment chosen. 8. [Open space requirement.] Open space requirement for an MPUD planned unit development in a PD (planned development) land use classification shall require a minimum of 25 percent of the total buildable land area to be designated as open spaces for MPUD master planned unit developments that do not have a residential component. There shall be provisions which insure that the open space shall continue as such and be properly maintained. The owner/developer shall indicate ownership and provide for the responsibility for maintenance of such open space land or provide for and establish one or more organizations for the ownership and maintenance of all common open space. In the case of multiple organizations for ownership and maintenance, each organization shall be a nonprofit homeowners' corporation or community development district formed pursuant to F.S. ch Where practical, it shall be designed as a contiguous area easily accessible to the residents and preserving natural features. B. Variances or variations from the standards set forth in this Code may be reviewed and approved by the board of county commissioners and the planning commission during the public hearing held on any application for MPUD master planned unit development zoning. The variance procedures requiring notice to adjacent property owners, as set forth in this Code, need not be followed where the MPUD master planned unit development application is before the board of county commissioners as part of a public hearing; however, the criteria in section of this Code shall govern. When such variations from this Code are considered by the board of county commissioners at a MPUD master planned unit development public hearing, it shall not be necessary for a formal variance application to be filed under this Code. Submittal requirements for MPUD master planned unit developments. A. The applicant for an MPUD master planned unit development approval (hereinafter referred to as "applicant") shall provide the reviewing county staff with a master planned unit development plan, which shall include the following information with all map products at a scale of one inch equals 200 feet, or as agreed upon by the zoning/code compliance administrator. 1. General requirements. a. Location map showing the relationship between the area proposed for development and surrounding developments or lots on a current aerial photograph, geodetic mapping section, or satellite photo, which in no case shall be older than that available at the Pasco County Property Appraiser's office, with boundaries of development and roadway layout delineated. The location map shall show all functionally classified roadways established by the Pasco County Comprehensive Plan 2025 Future Roadway Functional Classification Map and Highway Vision Plan within one mile of the development boundary. b. A boundary sketch and legal description signed and sealed by a surveyor describing the size and location of the tract to be subdivided. c. An agent of record letter notarized by the owner authorizing the representative, if any, to act on behalf of the owner in the rezoning proceeding. d. The location of all existing and proposed major public roadways, rights-of-way, and easements adjacent to or within the property. e. A recent aerial of the site and surrounding areas within 500 feet of the site at a scale of one inch equals 200 feet. 2. Physical resources. a. Topographic information providing 100-year floodplain and wetland delineations. The most recent U.S. Geological Survey Topographical Survey and U.S. Geological Survey Flood Prone or Federal Emergency Management Agency mapping may be used for topography on floodprone delineations. Pasco County wetlands maps or aerial photography interpretation may be used for wetlands delineation. b. A soils survey, which may be based on the most recent Pasco County soils survey, drawn to the same scale as the preliminary land use plan, and clearly identifying all soil types, especially those areas which are apparently not suitable for buildings or major structures due to soil limitations. c. An environmental/wildlife habitat study which shall evaluate plant and animal species listed as endangered, threatened, or species of special concern as designated by the state and federal authorities, and shall include the following description of the parcel: documentation of data collected and reviewed (such as the Florida Land Use and Cover Classification System, U.S. Fish and Wildlife, and Florida Fish and Wildlife Conservation Commission) and field survey map that characterizes and describes the natural resources of the site, including the location of protected species confirmed on

5 the site and habitat suitable for protected species. d. Submit a phase I cultural resource assessment which shall include the following: project scope, archival research, and identification of sites adjacent to the subject property; identification of research design; and description of field methodology, field work, and analysis of the findings and conclusions. An appropriate letter of clearance from the state agency of jurisdiction may be submitted in lieu of the phase 1 cultural resource assessment. e. A table showing predevelopment and post-development acres of wetlands by category (according to the Pasco County Comprehensive Plan) and a conceptual plan for the protection and use of on-site wetlands. Master plan. a. A master plan with topography; floodprone; category I, II, and III wetlands; and critical linkages as defined in the adopted Pasco County Comprehensive Plan, which clearly identifies proposed land uses; open space; proposed preservation or conservation areas; and the proposed location of major streets and thoroughfares, recreation areas, and other major facilities, including a delineation of proposed school sites and fire station sites, if necessary or warranted, for the service of the area as developed. The master plan shall also include a legend, title, and number of revision; date of plan and revision(s); scale of plan; north arrow; acreage in the tract being subdivided; total number of lots; and name, address, and telephone number of developer, owner, surveyor, and engineer. b. The master plan shall identify the existing zoning, the existing land use, and the adopted future land use classification on the site and the surrounding areas within 500 feet of the site. c. The master plan shall include a phasing plan that describes the proposed timing for, location of, and sequence of phasing or incremental development and the proposed density for each such phase or increment of development. The applicant may provide approved development of regional impact information which satisfies this requirement. d. A table showing acreage for each category of land use, including category I, II, and III wetlands, critical linkages, open space and recreation, and a table of proposed maximum gross and net residential acreages for residential land uses. e. Additional requirements to be shown on master plan in PD (planned development) land use classification: (1) A minimum twenty-five (25) percent total buildable land area must be designated open space areas. (2) Provide pedestrian circulation. (3) Provide recreation areas when residential is a portion of the mixed-use component. (4) Provide for type and size of buffers and setbacks to maximize compatibility with adjacent uses. (5) Nonresidential uses shall provide convenient pedestrian, vehicular, and bicycle access to residents to the maximum extent possible. Yield analysis. A conceptual lot layout for single-family detached housing and/or a conceptual layout for multifamily housing for nondevelopment of regional impact related MPUD master planned unit developments. Zoning narrative. a. A preliminary zoning classification description in sufficient detail to determine the general intent with respect to the following, if known: (1) The general purpose and character of the proposed development. (2) Land use by acreage and densities. (3) Structural concepts, including height and anticipated building type. (4) Recreation and open space. (5) Facilities commitments. b. A statement indicating that legal instruments will be created providing for the management of common areas and facilities. Utilities and services plan. a. Identify the location/source of sanitary sewers, potable water facilities, and the approximate location of existing facilities on the master plan. Provide a statement identifying the supplier of the potable water facilities, the method of disposal of sewage effluent, fire service, and electric service. The developer shall notify the appropriate electrical utility, in advance, of their intent to request service and provide confirmation to the county of service availability prior to preliminary plan approval. b. The general direction of natural surface drainage of the proposed MPUD master planned unit development site, including a general statement regarding the disposal of stormwater drainage,

