1 San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package Terminal 1 March, 2012 Civic Design Review_Phase III Design Development May 5, 2017 All rights reserved, Andrew Choi

2 SFO T1 CIVIC DESIGN REVIEW PHASE III DESIGN DEVELOPMENT TABLE OF CONTENTS 1. CONCEPT 2. PROJECT SCOPE 3. GLASS FRITT PATTERN STUDY 4. CURBSIDE VIEW 5. CURBSIDE EXPRESSION 6. BRIDGE CONNECTOR EXPRESSION 7. SOUTH EAST CORNER EXPRESSION 8. GLARE ANALYSIS 9. TERMINAL VESTIBULE EXPRESSION 10. CONSTRUCTION DETAILS AIRSIDE DRAWINGS CDRC comments & response from April 24, 2017 Comments from CDRC : Fritted glazing should extend to the bridge portal, and fading it along the curve past the point of solar gain is encouraged. Response : Frit pattern has been extended to provide coverage from the North end to the Bridge Connector as requested Comments from CDRC : Not the bridge, but the reentrant wall plane metal panels adjacent to the bridge connecting T1 to the International Terminal. We encourage the design team to look at a simplified panelization patterning. Response : after careful consideration, the landside facade is designed as composition of elements reflecting the forest pattern interpretation. This pattern has been simplified, and occurs at the South entry, Bridge connector, and Concourse C facade. The single color metal panel occurs to mark the Airside from the Landside. Comments from CDRC : Along the upper glazing fascia of the Terminal Landside facade, we encourage the design team to see if the intermediate horizontal mullion cap can be done as a structually glazed horizontal detail, not a capped one. Response : The Landside Facade glazing is now designed without mullion end caps. Structural glazing details of the system are on sheets 19 Comments from CDRC : Agreed, and encourage the design team to explore other faux bois finishes that appear less plastic than phenolic panels Response : Construction details and material selection to appear authentic, See Detail page 14 San Francisco International Airport Terminal 1 Renovation 2

3 1. CONCEPT The Building is not a solid object, it s a transparent box offering views and personal connections with the bay area naturalism represented. Warmth of the interior comes through as a simple clear box. You can also see vegetation and natural elements through the glass. The opportunity to enter this enclosed natural environment manifests itself in vestibules carved out of natural materials, creating a sense of a walk-through nature, providing a sense of relaxation and place upon entering the building. San Francisco International Airport Terminal 1 Renovation 3

4 2. PROJECT SCOPE NEED TO UPDATE San Francisco International Airport Terminal 1 Renovation 4

5 3. CREATING A BAY AREA NATURALISM EXPERIENCE: FRITT PATTERN MAKING PROCESS Comments from CDRC : Fritted glazing should extend to the bridge portal, and fading it along the curve past the point of solar gain is encouraged. Response : Frit pattern has been extended to provide coverage from the North end to the Bridge Connector as requested San Francisco International Airport Terminal 1 Renovation 5

6 4. TERMINAL CURBSIDE VIEW Comments from CDRC : Not the bridge, but the reentrant wall plane metal panels adjacent to the bridge connecting T1 to the International Terminal. We encourage the design team to look at a simplified panelization patterning. Response : after careful consideration, the landside facade is designed as composition of elements reflecting the forest pattern interpretation. This pattern has been simplified, and occurs at the South entry, Bridge connector, and Concourse C facade. The single color metal panel occurs to mark the Airside from the Landside. San Francisco International Airport Terminal 1 Renovation 6

7 5. TERMINAL CURBSIDE EXPRESSION Comments from CDRC : Along the upper glazing fascia of the Terminal Landside facade, we encourage the design team to see if the intermediate horizontal mullion cap can be done as a structually glazed horizontal detail, not a capped one. Response : The Landside Facade glazing is now designed without mullion end caps. Structural glazing details of the system are on sheets 19 San Francisco International Airport Terminal 1 Renovation 7

8 6. BRIDGE CONNECTOR EXPRESSION San Francisco International Airport Terminal 1 Renovation 8

9 7. SOUTH EAST CORNER EXPRESSION San Francisco International Airport Terminal 1 Renovation 9

10 8. GLARE ANALYSIS San Francisco International Airport Terminal 1 Renovation 10

11 9. TERMINAL VESTIBULE EXPRESSION Comments from CDRC : Agreed, and encourage the design team to explore other faux bois finishes that appear less plastic than phenolic panels Response : Construction details and material selection to appear authentic, See Detail page 14 San Francisco International Airport Terminal 1 Renovation 11

12 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) PARTIAL SECTION - 9 San Francisco International Airport Terminal 1 Renovation

13 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WALL SECTION AT VESTIBULE, TYPICAL AT DEPARTURE LEVEL San Francisco International Airport Terminal 1 Renovation

14 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) LANDSIDE CANOPY CANOPY BEAM CONNECTION - 1/4 SLOPE San Francisco International Airport Terminal 1 Renovation

15 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) MULLION - CANOPY - WT-06 - PURLIN MULLION - CANOPY - WT-06 - RAFTER San Francisco International Airport Terminal 1 Renovation

16 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW SILL (LANDSIDE DEPARTURES) San Francisco International Airport Terminal 1 Renovation

17 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW JAMB (LANDSIDE DEPARTURES) WINDOW VERTICAL (LANDSIDE DEPARTURES) San Francisco International Airport Terminal 1 Renovation

18 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW HORIZONTAL, INTERM.VERT. AT TOP (LANDSIDE ARRIVAL) WINDOW HORIZONTAL, INTERM.VERT. AT BOTTOM (LANDSIDE ARRIVAL) San Francisco International Airport Terminal 1 Renovation

19 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW HEAD (AIRSIDE) San Francisco International Airport Terminal 1 Renovation

20 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) WINDOW SILL (AIRSIDE) San Francisco International Airport Terminal 1 Renovation

21 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) 90 DEGREE WINDOW CORNER (AIRSIDE) San Francisco International Airport Terminal 1 Renovation

22 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) PARAPET DETAIL AT LANDSIDE, T1S MOD LANDSIDE PARAPET, TYPICAL San Francisco International Airport Terminal 1 Renovation

23 10. CONSTRUCTION DRAWINGS (EXTERIOR DEPARTURES) LANDSIDE BASE OF WALL DETAIL - GL WA.1 LANDSIDE BASE OF WALL DETAIL San Francisco International Airport Terminal 1 Renovation

24 B36 B35 B34 B33 B32 B31 B30 SHEET NOTES AREA 66 AREA 64 MATCH LINE SEE 01 / A T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 03 / A ' - 11" 39' - 9" SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA A A T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" 207 King St., Suite 300 San Francisco, CA Phone (415) EXTERIOR EAST PARTIAL ELEVATION (AREA 62, 64 & 66) 04 SCALE: 1/16" = 1'-0" 539 Bryant Street Suite 100 San Francisco CA Phone (415) B30 B29 B28 AREA 62 B27 B26 B25 B24 AREA 60 B A A B22 B21 MATCH LINE SEE 04 / A T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 02 / A ' - 11" GENERAL NOTES 1. REFER TO THE A02. 1 SERIES DRAWINGS FOR APRON LEVEL PLANS 2. REFER TO THE A02.2 SERIES DRAWINGS FOR CONCOURSE LEVEL PLANS 3. REFER TO THE A02.2M SERIES DRAWINGS FOR MEZZANINE LEVEL PLANS 39' - 9" 4. REFER TO THE A03.0 SERIES DRAWINGS FOR EXTERIOR ELEVATIONS 5. REFER TO THE A03.2 SERIES DRAWINGS FOR BUILDING SECTIONS BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt MATCH LINE SEE 03 / A B21 MATCH LINE SEE 02 / A B9 AREA A B20 B8 B19 03 A B7 B18 B17 03 A B A A A B6 B5 AREA 56 B4 B15 B3 B14 B A A A A A A A A A A AREA 52 Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. AREA A A B13 B1 T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" EXTERIOR EAST PARTIAL ELEVATION (AREA 58 & 60) 03 SCALE: 1/16" = 1'-0" MATCH LINE SEE 01 / A T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" 39' - 9" 56' - 11" 71' - 2" T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" EXTERIOR EAST PARTIAL ELEVATION (AREA 56 & 58) 02 SCALE: 1/16" = 1'-0" B0 CJ T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" 39' - 9" 56' - 11" 71' - 2" T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" EXTERIOR NORTH-EAST ELEVATION 01 SCALE: 1/16" = 1'-0" 6. REFER TO THE A03.3 SERIES DRAWINGS FOR WALL SECTIONS 7. REFER TO THE A04.7 SERIES DRAWINGS FOR WALL SECTIONS 8. REFER TO THE BB02.1 SERIES DRAWINGS FOR PBB's 01 GRAPHIC LEGEND 50 TRUE 52 VG - VISION GLASS METAL PANEL (AMF-01) METAL LOUVER (AMF-01) CONCRETE MASONARY UNIT WITH TAC-01 FINISH CONCRETE WITH TAC-01 FINISH GALV. CHAIN LINK FENCE 54 PLAN CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION As indicated DATE A EXTERIOR BUILDING ELEVATIONS Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 A SEPT 2, % DESIGN DEVELOPMENT ISSUE DATE DESCRIPTION Sheet Printed On: :56:03 PM