6 B. C. D. including identification of whether a site falls within a basin of special concern and/or lies within the floodprone areas map of the Pasco County Comprehensive Plan. c. An analysis of the impact of the proposed MPUD master planned unit development on schools and other public facilities as provided in section 402 of this Code. 7. Transportation management. a. A transportation analysis in accordance with the traffic impact study guidelines that identifies the location of existing arterial and collector roads which will be utilized to serve the master planned unit development site, the proposed location of other arterial or collector roads which will be constructed for the purposes of serving the site, and a description of the projected transportation impact of the MPUD master planned unit development at buildout, whose description shall include projected average daily trips, direction of traffic, and projected levels of service for arterial roads servicing the site. b. A roadway plan for the MPUD master planned unit development shall be shown on the submitted master plan, including subdivision access locations, internal subdivision collector roadways, and roadways required by section 610.3, collector and arterial spacing and design standards. c. A traffic study shall be completed and approved by the county prior to the scheduling of the development review committee meeting for the total MPUD master planned unit development rezoning. 8. Content meeting. The developer shall schedule and participate in a content review meeting with the zoning/code compliance administrator or designee prior to the submittal of an application for a rezoning to any MPUD master planned unit development district. This meeting will determine the completeness of the developer's application materials prior to submittal, and a letter will be issued finding the content sufficient or insufficient within three working days of the content review meeting. Following issuance of a letter of completeness, the developer shall be allowed to submit the application. The developer shall submit 25 copies (or one copy electronically in PDF format upon the county's request) of the master plan to the zoning/code compliance administrator or his/her designee for processing. The above requirements are intended to permit the reviewing county staff to make informed decisions on the approval or denial of a proposed MPUD master planned unit development without requiring the applicant to provide site-specific information, such as location of projected utility lines or improvements, location of drainage facilities, and other site-specific information more appropriately required at the preliminary plan stages of review, except as otherwise required by the zoning/code compliance administrator for the purpose of demonstrating compatibility. The applicant and the appropriate staff members or other governmental agencies may consult informally concerning the proposed MPUD master planned unit development at any time, provided that no statement or representation by a member of the staff or agency shall be binding upon the county. Reviewing staff authority. The appropriate county staff shall review all information submitted in a master planned unit development plan and: 1. Evaluate the impact of the proposed development upon public improvements, surrounding land uses in the neighborhood and subregion, and significant environmental features in the surrounding neighborhood and subregion. 2. Determine the degree to which the proposed development is consistent with the comprehensive plan or elements thereof. 3. Determine the adequacy of the existing public services and facilities serving the proposed development, including transportation systems, utilities, and fire and police protection. 4. Determine the potential expansion of such public services and facilities necessary to accommodate the proposed development. Based upon its evaluation of the factors set forth above, the county staff shall prepare a recommendation of approval or denial, recommended findings, and suggest conditions which should be imposed upon a proposed master planned unit development plan, or increment thereof, recommended for approval in accordance with the factors and criteria set forth in subparagraph D., below. The applicant shall have 120 days to respond to each round of review comments, if any, and/or submit information requested by the county. After the expiration of the 120 days for any round of comments, the application will be deemed withdrawn unless an extension is requested within 14 days prior to the expiration of the 120-day period for that round of comments. Upon a written request by the applicant, one extension of the response time for each round of comments may be granted by staff upon showing that a good faith effort is being made to provide additional or revised information. Additional requests shall necessitate board of county commissioners approval. In the event a response is not received or an extension obtained in any round of comments, the county will consider the application withdrawn. Conditions of approval. Conditions of approval may be imposed upon any approved master plan. Such conditions shall be recommended for the purposes of assuring consistency with the comprehensive plan or elements thereof;

7 E. offsetting or minimizing impacts upon public improvements, surrounding land uses, and significant environmental features; and assuring the adequacy of public services and facilities which will specifically serve the proposed MPUD master planned unit development site. Such conditions may relate to: 1. The establishment of limitations or ranges of densities or intensities upon the proposed MPUD master planned unit development, or increment thereof. 2. Traffic patterns and road improvements serving the site, whose conditions shall attempt to alleviate direct adverse impact on existing road systems and maximize safety. 3. The protection of natural features, water resources, wetlands, and other ecological systems on the site, which conditions may include: a. Controls on the siting and location of buildings for improvements to assure protection of subsurface and surface water resources to assure protection of conservation and preservation areas as designated on the plan, to assure compatibility through the protection of natural features and existing topography, and to assure the protection of scenic and environmentally significant natural resources such as tree stands, rivers, streams, ponds, and lakes. b. Controls which assure the protection of natural drainage systems through limitation of disturbances of land for drainage improvements, through utilization of on-site stormwater retention, and through use of innovative drainage designs or concepts. c. Controls which assure the adequacy of public services, including water and sewer service, available to the site. 4. The minimization of potential increased flood problems of developed areas within the site and surrounding areas. 5. The maintenance of major public improvements pending the development of the entire MPUD master planned unit development site. 6. The compatibility of proposed uses with established and planned uses of the surrounding neighborhood and subregion, including adequate buffering. 7. The internal compatibility of proposed uses, whose conditions may include restrictions on location of improvements, restrictions on design, and buffering requirements. 8. The adequacy of useful open space to serve the proposed MPUD master planned unit development site and phases or increments thereof. 9. The timing or sequence of phasing for purposes of assuring the adequacy of available improvements and facilities, both public and private. 10. Conditions imposed upon an approved master planned unit development plan shall constitute the standards and guidelines against which the development of the MPUD master planned unit development site, or any increment or phase thereof, shall be reviewed. 11. Conditions shall specify provisions, standards, conditions, or design specifications which must be met in order to assure compliance with the standards set forth in this Code and the comprehensive plan. Master planned unit development plan review and approval procedures. 1. The MPUD master planned unit development timeline for review shall consist of 120 days for all issues other than the traffic impact study. Once the application is deemed complete, the county shall have 45 days to submit review comments to the applicant. The applicant shall have 45 days to respond to the review comments in order to maintain the proposed hearing dates as provided in the letter of completeness submitted pursuant to section A.8. If these timelines cannot be met due to additional rounds of comments or comments received after the deadlines hereinabove, then the proposed hearing dates shall automatically be extended; however, unless otherwise requested by the applicant, the review time for nontraffic impact study related issues shall not exceed 180 days. The county shall have 30 days from receipt of the final round of responses or completion of the traffic impact study conditions, whichever is later, to review and finalize conditions of approval for the development application, and set the matter for hearing. The hearing before the development review committee shall be held within 45 days after the conditions of approval are finalized or within 45 days of the approval of the traffic impact study, whichever is later. Final conditions of approval, including applicant-proposed revisions to the conditions of approval, must be presented for review by the development review committee two weeks before the development review committee hearing or the matter will be continued. For development of regional impact related projects, although the application may be accepted sooner, the above time frames shall commence on the date the development order has been approved by the development review committee. 2. For developer rezoning applications that have a corresponding comprehensive plan amendment to PD (planned development) or EC (employment center), the development review committee meeting shall be set concurrently for the plan amendment and the rezoning to MPUD master planned unit development. The comprehensive plan amendment shall not be processed until all reviews and requirements associated with

8 F. G. the rezoning are met. The planning commission hearing shall be set approximately one month prior to the scheduled public hearing of the board of county commissioners for the comprehensive plan amendment and rezoning. The development review committee, based on the recommendation of staff, shall determine whether the said plans: a. Meet the requirements of the land use and zoning classification applicable to the subject property. b. Are consistent with this Code. c. Provide design features which assure the protection of the public health, safety, and welfare. d. Are consistent with the goals, objectives, and policies set forth in the comprehensive plan. e. Provide for necessary public improvements or facilities. 3. The recommendation of the development review committee shall then be forwarded to the planning commission for consideration. 4. The planning commission shall: a. Recommend approval of the application based on the master planned unit development plan as submitted; b. Recommend approval of the application subject to specified conditions not included in the master planned unit development plan as submitted; or c. Recommend denial of the application as submitted. 5. The matter shall then be forwarded to the board of county commissioners in accordance with the public notice requirements in section 303 of this Code. The planning commission may recommend to the board of county commissioners additional restrictions, and the board of county commissioners may, as deemed appropriate, impose additional restrictions not herein mentioned to protect the public interest. Form and effect of master planned unit development plan approval. Written conditions of approval and a master planned unit development plan, which recites all conditions to be imposed upon the development, shall be issued. After the rendering of such a written approval: 1. The zoning classification accorded to the property subject to the application shall be changed on the county zoning maps/layer to reflect an MPUD master planned unit development classification. 2. Development of the MPUD master planned unit development site shall substantially conform to the densities or intensities, or ranges of densities or intensities, approved by the board of county commissioners for the entire site and for each phase or increment of the master planned unit development plan. 3. All conditions imposed and all graphic material (excluding the yield analysis) presented depicting restrictions on development shall become part of the regulations which govern the manner in which the MPUD master planned unit development site may be developed and shall be binding upon the applicant or any successors in interest. Deviations from approved master plans or failure to comply with any requirement, condition, or safeguard shall constitute a violation of these zoning regulations. If there is a conflict between the conditions of approval and the master plan, the conditions of approval shall govern. 4. Commitment for completion and adherence to approved plans. The developer shall provide proposals describing agreements, covenants, contracts, or deed restrictions which shall be enacted to ensure the completion of the development without any expense to the general public which was not agreed to at the time of the approval. Additionally, said agreements, covenants, contracts, or deed restrictions shall bind all successive owners and developers of all or any portion of the district to any commitments made and any restrictions placed on the approved master planned unit development plan or any document, graphic, map, or other such information provided which is part of the official record. 5. All plans or plats for development of land approved subject to a master plan shall be processed in accordance with procedures established in this Code. The site plan or plat shall be required to be submitted in substantial compliance with the approved master plan. 6. The written approval and the conditions recited in said approval shall constitute a development order which authorizes the activity described in paragraph G., below. Authority granted by approval. 1. It shall be unlawful for any person to grade, fill, excavate, or install improvements with the master planned unit development plan approval only. 2. It shall be unlawful to convey lots by reference to a master planned unit development plan, sales map, or other illustrations. 3. Approval of a master planned unit development plan shall not be construed as authority for obtaining building permits or for the recording of a plat with the clerk of the circuit court. 4. Prior to development within any phase, the applicant or his successor in interest shall present for review and approval, detailed development plans for each phase in accordance with article 300 of this Code, provided

9 that: a. A preliminary plan as outlined in this Code must be approved for an entire increment (bubble) prior to any phased construction drawing approval. The maximum number of units and the density and intensity of each increment shall not exceed those limits of the approved master planned unit development plan. b. All off-site improvements and facilities required by conditions of approval of the MPUD master planned unit development necessary to adequately service the development or increment thereof must be completed or will be completed in conjunction with such development. c. Each preliminary plan or preliminary site plan submittal shall include an enclosed boundary survey of the total site, enclosed boundary survey of the phase to be developed within the total site, and of all lands to be held as open space or community facilities. d. Each preliminary site plan or preliminary plan submittal shall include the existing cumulative number of dwelling units and cumulative square footage of nonresidential development permitted within the MPUD master planned unit development. 5. Any preliminary site plan or preliminary plan for any phase of, increment of, or for the entire MPUD master planned unit development site shall be consistent with and conform to the conditions of approval set forth in the master planned unit development plan approval, in addition to all other requirements imposed by relevant county ordinances and regulations governing the development of land and construction of buildings and structures. 6. If the proposed MPUD master planned unit development would constitute a development of regional impact, the approved MPUD master planned unit development shall be subject to such revisions and modifications as are necessary to address and implement recommendations of the Tampa Bay Regional Planning Council and State Land Planning Agency after appropriate review in accordance with F.S H. Time limit on approval. Except where project development schedules are established for development of regional impacts and Florida quality developments, the following time limits on approvals shall apply: If the preliminary plans and preliminary site plans for the entire MPUD master planned unit development are not approved within six years of the original approval or from the last substantial modification, then the conditions of approval shall expire for those portions of the MPUD master planned unit development that do not have (unexpired) preliminary plan or site plan approval unless the board of county commissioners approves a longer duration. If the conditions of approval for the MPUD master planned unit development expire, a new rezoning for an MPUD master planned unit development shall be submitted, reviewed, and approved in accordance with the comprehensive plan and land development code in effect at that time and no new preliminary plans or site plans as well as extensions of duration to the site plans shall be submitted until the new MPUD master planned unit development is approved. Existing unexpired preliminary plans and site plans shall be subject to the new MPUD master planned unit development conditions of approval upon expiration. This applies to all MPUD master planned unit developments, CS-MPUDs, and EC-MPUDs. The foregoing expiration and additional review rules are in addition to any expiration and additional review rules set forth in section 402 of this Code Modification. The zoning/code compliance administrator is authorized to approve minor modifications in the approved master plan, but shall not have the power to approve changes that constitute a substantial modification as defined in section B. A substantial modification shall be processed by the zoning/code compliance department as a rezoning request in accordance with section B of this Code. A. Any substantial modification to an approved master plan shall be approved by the board of county commissioners upon recommendation by the development review committee and planning commission. B. Any modification of the master planned unit development plan shall be unlawful in the absence of compliance with this Code and if inconsistent with the goals, objectives, and policies of the comprehensive plan. C. In reaching a decision as to whether or not proposed changes are to be considered a substantial modification, the zoning/code compliance administrator shall, after reviewing the record of the project, determine if any of the following changes are proposed: Minor Modification Substantial Modification General Any change in a site-related stipulation or condition that was required by the Board of County Commissioners as a part of the rezoning hearing. Any alteration to uses or any material alteration in density or intensity approved in the master plan that lie within 100 feet of the boundary of the district, or within 100 feet of any part of the district that has a building or residence constructed or lot sold to any owner or owners