25 B15 AREA B16 B17 B18 B19 AREA 57 B20 B21 B22 B23 A A A A A SHEET NOTES MATCH LINE SEE 01 / A T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 04 / A ' - 11" 39' - 9" SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA T1C - ARRIVALS LEVEL 1 11' - 6" T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" 207 King St., Suite 300 San Francisco, CA Phone (415) EXTERIOR WEST PARTIAL ELEVATION (AREA 55 & 57) 05 SCALE: 1/16" = 1'-0" 539 Bryant Street Suite 100 San Francisco CA Phone (415) B23 B24 B AREA 59 A B26 B27 B28 AREA 61 B29 A A A BA MATCH LINE SEE 05 / A T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" MATCH LINE SEE 04 / A T1C PENTHOUSE FF T.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 02 / A ' - 11" GENERAL NOTES 1. REFER TO THE A02. 1 SERIES DRAWINGS FOR APRON LEVEL PLANS 2. REFER TO THE A02. 2 SERIES DRAWINGS FOR CONCOURSE LEVEL PLANS 3. REFER TO THE A02. 2M SERIES DRAWINGS FOR MEZZANINE LEVEL PLANS 39' - 9" 4. REFER TO THE A03. 1 SERIES DRAWINGS FOR ENLARGED ELEVATION 5. REFER TO THE A03. 2 SERIES DRAWINGS FOR BUILDING SECTIONS 6. REFER TO THE A03. 3 SERIES DRAWINGS FOR WALL SECTIONS BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt T1C - ARRIVALS LEVEL 1 11' - 6" MATCH LINE SEE 03 / A B29 B30 B31 B32 AREA 63 B33 B34 B35 AREA 65 B36 07 A EXTERIOR WEST PARTIAL ELEVATION (AREA 59 & 61) 04 SCALE: 1/16" = 1'-0" MATCH LINE SEE 02 / A A A A BA AREA 65 BB BC BD BE AREA 66 BG Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. 10 A T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 01 / A ' - 9" 56' - 11" T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" T1C PENTHOUSE FFT.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" MATCH LINE SEE 04 / A ' - 9" 56' - 11" T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" EXTERIOR NORTH PARTIAL ELEVATION (AREA 61) 03 SCALE: 1/16" = 1'-0" EXTERIOR WEST PARTIAL ELEVATION (AREA 63 & 65) 02 SCALE: 1/16" = 1'-0" T.O. APRON SLAB (1) - BAB NAVD88: 10' - 0" EXTERIOR SOUTH PARTIAL ELEVATION (AREA 65 & 66) 01 SCALE: 1/16" = 1'-0" 7. REFER TO THE BB02.1 SERIES DRAWINGS FOR PBB's GRAPHIC LEGEND 50 TRUE PLAN VG - VISION GLASS METAL PANEL (AMF-01) METAL LOUVER (AMF-01) CONCRETE MASONARY UNIT WITH TAC-01 FINISH CONCRETE WITH TAC-01 FINISH GALV. CHAIN LINK FENCE CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 As indicated DATE A EXTERIOR BUILDING ELEVATIONS A SEPT 2, % DESIGN DEVELOPMENT 02 ISSUE DATE DESCRIPTION Sheet Printed On: :56:26 PM

26 SHEET NOTES SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA King St., Suite 300 San Francisco, CA Phone (415) Bryant Street Suite 100 San Francisco CA Phone (415) GENERAL NOTES 1. REFER TO THE A02. 1 SERIES DRAWINGS FOR APRON LEVEL PLANS 2. REFER TO THE A02.2 SERIES DRAWINGS FOR CONCOURSE LEVEL PLANS 3. REFER TO THE A02.2M SERIES DRAWINGS FOR MEZZANINE LEVEL PLANS 4. REFER TO THE A03.0 SERIES DRAWINGS FOR EXTERIOR ELEVATIONS 5. REFER TO THE A03.2 SERIES DRAWINGS FOR BUILDING SECTIONS 6. REFER TO THE A03.3 SERIES DRAWINGS FOR WALL SECTIONS 7. REFER TO THE A04.7 SERIES DRAWINGS FOR WALL SECTIONS BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt MATCH LINE SEE 02 / A B4 A B5 A B6 A B7 AREA 53 B8 B9 Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. AREA 51 MATCH LINE SEE 01 / A T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" 37' - 2 1/2" T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" MATCH LINE SEE 05 / A T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" 37' - 2 1/2" 56' - 11" 56' - 11" 71' - 2" 71' - 2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" EXTERIOR SOUTH PARTIAL ELEVATION (AREA 51 & 53) 02 SCALE: 1/16" = 1'-0" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" T1C - ARRIVALS LEVEL 1 T.O. APRON SLAB (1) - BAB 11' - 6" NAVD88: 10' - 0" EXTERIOR SOUTH-WEST ELEVATION 01 SCALE: 1/16" = 1'-0" 8. REFER TO THE BB02.1 SERIES DRAWINGS FOR PBB's GRAPHIC LEGEND 50 TRUE PLAN VG - VISION GLASS METAL PANEL (AMF-01) METAL LOUVER (AMF-01) CONCRETE MASONARY UNIT WITH TAC-01 FINISH CONCRETE WITH TAC-01 FINISH GALV. CHAIN LINK FENCE CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION As indicated DATE A EXTERIOR BUILDING ELEVATIONS Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 A SEPT 2, % DESIGN DEVELOPMENT ISSUE DATE DESCRIPTION Sheet Printed On: :56:39 PM

27 DRAWINGS ARE IN PROGRESS IN RESPONSE TO THE UPDATED AGA BUILDING ENVELOPE SYSTEM 04 E.O.S. BB 04 E.0.S. BJ T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 2' - 7" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 2' - 7" 13' - 3 1/2" 10 13' - 1 1/2" 06 22' - 1 1/2" 19' - 6 1/2" 19' - 6 1/2" SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA ' - 10" 05 A ' - 0" King St., Suite 300 San Francisco, CA Phone (415) ' - 0" 539 Bryant Street Suite 100 San Francisco CA Phone (415) TYPICAL SPANDREL PANEL AT FIXED LINK GATE E.O.S. BB 04 E.0.S. BG 04 E.0.S. BJ BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 22' - 1 1/2" 22' - 1 1/2" 2' - 7" 19' - 6 1/2" 2' - 7" 19' - 6 1/2" 10" 9' - 0" 5' - 4 1/2" 7' - 11" 13' - 3 1/2" 8' - 10" C.O.M. C.O.M. C.O.M A GLASS PANEL AT GREEN ROOF A FULL SPANDREL PANEL AT GREEN ROOF 07 E.O.S. E.O.S. BB T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. 22' - 1 1/2" 22' - 1 1/2" 19' - 6 1/2" 2' - 7" 2' - 7" 19' - 6 1/2" 13' - 1 1/2" 9' - 0" 2' - 0" 13' - 3" 10' /4" 2' - 0" TYPICAL FULL SPANDREL AT CONCOURSE LEVEL 04 E.0.S. BJ T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" TYPICAL SPANDREL PANEL AT EXIT DOOR TYPICAL VISION PANEL AT CONCOURSE 02 T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 2' - 7" 19' - 6 1/2" 22' - 1 1/2" 7' /8" 5' - 4" 9' - 0 3/4" 2" 1' - 10" 2' - 7" 19' - 6 1/2" C.O.M. C.O.M. C.O.M. N.I.C A SEISMIC JOINT AT CONCOURSE & R1 LEVEL 01 CJ B0 CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J E OCT 28, 2016 C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 ISSUE DATE DESCRIPTION 1/4" = 1'-0" DATE A EXTERIOR WALL SECTIONS Sheet Printed On: :47:12 1:47:13 PM

28 DRAWINGS ARE IN PROGRESS IN RESPONSE TO THE UPDATED AGA BUILDING ENVELOPE SYSTEM E.O.S. BN E.O.S. BB 04 A A T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" 2' - 7" 8' - 3 1/2" T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" 8' - 3" T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" 03 C.O.M. C.O.M. 17' - 1 1/2" 19' - 8 1/2" SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" 41' - 3 1/2" 11' - 7" 5' - 2 1/2" C.O.M. 07 A F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" 39' - 3 1/2" 11' - 7 1/2" 5' - 2 1/2" C.O.M. 07 A King St., Suite 300 San Francisco, CA Phone (415) Bryant Street Suite 100 San Francisco CA Phone (415) C.O.M. C.O.M. 02 5' - 4 1/2" 19' - 7" C.O.M. 8' - 10" 14' - 4 3/4" A ' - 0" 1' - 10" 2" C.O.M. 10" 2" C.O.M. BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" 39' - 3 1/2" N.I.C. 12 A A A CJ B0 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL AT CONCOURSE & MEZZANINE LEVEL T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" 41' - 3 1/2" 2' - 7" 17' - 3 5/8" 19' - 5" 10' - 10" 10' - 7" 11' - 7" 8' - 3 1/2" C.O.M. C.O.M. 04 A E.O.S. BN T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" F.F. MEZZANINE (2M) - BAB NAVD88: 47' - 2 1/2" SEISMIC JOINT AT CONCOURSE, MEZZANINE & R2 LEVEL 05 CURTAIN WALL AT CONCOURSE & MEZZANINE LEVEL Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. CURTAIN WALL AT CONCOURSE & MEZZANINE LEVEL ' - 3 1/2" 2' - 7" 17' - 5 5/8" 19' - 5" 10" 2" 8' - 10" 5' - 4 1/2" 5' - 0 1/2" 11' - 9 1/2" 8' - 3" C.O.M. C.O.M. C.O.M. 04 A A A E.O.S. BB T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL AT CONCOURSE & MEZZANINE LEVEL CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J E OCT 28, 2016 C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 ISSUE DATE DESCRIPTION 1/4" = 1'-0" DATE A EXTERIOR WALL SECTIONS Sheet Printed On: :47:30 PM

29 BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 19' - 9" 19' - 9" 2' - 7" 14' - 7" 2' - 7" 2' - 7" 14' - 7" 2' - 7" 17' - 2" 17' - 2" E.0.S. BE T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL LOUVER AT MECHANICAL PENTHOUSE AT R2 LEVEL 10 19' - 9" 14' - 7" 2' - 7" 2' - 7" 17' - 2" E.0.S. BE T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" OPAQUE PANEL AT MECHANICAL PENTHOUSE AT R2 LEVEL 09 BE T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" SCREEN WALL AT MECHANICAL WELL T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 19' - 9" 2' - 7" 14' - 7" 2' - 7" 17' - 2" SCREEN WALL AT MECHANICAL WELL BE DRAWINGS ARE IN PROGRESS IN RESPONSE TO THE UPDATED AGA BUILDING ENVELOPE SYSTEM T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T1C PENTHOUSE FF T.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" E.0.S. E.0.S. T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T1C PENTHOUSE FF T.O. PARAPET (R2) - BAB NAVD88: 66' - 7 1/2" NAVD88: 66' - 11" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 34' - 0" 2' - 7" 14' - 7" 2' - 7" 11' - 9 1/2" 2' - 5 1/2" 2' - 5 1/2" 11' - 9 1/2" 17' - 2" 2' - 7" 14' - 3" 9' - 8" 7' - 4" 2" 14' - 3" 9' - 8" 7' - 4" 2" C.O.M. C.O.M. C.O.M. C.O.M E.0.S. E.0.S. BK BK T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL AT MARS GATE B7 04 Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 34' - 0" 19' - 9" 2' - 7" 14' - 7" 2' - 7" 11' - 9 1/2" 2' - 5 1/2" 2' - 7" 14' - 7" 2" 7' - 4" 9' - 8" 14' - 3" 2' - 7" 7' - 1" 7' - 4" 2" 2' - 7" C.O.M. C.O.M. C.O.M. C.O.M E.0.S. BK BK T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" CURTAIN WALL AT MEZZANINE & PENTHOUSE LEVEL 02 CURTAIN WALL AT MEZZANINE & PENTHOUSE LEVEL 03 CURTAIN WALL AT MEZZANINE LEVEL CLERESTORY AREA 01 CONTRACT NO. T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" SAN FRANCISCO INTERNATIONAL AIRPORT PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA King St., Suite 300 San Francisco, CA Phone (415) Bryant Street Suite 100 San Francisco CA Phone (415) SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z L DEC 09, 2016 ISSUE L J NOV 30, 2016 ISSUE J E OCT 28, 2016 C OCT 12, 2016 ISSUE C B SEPT 30, 2016 BID PACKAGE #3 ISSUE DATE DESCRIPTION 1/4" = 1'-0" DATE A EXTERIOR WALL SECTIONS Sheet Printed On: :47:59 PM

30 DRAWINGS ARE IN PROGRESS IN RESPONSE TO THE UPDATED AGA BUILDING ENVELOPE SYSTEM SAN FRANCISCO INTERNATIONAL AIRPORT 710 McDonnell Road, 2nd Floor San Francisco, CA King St., Suite 300 San Francisco, CA Phone (415) BM 13 T.O. PARAPET (R3) - BAB NAVD88: 81' - 2" T.O. ROOF DECK (R3) - BAB NAVD88: 78' - 8 1/2" 16' - 10" E.0.S. 539 Bryant Street Suite 100 San Francisco CA Phone (415) ' - 9 1/2" 14' - 3" 2' - 5 1/2" 12 BIM 360://SFO T1 BAB_2016/SFIA-T1-BAB_A.rvt Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited. T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" T.O. PARAPET (R2) - BAB NAVD88: 66' - 11" T.O. ROOF SLAB (R2) - BAB NAVD88: 64' - 4" T.O. ROOF SLAB (R1) - BAB NAVD88: 47' - 2" 19' - 9" 2' - 7" 2' - 7" 14' - 7" 2' - 7" 2' - 7" 14' - 7" 2' - 7" 1 1/4" 16' - 9 1/4" 3 1/2" E.0.S. E.0.S. BC BC E.0.S. T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" OPAQUE PANEL AT PENTHOUSE LEVEL 3 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" FORMED METAL WALL PANEL SYSTEM AT MEZZANINE ROOF LEVEL 2 T1C PENTHOUSE FF NAVD88: 66' - 7 1/2" OPAQUE PANEL AT PENTHOUSE CORRIDOR 1 CONTRACT NO. PROJECT TITLE ARCHITECT / ENGINEER SEAL NOTE: If this drawing is not on 30" x 42", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable SCALE TERMINAL 1 REDEVELOPMENT. BOARDING AREA B SAN FRANCISCO INTERNATIONAL AIRPORT SHEET TITLE REFERENCE ONLY NOT FOR CONSTRUCTION Z MAR 24, 2017 ISSUE Z ISSUE DATE DESCRIPTION 1/4" = 1'-0" DATE A EXTERIOR WALL SECTIONS Sheet Printed On: :48:10 PM