10 Use In an EC-PD Employment Center, a change from a support use or multifamily use to a target business, corporate office park, or industrial use. In an MPUD Master Planned Unit Development, a change from multifamily to single-family use. Building Area/Units A decrease in total residential units or nonresidential square footage. A cumulative increase of five percent or less in residential dwelling units, provided the increase does not occur within 100 feet of the boundary of the district. A cumulative increase of five percent or less in the amount of nonresidential square footage, provided the increase does not occur within 100 feet of the boundary of the district. An increase in structure height of less than ten feet. Site Characteristics A modification of the size and configuration of perimeter stormwater lakes or any internal lakes. A cumulative decrease in the amount of open space of less than five percent, provided the remaining open space is not less than that required in the district, not within 100 feet of the project boundary (see substantial criteria), and further provided the land was not designated as conservation or preservation land (including wetlands) on the master plan. A modification to the configuration of lots in areas previously designated for outparcels, provided no modification is within 100 feet of any residentially zoned property. Access A modification or addition to the external access points adjacent to nonresidential development or undeveloped different from the applicant requesting the change, that is not specifically set forth in this table as a minor modification, unless waivers are obtained from all lot owners. Any other modifications that affect the area depicted on the master plan or the perimeter of the proposed site that are not specifically set forth in this table as a minor modification. In an EC-PD Employment Center, any change that results in a material decrease in an approved target business use, Corporate Business Park use, or industrial use. Any addition of a use not previously approved in the master plan unless the use is changing one target industry for another. A change from single-family residential use to multifamily residential use, from any residential use to internal commercial use, or a change in the location of an internal commercial component. Any cumulative change that would create an increase in traffic generation by more than ten percent. An increase in floor area of five percent or more. A cumulative increase of greater than five percent in the total number of residential dwelling units proposed for the Master Planned Unit Development. A cumulative increase in the size of areas proposed for nonresidential uses of more than five percent. An increase in structure height of ten feet or greater. A reduction in the amount of open space, recreation areas, preservation areas, or buffer areas that results in a cumulative reduction of more than five percent, or any change in the location of open space or recreational uses within 100 feet of the boundary of the planned district, or within 100 feet of any part of a nonresidential planned district that has been constructed or sold to any owner or owners different from the applicant requesting the change, or within 100 feet of the boundary of any portion of a residential planned district that has received final plat approval. Any change made following plat approval to the boundaries of open space, recreation, or preservation areas previously recorded shall be considered a substantial modification. Addition or substantial relocation (as determined by the county engineer or his designee) of an access point as

11 residentially zoned property provided the applicant demonstrates that the spacing is appropriate, safe, does not adversely affect the operation of the adjacent public roadway, and is approved by the county engineer. shown on an approved master plan. A modification to internal access to outparcels, provided no modification is within 100 feet of any residentially zoned property. A modification to internal roads, internal bike lanes, or sidewalks in residential projects, provided all other county requirements for such facilities are met D. 1. In no case shall the intensity or density be increased over the maximum permitted by the adopted Comprehensive Plan. 2. The measurement of distances in the table above shall include only abutting property and shall not include any property across an external street. Review of changes. All requests for review of changes to the master plan shall include sufficient information to enable the zoning/code compliance administrator to make a determination whether or not one or more of the criteria listed in paragraph B., above, are met. A petition for a change to a planned district shall include, at a minimum, the following information: 1. A statement by the applicant which specifies the exact nature of the changes proposed to the master plan and whether each of the criteria contained in paragraph B., above, apply. 2. A graphic or map indicating the boundaries of the entire master planned unit district (MPUD master planned unit development, CS-MPUD, or EC-MPUD); the relationship of the portion of the planned district to be changed to the remainder of the planned district, if the revision does not include the entire planned district; and delineating those areas of the planned district that are currently developed. Areas within the planned district that are under separate ownership than the applicant requesting the change shall also be delineated A copy of the approved master plan. A revised master plan showing the proposed changes. As applicable, evidence that the proposed change does not subject the MPUD master planned unit development to additional concurrency review pursuant to section 402 of this Code. Notwithstanding the modification table above, a change of any aspect, attribute, or feature of the development that may be considered nonsubstantial which might adversely impact the development site or surrounding area in a manner which would be inconsistent with the goals, objectives, and policies or general standards for development approval as set forth in this Code or the comprehensive plan, may be considered substantial or require a hearing before the development review committee. E. Review and determination. Upon receipt of a completed application with all required documents, county staff shall have 30 days to review and request revisions. Development of regional impact related MPUD master planned unit developments may necessitate a longer review period. Upon receipt of responses to comments and requested revisions from the applicant, the zoning/code compliance administrator shall submit a nonsubstantial determination in writing within ten days along with any conditions that may be necessary to ensure compliance with the comprehensive plan and this Code. Any changes on the master plan that are not included in the narrative or statement required pursuant to section D.1., or as required pursuant to section A.5., shall not be considered approved by the county. Minor modifications to the MPUD master planned unit development may be approved by the zoning/code compliance administrator without the necessity of a public hearing. F. Deviations from approved plans. Deviations from approved master plans or failure to comply with any requirement, condition, or safeguard imposed by the board of county commissioners during the approval or platting procedure shall constitute a violation of these zoning regulations. G. For the purposes of this section, the zoning/code compliance administrator shall be empowered to determine whether the preliminary or preliminary site plan presented for review constitutes a substantial change to the original MPUD master planned unit development approval. Administration and review. A. Issuance of permits and all matters pertaining to administration of the MPUD master planned unit development as finally approved shall be the responsibility of the designated county staff members. B. The designated county staff shall review the progress, status, and construction of the plan and render reports on request by the board of county commissioners in order to assure compliance with the provisions of this section and the conditions of final plat approval. C. The designated county staff shall review all development plans to determine their consistency with the MPUD master planned unit development approval and conditions recited in that approval.

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include:

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include: CHAPTER 400. SECTION 403. PERMIT TYPES AND APPLICATIONS SITE DEVELOPMENT 403.3. Preliminary Site Plans (PSP) A. Intent and Purpose PSPs are used to identify existing site conditions and demonstrate general

More information

BY THE CITY COMMISSION ORDINANCE NO.:

BY THE CITY COMMISSION ORDINANCE NO.: BY THE CITY COMMISSION ORDINANCE NO.: 2005-0868 AN ORDINANCE BY THE CITY COMMISSION OF THE CITY OF DADE CITY, FLORIDA CREATING A DEVELOPMENT REVIEW PROCEDURES ORDINANCE; PROVIDING FOR INTENT, PURPOSE,

More information

ARTICLE 14 PLANNED UNIT DEVELOPMENT (PUD) DISTRICT

ARTICLE 14 PLANNED UNIT DEVELOPMENT (PUD) DISTRICT ARTICLE 14 PLANNED UNIT DEVELOPMENT (PUD) DISTRICT Section 14.01 Intent. It is the intent of this Article to allow the use of the planned unit development (PUD) process, as authorized by the Michigan Zoning

More information

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED BY BOARD OF COUNTY COMMISSIONERS ORDINANCE NO. AN ACT TO BE ENTITLED AN ORDINANCE AMENDING THE PASCO COUNTY LAND DEVELOPMENT CODE, ARTICLE 700, BY REPEALING EXISTING SECTION 702, ENVIRONMENTALLY SENSITIVE

More information

Article 7: Residential Land Use and Development Requirements

Article 7: Residential Land Use and Development Requirements Article 7: Residential Land Use and Section 701: Statement of Intent (A) (B) (C) The intent of Article 7 is to develop certain land use and development requirements for the residential uses within Cumru

More information

PLANNED UNIT DEVELOPMENTS (Ordinance No.: 3036, 12/3/07; Repealed & Replaced by Ordinance No.: 4166, 10/15/12)

PLANNED UNIT DEVELOPMENTS (Ordinance No.: 3036, 12/3/07; Repealed & Replaced by Ordinance No.: 4166, 10/15/12) 159.62 PLANNED UNIT DEVELOPMENTS (Ordinance No.: 3036, 12/3/07; Repealed & Replaced by Ordinance No.: 4166, 10/15/12) A. PURPOSE 1. General. The Planned Unit Development (PUD) approach provides the flexibility

More information

Chapter 22 PLANNED UNIT DEVELOPMENT.