31

32

33

34 B A B C VISION GLASS PAINTED METAL PANEL PAINTED LOUVERS C B A B B A A A A B B TYPICAL ELEVATIONS - BAB AIRSIDE

35

36

37

38

39

40

41

42

43 THANK YOU

Memo to the Planning Commission HEARING DATE: JUNE 30, 2016

Memo to the Planning Commission HEARING DATE: JUNE 30, 2016 Memo to the Planning Commission HEARING DATE: JUNE 30, 2016 Date: June 23, 2016 Case No.: 2014.0519CUAVAR Project Address: 2100 Market Street Zoning: Upper Market Street Neighborhood Commercial Transit

More information

625 San Anselmo Ave. Planning Submittal A0.00

625 San Anselmo Ave. Planning Submittal A0.00 LIVE OAK DESIGN COMPANY 855 POLK STREET #0 SAN FRANCISCO, CA 9409 65 SAN ANSELMO AVE. LLC SHEET NUMBER INDEX OF DRAWINGS SHEET NAME 0/09/08 - Planning Submittal 0/5/08 - Planning Submittal Rev 0 A0.00

More information

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch

Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual ch Architectural Narrative Columbia & Hawthorn responds to its unique location as a gateway to Little Italy and the Bay in several ways. 1. The visual character of the building is intended to symbolically

More information

SAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010

SAFEWAY - OAKLAND, CALIFORNIA PLANNING REVISIONS 1 - JULY 26, 2010 60 COLLEGE AVENUE OAKLAND, CA 9468 STORE #80 CURRENT OWNER: STORE NUMBER: 80 598 STONERIDGE MALL ROAD PLEASANTON, CA 94588-9 P) 95.46.08 F) 95.46.86 ASSESSOR'S PARCEL NUMBER: 048A00000 NO. DATE ISSUES

More information

SAN FRANCISCO FIRE DEPARTMENT FIRE STATION 5 CIVIC DESIGN REVIEW PHASE II APRIL 20TH, Building Design & Construction

SAN FRANCISCO FIRE DEPARTMENT FIRE STATION 5 CIVIC DESIGN REVIEW PHASE II APRIL 20TH, Building Design & Construction SAN FRANCISCO FIRE DEPARTMENT FIRE STATION 5 CIVIC DESIGN REVIEW PHASE II APRIL 20TH, 2015 SITE MAP Eddy Street Buchanan Street Turk Street Webster Street Fillmore Street Steiner Street PROJECT LOCATION

More information

2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015

2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015 2075 BROADWAY LOFTS DOWNTOWN ARAPAHOE SQUARE DESIGN DEVELOPMENT REVIEW SUBMISSION OCTOBER 8, 2015 U.S. POSTAL FACILITY / 20TH STREET GYM / SKYLOFTS ARRAJ COURT COMPLEX BRYON RODGERS FEDERAL BUILDING SKYLOFTS

More information

LANCASTER AVENUE WARREN STREET N. 33RD STREET N. 34TH STREET FILBERT STREET SITE PLAN ACC-DREXEL UNIVERSITY LANCASTER TOWER HALL CALHOUN HALL

LANCASTER AVENUE WARREN STREET N. 33RD STREET N. 34TH STREET FILBERT STREET SITE PLAN ACC-DREXEL UNIVERSITY LANCASTER TOWER HALL CALHOUN HALL TOWER HALL CALHOUN HALL LANCASTER AVENUE COMMUNITY EDUCATION CENTER N. 36TH STREET 7-ELEVEN ARCH STREET WARREN STREET BUCKLEY GREEN URBN CENTER ANNEX FILBERT STREET N. 34TH STREET RUSH BUILDING N. 33RD

More information

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design: BLOCK:00, LOT:4 ZONING TABULATION CHART ITEM REQUIRED EXISTING PROPOSED NOTE VARIANCE MIN. LOT SIZE*,500 SF,93.35 SF,93.35 SF CONFORMING NO MAX. STRUCTURE HEIGHT 5 STORIES 3 5 CONFORMING NO MIN. LOT WIDTH

More information

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1 50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca 900 BURRARD STREET

More information

AIRPORT BUILDING 624 SOUTHFIELD TENANT RELOCATION CONTRACT NO

AIRPORT BUILDING 624 SOUTHFIELD TENANT RELOCATION CONTRACT NO SOUTHFIELD TENANT RELOCATION CONTRACT NO. 10051.43 Phase 1: Schema c Design June 20, 2016 JOHN IMHOFF ARCHITECTS TUAN AND ROBINSON AGS, INC. A&S ENGINEERS, INC F.W. ASSOCIATES ENVIRONMENTAL BUILDING STRATEGIES

More information

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken. D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t 2072 ADDISON STREET PRELIMINARY DESIGN REVIEW For Committee Discussion/ Majority Recommendation JULY 20, 2017 Design Review #DRCP2016-0002

More information

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION M E M O R A N D U M 10-A PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION DATE: May 14, 2018 TO: FROM: SUBJECT: The Honorable Landmarks Commission Planning Staff 1314

More information

Letter of Determination

Letter of Determination SAN FRANCISCO PLANNING DEPARTMENT Letter of Determination 1650 Mission St. Suite 400 San Francisco, CA 94103-2479 June 11, 2014 Reception: 415.558.6378 Michael Castro Fax: Brereton Architects 415.558.6409

More information

Composition of traditional residential corridors.

Composition of traditional residential corridors. Page 1 of 7 St. Petersburg, Florida, Code of Ordinances >> PART II - ST. PETERSBURG CITY CODE >> Chapter 16 - LAND DEVELOPMENT REGULATIONS >> SECTION 16.20.060. CORRIDOR RESIDENTIAL TRADITIONAL DISTRICTS

More information

Small Lot Housing Code (June 2013):

Small Lot Housing Code (June 2013): Small Lot Housing Code (June 2013): Standards that establish a building envelope for a single Class 1a building and associated Class 10 buildings on an allotment. If an adjoining allotment is not subject

More information

Response to Urban Design Panel Comments

Response to Urban Design Panel Comments Response to Urban Design Panel Comments The project was brought forward to the International Urban Design Panel on Wednesday April 20th 2011. While the panel felt that the density and height was approvable,

More information

Secondary Suites Design Standards & Guidelines for houses built after July 1998

Secondary Suites Design Standards & Guidelines for houses built after July 1998 Secondary Suites Design Standards & Guidelines for houses built after July 1998 Overview This information outlines design elements you will need to include in your secondary suite, for houses built after

More information

Small Lot Housing Code

Small Lot Housing Code Small Lot Housing Code AUGUST 2014 SMALL LOT HOUSING CODE Level 29, 35 Collins Street Melbourne Victoria 3000 Telephone: 03 9651 9600 Facsimile: 03 9651 9623 Email: Info@mpa.vic.gov.au www.mpa.vic.gov.au

More information

1950 ADDISON. Berkeley, CA December 17, Design Reivew. Westwood BayRock Addison, L.P. c/o BayRock Multifamily, LLC

1950 ADDISON. Berkeley, CA December 17, Design Reivew. Westwood BayRock Addison, L.P. c/o BayRock Multifamily, LLC Page 1 of 38 1950 ADDISON Berkeley, CA Design Reivew c/o BayRock Multifamily, LLC Vicinity Map Drawing list Project team Martin Luther Jr. Way 1911 Addison 1915 Addison 1912 Addison Existing Residential

More information

2 OVERVIEW & GUIDE. 2.1 ZONING ATLAS OVERVIEW...9 Zoning Districts 9 Transit Areas 10 Pedestrian Streets 10

2 OVERVIEW & GUIDE. 2.1 ZONING ATLAS OVERVIEW...9 Zoning Districts 9 Transit Areas 10 Pedestrian Streets 10 2 OVERVIEW & GUIDE 2.1 ZONING ATLAS OVERVIEW...9 Zoning Districts 9 Transit Areas 10 Pedestrian Streets 10 2.2 BUILDING TYPES OVERVIEW...11 General 11 Building Assembly 11 Understanding the Building Type

More information

ZA and ZA Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center

ZA and ZA Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center ZA16-051 and ZA16-052 Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center ZA16-051 and ZA16-052 Owner: Applicant: Requests: Dominion Southlake Properties, LLC, White Chapel Village

More information

Part 9 Commercial, Mixed Use and Industrial Sign District

Part 9 Commercial, Mixed Use and Industrial Sign District Part 9 Commercial, Mixed Use and Industrial Sign District 9.1 Intent Part 9 contains regulations that apply to the Commercial, Mixed Use and Industrial Sign District, which includes the City s commercial,

More information

SAMMAMISH COMMUNITY CENTER FEASIBILITY STUDY

SAMMAMISH COMMUNITY CENTER FEASIBILITY STUDY Volume 1 of 2 TABLE OF CONTENTS: 1 COVER PACKAGE 2 SITE PHOTOGRAPHS 3 SITE PLAN 4 UPPER FLOOR PLAN 5 LOWER FLOOR PLAN 6 AXONOMETRIC ROOF PLAN 7 AXONOMETRIC UPPER FLOOR PLAN 8 AXONOMETRIC LOWER FLOOR PLAN

More information

Sodded Area. 8.5 m Storm Easement Typ. R12000 FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE

Sodded Area. 8.5 m Storm Easement Typ. R12000 FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE . m 0.0 m Standard Municipal Notes Standard Municipal Notes CIVIL AND GRADING INFO: REFER TO DRAWINGS BY GHD DATED: Mar., 0 SITE LIGHTING INFO: REFER TO DRAWINGS BY HAMMERSCHLAG + JOFFE INC. DATED: Jan.,

More information

Los Angeles Department of City Planning RECOMMENDATION REPORT

Los Angeles Department of City Planning RECOMMENDATION REPORT Los Angeles Department of City Planning RECOMMENDATION REPORT CULTURAL HERITAGE COMMISSION HEARING DATE: April 4, 2013 TIME: 10:00 AM PLACE: City Hall, Room 1010 200 N. Spring Street Los Angeles, CA 90012

More information

Draft Town Center Development and Design Guidelines w/placeholder graphics 11/21/15 Joint Commission Meeting

Draft Town Center Development and Design Guidelines w/placeholder graphics 11/21/15 Joint Commission Meeting CHAPTER 19.11 Sections 19.11.010 General 19.11.020 Town Center development-general. Land Uses 19.11.030 Nonconforming development Bulk Regulations 19.11.040 Building height. 19.11.050040 Significant ppublic

More information

A By-law to amend Zoning and Development By-law No regarding Laneway Houses

A By-law to amend Zoning and Development By-law No regarding Laneway Houses Zoning & Development By-law Amendments regarding Laneway Houses Draft for Public Hearing A By-law to amend Zoning and Development By-law No. 3575 regarding Laneway Houses 1. This By-law amends or adds

More information

Les Saisons Sai Wan Ho Building Journal, June 2002

Les Saisons Sai Wan Ho Building Journal, June 2002 Project name Location Publication Les Saisons Sai Wan Ho Building Journal, June 2002 C O V E R S T O R Y L E S S A I S O N S Les Saisons, Sai Wan Ho Seasonal change by Tim Youngs When joint developers

More information

EARTHQUAKE SAFETY and EMERGENCY RESPONSE (ESER) BOND 1 Neighborhood Fire Stations. Fire Station No. 5 Civic Design Review Informational Presentation

EARTHQUAKE SAFETY and EMERGENCY RESPONSE (ESER) BOND 1 Neighborhood Fire Stations. Fire Station No. 5 Civic Design Review Informational Presentation EARTHQUAKE SAFETY and EMERGENCY RESPONSE (ESER) BOND 1 Neighborhood Fire Stations Fire Station No 5 Civic Design Review Informational Presentation FIRE STATION No 5 Earthquake Safety and Emergency Response

More information

City of Vancouver Zoning and Development By-law Planning, Urban Design and Sustainability Department

City of Vancouver Zoning and Development By-law Planning, Urban Design and Sustainability Department Zoning and Development By-law Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancouver, BC V5Y 1V4 tel: 3-1-1, outside Vancouver 604.873.7000 fax: 604.873.7100 website: vancouver.ca

More information

West 1st Avenue By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

West 1st Avenue By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law) City of Vancouver Zoning and Development By-law Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7000 fax 604.873.7060 planning@vancouver.ca CD-1 (483) 236-298 West 1st Avenue By-law

More information

LINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P JENSON, K P CLARKE, T P

LINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P JENSON, K P CLARKE, T P Planning and Development Department Land Use Planning Division ACTION SUMMARY FOR DESIGN REVIEW COMMITTEE MEETING September 21, 2017 7:00 PM LINVILL, C P PINK, D A EDWARDS, B P MITCHELL, L P KAHN, C P

More information

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS

COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS ITEM #: 7 DATE: _02-07-18 COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS BACKGROUND: The Downtown Gateway area

More information

VIEW FROM CAMBIE STREET

VIEW FROM CAMBIE STREET VIEW FROM CAMBIE STREET Site Access, Slopes, and Programming The building separation between the north and south building is strategically placed, adjacent to the City s mini park along Cambie, as an extension

More information

DESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN

DESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN DESIGN CRITERIA January 26, 2018 DESIGN CRITERIA The Outparcel Design Criteria is established as a reference guide for Multi-tenant Outparcel Development projects at Ridgedale Center located in Minnetonka,

More information

Emma Grand Mixed-use Building 100, 108 & 114 Emma St. South Grand Valley, Ontario

Emma Grand Mixed-use Building 100, 108 & 114 Emma St. South Grand Valley, Ontario PROJECT TEAM OWNER: GOLDEN CANADIAN HOMES INC. Tel. 7..00 mohsinsam7@yahoo.ca ARCHITECT: LINE ARCHITECT INC. YONGE ST. SUITE 0 Toronto, Ontario MT Z Tel..0. Loghman@LINEarchitect.com www.linearchitect.com

More information

1615 EDGEWATER DRIVE, SUITE 180 ORLANDO, FL T: /F: Memorandum

1615 EDGEWATER DRIVE, SUITE 180 ORLANDO, FL T: /F: Memorandum 1615 EDGEWATER DRIVE, SUITE 180 ORLANDO, FL 32804 T: 407-975-1273/F: 407-975-1278 Memorandum To: Erik Bredfeldt, Planning and Development Services Department Director CC: Scott Wright; Ralph Hilliard;

More information

SCHEDULE B. Comprehensive Mixed Use Sign and Awning Package Replacing Section VI.P.3 of the Redevelopment Plan As amended January 22, 2013

SCHEDULE B. Comprehensive Mixed Use Sign and Awning Package Replacing Section VI.P.3 of the Redevelopment Plan As amended January 22, 2013 SCHEDULE B Comprehensive Mixed Use Sign and Awning Package Replacing Section VI.P.3 of the Redevelopment Plan As amended January 22, 2013 3. Mixed Use District a. All dwellings shall clearly display the

More information

PART R3-AM-1 and R3-AM-2 ZONES, MID-RISE MULTIPLE DWELLING DISTRICT. Permitted Uses 1. The following uses are permitted:

PART R3-AM-1 and R3-AM-2 ZONES, MID-RISE MULTIPLE DWELLING DISTRICT. Permitted Uses 1. The following uses are permitted: PART 3.10 R3-AM-1 and R3-AM-2 ZONES, MID-RISE MULTIPLE DWELLING DISTRICT Permitted Uses 1. The following uses are permitted: (d) (e) (f) single family dwellings and customary accessory uses, including

More information

Allowing for a 3 off-street parking stall reduction.