Chapter 22 PLANNED UNIT DEVELOPMENT. Chapter 22 PLANNED UNIT DEVELOPMENT. Sec. 22.1 INTENT. The use of land and the construction and use of buildings and other structures as Planned Unit Developments in Georgetown Township may be established

More information

CONDOMINIUM REGULATIONS

CONDOMINIUM REGULATIONS ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

Chapter 100 Planned Unit Development in Corvallis Urban Fringe 100.100 Scope and Purpose. Chapter 100 Planned Unit Development in Corvallis Urban Fringe (1) All applications for land divisions in the Urban Residential (UR) and Flood Plain Agriculture (FPA) zones within

More information

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST Completed DRC Application for Review Required for Application Process DRC Processing Fee 1 Commercial $2,500.00 Fire Department Review Fee 150.00 Total $2,650.00

More information

PLANNED UNIT DEVELOPMENT (PUD)

PLANNED UNIT DEVELOPMENT (PUD) SECTION 38.01. ARTICLE 38 PLANNED UNIT DEVELOPMENT (PUD) Purpose The purpose of this Article is to implement the provisions of the Michigan Zoning Enabling Act, Public Act 110 of 2006, as amended, authorizing

More information

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS Section 21.1 Purpose and Intent... 2 Section 21.2 Administrative Site Plan Review

More information

SECTION 16. "PUD" PLANNED UNIT DEVELOPMENT OVERLAY DISTRICT

SECTION 16. PUD PLANNED UNIT DEVELOPMENT OVERLAY DISTRICT SECTION 6. "PUD" PLANNED UNIT DEVELOPMENT OVERLAY DISTRICT Subsection. Purpose. This district is established to achieve the coordinated integration of land parcels and large commercial and retail establishments

More information

ORDINANCE WHEREAS, the adoption of this Ordinance shall not be construed as an admission that the aforesaid claim has merit or is correct; and

ORDINANCE WHEREAS, the adoption of this Ordinance shall not be construed as an admission that the aforesaid claim has merit or is correct; and ORDINANCE 12-24 AN ORDINANCE OF THE CITY OF WINTER GARDEN, FLORIDA, REPEALING ORDINANCE 12-02 AND REPLACING IT WITH THE AMENDMENTS TO ARTICLE V OF CHAPTER 118 OF THE WINTER GARDEN CODE OF ORDINANCES CONTAINED

More information

AN ORDINANCE TO AMEND SECTION OF THE RAPID CITY MUNICIPAL CODE TO ALLOW FOR ADMINISTRATIVE DISSOLUTION OF PLANNED DEVELOPMENTS

AN ORDINANCE TO AMEND SECTION OF THE RAPID CITY MUNICIPAL CODE TO ALLOW FOR ADMINISTRATIVE DISSOLUTION OF PLANNED DEVELOPMENTS Ordinance No. 6231 AN ORDINANCE TO AMEND SECTION 17.50.050 OF THE RAPID CITY MUNICIPAL CODE TO ALLOW FOR ADMINISTRATIVE DISSOLUTION OF PLANNED DEVELOPMENTS WHEREAS, the City of Rapid City has adopted a

More information

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached: Staff Report: Completed by Jeff Palmer Director of Planning & Zoning Date: November 7, 2018, Updated November 20, 2018 Applicant: Greg Smith, Oberer Land Developer agent for Ronald Montgomery ET AL Property

More information

Special Use Permit - Planned Unit Development Checklist. Property Address:

Special Use Permit - Planned Unit Development Checklist. Property Address: Special Use Permit - Planned Unit Development Checklist Special Use Permit Number. Parcel Code/s #28-11- - - Property Address: Applicant: ARTICLE VIII Ordinance Reference - Section 8.1.2 Permit Procedures:

More information

ARTICLE 24 SITE PLAN REVIEW

ARTICLE 24 SITE PLAN REVIEW ARTICLE 24 SITE PLAN REVIEW 24.1 PURPOSE: The intent of these Ordinance provisions is to provide for consultation and cooperation between the land developer and the Township Planning Commission in order

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB ARTICLE VI: LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS VI-21 610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB 610-1 Property Line Adjustments (Property Line Relocation) A property line

More information

DRAFT FOR PUBLIC HEARING (rev. March, 2016)

DRAFT FOR PUBLIC HEARING (rev. March, 2016) Chapter 200. ZONING Article VI. Conservation/Cluster Subdivisions 200-45. Intent and Purpose These provisions are intended to: A. Guide the future growth and development of the community consistent with

More information

The following regulations shall apply in the R-E District:

The following regulations shall apply in the R-E District: "R-E" RESIDENTIAL ESTATE DISTRICT (8/06) The following regulations shall apply in the R-E District: 1. Uses Permitted: The following uses are permitted. A Zoning Certificate may be required as provided

More information

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 2188

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 2188 CHAPTER 2004-372 Committee Substitute for Committee Substitute for Senate Bill No. 2188 An act relating to land development; amending s. 197.502, F.S.; providing for the issuance of an escheatment tax

More information

ARTICLE FIVE FINAL DRAFT

ARTICLE FIVE FINAL DRAFT ARTICLE FIVE 021218 FINAL DRAFT Sec. 503.6 Open Space Preservation Option Open Space Preservation Option Open Space Preservation developments may be approved in the AR, R-1, R-2 and R-3 zoning districts,

More information

Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018.

Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018. Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018. No changes were made at the 1st Public Hearing. Proposed wording for the 1 st Public Hearing in red, eliminated text in

More information

Plan nt Plan Filing and

Plan nt Plan Filing and PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT APPENDIX VI PLANNED UNIT DEVELOPMENT (PUD) CODE Contents: 17-601. General Purpose: Procedures... 3 17-602. General Character:...

More information

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist Prior to filing any application for SUBDIVISION approval, the applicant shall request in writing that the zoning administrator schedule a pre-submission conference. APPLICATION TO THE PLANNING BOARD TOWN

More information

Appendix J - Planned Unit Development (PUD)

Appendix J - Planned Unit Development (PUD) Appendix J - Planned Unit Development (PUD) Intent and Purpose The purpose of the PUD is: 1. To provide development that is consistent with the Comprehensive Land Use Plan and promote the goals and objectives

More information

A. Preserve natural resources as identified in the Comprehensive Plan.

A. Preserve natural resources as identified in the Comprehensive Plan. 1370.08 Conservation Residential Overlay District. Subd. 1 Findings. The City finds that the lands and resources within the Conservation Residential Overlay District are a unique and valuable resource

More information

CHECKLIST FOR DEVELOPMENT REVIEW

CHECKLIST FOR DEVELOPMENT REVIEW CHECKLIST FOR DEVELOPMENT REVIEW Petitions and related documents and plans for land development or other proposals regulated by Title 16 of the Municipal Code (Development Ordinance) and Title 17 of the

More information

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS - Larimer County Planning Dept. Procedural Guide for 1041 PERMITS PLEASE NOTE: A PRE-APPLICATION CONFERENCE IS REQUIRED PRIOR TO SUBMITTING THIS APPLICATION. PURPOSE: State Statutes allow local governments

More information

Chapter Planned Residential Development Overlay

Chapter Planned Residential Development Overlay Chapter 19.29 Planned Residential Development Overlay Sections 010 Purpose 020 Scope 030 Definitions 030 Minimum Size 040 Allowable Uses 050 Minimum Development Standards 060 Density Bonus 070 Open Space