Allowing for a 3 off-street parking stall reduction. DISTRICT OF SQUAMISH REPORT TO: Council FOR: Business PRESENTED: July 17 th, 2007 FILE: DP No. 268 FROM: SUBJECT: Planning Department Development Permit No. 268 38144 Cleveland Avenue Recommendation: THAT

More information

Attachment 1 - Letter of Submission

Attachment 1 - Letter of Submission Attachment 1 - Letter of Submission 3 November 06, 2014 Attention: Mr. Paul Sampson, Planner Development Approvals Community and Recreational Services Developments Approvals Halifax Regional Municipality

More information

ARTIST WALK Fremont, California #

ARTIST WALK Fremont, California # Fremont, California AGE Environmental Graphics Schematic Design November 9, 06 SCOTT AG, LLC ENVIRONMENTAL GRAPHICS SCOTTAG.COM - - 0. 0. 0. '-0" 8" '-0" 9'-4" MIN 9'-4" MIN TYPICAL ELEVATION @ WALL MOUNTED

More information

TOWNLEY STREET RENDERING

TOWNLEY STREET RENDERING REZONING AND DEVELOPMENT APPLICATION RESUBMISSION MAY 27, 2016 OWNER Greater Victoria Housing Society 2326 Government Street Victoria, BC V8T 5G5 T: 250384 F: 250386 PROJECT ADDRESS 1780 TOWNLEY STREET,

More information

[BUILDING STATISTICS PART I]

[BUILDING STATISTICS PART I] [BUILDING STATISTICS PART I] River Vue Apartments is a unique project due to its distinctive location at the point in downtown Pittsburgh, Pennsylvania as well as its curved-cornered facade. Formerly known

More information

PACIFIC HEIGHTS TROPHY PROPERTY! 15 APARTMENT UNITS

PACIFIC HEIGHTS TROPHY PROPERTY! 15 APARTMENT UNITS PROPERTY HIGHLIGHTS Incredible Pacific Heights Location! 6 Two Bedroom Two Bath Apartments 7 One Bedroom Apartments 2 Studio Apartments 18 Covered Parking Spaces (8 Single and 5 Tandem/Double Spaces) 20

More information

Appendix 1 OAS Real Estate Asset Location (GSB and Constitution Avenue Complex)

Appendix 1 OAS Real Estate Asset Location (GSB and Constitution Avenue Complex) Appendix 1 OAS Real Estate Asset Location (GSB and Constitution Avenue Complex) Appendix 2 Organization of American States GSB Building Description 2.1 The General Secretariat Building (GSB) is located

More information

ONE SEAPORT SQUARE. Boston Civic Design Commission

ONE SEAPORT SQUARE. Boston Civic Design Commission Boston Civic Design Commission Table of Contents 1. 2. 3. 4. 5. PROJECT SUMMARY SITE ANALYSIS DESIGN CONCEPT PEDESTRIAN EXPERIENCE DESIGN PROPOSAL Design Statement A centerpiece to Seaport Square Planned

More information

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT erie street hotel 12-22 WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT PROJECT F.A.R. BASE F.A.R. PROPOSED F.A.R. 13,819 SF 111,933 SF 14 LEVELS+

More information

12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential

12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential Project Name : Lot Size : Building Size : Location : Project Type : 12th Avenue Arts 29,058 SF (0.67 acres) 149,501 SF Seattle, WA Midrise, Mixed-Use Residential Project Narrative : Rapid redevelopment

More information

Larkin Larkin Street LARKIN STREET MALIN GIDDINGS MAX ARMOUR Representing the City s most distinctive properties

Larkin Larkin Street LARKIN STREET MALIN GIDDINGS MAX ARMOUR Representing the City s most distinctive properties Larkin 2739 LARKIN STREET Proudly presented by: MALIN GIDDINGS 415.531.5033 MAX ARMOUR 415.290.6058 Representing the City s most distinctive properties 2739 Larkin Street 1 RUSSIAN HILL RESIDENCE Exceptional

More information

652 Lockhaven Drive, Pacifica, CA Shattuck Avenue, B100 Berkeley, CA 94704

652 Lockhaven Drive, Pacifica, CA Shattuck Avenue, B100 Berkeley, CA 94704 L A N D M A R K S P R E S E R V A T I O N C O M M I S S I O N S t a f f R e p o r t FOR ADVISORY COMMENT OCTOBER 07, 2010 Staff Level Design Review Application (DR#10-30000052) to install two (2) halo-lit

More information

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen.

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen. Farm Street Bdy 18.32 123 o 36' 30" Entry Canopy Above 3.0 Roadside Setback 0-157 Bdy 44.26 33 o 36' 30" -347-492 -496 01 1.5 Boundary Setback Ramp Floor Area 132.82 m 2 1.5 Boundary Setback 150 7,400

More information

HASSELL ELEVATION - EAST ELEVATION - NORTH KEYNOTE LEGEND 3600 BASEMENT CARPARK. Scale Project Name Drawing THE WESTIN HOTEL_ ELEVATION - NORTH & EAST

HASSELL ELEVATION - EAST ELEVATION - NORTH KEYNOTE LEGEND 3600 BASEMENT CARPARK. Scale Project Name Drawing THE WESTIN HOTEL_ ELEVATION - NORTH & EAST Key Value KEYNOTE LEGEND Keynote Text AWNING TYPE _HOTEL_OFF FORM COLOURED CONCRETE AWNING TYPE _HOTEL_OFF FORM COLOURED CONCRETE BALUSTRADE TYPE _HOTEL_METAL BALUSTRADE WITH GLAZED PANEL BALUSTRADE TYPE

More information

2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa

2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa 2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa Date Submitted: 3/16/18 Project Information PROJECT NAME & ADDRESS: 418 East Grand Mixed Use Development OWNER/DEVELOPER: Nelson

More information

PDS Online eapply City of Boise Planning & Development Services (208) pds.cityofboise.org #161: Design Review Application Case #: DRH

PDS Online eapply City of Boise Planning & Development Services (208) pds.cityofboise.org #161: Design Review Application Case #: DRH Property Information PDS Online eapply City of Boise Planning & Development Services (208) 384-3830 pds.cityofboise.org #11: Design Review Application Case #: DRH13-00192 Address Street Number: 3080 Prefix:

More information

SELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR STATION CHURCH

SELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR STATION CHURCH SELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR 97202 STATION 503-234-3570 CHURCH 503-233-1497 May 10, 2017 Dear Mr. Graves: The Sellwood-Moreland Improvement League (SMILE) is providing

More information

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number:

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number: Township of Bethlehem Page 1 of 8 PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY 08802 Date of Application: Township Application Number: Jurisdiction: Planning Board

More information

AN ORDINANCE OF THE CITY OF MINNEAPOLIS. By Palmisano

AN ORDINANCE OF THE CITY OF MINNEAPOLIS. By Palmisano AN ORDINANCE OF THE CITY OF MINNEAPOLIS By Palmisano Amending Title 20, Chapter 520 of the Minneapolis Code of Ordinances relating to Zoning Code: Introductory Provisions. The City Council of the City

More information

Property Description EA Aviation Buildings 204, 204a and 205 London Biggin Hill Airport

Property Description EA Aviation Buildings 204, 204a and 205 London Biggin Hill Airport Property Description EA Aviation Buildings 204, 204a and 205 London Biggin Hill Airport Overview The buildings which comprise EA Aviation s premises at Biggin Hill house 2 hangars as well as top quality

More information

ÉCOLE ÉLÉMENTAIRE CATHOLIQUE SAINTE JEANNE D'ARC

ÉCOLE ÉLÉMENTAIRE CATHOLIQUE SAINTE JEANNE D'ARC DRAWING LIST: URAL A000 TITLE SHEET A SCOPE OF WO A0 DEMOLITION PLANS A0 SECURITY REQUIREMENT AND EXISTING CONDITIONS PROPOSED FLOOR PLANS A05 EXTERIOR ELEVATIONS AND DETAILS A DOOR & FRAME TYPE SCHEDULE

More information

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres Department of Community Planning & Economic Development 250 South 4th Street, Room 300 Minneapolis, MN 55415-1385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,

More information

Public Hearing Council Chambers 100 Newport Drive, Port Moody April 8, 2014 at 7:00pm

Public Hearing Council Chambers 100 Newport Drive, Port Moody April 8, 2014 at 7:00pm San Remo Drive Land Use Contract Amendment Pages 3-30 1. Business 1.1 File: 3220-09/BL2975 Public Hearing Council Chambers 100 Newport Drive, Port Moody April 8, 2014 at 7:00pm City of Port Moody Land