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

CHAPTER 10 Planned Unit Development Zoning Districts

CHAPTER 10 Planned Unit Development Zoning Districts CHAPTER 10 Planned Unit Development Zoning Districts Section 10.1 Intent and Purpose The Planned Unit Development (PUD) districts are intended to offer design flexibility for projects that further the

More information

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015 ARTICLE 4 PRELIMINARY PLAN 401 Intent An in-depth analysis of the proposed subdivision, including a review of the design considering the ability to obtain water and sanitation, identified geologic hazards,

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 PLANNED DEVELOPMENT

More information

INDIAN RIVER COUNTY, FLORIDA. The Honorable Members of the Planning and Zoning Commission DEPARTMENT HEAD CONCURRENCE

INDIAN RIVER COUNTY, FLORIDA. The Honorable Members of the Planning and Zoning Commission DEPARTMENT HEAD CONCURRENCE Public Hearing Legislative INDIAN RIVER COUNTY, FLORIDA M E M O R A N D U M TO: The Honorable Members of the Planning and Zoning Commission DEPARTMENT HEAD CONCURRENCE Robert M. Keating, AICP; Community

More information

Article 6: Planned Unit Developments

Article 6: Planned Unit Developments LUDC 2013 GARFIELD COUNTY, COLORADO Article 6: Planned Unit Developments ARTICLE 6 PLANNED UNIT DEVELOPMENTS TABLE OF CONTENTS DIVISION 1. GENERAL.... 1 6-101. GENERAL PROVISIONS.... 1 A. Purpose....

More information

ORDINANCE NOW THEREFORE, BE IT ENACTED BY THE CITY COMMISSION OF THE CITY OF WINTER GARDEN, FLORIDA, AS FOLLOWS:

ORDINANCE NOW THEREFORE, BE IT ENACTED BY THE CITY COMMISSION OF THE CITY OF WINTER GARDEN, FLORIDA, AS FOLLOWS: ORDINANCE 12-02 AN ORDINANCE OF THE CITY OF WINTER GARDEN, FLORIDA, AMENDING ARTICLE V OF CHAPTER 118 OF THE WINTER GARDEN CODE OF ORDINANCES ENTITLED PLANNED UNIT DEVELOPMENTS CREATING URBAN VILLAGE PLANNED

More information

CHAPTER XVIII SITE PLAN REVIEW

CHAPTER XVIII SITE PLAN REVIEW CHAPTER XVIII SITE PLAN REVIEW Section 18.1 Section 18.2 Description and Purpose. The purpose of this chapter is to provide standards and procedures under which applicants would submit, and the Township

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 DEVELOPMENT NAME SUBDIVISION NAME Springhill Village Subdivision Springhill Village Subdivision LOCATION 4350, 4354, 4356, 4358,

More information

Transportation - Corridor Management. Intent and Purpose

Transportation - Corridor Management. Intent and Purpose CHAPTER 900. SECTION 90 DEVELOPMENT STANDARDS TRANSPORTATION 90 Transportation - Corridor Management A. Intent and Purpose 3. 4. The intent of this section is to coordinate the full development of roads

More information

Planned Residential Development ( PRD ) Application

Planned Residential Development ( PRD ) Application FOR PLANNING USE ONLY Application # PRD Application Fee $ Receipt No. Filing Date Completeness Date Planned Residential Development ( PRD ) Application A. PROJECT INFORMATION 1. Project Name: 2. Address

More information

Sec Planned unit development (PUD) zoning district requirements and procedures.

Sec Planned unit development (PUD) zoning district requirements and procedures. Sec. 10-6.696. Planned unit development (PUD) zoning district requirements and procedures. (a) Purpose and intent of district. The planned unit development (PUD) zoning district is intended to provide

More information

ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES

ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES 301. Prior to Submission a. Copies of this Ordinance shall be available on request, at cost, for the use of any person who desires information

More information

ARTICLE 13 CONDOMINIUM REGULATIONS

ARTICLE 13 CONDOMINIUM REGULATIONS ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

Salem Township Zoning Ordinance Page 50-1 ARTICLE 50.0: PUD PLANNED UNIT DEVELOPMENT

Salem Township Zoning Ordinance Page 50-1 ARTICLE 50.0: PUD PLANNED UNIT DEVELOPMENT Salem Township Zoning Ordinance Page 50-1 ARTICLE 50.0 PLANNED UNIT DEVELOPMENT Section 50.01 Purpose The provisions of this Article provide enabling authority and standards for the submission, review,

More information

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable). Office Use Only Preliminary Long Plat Long Subdivision Applicant Checklist PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT FINAL LONG PLAT LONG SUBDIVISION CHECKLIST Mailing Address: P.O. Box 547,

More information

REZONING APPLICATION INSTRUCTIONS

REZONING APPLICATION INSTRUCTIONS REZONING APPLICATION INSTRUCTIONS All required information, as stated on the Rezoning Application Checklist, must be included to qualify as a complete application. Upon receipt, staff will review the application

More information

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES The Sufficiency Table is a checklist to help identify the types of information and documentation needed for various types of projects. The

More information

Exhibit "A" have applied for a re-zoning and re-classification of that property from OPEN RURAL (OR) to that of a PLANNED UNIT DEVELOPMENT (PUD); and

Exhibit A have applied for a re-zoning and re-classification of that property from OPEN RURAL (OR) to that of a PLANNED UNIT DEVELOPMENT (PUD); and I NSTR # 200632845 OR BK 61439 PGS 0728-0750 RECORDED 06/24/2066 12:25:50 PR JOHN Q. CRAWFOKD CLERK OF CIRCUIT COURT NASSAU COUNTY, FLORIDA RECORDING FEES 1.37.80 ORDINANCE NO. 2006-65 AN ORDINANCE AMENDING

More information

Initial Subdivision Applications Shall Include the Following:

Initial Subdivision Applications Shall Include the Following: Initial Subdivision Applications Shall Include the Following: 1) Subdivision Application Form: completely filled out (12 copies) 2) Plat: The Plat must adhere to the requirements set forth in the Town

More information

City of Eustis Development Services Checklist for Submittals by Application Type

City of Eustis Development Services Checklist for Submittals by Application Type I. General Requests A. Alcoholic Beverage Review (Regular & Special Event) (Sec. 109-4.3) 1 Regular Sales Alcoholic Beverage Review Application - Completed & Signed Application Fee $50 State of Florida

More information

PERMITTED USES: Within the MX-1 Mixed Use Neighborhood District the following uses are permitted:

PERMITTED USES: Within the MX-1 Mixed Use Neighborhood District the following uses are permitted: 6.25 MX-1 - MIXED USE NEIGHBORHOOD 6.25.1 INTENT: The purpose of the MX-1 Mixed Use Neighborhood District is to accommodate the development of a wide-range of residential and compatible non-residential

More information

DENTON Developer's Handbook

DENTON Developer's Handbook DENTON Developer's Handbook A guide for land development in the City of Denton Department of Development Services 2017 2 Table of Contents 1. City of Denton Development Process...5 Role of the Development

More information

SUBDIVISION AND PLATTING STANDARDS Intent and Purpose

SUBDIVISION AND PLATTING STANDARDS Intent and Purpose CHAPTER 700. SUBDIVISION AND PLATTING STANDARDS 700.1. Intent and Purpose 700.2. General The intent and purpose of this chapter is to set forth the standards for subdividing and platting land. It is the

More information

Cover Letter with Narrative Statement

Cover Letter with Narrative Statement Cover Letter with Narrative Statement March 31, 2017 rev July 27, 2017 RE: Rushton Pointe Residential Planned Unit Development Application for Public Hearing for RPUD Rezone PL2015 000 0306 Mr. Eric Johnson,

More information

CONCEPTUAL MASTER PLAN CHECKLIST Major Land Development Project

CONCEPTUAL MASTER PLAN CHECKLIST Major Land Development Project CONCEPTUAL MASTER PLAN CHECKLIST Major Land Development Project To initiate the application, the applicant shall submit to the Administrative Officer: 1. The application review fee, as established by the

More information

LEXINGTON OAKS COMMERCIAL PD/MPUD Application for Planned Development/Master Planned Unit Development Approval Project Narrative.

LEXINGTON OAKS COMMERCIAL PD/MPUD Application for Planned Development/Master Planned Unit Development Approval Project Narrative. LEXINGTON OAKS COMMERCIAL PD/MPUD Application for Planned Development/Master Planned Unit Development Approval Project Narrative Introduction Applicant, Specialty Restaurants Corporation ( Applicant )

More information

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached: Staff Report: Completed by Jeff Palmer Director of Planning & Zoning Date: November 7, 2018 Applicant: Greg Smith, Oberer Land Developer agent for Ronald Montgomery ET AL Property Identification: Frontage

More information

Subtitle 24 Revision to incorporate SGT SB 236 8/3/2012 STAFF DRAFT 2

Subtitle 24 Revision to incorporate SGT SB 236 8/3/2012 STAFF DRAFT 2 Subtitle 24 Revisions DRAFT 2 Definitions: Section 24-101 Remainder Agricultural Parcel-On or after October 1, 2012 pursuant to Section 9-206 of the Environment Article a remainder parcel is created by

More information

Article 2 Application Type and Standards Requirements

Article 2 Application Type and Standards Requirements Article 1 Article 2 Division 1 Application Type and Standards Requirements General Provisions Sec. 2.1.1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 Division 9 Sec. 2.9.1

More information

CHAPTER 14 PLANNED UNIT DEVELOPMENTS

CHAPTER 14 PLANNED UNIT DEVELOPMENTS 9-14-1 9-14-1 CHAPTER 14 PLANNED UNIT DEVELOPMENTS SECTION: 9-14-1: Purpose 9-14-2: Governing Provisions 9-14-3: Minimum Area 9-14-4: Uses Permitted 9-14-5: Common Open Space 9-14-6: Utility Requirements

More information

Midwest City, Oklahoma Zoning Ordinance

Midwest City, Oklahoma Zoning Ordinance 2010 Midwest City, Oklahoma Zoning Ordinance 9/2/2010 Table of Contents Section 1. General Provisions... 5 1.1. Citation... 5 1.2. Authority... 5 1.3. Purpose... 5 1.4. Nature and Application... 5 1.5.

More information

Chapter Development Standards Table of Contents. Section Name Page

Chapter Development Standards Table of Contents. Section Name Page Chapter 900 - Development Standards Table of Contents Section Name Page Section 901 Transportation 901.1-1 901.1 Transportation Corridor Spacing 901.1-1 901.2 Transportation - Corridor Management 901.2-1

More information

HOW TO APPLY FOR A USE PERMIT

HOW TO APPLY FOR A USE PERMIT HOW TO APPLY FOR A USE PERMIT MENDOCINO COUNTY PLANNING AND BUILDING SERVICES What is the purpose of a use permit? Throughout the County, people use their properties in many different ways. They build

More information

Planned Unit Development (PUD). Sections:

Planned Unit Development (PUD). Sections: Chapter 19.07. Planned Unit Development (PUD). Sections: 19.07.01. Purpose. 19.07.02. PUD Definition and Design Compatibility. 19.07.03. General PUD Standards. 19.07.04. Underlying Zones. 19.07.05. Permitted

More information

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION I. SUBMITTAL REQUIREMENTS: 1. Fees per current schedule. 2. Deed to property. 3. Pre-Application meeting is mandatory. Contact the Building Official

More information

ZONING ORDINANCE: OPEN SPACE COMMUNITY. Hamburg Township, MI

ZONING ORDINANCE: OPEN SPACE COMMUNITY. Hamburg Township, MI ZONING ORDINANCE: OPEN SPACE COMMUNITY Hamburg Township, MI ARTICLE 14.00 OPEN SPACE COMMUNITY (Adopted 1/16/92) Section 14.1. Intent It is the intent of this Article to offer an alternative to traditional

More information

SECTION 10.7 R-PUD (RESIDENTIAL PLANNED UNIT DEVELOPMENT) ZONE

SECTION 10.7 R-PUD (RESIDENTIAL PLANNED UNIT DEVELOPMENT) ZONE Article X Zones 10-20 SECTION 10.7 R-PUD (RESIDENTIAL PLANNED UNIT DEVELOPMENT) ZONE A. PURPOSE AND INTENT: The R-PUD Residential PUD Zone is intended to provide alternative, voluntary zoning procedures

More information

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE Effective date March 17, 1981 Revised March 16, 1982 Revised March 13, 1986 Revised March 10, 1987 Revised March 14, 2013 Revised March 8, 2016 TOWN OF WATERVILLE

More information

Residential Project Convenience Facilities

Residential Project Convenience Facilities Standards for Specific Land Uses 35.42.220 E. Findings. The review authority shall approve a Land Use Permit in compliance with Subsection 35.82.110.E (Findings required for approval) or a Conditional

More information

CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT

CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT CHAPTER 22 SUBDIVISION AND LAND DEVELOPMENT 22-101. Title 22-102. Legislative Intent Part 1 General Provisions 22-201. Development Permits Part 2 Administration 22-301. Fee Schedule Part 3 Fee Schedule

More information

City of Sanibel. Planning Department STAFF REPORT

City of Sanibel. Planning Department STAFF REPORT City of Sanibel Planning Department STAFF REPORT Planning Commission Meeting: July 23, 2013 Planning Commission Agenda Item: No 7b. Application Number: 13-7438DP Applicant Name: Attorney Beverly Grady

More information

Draft Model Access Management Overlay Ordinance

Draft Model Access Management Overlay Ordinance Draft Model Access Management Overlay Ordinance This model was developed using the City of Hutchinson and the Trunk Highway 7 corridor. The basic provisions of this model may be adopted by any jurisdiction

More information

Town of Bristol Rhode Island

Town of Bristol Rhode Island Town of Bristol Rhode Island Subdivision & Development Review Regulations Adopted by the Planning Board September 27, 1995 (March 2017) Formatted: Highlight Formatted: Font: 12 pt Table of Contents TABLE

More information

Waseca County Planning and Zoning Office

Waseca County Planning and Zoning Office Waseca County Planning and Zoning Office 300 North State Street Waseca, Minnesota 56093 Phone: 507-835-0650 Fax: 507-837-5310 Form no. PZ 081009 Web Site: www.co.waseca.mn.us FEES: 1) CUP FEE- $400.00