More information

BOROUGH OF HOPATCONG ORDINANCE No

BOROUGH OF HOPATCONG ORDINANCE No BOROUGH OF HOPATCONG ORDINANCE No. 10-2014 AN ORDINANCE OF THE BOROUGH OF HOPATCONG, SUSSEX COUNTY, NEW JERSEY TO ADOPT A FORM BASED CODE AS AN OVERLAY DISTRICT AFFECTING PORTIONS OF THE B-1 AND R-1 ZONING

More information

STAFF BRIEF. Identifying Sign Design and Principles Pages:

STAFF BRIEF. Identifying Sign Design and Principles Pages: Community Planning and Development Denver Landmark Preservation 201 West Colfax, Dept. 205 Denver, CO 80202 p: 720.865.2709 f: 720.865.3050 www.denvergov.org/preservation STAFF BRIEF This document is the

More information

In Development. Consultant Selection. Consultant - Scope of Work. Design-Permitting. Planning. Construction. Closeout

In Development. Consultant Selection. Consultant - Scope of Work. Design-Permitting. Planning. Construction. Closeout CAPITAL IMPROVEMENT PROGRAM REPORT - AUGUST 2018 PROJECT LIST by PHASE In Development 999-16 Property Acquisition - RW 33 RPZ 999-17 Wetland Mitigation Phase 2 of 2 999-19 Property Acquisition - RW 22

More information

KAISER PERMANENTE AURORA CENTREPOINT MEDICAL OFFICE

KAISER PERMANENTE AURORA CENTREPOINT MEDICAL OFFICE LOADING KAISER PERANENTE AURORA CENTREPOINT EDICAL OFFICE INOR SITE PLAN AENDENT 1301 Wazee. Suite 100 Denver. Colorado. 80204 303. 623. 7323 303. 623. 2836 Fax OWNER KAISER PERANENTE 10350 East Dakota

More information

Technical Requirements North Site

Technical Requirements North Site . Technical Requirements Technical Requirements North Site Parking Summary parking spaces market social Non-family Family Visitor Area (m ) 6,76. m Units 5 5 Required (Min) Permitted (Max) n/a n/a n/a

More information

Multi-unit residential uses code

Multi-unit residential uses code 9.3.11 Multi-unit residential uses code 9.3.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Multi-unit residential uses code by the tables

More information

SCANDINAVIAN DESIGNS - CORTE MADERA

SCANDINAVIAN DESIGNS - CORTE MADERA CONCEPT PHASE - PRELIMINARY PLANNING REVIEW DOCUMENTS FEBRUARY 4, 2017 SCANDINAVIAN DESIGNS HISTORY FAMILY RUN COMPANY : 32 FURNITURE STORES IN 7 STATES MARIN COUNTY RESIDENTS : 3 GENERATIONS FIRST STORE

More information

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT this page left intentionally blank Contents ARTICLE 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT DIVISION 3.1 NEIGHBORHOOD CONTEXT DESCRIPTION...3.1-1 Section 3.1.1

More information

CONCESSIONS PROGRAM DOING BUSINESS AT THE AIRPORT 3/2/17

CONCESSIONS PROGRAM DOING BUSINESS AT THE AIRPORT 3/2/17 CONCESSIONS PROGRAM DOING BUSINESS AT THE AIRPORT 3/2/17 Airport Contacts Airport Contacts Brad Wolfe Mike Rawson Raymond Christy Commercial Manager Business Development Mgr. Sr. Planner ACDBE Coordinator

More information

MARRIOTT HQ BETHESDA, MD DESIGN ADVISORY PANEL November 8th, 2017 VICINITY MAP ILLUSTRATIVE SITE PLAN HOTEL ENTRANCE BAR OFFICE LOBBY RESTAURANT LAYBY LANE DIAGRAMS SHARING STEPPING EMBRACING ARTICULATING

More information

Toronto and East York Community Council Item TE33.3, as adopted by City of Toronto Council on June 26, 27 and 28, 2018 CITY OF TORONTO BY-LAW -2018

Toronto and East York Community Council Item TE33.3, as adopted by City of Toronto Council on June 26, 27 and 28, 2018 CITY OF TORONTO BY-LAW -2018 Authority: Bill 826 Toronto and East York Community Council Item TE33.3, as adopted by City of Toronto Council on June 26, 27 and 28, 2018 CITY OF TORONTO BY-LAW -2018 To amend Zoning By-law 569-2013,

More information

HAHN STREET - NEIGHBORING PROPERTIES. ARIAL VIEW SHOWING VACANT LOT/ AREA OF PROPOSED WORK AT THE CNR OF SUNNYDALE AVENUE AND HAHN STREET.

HAHN STREET - NEIGHBORING PROPERTIES. ARIAL VIEW SHOWING VACANT LOT/ AREA OF PROPOSED WORK AT THE CNR OF SUNNYDALE AVENUE AND HAHN STREET. SHEET INDEX T0.0 COVER SHEET T0. MATERIAL COLOR BOARD T. BUILDING RENDERINGS T. BUILDING RENDERINGS T. BUILDING RENDERINGS T. BUILDING RENDERINGS L.0 STREET LEVEL LANDSCAPE MATERIALS PLAN L.0 PODIUM LEVEL

More information

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison Design and Access Statement Volume III Part 6 of 9 Plot A1 May 2018 Allies and Morrison 6 OFFICE 135 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018 6.1 Introduction The office development

More information

Los Angeles Department of City Planning RECOMMENDATION REPORT

Los Angeles Department of City Planning RECOMMENDATION REPORT Los Angeles Department of City Planning RECOMMENDATION REPORT CULTURAL HERITAGE COMMISSION DATE: February 21, 2008 TIME: 10:00 AM PLACE: City Hall, Room 1010 200 N. Spring Street Los Angeles, CA 90012

More information

2015 IBC Allowable Heights and Areas

2015 IBC Allowable Heights and Areas 2015 IBC Allowable Heights and Based on the 2015 International Building Code (IBC ) Course Description This seminar addresses the key issues of the 2015 International Building Code (IBC ) Chapter 5 regarding

More information

The effect of atrium façade design on daylighting in atrium and its adjoining spaces

The effect of atrium façade design on daylighting in atrium and its adjoining spaces Design and Nature V 9 The effect of atrium façade design on daylighting in atrium and its adjoining spaces S. Samant Department of the Built Environment, University of Nottingham, UK Abstract Atrium buildings

More information

By-law No Part 1

By-law No Part 1 By-law No. 11879 A By-law regarding Signs on private property THE COUNCIL OF THE CITY OF VANCOUVER, in public meeting, enacts as follows: Part 1 Interpretation 1.1 Name of By-law The name of this by-law,

More information

414 BRANNAN ST SAN FRANCISCO, CA

414 BRANNAN ST SAN FRANCISCO, CA 414 BRANNAN ST SAN FRANCISCO, CA (ADD TO THIS LIST WHEN NEEDED) SHEET INDEX ABBREVIATIONS LEGEND EXISTING FRONT ELEVATION OWNER INFORMATION Vickey Li INTERSECTION SPACE (650) 430-0428 3165 Olin Ave, San

More information

SIGNS MASTER SIGN PROGRAM

SIGNS MASTER SIGN PROGRAM SIGNS MASTER SIGN PROGRAM How to apply for a Master Sign Program What is the purpose of a Master Sign Program? A Master Sign Program (MSP) is used to create standard sign design guidelines for projects

More information

State of California The Resources Agency DEPARTMENT OF PARKS AND RECREATION PRIMARY RECORD

State of California The Resources Agency DEPARTMENT OF PARKS AND RECREATION PRIMARY RECORD State of California The Resources Agency DEPARTMENT OF PARKS AND RECREATION PRIMARY RECORD Primary # HRI # Trinomial NRHP Status Code Other Listings Review Code Reviewer Date Page _1_ of _3_ *Resource