More information

PLANNED UNIT DEVELOPMENT (PUD) AREA PLAN/REZONING REVIEW PROCEDURE

PLANNED UNIT DEVELOPMENT (PUD) AREA PLAN/REZONING REVIEW PROCEDURE PLANNED UNIT DEVELOPMENT (PUD) AREA PLAN/REZONING REVIEW PROCEDURE Professional inquiries will be made to our Township Planning Consultant, Township Engineer, and Township Attorney to get their opinions

More information

I. Requirements for All Applications. C D W

I. Requirements for All Applications. C D W 108-16.1. Application checklists. Checklist for Required Submissions to the Planning Board or Zoning Board of Adjustment of Monroe Township All required submissions are to be made to the Administrative

More information

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED SECTION 950 GENERALLY All applications shall be properly signed and filed by the owner or, with the owner s specific written consent, a contract purchaser

More information

Section SKETCH PLAN REVIEW

Section SKETCH PLAN REVIEW Section 210 - SKETCH PLAN REVIEW 1. Within 30 days of receiving a complete application for a subdivision involving three or more lots, the Zoning Administrator shall refer the matter to the first available

More information

In order to permit maximum applicability of the PUD District, PUD-1 and PUD-2 Districts are hereby created.

In order to permit maximum applicability of the PUD District, PUD-1 and PUD-2 Districts are hereby created. ARTICLE III. PUD ned Unit Development Overlay District 205-128. Purpose. The PUD ned Unit Development Overlay District is intended to provide flexibility in the design of planned projects; to encourage

More information

ARTICLE XI - CONSERVATION SUBDIVISIONS

ARTICLE XI - CONSERVATION SUBDIVISIONS ARTICLE XI - CONSERVATION SUBDIVISIONS Section 1101: Purpose and Intent. This Article is intended to provide for residential subdivisions that are designed based first and foremost on the preservation

More information

2025 COMPREHENSIVE PLAN PASCO COUNTY, FLORIDA

2025 COMPREHENSIVE PLAN PASCO COUNTY, FLORIDA FUTURE LAND USE ELEMENT APPENDIX SECTION FLU A-1 COMPREHENSIVE PLAN AMENDMENT STANDARDS OF REVIEW The Pasco County Comprehensive Plan is designed to preserve and enhance the public health, safety, and

More information

TOWN OF OCEAN ISLE BEACH

TOWN OF OCEAN ISLE BEACH TOWN OF OCEAN ISLE BEACH PLANNED UNIT DEVELOPMENT ORDINANCE ADOPTED IN EFFECT FEBRUARY 13, 2001 This ordinance has been prepared by the Ocean Isle Beach Planning & Inspections Department. Section 66-55.

More information

ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE

ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE SECTION 8C.01 PURPOSE It is the purpose of this Ordinance to insure that plans for development within Oceola Township proposed under the provisions of

More information

FINAL DRAFT 12/1/16, Rev. to 7/18/17

FINAL DRAFT 12/1/16, Rev. to 7/18/17 FINAL DRAFT 12/1/16, Rev. to 7/18/17 (As Adopted 8/8/17 Effective 9/1/17) SHELTON PLANNING AND ZONING COMMISSION Proposed Amendments to Zoning Regulations I. Amend Section 23 PERMITTED USES by inserting

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

ARTICLE 1 GENERAL PROVISIONS

ARTICLE 1 GENERAL PROVISIONS ARTICLE 1 GENERAL PROVISIONS SECTION 100 TITLE This Ordinance shall be known and cited as the "Rice Township Subdivision and Land Development Ordinance." SECTION 101 AUTHORITY Rice Township is empowered

More information

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable). Office Use Only Preliminary Long Plat Long Subdivision Applicant Checklist PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT PRELIMINARY LONG PLAT LONG SUBDIVISION CHECKLIST Mailing Address: P.O.

More information

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT RECEIVED STAMP SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT A checklist of background information and submission requirements for processing of a sketch plan, preliminary plat

More information

FUTURE LAND USE. City of St. Augustine Comprehensive Plan EAR-Based Amendments

FUTURE LAND USE. City of St. Augustine Comprehensive Plan EAR-Based Amendments FUTURE LAND USE City of St. Augustine Comprehensive Plan EAR-Based Amendments Future Land Use Element FLU Goal To create an environment within the City and adjacent areas in which its residents have the

More information

Guide to Preliminary Plans

Guide to Preliminary Plans Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures

More information

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL SECTION 22.01 PURPOSE ARTICLE XXII PROCEDURES The purpose of this Article is to establish uniform requirements of procedure for all developments in the Township. Certain specific types of minor development

More information

TOOELE COUNTY LAND USE ORDINANCE CHAPTER 31 Page 1

TOOELE COUNTY LAND USE ORDINANCE CHAPTER 31 Page 1 CHAPTER 31 PLANNED COMMUNITY ZONE (P-C) Section 31-1 Definitions. 31-2 Purpose. 31-3 Land use districts. 31-4 P-C zone area minimum requirements. 31-5 Permitted uses. 31-6 Conditional uses. 31-7 Planning

More information

SECTION 4: PRELIMINARY PLAT

SECTION 4: PRELIMINARY PLAT SECTION 4: PRELIMINARY PLAT After the completion of the sketch plan process, if submitted, the owner or developer shall file with the City an application for preliminary plat. The preliminary plat stage

More information

PLANNED RESIDENTIAL DEVELOPMENT (PRD)

PLANNED RESIDENTIAL DEVELOPMENT (PRD) PLANNED RESIDENTIAL DEVELOPMENT SECTION 10. PLANNED RESIDENTIAL DEVELOPMENT (PRD) 10.1 Purpose Planned Residential Development allows by special permit from the Board an alternative pattern of residential

More information

SPECIAL ZONING DISTRICTS

SPECIAL ZONING DISTRICTS SPECIAL ZONING DISTRICTS 5.01 5.99 RESERVED 5.100 PLANNED DEVELOPMENTS: Purpose: This district is intended to accommodate unified design of residential, commercial, office, professional services, retail

More information

ORDINANCE # NOW THEREFORE BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF HERNANDO COUNTY, FLORIDA:

ORDINANCE # NOW THEREFORE BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF HERNANDO COUNTY, FLORIDA: ORDINANCE #2003-08 AN ORDINANCE AMENDING APPENDIX A, ZONING, ARTICLE IV, SECTION 3. COMMERCIAL DISTRICTS THROUGH MODIFICATION BY ESTABLISHING MAXIMUM DEVELOPMENT THRESHOLDS; BY AMENDING APPENDIX A, ZONING,

More information

ARTICLE 9: VESTING DETERMINATION, NONCONFORMITIES AND VARIANCES. Article History 2 SECTION 9.01 PURPOSE 3

ARTICLE 9: VESTING DETERMINATION, NONCONFORMITIES AND VARIANCES. Article History 2 SECTION 9.01 PURPOSE 3 ARTICLE 9 VESTING DETERMINATIONS, NONCONFORMITIES, AND VARIANCES Table of Contents Article History 2 SECTION 9.01 PURPOSE 3 SECTION 9.02 LOT OF RECORD AND VESTING DETERMINATIONS FOR NONCONFORMING DEVELOPMENTS

More information