More information

THE STONYBROOK ISSUED FOR CONSTRUCTION CRM PROPERTY DEVELOPMENT CORP WASHINGTON ST. BOSTON, MA AUGUST 11, 2016

THE STONYBROOK ISSUED FOR CONSTRUCTION CRM PROPERTY DEVELOPMENT CORP WASHINGTON ST. BOSTON, MA AUGUST 11, 2016 THE STONYBROOK CRM PROPERTY DEVELOPMENT CORP. ISSUED FOR CONSTRUCTION BOYLSTON STREET MONTEBELLO ROAD HAVERFORD STREET 3193 AERIAL VIEW THE STONYBROOK 01 copyright: Studio, llc. 8/10/2016 3:50:45 PM SCHOOL

More information

Anacortes, WA. 718 commercial ave. FOR lease. 2,320 +/- sf retail space in a 10,820 +/- sf building. Located in historic downtown Anacortes

Anacortes, WA. 718 commercial ave. FOR lease. 2,320 +/- sf retail space in a 10,820 +/- sf building. Located in historic downtown Anacortes 718 commercial ave Anacortes, WA FOR lease 2,320 +/- sf retail space in a 10,820 +/- sf building Located in historic downtown Anacortes Frontage on Commercial Ave alongside four other retail spaces Zoned

More information

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

BUILDING PERMIT INSTRUCTIONS CONTRACTOR DEVELOPMENT SERVICES DIVISION 3521 NW 43 rd Avenue Lauderdale Lakes, FL 33319 (954) 535-2480 Fax (954) 731-5309 www.lauderdalelakes.org BUILDING PERMIT INSTRUCTIONS CONTRACTOR WHEN DO I NEED A BUILDING

More information

1 EAST ELEVATION 2 NORTH ELEVATION 3 COURTYARD ELEVATION

1 EAST ELEVATION 2 NORTH ELEVATION 3 COURTYARD ELEVATION EAST ELEVATION NORTH ELEVATION 3 3 COURTYARD ELEVATION WEST ELEVATION SOUTH ELEVATION NORTH ELEVATION EAST ELEVATION 3 3 COURTYARD ELEVATION SOUTH ELEVATION WEST ELEVATION 3 3 COURTYARD ELEVATION EAST

More information

Review Authority. CMC Section (D) requires that applications for a Site Plan Review be reviewed by the commission at a public hearing.

Review Authority. CMC Section (D) requires that applications for a Site Plan Review be reviewed by the commission at a public hearing. File No. 17000690 A request for a Site Plan Review to construct a new 538 square-foot garage and to convert an existing garage into a theater room at 25550 Prado De Amarillo located Site Plan Review Review

More information

Compatible-Scale Infill Housing (R-2 Zones) Project

Compatible-Scale Infill Housing (R-2 Zones) Project Project Scope: A targeted amendment to the regulations for building bulk/height in the R-2 zones. Objectives: Allow more housing opportunities in the R-2A, R-2D, and R-2M zones, while ensuring the height

More information

At the same time, this very simple strategy imposed maybe one of the most radical impacts on the structure of the building. By expanding the square

At the same time, this very simple strategy imposed maybe one of the most radical impacts on the structure of the building. By expanding the square ROCK CREEK HOUSE The Rock Creek House is an adaptive reuse project of a 1920 s brick structure that was originally composed of two floors, as well as a mechanical basement at the garden level, and an attic

More information

Sedro woolley, WA 720 MURDOCK ST. FOR sale. 14,500 +/- sf office building with 8,500 +/- sf unfinished basement space on 0.

Sedro woolley, WA 720 MURDOCK ST. FOR sale. 14,500 +/- sf office building with 8,500 +/- sf unfinished basement space on 0. 720 MURDOCK ST Sedro woolley, WA FOR sale 14,500 +/- sf office building with 8,500 +/- sf unfinished basement space on 0.27 +/- AC Former City Hall built in 1930 Located in the Downtown Sedro Woolley core

More information

Kieran Boughan. San Francisco Architect RESIDENTIAL

Kieran Boughan. San Francisco Architect RESIDENTIAL LOEVEN/BURRBIDGE RESIDENCE 159 DAY STREET San Francisco, CA Right: Front Sketch Elevation Renovation and 2-story additions to a cottage-style house in Noe Valley. The existing house had living space above

More information

CHECKS PAYABLE TO: PGA/POA (Only cash and checks are accepted as payment)

CHECKS PAYABLE TO: PGA/POA (Only cash and checks are accepted as payment) Telephone PGA PROPERTY OWNERS ASSOCIATION Facsimile 561-627-2800 7100 FAIRWAY DRIVE, SUITE 29 561-622-6324 PALM BEACH GARDENS, FL 33418 TO: FROM: SUBJECT: ARCHITECTURAL REVIEW COMMITTEE & INTERESTED PARTIES

More information

Construction Begins on Sacramento s Historic Powerhouse Science Center, Designed by Dreyfuss + Blackford Architecture

Construction Begins on Sacramento s Historic Powerhouse Science Center, Designed by Dreyfuss + Blackford Architecture Construction Begins on Sacramento s Historic Powerhouse Science Center, Designed by Dreyfuss + Blackford Architecture Project advances rehabilitation and adaptive reuse of prominent landmark with new planetarium

More information

Code Update Process For: Downtown Neighborhood Conservation Buffer (NCB)

Code Update Process For: Downtown Neighborhood Conservation Buffer (NCB) Code Update Process For: Downtown Neighborhood Conservation Buffer (NCB) Code Update Objectives Retain and enhance our sense of place Strengthen compatibility and transition standards Promote individual

More information

Toronto and East York Community Council Item TE27.20, adopted as amended, by City of Toronto Council on November 7, 8 and 9, 2017 CITY OF TORONTO

Toronto and East York Community Council Item TE27.20, adopted as amended, by City of Toronto Council on November 7, 8 and 9, 2017 CITY OF TORONTO Authority: Toronto and East York Community Council Item TE27.20, adopted as amended, by City of Toronto Council on November 7, 8 and 9, 2017 CITY OF TORONTO BY-LAW 492-2018 To designate the properties

More information

SALE 3 SCARFE COURT - BURNSIDE BUSINESS PARK DARTMOUTH, NS INDUSTRIAL 6,762 SF

SALE 3 SCARFE COURT - BURNSIDE BUSINESS PARK DARTMOUTH, NS INDUSTRIAL 6,762 SF FOR SALE 3 SCARFE COURT - BURNSIDE BUSINESS PARK DARTMOUTH, NS INDUSTRIAL 6,762 SF PHIL BOLHUIS Real Estate Advisor 902.293.4524 philbolhuis@kwcommercial.com TOM GERARD, SIOR, CCIM Real Estate Advisor

More information

Accessory Structures Zoning Code Update-, 2015

Accessory Structures Zoning Code Update-, 2015 Accessory Structures Zoning Code Update-, 2015 This detached ADU code update language on the next 5 pages is excerpted verbatim from the zoning code update, available in full at www.portlandoregon.gov/bps/ricap

More information

CERRITOS INDUSTRIAL PARK A 15,337 SQ. FT. MULTI-TENANT BUSINESS PARK INVESTMENT OPPORTUNITY

CERRITOS INDUSTRIAL PARK A 15,337 SQ. FT. MULTI-TENANT BUSINESS PARK INVESTMENT OPPORTUNITY A 15,337 SQ. FT. MULTI-TENANT BUSINESS PARK INVESTMENT OPPORTUNITY 10805 Artesia Blvd Cerritos, CA Exclusively Offered By: Michael Hefner, SIOR Executive Vice President Lic # 00857352 D 714.935.2331 MHefner@voitco.com

More information

T A white metal skin and roof coating was chosen for maximum heat reflectance with blue tinted glazing.

T A white metal skin and roof coating was chosen for maximum heat reflectance with blue tinted glazing. Program Summary: 4 story, 37,400 sf office building to house corporate and operational services. The building contains offices, support spaces, meeting rooms, and large storage spaces. Program Statement:

More information

FORMER SHAUGHNESSY HOSPITAL

FORMER SHAUGHNESSY HOSPITAL STATEMENT OF SIGNIFICANCE REVISED 7 January 2009 FORMER SHAUGHNESSY HOSPITAL 4500 Oak Street, VANCOUVER Note: this SOS is prepared for DYS Architecture for municipal heritage planning purposes. The consent